B08_Solicitation_Attachment_1_Scope_of_Work_(SOW__PWS__SOO)__04_15_2026.pdf
PDF 509 KB Posted
- Attached to
- PR-VIEQUES NWR-PRIORITY RDS CONSTRUCTION Federal contract opportunity
- Solicitation number
- 140FC126R0023
About this file
This is a Statement of Work (SOW) for construction services to rehabilitate five roads at Vieques National Wildlife Refuge in Vieques, Puerto Rico, totaling approximately 9.874 miles of roadwork. The project addresses surface damages sustained from Hurricane Fiona in September 2022.
The five roads requiring rehabilitation are: RT#011 Puerto Ferro Peninsula Rd (3.165 miles), RT#010 Main Rd (2.877 miles), RT#102 Tres Palmitas Rd (1.285 miles), RT#017ZZ La Plata Rd (0.893 miles), and La Chiva Rd (1.654 miles). All roads require scarifying, grading, shaping, sloping, and compacting to a 12-foot width with 4-inch depth. Work specifications include achieving 100% compaction using a 16-ton roller minimum, providing 2% cross slope for drainage, and removing loose debris. RT#010 Main Rd includes an additional asphalt repair component (1.783 miles) requiring cold asphalt placement and compaction. The government will furnish all materials, including A-2-4 surface material, Mogolla subsurface material, and cold asphalt totaling approximately 10,335 tons across all projects. The contractor must obtain a Puerto Rico general contractor license and provide a qualified English-speaking supervisor on-site during working hours. The period of performance is six months from notice to proceed. All materials will be stockpiled at the refuge maintenance shop at coordinates (18.116005, -65.416184). The contractor is responsible for equipment maintenance, security of materials, safety and health program implementation complying with OSHA standards, environmental compliance, erosion control, and archaeological protocols. Weekly progress meetings and site visit reports are required, with final inspection and closeout procedures including submittal of RFIs, submittals register, and project documentation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FC126R0023_Amd_0001.pdf | ||
| B09_Solicitation_Amend_1_-_Attachment_1_Scope_of_Work_(SOW__PWS__SOO)__Updated_7_28_26_0001.pdf | ||
| B09_Solicitation_Amend_1_-_Attachment_5_-_Questions_and_Answers_7_28_26_3_pgs_0001.pdf | ||
| B08_Solicitation_Attachment_2_DOL_Wage_Determination__PR20260002__dated_1_2_26.pdf | ||
| Sol_140FC126R0023.pdf | ||
| B08_Solicitation_Attachment_3_Bid_sheet_6_3_26.pdf | ||
| B08_Solicitation_Attachment_4_Detailed_Bid_sheet_6_3_26.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RT#011 Puerto Ferro Peninsula Rd, RT#010 Main Rd, RT#102 Tres Palmitas Rd, RT#017ZZ La Plata Rd, and La Chiva Rd Rehabilitation SOW
SCOPE OF WORK
For
Construction Services For RT#011 Puerto Ferro Peninsula Rd, RT#010 Main Rd, RT#102 Tres Palmitas Rd, RT#017ZZ La Plata Rd, and La Chiva Rd Rehabilitation Projects
Vieques National Wildlife Refuge Vieques, Puerto Rico
April 15, 2026
I. BACKGROUND:
RT#011 Puerto Ferro Peninsula Rd, RT#010 Main Rd, RT#102 Tres Palmitas Rd, RT#017ZZ La Plata Rd, and La Chiva Rd located at Vieques National Wildlife Refuge require rehabilitation after sustaining surface damages from Hurricane Fiona in September 2022. Work will include the scarifying, grading, shaping, sloping, and compacting of approximately 9.874 miles x 12ft wide road.
ROADS TO BE REHABILITATED
1 RT#011 Puerto Ferro Peninsula Rd 3.165 miles 2 RT#010 Main Rd 2.877 miles 3 RT#102 Tres Palmitas Rd 1.285 miles 4 RT#017ZZ La Plata Rd 0.893 miles 5 La Chiva Rd 1.654 miles TOTAL MILES 9.874 miles
II. DESCRIPTION OF WORK:
i. RT#011 Puerto Ferro Peninsula Rd Rehabilitation located at coordinates (18.12104, - 65.4377):
1. Transport materials from stockpile to then scarify, grade, shape, slope, and compact 3.165 miles x 12ft wide x 4in depth of the Puerto Ferro Peninsula Rd.
