B08_Solicitation_Attachment_1_SOW.pdf
PDF 833 KB Posted
- Attached to
- BOSTON NHP-SPECIAL EVENT PLAN/SUPT BHM 250TH
- Solicitation number
- 140P4325Q0047
About this file
This Statement of Work (SOW) details event planning and production services for the 250th commemoration of the Battle of Bunker Hill, to be held June 12-17, 2025, in Boston, Massachusetts. The National Park Service requires a contractor to provide comprehensive event support for five events, including an Immigration and Naturalization Ceremony, Community Concert, Cornerstone Laying Event, and a primary Remembrance Day Ceremony on June 17. Key deliverables include site plan preparation, setup oversight, audio-visual support, video production, stage management, and media coordination.
The contract requires full technical production services for the June 17 Remembrance Ceremony, which will feature high-profile attendees including elected officials, international dignitaries, military leaders, and veterans. Specific technical requirements include tent and stage setup, professional lighting, sound engineering, a media platform, live simulcast capabilities, an LED jumbotron, and American Sign Language services. The event is expected to draw large crowds, with 450 attendees beneath a tent and 200 in a satellite viewing area. The contract period runs from May 30 to June 26, 2025, with a firm fixed-price structure and strict guidelines for site usage, security, and preservation of the historic Bunker Hill Monument grounds.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P4325Q0047_Amd_0001.pdf | ||
| Sol_140P4325Q0047.pdf | ||
| B08_Solicitation_Attachment_2_DOL_Wage_Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 SOW Bunker Hill 250 Special Event Planning and Production
United States Department of the Interior
National Park Service Boston National Historical Park
21 2nd Ave Boston, MA 02129
STATEMENT OF WORK
Battle of Bunker Hill 250 Commemoration
Event Planning and Production Services
Table of Contents
Section 1.0 Scope Section 2.0 General Section 3.0 Scope of Work Section 4.0 Government-Furnished Property Section 5.0 Security Section 6.0 Period of Performance Section 7.0 Contractor’s Use of Premises Section 8.0 Restrictions
SECTION 1.0 SCOPE
1.1 Purpose of Contract: Contractor shall furnish all labor, transportation, materials, and supervision to support a five-day series of events, June 12-17, 2025, marking the national commemoration of the 250th anniversary of the Battle of Bunker Hill. The selected contractor shall examine all conditions at the project site prior to submitting a quote for services associated with this contract.
As one of the nation’s A250 signature cities, Boston is expected to draw large crowds (hundreds of thousands of visitors over the peak commemorative years, 2025-2026). Events leading up to and including the June 17 Remembrance Ceremony will take place at Bunker Hill Monument – a National Park Service site in the Charlestown neighborhood of Boston. Events will draw large crowds, with the high-profile June 17 Remembrance Ceremony attended by elected officials, international dignitaries, military leaders and service members, veterans, students and a mix of people from around the corner and around the world.
2 SOW Bunker Hill 250 Special Event Planning and Production
Events take place outdoors rain or shine with the Monument as backdrop to events. Events June 12-16 require a tent, chairs, stage and limited sound and lighting support that will be accomplished through the awardee providing design services based upon needs outlined in this scope. The June 17 event will require full technical production services, including pre-planning, site design and outfitting, sound and lighting, script sequencing and cueing, audio visual services, management of an on-line ticketing system, and guest entry and seating. Awardee is required to participate in a pre-event site visit with the COR within 72 hours of award to review all necessary requirements, event needs and contract deliverables, and provide plan to carry out all necessary means to accomplish.
Deliverables shall include:
1. Site Plan Preparation and Event Coordination June 12-17.
2. Setup Oversight
3. Cue Sheet and Script Input
4. Audio Visual Support
5. Stage Manager Coordination
6. Media Coordination
7. Video Production
1.2 Applicable laws: All work of this Contract shall be performed in accordance with applicable laws, ordinances, rules, regulations and standards: Selected contractor must be fully insured for damages during the contract period of performance.
1.3 Description of Project Sites: The location of events is on the grounds of Bunker Hill Monument located at Monument Square in the Charlestown neighborhood of Boston. The monument and grounds are located in the heart of a residential urban neighborhood with limited parking, narrow streets and a largely residential traffic pattern. Noise management, community relationships and compliance with local ordinances are required.
