This document is a Statement of Work (SOW) for electrical and insulation work at Lake Meredith National Recreation Area in Texas. The project requires installing a 150-amp breaker panel with 24 spaces, fourteen 125-amp outlets, and one 60-amp 230-volt waterproof AC disconnect in a law enforcement storage building at Spring Canyon. The contractor must also apply 2.0 closed-cell spray foam to the interior envelope and paint the interior white.
Specific requirements include precise outlet placement on each wall (South, North, East, West), a light switch on the east wall, and installation of electrical components following National Electrical Code and International Building Code standards. The work must be completed Monday through Friday between 8:00 am and 4:00 pm, with the contractor responsible for providing all materials, ensuring site safety, maintaining a clean work environment, and submitting safety plans and material cut sheets for approval. The project is part of Solicitation Number 140P6025Q0020 under the Department of the Interior National Park Service Midwest Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6025Q0020_Amd_0001.pdf | ||
| B11_Question_Answer_doc_0001.docx | DOCX document | |
| B08_Solicitation_-_Attachment_3_-_PPQ.doc | DOC document | |
| B08_Solicitation_-_Attachment_4_-_Tech_Questionnaire.docx | DOCX document | |
| Sol_140P6025Q0020.pdf | ||
| B08_Solicitation_-_Attachment_2_-_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lake Meredith National Recreation Area
STATEMENT OF WORK:
Law Enforcement Storage Building Electrical and Insulation
PMIS: # NA
DATED:
March 2025
NATIONAL PARK SERVICE
INTERMOUNTAIN REGION
Storage Building Electrical and Insulation SOW LAMR
Introduction:
Lake Meredith National Recreational Area (LAMR) and Alibates Flint Quarries National Monument (ALFL) are located in the Panhandle of northern Texas. The two units share boundaries outside the town of Fritch, Texas.
Alibates Flint Quarries National Monument was listed in the National Register of Historic Places in 1966 and encompasses 1,731 acres. This site shows evidence of human habitation for nearly 13,000 years and has 700 flint quarries that were used to provide raw materials for the manufacture of tools and weapons. This site receives approximately 4000 visitors annually.
Lake Meredith National Recreation Area surrounds a man-made reservoir creating the largest area of public lands in the northern Texas Panhandle roughly 45,000 acres. The reservoir was created with Canadian River in 1965 by eleven Texas panhandle cities to provide water for sustainability of urban life. The recreation area offers numerous trails, camping opportunities, fishing, boat ramps, and RV sites for visitors to access this rare opportunity in the region.
Objective:
This project shall consist of installing one (1) 150 amp breaker panel with 24 spaces and associated equipment on metal storage building located at Lake Meredith National Recreation Area Spring Canyon. Contractor shall provide wiring and install fourteen (14) 125 amp outlets and one (1) 60 amp 230 volt waterproof AC disconnect in specified location for outside power source. Once electrical installation is complete, contractor shall apply 2.0 closed-cell spray foam for the interior envelope and paint with to seal. Breaker panel shall be installed for energizing from local power distributor. This building is used for Law Enforcement and provides critical storage for search and rescue equipment and training items. The need for keeping equipment charged and at the ready is essential.
SCOPE:
1. Contractor shall provide all material, equipment, parts and labor required to perform all of the work of this contract.
2. All equipment, material and waste removed or generated by work of this contract shall be properly disposed of offsite by the contractor.
3. Contractor shall identify materials to be replaced, and verify with COR within quantities stated in SOW.
4. All work shall follow National Electrical Code (NEC) and International Building Code (IBC) standards.
5. Contractor shall provide power and water needed to complete with work. No power and water at site.
6. Contractor shall verify the exterior square footage and quantity of materials needed to complete the task identified in this statement of work (SOW).
7. Contractor shall provide a work site and environment that is safe for employees, for visitors to the Park, and NPS staff. The work area shall be cordoned off (if necessary) and secure.
8. Contractor shall leave the worksite clean and free of construction debris.
9. Parking and dumpster sites shall be designated by Park COR.
10. All work shall be performed Monday through Friday from 8:00 am until 4:00 pm. No work shall be performed on weekends or federal holidays without prior approval.
11. Contractor and employee parking and equipment storage areas will be designated by the Park. No company signs shall be installed on government property. Smoking and eating shall be performed in areas designated by the Park. Employees shall wear appropriate clothing at all times.
12. Contractors shall notify NPS staff of scheduled site visits to ensure access to secure areas.
13. Contractor shall protect all physical resources, including the grass, trees\shrubs, walkways and utilities. Upon completion of work, contractor shall remove all debris, nails, fasteners, and excess material.
Tasks: This contract shall include, but is not limited to the following tasks:
1. Install one (1) 150 amp breaker panel with 24 spaces and 20 AMP breakers in designated location on southeast corner of storage building. (Placement marked on structure)
2. Install armored metal clad wiring with code correct wire size to eleven (11) 20 amp 120 volt outlet positions and one (1) duplex light switch and one (1) 60 amp 230 volt waterproof AC disconnect.
3. Light switch shall control (3) evenly spaced outlets boxes on ceiling.
4. All wiring and outlets shall be wired to breaker panel and breakers designated by structure sides (North, South, East, West)
5. AC disconnect shall have designated breaker in main panel for service.
6. Upon completion of electrical installation contractor shall notify electrical distributor for energizing structure via underground service, or per distributers advise.