The contractor shall scarify the entire road (3.165 miles). Scarifying involves loosening, breaking up the existing surface layer without fully removing it, so it can be re-shaped, re-graded and re-compacted.
The contractor shall re-grade and re-shape the entire road (3.165 miles) to provide a 12ft wide x 4” depth smooth, uniform surface, free of depressions.
The contractor shall provide a cross slope of 2% from centerline to edges ensuring positive drainage with no ponding.
RT#011 Puerto Ferro Peninsula Rd, RT#010 Main Rd, RT#102 Tres Palmitas Rd, RT#017ZZ La Plata Rd, and La Chiva Rd Rehabilitation SOW
The contractor shall achieve a 100% compaction. A 16-ton rolled minimum will be required. To achieve the required compaction, the layers shall not exceed 8 inches of loose material at optimum moisture level and shall receive at least five (5) passes at 2 to 5 mph.
2. Project includes government furnished property/material to include the following:
Quantity Description 1,645 tons A-2-4: Surface Material
3,280 tons Mogolla: Subsurface (a mix of A-2-4 & 3-6” material, In addition to previous A-2-4)
ii. RT#010 Main Rd Rehabilitation located at coordinates (18.11999, -65.4109):
1. Transport materials from stockpile to then scarify, grade, shape, slope, and compact 2.877 miles X 12ft wide X 4in depth of the Main Rd.
The contractor shall scarify the entire road (2.877 miles). Scarifying involves loosening, breaking up the existing surface layer without fully removing it, so it can be re-shaped, re-graded and re-compacted.
The contractor shall re-grade and re-shape the entire road (2.877 miles) to provide a 12ft wide x 4” depth smooth, uniform surface, free of depressions.
The contractor shall provide a cross slope of 2% from centerline to edges ensuring positive drainage with no ponding.
The contractor shall achieve a 100% compaction. A 16-ton rolled minimum will be required. To achieve the required compaction, the layers shall not
2. This road includes an asphalt portion (1.783 miles of the 2.877miles) to be repaired with cold asphalt.
The contractor shall clean the areas where cold asphalt is to be placed.
Cleaning the areas includes the following: removing loose debris, dirt, water, and vegetation, using a broom, shovel, or even compressed air if available.
The contractor shall prepare the edges where the cold asphalt is to be placed. Square up the edges of the hole with a shovel or saw.
The contractor shall then place the cold asphalt during dry conditions, slightly overfilling holes (about ½” to 1”) to allow for compaction. For deeper holes ((>3–4 inches), place in lifts (layers).
The contractor shall compact the cold asphalt. For this they can use a hand tamper, plate compactor, or even a vehicle tire. Compact in layers if the patch is deeper than ~2–3 inches. Keep compacting until it feels firm and level with the surface.
The contractor shall leave a smooth/finished surface.
3. Project includes government furnished property/material to include the following:
1,395 tons A-2-4: Surface Material
2,785 tons Mogolla: Subsurface (a mix of A-2-4 & 3-6” material, In addition to previous A-2-4)
45 tons Cold Asphalt
RT#011 Puerto Ferro Peninsula Rd, RT#010 Main Rd, RT#102 Tres Palmitas Rd, RT#017ZZ La Plata Rd, and La Chiva Rd Rehabilitation SOW
iii. RT#102 Tres Palmitas Rd Rehabilitation located at coordinates (18.11331, -65.4127):
1. Transport materials from stockpile to then scarify, grade, shape, slope, and compact 1.285 miles X 12ft wide X 4in depth of the Tres Palmitas Rd.
The contractor shall scarify the entire road (1.285 miles). Scarifying involves loosening, breaking up the existing surface layer without fully removing it, so it can be re-shaped, re-graded and re-compacted.
The contractor shall re-grade and re-shape the entire road (1.285 miles) to provide a 12ft wide x 4” depth smooth, uniform surface, free of depressions.
The contractor shall provide a cross slope of 2% from centerline to edges ensuring positive drainage with no ponding.
The contractor shall achieve a 100% compaction. A 16-ton rolled minimum will be required. To achieve the required compaction, the layers shall not
630 tons A-2-4: Surface Material
1,260 tons Mogolla: Subsurface (a mix of A-2-4 & 3-6” material, In addition to previous A-2-4)
iv. RT#017ZZ La Plata Rd Rehabilitation located at coordinates (18.11318, -65.3823):
1. Transport materials from stockpile to then scarify, grade, shape, slope, and compact 0.893 miles X 12ft wide X 4in depth of the La Plata Rd.