SECTION 2.0 GENERAL
2.1 Selected contractor shall notify the COR of any unforeseen needs or conditions that are beyond the scope of work detailed in Section 3.0. Substantial increases in the scope will need to be assessed by the CO and COR for any modification of the contract.
2.2 The contractor shall furnish all labor, transportation, materials, and supervision for services described as part of a fully encompassing Firm Fixed-Price SECTION 3.0.
2.3 Contractor’s central office or representative shall be available by phone weekdays, Monday through Friday 8:00 am to 4:30 pm.
3 SOW Bunker Hill 250 Special Event Planning and Production
2.4 Proposals shall include the firm-fixed price for all requested services and supplies associated with performance of the requirements of this contract to include:
1. Rentals of tent, staging, chairs, etc.
2. Consulting & supervision costs – setup, take down, preparation work, meetings
3. Set-up and break-down – staging & set up beginning June 10; break down and removal on June 18.
4. Other costs necessary to support the execution of the events listed in section 3.9
Offers must include a detailed price breakdown in adequate detail to provide a basis for and to substantiate the quoted lump sum price
2.5 The requested event services shall be in support of the following events. Each event will have different needs for equipment and, event support.
1. June 12: Immigration and Naturalization Ceremony (11am to noon)
2. June 14: Community Concert (5-7:00 pm)
3. June 16: Bunker Hill Monument Association cornerstone laying event (10-noon)
4. June 17: Remembrance Day Events (1:30-5:00 pm)
SECTION 3.0 SCOPE OF WORK
3.1 Site Plan Preparation – The selected contractor shall create a site plan that illustrates the layout of all the audience, participant, media, and circulation needs.
3.2 Setup Oversight – The selected contractor shall ensure that the setup of all tents, chairs, stage, podium, sound, screens, flags, bunting, ropes, and stanchions, etc. are executed according to the plan reviewed and approved by the CO and COR.
3.3 Cue Sheet and Script Input – For June 17 only, the contractor shall prepare a cue sheet after the script has been written, incorporating input from the COR and NPS staff regarding technical issues and event needs. NPS and the speakers will prepare their remarks. Additionally, the contractor is responsible for developing an overall timeline for speakers and performers, cueing speakers, music, and ceremonial elements (e.g., closing musket fire and UK/US bugle volley).
The contractor will also choreograph the ceremonial wreath-laying at the end of the program to ensure that media and the public can capture photos effectively.
3.4 Sound and Lighting –
3.4.1 Sound: Awardee will determine all sound related equipment needs such as necessary wattage of equipment needed, decibel standard for distance from the stage, how many speakers will be required for optimal performance based upon audience size, and what, if any, amplifications are required to meet that standard. In addition, the awardee will determine if a sound board and mixer along with sound engineer are required and provide design proposal to the COR for review and approval before executing on final plan for sound for events on June 12, 14, 16 and 17.
4 SOW Bunker Hill 250 Special Event Planning and Production
3.4.2 Sound: The contractor shall oversee the sourcing and set up to provide for sound needs for events June 12 -17. NPS will use the base set-up to provide for sound for events on June 12 and 14. The contractor shall oversee sourcing and performance of sound (sound board, mixers, amplification, speakers, microphones) for events on June 16 and 17.
3.4.3 Lighting: Determine the necessary lighting in the proposed design, and once approved by COR, provide the light installation to support events 12-16 and broadcast quality lighting for the event on June 17
3.4.3 Electrical: Awardee will determine if electrical capabilities sufficient to address all needs are available at proposed locations. Once NPS has this information, the NPS can arrange for electrical modifications (if required) with NPS electricians, at no cost to the awardee. If offeror determines that generators are the preferred option, the offeror shall include any associated costs in the bid amount.
3.5 Stage Manager Coordination – For June 17 only, the contractor shall ensure that a stage manager cues speakers, singers, bands, marchers, etc. for appropriate entrances.
3.6 Media Coordination – For June 17 only, the contractor shall provide for designated press box to provide for media filming needs.
3.7 Audio Video Production – The contractor shall source and oversee an audio-visual production team to provide for
3.7.1 Documentary video recording of the following events:
June 12 Naturalization Ceremony and flag planting (2 hours) June 14 flag ceremony and Old Guard Fife and Drum Demonstration (2 hours) June 14 community concert (2 hours)
3.7.2 High-value, broadcast-quality footage with multi-camera and playback production package for:
June 17 Remembrance Events (3.5 hrs; 1:30-5:00PM), This includes the procession from Saint Francis de Sales Parish to the Bunker Hill Burial Ground, the wreath-laying ceremony, the procession from the Burial Ground to the monument, and the formal arrival of dignitaries through the Massachusetts Gates to their places on stage. The full program will be live simulcast and streamed to the client’s web platforms, with video recordings made for immediate archival purposes and post-event products not included in this scope.
