Summary of Final Construction Documents
This is a Final Construction Documents package for the remodel of public restrooms to achieve ADA accessibility at the Infantry Barracks (HS-6) located at Fort Scott National Historic Site, 199 Old Fort Boulevard, Fort Scott, Kansas 66701. The project scope encompasses approximately 550 square feet of remodeling work to both men's and women's restrooms to provide a minimum of one ADA-compliant toilet compartment and two standard toilet compartments for each, along with three lavatories per restroom. The work also includes removal and replacement of four air handlers/furnaces and four heat pumps/condensing units with associated line sets and electrical components. The project is identified as PMIS 307909, Package A - HS6, with an Arch/Eng Project Number 09258015, prepared by Schemmer Associates. Work must be completed within 120 calendar days of the Notice to Proceed, with all costs for supply lead times, material deliveries, decommissioning, installation, and final commissioning included in the contract price.
The construction documents include comprehensive architectural, plumbing, mechanical, and electrical specifications and plans with detailed demolition requirements, fixture schedules, accessibility compliance details, and construction notes. Key requirements include field verification of existing conditions, coordination with federal historic preservation standards, protection of existing utilities and landscaping, compliance with 2024 IBC/IEBC codes and 2017 ABA accessibility standards, and adherence to NPS operations protocols regarding work hours (7 a.m. to 3:30 p.m. weekdays), smoking restrictions, emergency procedures, and environmental protection. The contractor must provide weekly 15-minute safety meetings, photo documentation of existing conditions and progress, recycling of construction waste, and maintain the site in orderly condition using an approved staging area. New restroom fixtures include ADA-compliant water closets, accessible lavatories with sensored faucets, accessible drinking fountains, and grab bars with specific mounting heights per accessibility standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
LOCATION
NORTH
CONTRACTOR
PARKING &
STAGING AREA
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs
\r s c a rb o ro u g h \D o c u m e n ts
\0
-A
R C
H
R rS c a rb o ro u g h
D Q
X C
S .r v t
RAS
RAS
JB
4/09/2026
09258015
G1.1
COVER SHEET
REMODEL PUBLIC RESTROOMS FOR ACCESSIBILITY AT INFANTRY
BARRACKS
009258015-0-G1.1 COVER SHEET
FORT SCOTT HISTORIC SITE, 199 OLD FORT BLVD
FORT SCOTT, KS 66701
80073
307909
FINAL CONSTRUCTION DOCUMENTS
ARCHITECTURAL
A 00.1 ARCHITECTURAL INFO SHEET
A 01.1 ARCHITECTURAL SPECIFICATIONS
A 02.1 ARCHITECTURAL SPECIFICATIONS
AD01.1 DEMOLITION PLAN
A101.1 FLOOR PLAN
A201.1 REFLECTED CEILING PLAN
A301.1 SCHEDULES, DOOR AND WINDOW DETAILS, WALL TYPES
A501.1 MOUNTING HEIGHTS AND INTERIOR ELEVATIONS