The contractor shall scarify the entire road (0.893 miles). Scarifying involves loosening, breaking up the existing surface layer without fully removing it, so it can be re-shaped, re-graded and re-compacted.
The contractor shall re-grade and re-shape the entire road (0.893 miles) to provide a 12ft wide x 4” depth smooth, uniform surface, free of depressions.
The contractor shall provide a cross slope of 2% from centerline to edges ensuring positive drainage with no ponding.
The contractor shall achieve a 100% compaction. A 16-ton rolled minimum will be required. To achieve the required compaction, the layers shall not
440 tons A-2-4: Surface Material
875 tons Mogolla: Subsurface (a mix of A-2-4 & 3-6” material, In addition to previous A-2-4)
RT#011 Puerto Ferro Peninsula Rd, RT#010 Main Rd, RT#102 Tres Palmitas Rd, RT#017ZZ La Plata Rd, and La Chiva Rd Rehabilitation SOW
v. La Chiva Rd Rehabilitation located at coordinates (18.11461, -65.3969):
1. Transport materials from stockpile to then scarify, grade, shape, slope, and compact 1.654 miles X 12ft wide X 4in depth of the La Chiva Rd.
The contractor shall scarify the entire road (1.654 miles). Scarifying involves loosening, breaking up the existing surface layer without fully removing it, so it can be re-shaped, re-graded and re-compacted.
The contractor shall re-grade and re-shape the entire road (1.654 miles) to provide a 12ft wide x 4” depth smooth, uniform surface, free of depressions.
The contractor shall provide a cross slope of 2% from centerline to edges ensuring positive drainage with no ponding.
The contractor shall achieve a 100% compaction. A 16-ton rolled minimum will be required. To achieve the required compaction, the layers shall not
1,945 tons A-2-4: Surface Material
3,885 tons Mogolla: Subsurface (a mix of A-2-4 & 3-6” material, In addition to previous A-2-4)
RT#011 Puerto Ferro Peninsula Rd, RT#010 Main Rd, RT#102 Tres Palmitas Rd, RT#017ZZ La Plata Rd, and La Chiva Rd Rehabilitation SOW
III. GENERAL NOTES:
A. The Contractor shall coordinate with the Refuge on appropriate access and necessary equipment storage.
B. All materials will be stockpiled at or near the refuge maintenance shop at the approximate coordinates of (18.116005, -65.416184).
C. Contractor is responsible for furnishing and performing maintenance of all equipment.
D. Contractor is to utilize highway grade heavy equipment for the transportation of materials from stockpile locations to RT#012 Punta Arenas Rd.
E. The Contractor is responsible for the security of materials and equipment. The Contractor shall provide secured areas deemed necessary for the protection of their materials.
F. The Contractor shall coordinate with refuge staff for safety and operational requirements.
G. PERIOD OF PERFORMANCE: six (6) months after the notice to proceed (NTP).
H. DEFINITIONS:
1. Commissioning is the act of statically and dynamically testing the operation of equipment and building systems to ensure they operate as designed and can satisfactorily meet the needs of the building throughout the entire range of operating conditions.
2. Construction is defined as, but not limited to, constructing (giving form by combining the parts), altering, repairing, adding to, subtracting from, improving, restoring, moving, wrecking or demolishing any building, highway, road, excavation or other structure, project, or improvement attached to real estate.
3. Contracting Officer (CO) is defined as a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the United States of America.
4. Day or Days shall mean calendar days unless otherwise specifically noted.
5. “Service” or “FWS” means United States Department of Interior, Fish and Wildlife Service, Region 4 (Southeast Region).
6. Government may also be referred to as the Owner, Contracting Officer, Contracting
Officer's Representative, the Service, or Fish and Wildlife Service (FWS).
7. Incident Rate (IR) is the number of recordable incidents resulting in days away from work for each 100 full-time employees per year, based on 2,000 hours worked per employee per year.
8. Local Authority Having Jurisdiction: Duly adopted local code authority, agency, or serving utility governing or serving the location of the project.