3.7.3 Recordings will be delivered to the COR within 10 days after the conclusion of the events as part of the final submittals.
3.8 Meetings – The contractor shall lead and/or attend all production and security meetings.
3.9 Event Needs –
3.9.1 June 12: Immigration and Naturalization Ceremony (11am to noon)
250 candidates take the oath of citizenship in a US Citizenship and Immigration Services Naturalization Ceremony on the Bunker Hill grounds. Anticipated audience size: 400
5 SOW Bunker Hill 250 Special Event Planning and Production
Contractor shall provide design services with COR, coordinate and implement the approved plan, and provide all set up and relevant break down for event. Set-up to take place on June
10. The stage, tent and set-up for sound will remain in place through June 17. Chairs will remain on site, folded and stored within the tent for use at events on June 14, 16 and 17:
Tent: to cover seating and stage determined by awardee.
Stage: 24’w x 18’d x 3’h with navy skirting ADA compliant access ramp (4’ 24’) Access stairs (2) Stage wing (R): 12’w x 8’d x 2’6”h with navy skirting Formal stage seating (8 - stackable) Wooden Podium Audience seating (400): lightweight, white/ivory folding chairs Necessary Sound equipment determined by awardee (no sound engineering; client will provide for microphones, amplification and sound engineering using the base sound set-up established by the awardee (i.e., electrical, sound board, speakers)
3.9.2 June 14: Community Concert (5-7 pm)
Four piece band – instrumentals and vocal. Anticipated audience size: 1200 (400 chairs;
lawn seating)
Contractor shall coordinate, provide and set up:
Retain stage and chairs as per requirements listed in section 3.9.1 Retain base sound set-up (i.e., electrical, sound board, speakers) established by awardee as per section 3.9.1
3.9.3 June 16: Cornerstone Laying Event (10AM-noon)
Event to mark bicentennial of the laying of the monument cornerstone. Audience size:
Contractor shall coordinate, provide and set up:
Stage and chairs per requirements listed in section 3.9.1 Awardee will determine all sound related equipment needs such as necessary wattage of equipment needed, decibel standard for distance from the stage, how many speakers will be required for optimal performance based upon audience size, and what, if any, amplifications are required to meet that standard. In addition, the awardee will determine if a sound board and mixer along with sound engineer are required and provide design proposal to the COR for review and approval before executing on final plan.
Five clip-on microphones, three standing microphones with boom stands.
Awardee will provide at least 1 extra portable, ready-to-go microphone for as needed, emergency use.
3.9.4 June 17: Remembrance Ceremony (3:15 – 4:45 pm)
6 SOW Bunker Hill 250 Special Event Planning and Production
Fully produced event. Speaking, music, poetry, presentation of colors, band, choir.
Audience size: 450 beneath the tent, 200 at satellite viewing area on the grounds (jumbotron screen)
Contractor shall coordinate, provide and set up:
Tent: to cover seating and stage (approx. 100’W x 80’ D TBD by awardee and proposed to COR), based upon audience size, stage, egress needs and site conditions.
Tent sides with five doors (provisional, as needed per weather) Stage: 24’w x 18’d x 3’h with navy skirting ADA compliant access ramp (4’ 24’) Access stairs (2) Stage wing (L): 12’w x 8’d x 2’6”h with navy skirting Stage wing (R): 12’w x 8’d x 2’6”h with navy skirting Stage seating (12 - stackable black) Design, and implement agreed upon stanchions and ropes to designate zones
(sizes of zones and locations determined by awardee) Design, and implement agreed upon a designated section for barricades to designate ticketed seating Wooden Podium Audience seating (400): lightweight, white/ivory folding chairs Tent lighting: professional lighting services to include a temporary broadcast lighting system designed to furnish even stage wash for press event Tent audio: Design and implement means to provide audio (sound engineering and equipment) to support seating of approx. 400 people beneath a 100’x 80’ tented area, Media platform (8’x8’ x 3’h) Video production services to allow for live simulcast viewing of the event at adjacent location on the Bunker Hill Monument grounds live streaming to the NPS web platform and recording of video coverage for immediate archival purposes and to support post event produced projects. Awardee will submit final recording of livestreaming footage and raw camera feeds to the COR after work has concluded within 10 business days after events conclude, as part of their final submittal process.