GENERAL
G1.1 COVER SHEET
G2.1 ARCHITECTURAL CODE COMPLIANCE
PLUMBING
P 00.1 PLUMBING INFO SHEET
P 01.1 SHEET SPECIFICATIONS - PLUMBING
P 02.1 SHEET SPECIFICATIONS - PLUMBING
P 03.1 SHEET SPECIFICATIONS - PLUMBING
P 04.1 SHEET SPECIFICATIONS - PLUMBING
PD01.1 DEMOLITION FLOOR PLAN - PLUMBING
P101.1 FLOOR PLAN - PLUMBING
P401.1 SCHEDULES, RISER & DETAILS - PLUMBING
MECHANICAL
M 00.1 MECHANICAL INFO SHEET
M 01.1 SHEET SPECIFICATIONS - MECHANICAL
M101.1 FLOOR PLAN - MECHANICAL
DRAWING INDEX
FORT SCOTT NATIONAL HISTORIC SITE
ELECTRICAL
E 00.1 ELECTRICAL INFO SHEET
E 01.1 ELECTRICAL INFO SHEET
E 02.1 ELECTRICAL SPECIFICATIONS
E 03.1 ELECTRICAL SPECIFICATIONS
E 04.1 ELECTRICAL SPECIFICATIONS
ED01.1 FLOOR PLAN - DEMOLITION
E101.1 FLOOR PLAN - LIGHTING
E201.1 FLOOR PLAN - POWER AND AUXILIARY SYSTEMS
E401.1 ELECTRICAL DETAILS
E601.1 ELECTRICAL SCHEDULES
PMIS 307909 - REMODEL PUBLIC RESTROOMS FOR ACCESSIBILITY AT INFANTRY BARRACKS
PACKAGE A - HS6
FINAL CONSTRUCTION DOCUMENTS
4/09/2026
DATE INITIAL
4/9/26
UP
UP UP
UP
3 & 4 24' - 3"
E
3 & 4 11' - 4"
B
E
2 & B 13' - 6"
B
7'
9/
E
33' - 8 27/32"
E A
22' - 0"
B
40' - 9"
B 11' - 7"
E
B
WOMENS RR
MENS RR
STORAGE
DRESSING
DRESSING
UTILITY
CORRIDOR
Room
Z
Room
Z
Room
Z
Room
Z
Room
Z
Room
Z
FIRE
108MECH
ASSEMBLY
STORAGE
STORAGE
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs
\r s c a rb o ro u g h \D o c u m e n ts
\0
-A
R C
H
R rS c a rb o ro u g h
D Q
X C
S .r v t
RAS
RAS
JB
4/09/2026
09258015
G2.1
ARCHITECTURAL CODE
COMPLIANCE
REMODEL PUBLIC RESTROOMS FOR ACCESSIBILITY AT INFANTRY
BARRACKS
009258015-0-G2.1 ARCHITECTURAL CODE COMPLIANCE
FORT SCOTT HISTORIC SITE, 199 OLD FORT BLVD
FORT SCOTT, KS 66701
80073
307909
FINAL CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"
FIRST FLOOR - CODE REVIEW PLAN
XX FIRE BARRIER (X HOURS)
XX FIRE PARTITION (X HOURS)
XX SMOKE BARRIER (X HOURS)
XX SMOKE PARTITION (X HOURS)
XX BUILDING SEPARATION
(X HOURS)
E
CODE COMPLIANCE
LEGEND
NOTES:
• CONTRACTOR SHALL PROVIDE PERMANENT
SIGNAGE OR STENCILING WITHIN CEILING
PLENUM AT ALL FIRE RATED WALLS, SMOKE
BARRIERS & SMOKE PARTITIONS. LETTERING
SHALL BE AT LEAST 3" IN HEIGHT WITH THE
WORDING: "FIRE AND/OR SMOKE BARRIER -
PROTECT ALL OPENINGS:. REPEAT AT
INTERVALS NOT EXCEEDING 30'-0" MEASURED
HORIZONTALLY ALONG THE PARTITION WALL.
• SEAL PENETRATIONS IN FIRE RATED SMOKE
BARRIERS, FIRE RATED BARRIERS & SMOKE
BARRIERS.
ACCESSORY OCCUPANCY
INCIDENTAL OCCUPANCY
NOT HABITABLE
OCCUPANCY
36" 90" DOOR RATING (MIN)180 9
ANTICIPATED LOAD
EXIT CAPACITY
DOOR WIDTH (IN)
9 ANTICIPATED LOAD36" 180
EXIT CAPACITY
STAIR WIDTH (IN)
TRAVEL DISTANCE
XXX'-XX"
DEAD-END DISTANCE
XXX'-XX"
EXIT LOCATION SYMBOL
NEW FIRE
EXTINGUISHER- INSIDE
RECESSED CABINET -
(FE1)
75'
CODE SUMMARY
APPLICABLE CODES
BUILDING :
ACCESSIBILITY :
LIFE SAFETY :
ENERGY :
MECHANICAL :
PLUMBING :
ELECTRICAL :
OCCUPANCY GROUP :
TYPE OF CONSTRUCTION :
MAXIMUM ALLOWED HEIGHT
MAXIMUM ALLOWED AREA