9. Management Plan: Contractor's project approach for planning, design, and construction and includes, at a minimum, but is not limited to the following:
• Schedule
• Project Staffing Plan
• Safety Plan
• Subcontracting Plan
• Organization Chart with Roles and Responsibilities
RT#011 Puerto Ferro Peninsula Rd, RT#010 Main Rd, RT#102 Tres Palmitas Rd, RT#017ZZ La Plata Rd, and La Chiva Rd Rehabilitation SOW
• QA/QC Plan
• Commissioning Plan
10. DOI “Sustainable Building Assessment and Compliance Tool Construction Checklist for
New Construction and Major Renovation Projects” and supporting documents. (This checklist will be furnished to the Contractor by the USFWS)
11. Notice to Proceed (NTP): There will be one NTP for this project issued by the Contracting Officer (CO) to initiate the construction phase. The NTP will identify any qualifications, limitations, or exceptions to the work.
12. Open Book Accounting is the right of the government to have free and open access to financial and accounting documents that the Contractor has associated with the project being completed.
13. Performance Specifications are specifications that state what the required results will be with measurable or observable criteria for verifying compliance.
14. Public Works is construction performed under a contract with a Federal, State, County, City, or other government entity.
15. Schedule is a chronological layout of the work to be performed prepared using commercially available scheduling software.
16. Subcontractor is any person or entity retained by the Contractor as an independent Contractor to perform a portion of the Work and shall include material, labor and suppliers.
17. Sub-Subcontractor is any person or entity retained by a Subcontractor as an independent Contractor to perform any portion of a Subcontractor's Work and shall include material, labor and suppliers.
18. Work is comprised of all permitting, construction and other services required by the Contract Documents, including procuring and furnishing all equipment (if needed), services and labor reasonably inferable from the Contract Documents.
19. Government Furnished Property (GFP) refers to property in the possession of or acquired by the government and furnished to the contractor for contract performance.
RT#011 Puerto Ferro Peninsula Rd, RT#010 Main Rd, RT#102 Tres Palmitas Rd, RT#017ZZ La Plata Rd, and La Chiva Rd Rehabilitation SOW
IV. CONSTRUCTION SERVICES:
A. GENERAL
1. Following the Issuance of the Construction NTP, the Contractor shall provide the following items to the COR at the Preconstruction Meeting for approval and amendment into the contract file:
a. A project schedule reflective of the critical path and other phases of the work.
b. A schedule of the planned site visits. The prime Contractor shall periodically, and at appropriate times, visit the site to inspect the construction. They shall prepare a site visit report for each visit and shall submit the reports to the COR within 5 calendar days after the visit. The reports shall include comments about overall quality and accuracy of the construction. The reports shall also note all deficiencies observed.
2. The Contractor shall possess and maintain, for the duration of this project, a Puerto Rico license as a general Contractor in Puerto Rico, where the project is located.
3. The Contractor shall provide supervision, labor, materials, non-government furnished equipment (as listed above), tools, construction equipment and machinery, inspection, testing, start-up, water, heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work.
4. The Contractor shall have at least one qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours.
5. The Contractor shall perform all construction activities efficiently and with the requisite expertise, skill, and competence to satisfy the requirements of the Contract Documents. At all times exercise complete and exclusive control over the means, methods, sequences, and techniques of construction.
6. The Contractor shall utilize Subcontractors who are duly licensed and qualified to perform the Work consistent with the Contract Documents. Government may reasonably object to Contractor's selection of any Subcontractor.
7. The Contractor is responsible for quality control of its own work and work performed by its Subcontractors and their Sub-subcontractors.
8. The Contractor shall assume responsibility for the proper performance of the Work of Subcontractors and all acts and omissions in connection with such performance. Nothing in the Contract Documents is intended or deemed to create any legal or contractual relationship between Government and any Subcontractor or Sub Subcontractor.
9. The Contractor shall coordinate the activities of all Subcontractors. If Government performs other work on the Project or at the Site with separate Contractors under Government's control, Contractor agrees to reasonably cooperate and coordinate its activities with those of such separate Contractors so that the Project can be completed in an orderly and coordinated manner without unreasonable disruption.
10. The Contractor shall minimize creation of construction, deconstruction, and demolition waste. Minimize factors that contribute to waste such as over-packaging, improper storage, poor planning, breakage, mishandling, and contamination. Develop a Waste Management
RT#011 Puerto Ferro Peninsula Rd, RT#010 Main Rd, RT#102 Tres Palmitas Rd, RT#017ZZ La Plata Rd, and La Chiva Rd Rehabilitation SOW
Plan to ensure that existing site and boardwalk materials are reused, salvaged, or recycled.
