These engineering design documents detail the rehabilitation of the Aquarium Entrance Road at Gavins Point National Fish Hatchery in South Dakota. The technical drawings include a site plan, vicinity map, and detailed road construction specifications for a full-depth reclamation project involving 7" pulverization of existing pavement, application of prime and tack coats, and installation of 4" asphalt concrete pavement in two lifts. The project scope covers road reconstruction with specific requirements such as maintaining access for government staff and residents, completing work by Labor Day 2025, and establishing parking and storage areas with contractor responsibility for any damages.
The drawings show the proposed road alignment, construction limits, and typical cross-sections, with notes indicating approximate dimensions that may be adjusted by the Contracting Officer. The site plan reveals the location of the entrance road relative to the hatchery buildings, parking areas, and surrounding landscape, with color-coded lines indicating different construction phases and existing infrastructure. The project is part of a federal contract opportunity (Solicitation Number: 140FGA25Q0030) under the Department of the Interior Fish and Wildlife Service, aimed at rehabilitating the aquarium entrance road infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gavins Point NFH amercer Line amercer Line amercer Line
Construction Limits x' x' ------ Traveled Way
Prime coat Matc�sting
Traveled Way
Fog Seal Match�ting
----!] 4" Asphalt concrete pavement placed in two lifts
L-
7" Full depth reclamation
Tack coat (between lifts)
TYPICAL SECTION
AQUARIUM
DEPTH RECLAMATION FULL
ENTRANCE ROAD
DETAIL B
NOTE:
1. Existing superelevated and widened sections are not shown.
2. Existing pavement and base course depths are approximate.
Construct a 1 :4 or flatter foreslope unless otherwise directed by the CO. Steepen the foreslopes as necessary, but not steeper than 1 :2, to stay on the existing bench.
4. Dimensions shown are approximate and may be varied by the CO.
@ Pulverize the existing paved width or as directed by the CO. Pulverize to a depth of 7".
6. Place asphalt concrete pavement in two lifts. Apply tack coat at the first lift prior to placing the second lift.
See mainline typical section for structural section details
NO SCALE
GAVINS POINT NATIONAL FISH HATCHERY
GENERAL NOTES AND TYPICAL SECTIONS
AQUARIUM ENTRANCE ROAD
DESIGNED DRAWN CHECKED
D. SMITH D. SMITH
DATE DRAWING NO.
XX/XX/XX SF-SD-492-22-025
SUB-SHEET
C1
SHEET
02 OF03
amercer Line amercer Line amercer Line amercer Line amercer Line amercer Line amercer Text Box
NOT IN CONTRACT
amercer Text Box
NOT IN CONTRACT
amercer Text Box
NOT IN CONTRACT
AQUARIUM ENTRANCE ROAD C2
amercer Line amercer Line amercer Text Box
AQUARIUM PARKING LOT NOT IN CONTRACT
amercer Text Box
2. Access for government staff and residents to 436th Ave must be maintained at all times.
3. Work on the Entrance Road can begin after Labor Day (2 September 2025)
4. Aquarium parking lot can be used for parking and storage after Labor Day. Any damage will be the responsibility of the contractor to repair.
5. Exterior water hose bibb is available at the Aquarium. No other utilities are available on-site