MIXED USE SEPARATIONS :
HEIGHT AND AREA LIMITS
FIRE SEPARATION ASSEMBLIES
EXITS
SHAFTS / HOISTWAYS
DWELLING UNIT SEPARATIONS
INTERIOR LOAD BEARING
WALLS, COLUMNS, FRAMING
ROOF CONSTRUCTION
FLOOR CONSTRUCTION
FIRE WALLS
EXTERIOR WALL OPENING LIMITS :
DRAFTSTOPS :
FIRE PROTECTIVE SYSTEMS
AUTO FIRE SUPPRESSION :
STANDPIPE :
FIRE ALARM SYSTEM :
AUTO FIRE DETECTION :
SMOKE DETECTION :
FIRE RESISTANCE OF STRUCTURAL
ELEMENTS
RATING
(HOURS)
DESIGN
NUMBER
EXTERIOR WALLS
LOAD BEARING WALLS
NON-LOAD BEARING WALLS
CALCULATIONS
DOOR
STAIR
A-3
VB (EXISTING)
60', 2 STORIES
24,000 SF
NA
2017 ABAAS
NA
NA
EXISTING
NA
NFPA 13
NA
NFPA 72
NFPA 13
NFPA 72
NFPA 101/2024 IFC
2024 IECC
2024 IMC
2024 UPC
2023 NEC
2024 IBC & IEBC
0.2" / OCC = 56.8" - MIN. 72" PROVIDED
0.3" / OCC = 85.2" - MIN. 15' PROVIDED
PLUMBING FIXTURE
REQUIREMENTS
MEN - REQUIRED
WOMEN - REQUIRED
MEN - PROVIDED
WOMEN - PROVIDED
NUMBER OF OCCUPANTS
MEN
WOMEN
WC LAV URINALS
TUB/
SHOWER
DRINKING FOUNTAINS
REQUIRED
PROVIDED
OCC TYPE A-3
1 PER 50 2 PER 50 - - 1 PER 8
1 PER 100
2 3 1 NA
2 3 2 NA
3 3 NA
5 3 NA
FIRST FLOOR
SECOND FLOOR
TOTAL
AREA (GROSS SQUARE FOOTAGE) :
BUILDING STATISTICS
NUMBER OF STORIES :
4316 SF
2158 SF
2158 SF
DATE INITIAL
SCALE: 1/8" = 1'-0"
SECOND FLOOR - CODE REVIEW PLAN
ACC_ROOM SCHEDULE
ROOM NO ROOM NAME FUNCTION OF SPACE CALC (SQF/OCC) OCCUPANT LOAD
AREA / OCC
FIRST FLOOR
101 WOMENS RR (none) 108 SF / 200 SF 1
102 MENS RR (none) 184 SF / 200 SF 1
103 CORRIDOR (none) 129 SF / 200 SF 1
104 STORAGE ACCESSORY STORAGE
AREAS, MECHANICAL,
EQUIPMENT ROOM
340 SF / 300 SF 1
105 DRESSING LOCKER ROOMS 249 SF / 50 SF 5
106 DRESSING LOCKER ROOMS 242 SF / 50 SF 5
107 UTILITY ACCESSORY STORAGE
AREAS, MECHANICAL,
EQUIPMENT ROOM
310 SF / 300 SF 1
108 FIRE ACCESSORY STORAGE
AREAS, MECHANICAL,
EQUIPMENT ROOM
33 SF / 300 SF 0
109 MECH ACCESSORY STORAGE
AREAS, MECHANICAL,
EQUIPMENT ROOM
37 SF / 300 SF 0
: 9 14
: 9 14
FIRST FLOOR: 9 14
SECOND FLOOR
201 ASSEMBLY ASSEMBLY WITHOUT FIXED
SEATS CONCENTRATED
(CHAIRS ONLY - NOT FIXED)
1887 SF / 7 NET SF 270
202 STORAGE ACCESSORY STORAGE
AREAS, MECHANICAL,
EQUIPMENT ROOM
31 SF / 300 SF 0
203 STORAGE ACCESSORY STORAGE
AREAS, MECHANICAL,
EQUIPMENT ROOM
31 SF / 300 SF 0
: 3 270
: 3 270
SECOND FLOOR: 3 270
TOTALS:: 12 284
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATEwww.schemmer.comC U s e rs
\r s c a rb o ro u g h \D o c u m e n ts
\0
-A
R C
H
R rS c a rb o ro u g h
D Q
X C
S .r v t
Designer
Author
Checker
4/09/2026
09258015
A 00.1
ARCHITECTURAL INFO SHEET
REMODEL PUBLIC RESTROOMS FOR ACCESSIBILITY AT INFANTRY
BARRACKS
009258015-2-A 00.1 ARCHITECTURAL INFO SHEET
FORT SCOTT HISTORIC SITE, 199 OLD FORT BLVD
FORT SCOTT, KS 66701
80073
307909
FINAL CONSTRUCTION DOCUMENTS
A. THE DEMOLITION PLANS WERE PRODUCED BY DUPLICATING THE ORIGINAL DRAWINGS
PROVIDED BY THE OWNER AND LIMITED FIELD VERIFICATION. DIMENSIONS AND EXISTING
CONDITIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS.