LED jumbotron, with captions included option type, approved by COR, (approximately 17’w x 10’H elevated at 2’H screen size), with a minimum of 1080 full HD clarity; determined by awardee based on audience size site conditions, and egress needs
Awardee will provide A/V technical staff to operate all lighting, sound, video and simulcast for this event.
ASL services for 3:15-4:45 run of show.
SECTION 4.0 GOVERNMENT FURNISHED PROPERTY
7 SOW Bunker Hill 250 Special Event Planning and Production
4.1 The Government will furnish no materials or tools. All materials and tools are Contractor furnished from outside the park.
SECTION 5.0 SECURITY
5.1 All contract employees shall display identification upon request if entering the secured area of the Charlestown Navy Yard. Identification shall be furnished by the contractor at no additional cost to the Government. Contractor’s staff shall notify the security office if access to the secured area of the Navy Yard is required. Contractor staff shall park vehicles only in areas designated by park personnel.
5.2 Contractor shall take the necessary safety measures to ensure public safety while performing fire suppression repairs. Notify COR of when on site work is being completed.
5.3 The National Park Service (NPS) does not require overnight security services under this contract. If an offeror wishes to include overnight security, they must note this in their offer submission and include all associated costs in their quote for Contract Line Item Number (CLIN) 00010 – Event Planning and Production Services. NPS will manage security for all daytime activities, including setup on June 10 and breakdown on June 18. Law enforcement and non-law enforcement Rangers will be present at each event to ensure security and crowd control for the public. NPS will provide for overnight security services. Therefore, no additional security or crowd control services are required under the scope of this contract.
SECTION 6.0 PERIOD OF PERFORMANCE
6.1 The period of performance shall commence on May 30, 2025, and all work associated with this contract shall be complete by June 26, 2025.
SECTION 7.0 CONTRACTOR’S USE OF PREMISES
7.1 Public or employee restrooms will be available for the contractor employees to use.
7.2 All work shall be completed in such a way as to create no damage and to protect the surrounding government property, and belongings etc. The contractor shall ask the COR for clarification if the need arises.
7.3 Use of water and power are currently available on-site. Confirm with Park Electrician that electrical needs for A/V equipment and lighting selected for this contract is available at each event site.
7.4 Dumpsters for disposal of waste and recycling are available at the Charlestown Navy Yard. Only waste associated with performance of this contract shall be disposed within NPS dumpsters.
SECTION 8.0 RESTRICTIONS
8 SOW Bunker Hill 250 Special Event Planning and Production
8.1 No on site work preparing either site for events will be permitted outside of regular hours. Site is available Monday through Friday from 7:00 am to 5:00 pm. Only on the dates of scheduled special events will work be permitted outside these hours.
8.2 No parking of contractor vehicles will be allowed on the grounds of the Bunker Hill monument. Any deliveries to the site which require vehicle access shall be coordinated with the COR to prevent unnecessary damage to the grounds or irrigation systems.
8.3 Contractor and subcontractors shall not install any temporary or permanent device into the grounds, historic structure or historic object within the Bunker Hill or Navy Yard locations in performance of this contract. This includes no tent stakes driven into park grounds, and no anchors shall be attached to trees or fences. Only exceptions to this shall be provided by the COR in consultation with park resources staff.
8.4 Contractor may use lawns for installation of event equipment in performance of this contract. Work must be coordinated with the COR and park grounds supervisor to ensure compatibility with irrigation systems, walkways and other defining features of the landscape.
After work has concluded, the awardee will perform a walk through with the COR and NPS grounds supervisor to identify turf zones that sustained damages from contracted work.
Those area will require infill of approved soil and grass seed (premium sun and shade mix), provided by the awardee as part of the FFP price in this contract; to ensure turf recovery to existing conditions. Any future care of that grass seed will be the responsibility of the NPS, at no liability to the awardee.
8.5- Site Locations and Proposed Layout
9 SOW Bunker Hill 250 Special Event Planning and Production
CONTRACTING OFFICER’S REPRESENTATIVE
Cidney Webster Boston National Historical Park 21 2nd Ave Boston, MA 02129 617-999-0772 Cidney_webster@nps.gov
File details come from the government source that posted it. Updated .