7. Clean and prepare walls for foam application.
8. Apply 2.0 closed-cell spray foam to a depth of two inch minimum on all interior surfaces excluding entranceways.
9. Paint interior white excluding doors, outlets, and switches.
Specific Requirements:
· South wall shall have three outlets installed along the first, third, and sixth vertical building frame at 18” height from floor.
· North wall shall have three outlets installed evenly spaced along the vertical building frame at 18” from floor.
· East wall shall have three outlets installed along the vertical building frame, two shall be installed at a height of 18” on the first and third vertical frame, the third shall be installed at a height of five feet on the middle vertical building frame.
· West wall shall have three outlets installed along the vertical building frame, two shall be installed at a height of 18” on the first and third vertical frame, the third shall be installed at a height of five feet on the middle vertical building frame.
· One light switch shall be installed on the east wall inside building frame next to east door at a height of four feet and will control the ceiling outlets.
· One Square D 60 amp AC disconnect breaker box shall be installed at a height of four feet on center frame of west wall.
· Wire from main breaker panel shall be routed at ninety degree angles along walls to match height of outlet
· One Square D 150 amp breaker panel with 24 spaces and a 20 AMP breaker for each set (5 total) of wall outlets and one 60 amp breaker for outside breaker box, in the southeast corner of building at a height of five feet along vertical frame.
· Breaker panel install shall be ready to accept power supply line and meter from existing provider’s utility pole.
· Closed cell foam shall cover all penetrations through exterior envelope. No light penetration upon completion.
· Closed cell foam shall be painted white after cure time.
Surface Preparation:
· Each surface shall be cleaned and prepared as specified. The painting contractor is responsible for the final appearance and finish. Should any surface be found unsuitable for painting, it is the contractor's responsibility to notify the COR of those conditions that if not corrected could affect the coating system. No materials shall be applied to any area or surface that is thought to be unsuitable until these have been satisfactorily addresses. Commencement of work in a specific area shall be construed as acceptance of the surfaces as fit for and proper to receive finish.
Application:
· All paint shall be applied by air sprayer or manufacturers recommendation.
· Keep surfaces dust, dirt and debris free before and during painting.
· Execute work in accordance with label directions. Coating application shall be made in conformance to this specification and to the manufacturer’s paint instruction on the labels and product data sheets.
· All sprinkler systems, trees/shrubbery, walkways, and adjacent grounds shall be fully protected against damage during each stage of the painting project.
· All exterior substrates designated not to receive paint coatings shall be kept free of paint residue, i.e. window glass, walkways, door and shutter hardware etc.
· Contractor shall protect his/her work at all times and shall protect all adjacent work and materials by suitable covering or other method during progress of the work. Upon completion of work, he/she shall remove all paint and varnish spots from floors, glass and other surfaces. He shall remove from premises all rubbish and accumulated materials of whatever nature not caused by others and shall leave his part of work clean, orderly, and acceptable condition.
· If specified by Park, contractor shall remove and protect hardware, accessories, device plates, lighting fixtures, factory finished work and similar items or provide ample in-place protection. Upon completion of each area, carefully replace all removed items.
· Cover all electrical panel boxes, covers and doors before painting walls. Omit if covers have been previously painted.
· Materials shall be applied under adequate illumination, evenly spread and flowed on smoothly to avoid runs, sags holidays, brush marks, air bubbles and excessive roller stipple.
· Paint coats shall be dry to manufacturer's instructions before applying succeeding coats. Prior to each coat of paint being applied, the contractor shall notify the COR and obtain approval to apply the next coat of paint.
Submittals:
· Contractor will submit cut sheets to the COR for material approval prior to use for the following items:
· Outlets (color, amps, Manufacture)
· Spray foam (Manufacture, R-value, Color, etc.)
· Paint (white, SDS, Manufacture specs)
SAFETY:
All work performed on government property shall be accomplished in accordance with OSHA, EPA, Federal, State and local regulations and requirements. Prior to starting work on government property, the contractor shall submit to Lake Mead National Recreation Area (LAMR) for approval a copy of their company safety plan pertaining to this particular contract. Although not all inclusive, the safety plan must address at a minimum the following areas:
1) Confined space operations (if required)
2) Heavy equipment operations (if required)
3) Public/visitor safety (barriers/signage, etc…)
4) Traffic safety plan (if required)
5) Trenching/sloping of soil
6) Personal protective equipment to be used
7) Hazardous materials (HAZMAT) to be used
a. Copies of Safety Data Sheets must be provided to LAMR
b. Storage of HAZMAT
8) Emergency response protocols
9) Personnel training requirements
10) OSHA DART rate
a. OSHA 300A Summary for last three years
Contractor shall use “green” products whenever possible, and all HAZMAT must be pre-approved for use by the LAMR Collateral Duty Safety Coordinator. The contractor shall be responsible for the safety and security of the site to ensure unauthorized personnel (park visitors & employees) do not enter the construction area.
SECURITY & WORK HOURS:
Contractor shall only perform this work during normal operating hours (7:00am – 3:30pm) Monday through Friday, unless approval is given by Park.
Storage building
Location north of Lake Meredith dam
SOUTH WALL
West wall
East wall
North wall
Ceiling image1.png image2.png image3.png image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg
File details come from the government source that posted it. Updated .