ITEMS WHICH ARE INTENDED TO BE REMOVED, RELOCATED, OR SALVAGED ARE SHOWN AS
FULL-TONE DASHED LINES AND ARE LISTED IN THE REFERENCED DEMOLITION NOTES. ALL
OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE AND ARE SHOWN HALF-TONE.
B. DEMOLITION SHALL INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS BELOW OR HERE-IN. THE
CONTRACTOR SHALL COORDINATE ALL REQUIRED RENOVATION AND NEW CONSTRUCTION
WITH THE EXISTING BUILDING TO IDENTIFY THE TOTAL EXTENT OF THE DEMOLITION
REQUIRED AND AS LISTED BELOW.
C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF ALL
EXISTING BUILDING COMPONENTS, MATERIALS, EQUIPMENT, AND APPURTENANCES AS
REQUIRED TO BUILD, ERECT, INSTALL, OR ACCOMMODATE ALL NEW CONSTRUCTION
WITH THE OWNER HAVING FIRST RIGHT OF REFUSAL ON ALL ITEMS.
D. ITEMS NOTED TO BE REMOVED AND SALVAGED OR REINSTALLED SHALL BE CAREFULLY
REMOVED BY THE CONTRACTOR WITHOUT DAMAGE AND STORED OR REINSTALLED ON THE
SITE AS DIRECTED. REMOVED AND SALVAGED ITEMS SHALL REMAIN THE PROPERTY OF THE
OWNER.
E. WHERE EXISTING FLOOR MATERIALS AND/OR WALLS ARE TO BE REMOVED, PREP REMAINING
FLOOR AND/OR WALL SUBSTRATE AS REQUIRED PER MANUFACTURERS RECOMMENDATIONS
FOR THE NEW FLOOR/WALL FINISH MATERIAL. REMOVE ALL FINISH FLOORING DOWN TO
BASE SUBSTRATE FLOORING AND PREP TO RECEIVE NEW FINISH.
F. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL REASONABLY
BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY OTHER HAZARDOUS MATERIAL
WHICH HAS NOT BEEN RENDERED HARMLESS, THE CONTRACTOR SHALL IMMEDIATELY STOP
WORK IN THE AREA AFFECTED AND REPORT THE CONDITION TO THE OWNER AND
ARCHITECT IN WRITING. THE WORK IN THE AFFECTED AREA SHALL NOT THEREAFTER BE
RESUMED EXCEPT BY WRITTEN AGREEMENT OF THE OWNER AND CONTRACTOR.
G. THE CONTRACTOR IS RESPONSIBLE FOR THE ERECTION, MAINTENANCE, AND REMOVAL OF
ALL CONSTRUCTION BARRIERS.
H. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ELEMENTS THAT ARE EXISTING TO
REMAIN. IF ANY DAMAGE IS INCURRED DURING DEMOLITION, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THOSE ITEMS.
A. EXISTING CONDITIONS ARE BASED ON DRAWINGS PROVIDED BY THE OWNER AND LIMITED
FIELD VERIFICATION. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS
AND DIMENSIONS AND NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR
VARIATIONS FROM THOSE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL ADJUST TO
ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER.
B. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF DOCUMENTS TO
DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR SHALL NOT BE ALLOWED EXTRA
COSTS DUE TO FAILURE TO REVIEW ENTIRE SET OF DOCUMENTS.
C. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR WORK AND BE RESPONSIBLE FOR
SAME. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO ADDITIONAL
EXPENSE TO OWNER. COORDINATE THE WORK AND SHOP DRAWINGS WITH ALL OTHER
TRADES AFFECTED.
D. SCREENED HALF-TONE LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. FULL-TONE
LINES INDICATE NEW OR RELOCATED CONSTRUCTION.
E. DIMENSIONS ARE TYPICALLY TO FINISH FACE OF MASONRY, CONCRETE, GYPSUM WALL
BOARD, AND METAL FRAMES; OR CENTER LINE OF COLUMN OR BEAMS, UNLESS NOTED
OTHERWISE.