Unless modified by the CO, divert 50%, minimum, of total project waste from landfills.
Dispose of all materials not salvaged, reused, or recycled legally, off-site, in licensed disposal facilities.
11. No work shall be performed during Federal Holidays. During normal working hours (Monday to Friday from 7:00 am. to 3:30 pm.) throughout the duration of the contract, the Contractor shall promptly furnish information and provide reasonable facilities and access for obtaining information respecting: the character of the materials, condition of the work-in-progress, number of workers employed, their pay rate, time worked, inspection reports and test results from sampling and testing laboratories, and similar information.
12. Government buildings and other facilities are not available for storage of Contractor's materials, equipment, and tools except for designated staging areas. .
13. Housing for workers and campsites are not available on site.
14. The Contractor shall furnish all temporary facilities and utilities needed including heat, light, power, water, telephone, sanitary facilities, job offices, material handling equipment, temporary construction aids, and storage enclosures. The Contractor is responsible for all temporary connections and disconnections.
15. Permits. It is the responsibility of the Contractor to obtain all permits and pay all permitting fees required for this project. The Contractor is responsible for providing permitting drawings, engineering data and other technical information required by the permitting authority.
B. COMMUNICATION
1. The FWS Project Manager must be in the information loop for Quality Assurance purposes.
a. RFI Process: Unless a more stringent protocol is accepted in the Management Plan, the Contractor shall utilize the following protocol:
(i) Utilize a RFI Form: All supplemental information and answers to questions shall be documented on Request for Information (RFI) forms. The Contractor may use any format they choose for the Request for Information form but all shall be identified with the words “Request for Information” at the top of the form along with the Government Contract Number, Project Location (Tensas NWR) Project Title and the Contractor’s Name.
(ii) Numbering: RFI’s shall be sequentially numbered, logged and filed and shall be part of the Closeout Documents submitted to the Government.
(iii) FWS Concurrence: As RFI’s are generated and answered, submit copies to the COR for review within 2 business days for concurrence via email .pdf format.
(iv) RFI Files Onsite: The Site Superintendent shall maintain a file of RFI changes. This RFI file shall be subject to inspection by the FWS without advance notice.
(v) Escalation process for unresolved RFIs: The contractor shall notify the contracting officer (CO) in writing if there is an RFI that impacts the cost, schedule, or performance of the project and it has not been adequately resolved within fourteen
(14) days of the initial RFI.
RT#011 Puerto Ferro Peninsula Rd, RT#010 Main Rd, RT#102 Tres Palmitas Rd, RT#017ZZ La Plata Rd, and La Chiva Rd Rehabilitation SOW
b. Submittals: Unless a more stringent protocol is accepted in the Management Plan, the Contractor shall utilize the following protocol.
(i) Utilize a Submittal Register: Develop a submittal register and update this register as submittals and logged and processed.
(ii) Numbering: Submittals shall be sequentially numbered. A completed submittal register shall be submitted with the Project Closeout Documents.
(iii) FWS Concurrence: Provide the FWS Project Manager/COR with (1) copy of the approved submittal and provide the FWS Construction Representative (1) copy of the approved submittal within (2) business days of the approval date.
(iv) Site Responsibility: The Contractor’s Site Superintendent shall maintain a file of approved submittals for reference purposes. This Submittal file shall be subject to inspection by the FWS without advance notice.
C. PAYMENT PROCEDURES
1. Measurement: No measurement of the work will be made unless unit prices are included in the project.
2. Schedule of Values: Prepare a Schedule of Values in the format of the American Institute of Architects (AIA) form number G702/703 Application and Certificate for Payment (or approved equivalent format). Submit a detailed Schedule of Values no less than 7 calendar days prior to the start of on-site construction work.
a. Payment Request Data: In addition to data required by the Contracting Officer: (1) Format the Schedule of Values to match the Schedule of Items and show sufficient additional detail to allow accurate calculation of monthly progress payments; and (2) Submit updated construction schedule identifying actual work complete.
D. PROJECT SAFETY
1. The Contractor shall have the ultimate responsibility for safety on the project site at all times, from issuance of the Notice to Proceed until final completion and acceptance of the project by the Contracting Officer. Ensure that all onsite activities, equipment, and facilities constructed by the Contractor, Subcontractor, or supplier conform fully to the standards of the Department of Labor, Occupational Safety and Health Administration (OSHA) 29 CFR 1926 and 1910; and DOI and FWS policies. In addition, the Contractor shall adhere to all current Federal, State and local safety requirements. In the event where any safety standard referenced herein conflicts with another, the more stringent shall govern.