F. INTERIOR DOORS WITH THE HINGE-SIDE SHOWN CLOSE TO CORNERS SHALL BE LOCATED 4
INCHES FROM ADJACENT WALL UNLESS NOTED OTHERWISE
G. CHANGES IN FLOOR MATERIALS SHALL OCCUR UNDER DOORS.
TRUE
NORTH
PLAN
NORTH
NORTH
NORTH
ARROW
NAME
ELEVATION
LEVEL
MATCHLINE
AREA A
AREA B
TITLE
MARKER
VIEW NAME
SCALE: 1/8" = 1'-0"
EXISTING
COLUMN
NEW
COLUMN
X
X
X
XX-XX
SIM
X
XX-XX
XXXX
DX
X
SECTION/
DETAIL
PLAN
DETAIL
REFERENCE
NOTE
REFERENCE
DEMOLITION
NOTE
EQUIPMENT
NUMBER
ROOM NAME
150 SF
ROOM
NUMBER
LETTER INDICATES
NEW COLUMN LINE
LETTER INDICATES
EXISTING COLUMN LINE
SECTION/DETAIL
NUMBER
SHEET NUMBER
INDICATES DIRECTION
OF VIEW
DETAIL NUMBER
SHEET NUMBER
REFERENCE
DESIGNATION
DEMOLITION
DESIGNATION
EQUIPMENT
NUMBER
ROOM NAME
DESIGNATION
ROOM NUMBER
DESIGNATION
ROOM AREA
DESIGNATION
ROOM /
FRAMING
ELEVATION
EXTERIOR
ELEVATION
XX-XX
XX-XX
ELEVATION LETTER
DIRECTION OF VIEW
SHEET NUMBER
ELEVATION LETTER
DIRECTION OF VIEW
SHEET NUMBER
DOOR
NUMBER
DOOR NUMBER10
WINDOW
DESIGNATION
WINDOW DESIGNATION000
TA-X
TOILET
ACCESSORY
TOILET ACCESSORY
NUMBER
WALL
TYPE
LETTER
INDICATES
PARTITION OR
WALL TYPE
X
DETAIL NUMBER
LEVEL CALLOUT
DESIGNATION
ELEVATION
DESIGNATION
GRAPHIC AREA FOR
DRAWING
TITLE
SCALE OF THE
DRAWING
ABBREVIATIONSREFERENCE LEGEND GENERAL NOTESGENERAL DEMO NOTES
S SOUTH
SA SUPPLY AIR
SAN SANITARY
SB SECURITY BARS
SB SPLASH BLOCK
SCH SCHEDULE
SCHED SCHEDULE
SCR SCREW
SCT STRUCTURAL CLAY TILE
SCUT SCUTTLE
SCW SOFT COLD WATER
SD STORM DRAIN
SD SUBDRAIN
SDI STEEL DECK INSTITUTE
SECT SECTION
SECY SECRETARY
SEQ SEQUENCE
SF SQUARE FOOT (FEET)
SFU STRUCTURAL FACING
UNIT
SHLD SHOULDER
SHT SHEET
SHTG SHEATHING
SHW SOFT HOT WATER
SIM SIMILAR
SJI STEEL JOIST INSTITUTE
SL SNOW LOAD
SLBB SHORT LEG BACK TO
BACK
SM SPRINKLER MAIN
SOV SHUT OFF VALVE
SPA SPACE(ING)
SPEC SPECIFICATIONS
SPF SOUNDPROOF
SPH SPACE HEATER
SPKR SPEAKER
SPL SPECIAL
SQ SQUARE
SS SANITARY SEWER
SS STAINLESS STEEL
SSMR STANDING SEAM METAL
ROOFING
STA STATION
STAIR STAIRWAY
STC SOUND TRANSMISSION
COEFFICIENT
STD STANDARD
STGR STRINGER
STIFF STIFFENER
STIRR STIRRUPS
STL STEEL
STN STONE
STOR STORAGE
STR STRUCTURAL
SUB FL SUB FLOOR
SUCT SUCTION
SUSP SUSPENDED
SVF SHEET VINYL FLOORING
SW SWITCH
SWBD SWITCH BOARD
SYM SYMMETRICAL
T TREAD
T or TLT TOILET
TAN TANGENT
TBD TACK BOARD
TE TOP ELEVATION
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
TERM TERMINAL
TGL TOGGLE
TH THRESHOLD
THK THICK
THRD THREAD
TO TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOJ TOP OF JOIST
TOPO TOPOGRAPHIC
TOS TOP OF STEEL
TOW TOP OF WALL
TRANS TRANSVERSE
TSTAT THERMOSTAT
TV TELEVISION
TW TEMPERED WATER
TWR TEMPERED WATER
RETURN
TYP TYPICAL
UC UNIT COOLER
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITERS
LABORATORIES
UNEX UNEXCAVATED
UNFIN UNFINISHED
UNO UNLESS NOTED
OTHERWISE
UPS UNINTERRUPTIBLE
POWER SYSTEM
UR URINAL
UT UTILITY
UV UNIT VENTILATOR
V VOLT
VAC VACUUM
VAV VARIABLE AIR VOLUME
VCP VITRIFIED CLAY PIPE
VCT VINYL COMPOSITION TILE
VD VAULT DOOR
VEL VELOCITY
VENT VENTILATOR(ION)
VERT VERTICAL
VEST VESTIBULE
VFD VARIABLE FREQUENCY
DRIVE
VOL VOLUME
VPC VERTICAL POINT OF
CURVATURE
VPI VERTICAL POINT OF
INTERSECTION
VPT VERTICAL POINT OF
TANGENCY
VS VENT STACK
VT VINYL-TILE
VTR VENT THRU ROOF
VWC VINYL WALL COVERING
W WEST
W WIDE (WIDTH)
W WIRE
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER CLOSET
WC WATER COLUMN
WD WASTE DRAIN
WD WOOD
WD BLKG WOOD BLOCKING
WD DR WOOD DOOR
WDW WINDOW
WF WIDE FLANGE
WG WIRE GLASS
WH WALL HYDRANT
WHT WHITE
WI WROUGHT IRON
WKSH WORK SHOP
WL WIND LOAD
WNSCT WAINSCOT
WP WEATHER PROOF
WP WORK POINT
WPF WATER PROOF
WPFG WATER PROOFING
WRB WARDROBE
WS WASTE STACK
WT WEIGHT
WWF WELDED WIRE FABRIC
WWM WOVEN WIRE MESH
XFMR TRANSFORMER
YD YARD or YARD DRAIN
LBS POUNDS
LD LOAD
LDG LOADING
LE LEFT END
LG LENGTH (LONG)
LIN LINEAR
LIS LAWN IRRIGATION
SYSTEM
LL LIVE LOAD
LLBB LONG LEG BACK TO BACK
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LNTL LINTEL
LP LOW POINT
LPG LIQUIFIED PETROLEUM
GAS
LPS LOW PRESSURE STEAM
LR LIVING ROOM
LS LAWN SPRINKLER
LT LIGHT
LT WT LIGHT WEIGHT
LTG LIGHTING
LVT LUXURY VINYL TILE
M MIDDLE
M THOUSAND
M & B MATCHED AND BEADED
MA MAKE-UP AIR
MACH MACHINE
MAS MASONRY
MAT or
MATL
MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MBH 1000 BTUH
MC MEDICINE CABINET
MC MISCELLANEOUS
CHANNELS
MECH MECHANICAL
MER MECHANICAL EQUIPMENT
ROOM
MET METAL
MFG MANUFACTURING
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
ML METAL LATH
MLDG MOULDING
MO MASONRY OPENING
MONO MONOLITHIC
MT METAL THRESHOLD
MTD MOUNTED
N NORTH
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL
CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS
ASSOCIATION
NFPA NATIONAL FIRE
PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NO NUMBER
NR NOT REQUIRED
NS NEAR SIDE
NTS NOT TO SCALE
OA OUTSIDE AIR
OB WG OBSCURE WIRE GLASS
OBGL OBSCURE GLASS
OBSC OBSCURE
OC ON CENTER(S)
OCEW ON CENTER EACH WAY
OD OUTSIDE DIAMETER
OFF OFFICE
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
OPS OPERATIONS
OS & Y OUTSIDE SCREW & YOKE
OSF OUTSIDE FACE
OV OVERFLOW VALVE
OX OXYGEN
OZ OUNCE
P PAINT
PA PUBLIC ADDRESS
PBS PUSH BUTTON STATION
PC PIECE
PC POINT OF CURVATURE
PC PRECAST
PCC PORTLAND CEMENT
CONCRETE
PCT PORCELAIN CERAMIC TILE
PD PRESSURE DROP
PE POLYETHYLENE
PEN PENETRATION
PERF PERFORATED
PH PHASE
PHAR PHARMACY
PI POINT OF INTERSECTION
PIV POST INDICATING VALVE
PL or P PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLATF PLATFORM
PLBG PLUMBING
PLG PILING