2. The Contractor shall initiate and maintain, throughout the performance of this contract, an effective safety and health program that provides adequate policies, procedures, and practices to protect employees from, and allow them to recognize, job-related safety and health hazards. The program shall include provisions for the identification, evaluation, prevention and control of general work site hazards, specific job hazards, and potential hazards that may arise from foreseeable construction methods and conditions, as well as providing a competent person to conduct frequent and regular inspections. Each employee (Contractor and Subcontractors) must be instructed in the recognition and avoidance of unsafe conditions and the regulations applicable to the work environment.
RT#011 Puerto Ferro Peninsula Rd, RT#010 Main Rd, RT#102 Tres Palmitas Rd, RT#017ZZ La Plata Rd, and La Chiva Rd Rehabilitation SOW
3. The Contractor shall provide barricades and warning devices as necessary to safeguard the public, workers, and government personnel. Where project work affects public roads, provide signage in accordance with the current edition of the Manual on Uniform Traffic Control Devices (MUTCD) as published by the US Department of Transportation, Federal Highway Administration.
4. The Contractor shall provide Rollover Protection and Seat Belts.
E. Protections:
1. The Contractor shall comply with all applicable federal, state, and local environmental laws and regulations. This condition applies to, but is not limited to, laws and regulations governing noise levels, air and water quality standards, erosion control, surface runoff, and cultural resources.
2. The Contractor shall provide erosion control methods (such as watering dry soils) and appurtenances (such as silt fence) as necessary to prevent wind-borne dust and water-borne silt from leaving the immediate work area.
3. The Contractor shall immediately stop work if paleontological, archaeological or historical remains (including burials or skeletal material) are encountered, immediately stop the work and notify the Construction Representative, COR, or Contracting Officer. The Contracting Officer will notify the Regional Archaeologist so the provisions of 36 CFR 800.7 (Resource Discovered During Construction) and other relevant laws are followed. Work will cease in the immediate vicinity until permitted to resume by written order from the Contracting Officer. Work in other areas may proceed as approved by the Contracting Officer.
4. The Contractor shall protect adjacent vegetation, property, structures, and improvements from damage.
5. Heavy equipment operated on FWS roads and parking areas shall comply with highway-legal load limits unless explicitly approved otherwise. Prior to operations, the Contractor and contracting officer will document condition of roads and parking. The Contractor is responsible for repairs of damage to roads and parking caused by their own actions.
6. Clearing limits and working limits shall be approved in the field. Do not remove any trees without prior COR field review and approval. If no clearing limits are indicated, contact the COR for clarification. Coordinate with the local FWS staff to select a construction staging area. Construction equipment and operations shall be contained within the work limits and staging areas.
F. Closeout Procedures
1. Final Inspection: The Contractor shall submit a request in writing to the CO requesting the Final Inspection. Notify the COR at least 10 calendar days prior to the anticipated date of completion of all work. The COR will proceed with Final Inspection as promptly as practicable. The time required for such Final Inspection and for making any corrections as a result thereof shall be included in the contract performance time. The Contractor representative responsible for the work shall be present at the Final Inspection and shall submit a preliminary list of unfinished work prior to Final Inspection.
RT#011 Puerto Ferro Peninsula Rd, RT#010 Main Rd, RT#102 Tres Palmitas Rd, RT#017ZZ La Plata Rd, and La Chiva Rd Rehabilitation SOW
V. CONFERENCES:
An Initial Conference shall be held after the Notice to Proceed as directed by the Contracting Officer.
Weekly progress meetings shall be held during the construction phase. After these weekly meetings, the contractor shall provide meeting minutes within the five (5) following workdays.
--- END OF SCOPE OF WORK ---
RT#011 Puerto Ferro Peninsula Rd, RT#010 Main Rd, RT#102 Tres Palmitas Rd, RT#017ZZ La Plata Rd, and La Chiva Rd Rehabilitation SOW
List of Attachments:
Appendix A: Site Mapping
Figure 1: Location Map for Stockpile Laydown Area and RT#011, RT#010, RT#102, RT#017ZZ and La Chiva Rd
Figure 2: Stockpile Laydown Area
File details come from the government source that posted it. Updated .