PLWD PLYWOOD
PNL PANEL
POL POLISH(ED)
PORC PORCELAIN
PPM PARTS PER MILLION
PR PAIR
PREFAB PREFABRICATED
PREFIN PREFINISHED
PRESS PRESSURE
PROJ PROJECT
PRV PRESSURE REGULATING
VALVE
PS PRESSED STEEL
PSFT POUNDS PER SQUARE
FOOT
PSI POUNDS PER SQUARE
INCH
PT POINT
PT POINT OF TANGENCY
PTD PAINTED
PTN PARTITION
PVC POLYVINYL-CHLORIDE
PVMT PAVEMENT
PW PASS WINDOW
1/4 RD QUARTER ROUND
QT QUARRY TILE
QT QUART
QTRS QUARTERS
QTY QUANTITY
QTZ QUARTZ
R REGISTER
R RISER
RA RETURN AIR
RAD OR
R
RADIUS
RB RESILIENT BASE
RC REMOTE CONTROL
RCP REINFORCED CONCRETE
PIPE
RD ROOF DRAIN
RE RIGHT END
REC RECEIVER
RECP RECEPTACLE
RECR RECREATION
RECT RECTIFIER
REF REFERENCE
REFR REFRIGERANT
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCEMENT
REM REMOVE(ABLE)
REQD REQUIRED
RESIL RESILIENT
REV REVISIONS
RFG ROOFING
RH RELATIVE HUMIDITY
RL REFRIGERANT LIQUID
RM ROOM
RND ROUND
RO ROUGH OPENING
RPM REVOLUTIONS PER
MINUTE
RT RUBBER TILE
RTU ROOF TOP UNIT
RUB RUBBER
DIAG DIAGONAL
DIM DIMENSION
DIP DUCTILE IRON PIPE
DISC DISCONNECT
DIST DISTRIBUTION
DL DEAD LOAD
DMPR DAMPER
DN DOWN
DP DAMP PROOFING
DPT DEW POINT
DR DOOR
DRN DRAIN
DS DOWN SPOUT
DV DENTAL VACUUM
DWG DRAWING
DWLS DOWELS
DX DIRECT EXPANSION
E EAST
EA EACH
EA EXHAUST AIR
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY
RATIO
EJ EXPANSION JOINT
EL OR
ELEV
ELEVATION - GRADE OR
BUILDING
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
ENCL ENCLOSURE
ENT ENTERING
ENT ENTRANCE
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
EST ESTIMATE
EVAP EVAPORATOR
EW EACH WAY
EWC ELECTRIC WATER
COOLER
EXC EXCAVATE
EXD EXIT DEVICE
EXH EXHAUST
EXIST EXISTING
EXP EXPOSED
EXPL EXPLOSION
EXPN EXPANSION
EXT EXTERIOR
F FAHRENHEIT
F FIRE
FA FRESH AIR
FCG FACING
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEB FIRE EXTINGUISHER
BRACKET
FEC FIRE EXTINGUISHER
CABINET
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH
FIX FIXTURE
FL or FLR FLOOR
FLASH FLASHING
FLEX FLEXIBLE
FLG FLANGE
FLG FLOORING
FLUOR FLUORESCENT
FP FIRE PROTECTION
FPM FEET PER MINUTE
FPRF FIRE PROOF
FR FRAME
FRG FURRING
FS FAR SIDE
FS FLOOR SINK
FS FULL SIZE
FT FEET (FOOT)
FTG FOOTING
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G GRILLE
G NATURAL GAS
GA GAGE OR GAUGE
GAL GALLON
GALV GALVANIZED
GEN GENERAL
GFE GOVERNMENT FURNISHED
EQUIPMENT
GFE/CI GOVERNMENT FURNISHED
EQUIPMENT/CONTRACTOR
INSTALLED
GFI GROUND FAULT
INTERRUPTER
GI GALVANIZED IRON
GL GLASS
GND GROUND
GOVT GOVERNMENT
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GRADE
GRS GALVANIZED RIGID STEEL
CONDUIT
GRTG GRATING
GSU GLAZED STRUCTURAL
UNITS
GWB GYPSUM WALLBOARD
GWT GLAZED WALL TILE
GYP GYPSUM
H or HT HEIGHT (HIGH)
HB HOSE BIBB
HBD HARDBOARD
HC HANDICAPPED
HD HEAD
HDPE HIGH DENSITY
POLYETHYLENE
HDR HEADER
HDW HARDWARE
HIP HIGH PRESSURE
HM HOLLOW METAL
HORIZ HORIZONTAL(LY)
HP HORSE POWER
HPS HIGH PRESURE STEAM
HPT HIGH POINT
HR HOUR
HS HIGH STRENGTH
HSGYP HIGH STRENGTH GYPSUM
PLASTER
HTG HEATING
HTR HEATER
HW HEAD WALL
HW HOT WATER
HWH HOT WATER HEATER
HWR HOT WATER RETURN
(HEATING)
HWS HOT WATER SUPPLY
(HEATING)
HYD HYDRAULIC
I or FE IRON
IC INTERCOM
ID INSIDE DIAMETER
IE INVERT ELEVATION
IES ILLUMINATING
ENGINEERING SOCIETY
IN INCH
INSUL INSULATION
INT INTERIOR
INV INVERT OR INVERTER
IP IRON PIPE
ISF INSIDE FACE
JB JUNCTION BOX
JBOX JUNCTION BOX
JC JANITOR CLOSET
JCT JUNCTION
JST JOIST
JT JOINT
K KEY
KCP KEENE'S CEMENT
PLASTER
KIP or K KILOPOUND (1000 LBS)
KIT KITCHEN
KL KEY LOCK
KP KICK PLATE
KV KILOVOLTS
KVA KILOVOLT AMPERES
KW KILOWATT
LAB LABORATORY
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
A COMPRESSED AIR
A/C AIR CONDITIONING
AB ANCHOR BOLT
ABS ACRYLONITRILE BUTAD
STYRENE
AC ALTERNATING CURRENT
ACI AMERICAN CONCRETE
INSTITUTE
ACSR ALUMINUM CONDUCTOR
STEEL REINFORCED
ACST ACOUSTIC
AD ACCESS DOOR
AD AREA DRAIN
ADMIN ADMIN ADMINISTRATION
(IVE)
AFF ABOVE FINISH FLOOR
AFFF AQUEOUS FILM FORMING
FOAM
AGG AGGREGATE
AHU AIR HANDLING UNIT
AI AREA INLET
AIC AMPS INTERRUPTING
CAPACITY (SYM RMS)
AISC AMERICAN INSTITUTE OF
STEEL CONSTRUCTION
AL ACTIVE LEAF
AL ALUMINUM
ALT ALTERNATE
AMP AMPERE
ANSI AMERICAN NATIONAL
STANDARDS INSTITUTE
AP ACCESS PANEL
APD AIR PRESSURE DROP
APPD APPROVED
APPROX APPROXIMATE
ARCH ARCHITECTURAL OR
ARCHITECT
ARI AMERICAN
REFRIGERATION
INSTITUTE
ASB ASBESTOS
ASPH ASPHALT
APC ACOUSTICAL PANEL
CEILING
AUTO AUTOMATIC
AV ACID VENT
AVG AVERAGE
AW ACID WASTE
AWC ACOUSTICAL WALL
COVERING
AWG AMERICAN WIRE GAUGE
L ANGLE
BATT BATT INSULATION
BB BULLETIN BOARD
BBO BOILER BLOW OFF
BC BOOKCASE
BD BOARD
BDY BOUNDARY
BEJ BRICK EXPANSION JOINT
BIT BITUMINOUS
BKR BREAKER
BL BUILDING LINE
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM
BM BENCH MARK
BO BOTTOM OF
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRK BRICK
BRKT BRACKET
BS BOTH SIDES
BTU BRITISH THERMAL UNIT
BTUH BTU PER HOUR
BUR BUILT-UP ROOFING
BW BOTH WAYS
C CENTER
C OR
CND
CONDUIT (ELECTRICAL
SHEETS)
C TO C CENTER TO CENTER
CAP CAPACITY
CB CATCH BASIN (OR CIRCUIT
BREAKER)
CC CENTER TO CENTER
CCT CIRCUIT
CD CONDENSATE DRAIN
CE COVER ELEVATION
CEM CEMENT
CF CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CHIM CHIMNEY
CI CAST IRON
CI CURB INLET
CIP CAST IN PLACE
CIR CIRCULAR
CJ CONTROL JOINT
CKT CIRCUIT
CL CENTER LINE
CL WG CLEAR WIRE GLASS
CLG CEILING
CLKG CAULKING
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY
UNIT
CNTR COUNTER
CO CLEAN OUT
CO2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION
COMB COMBUSTION
COMP COMPRESSIBLE
COMPR COMPRESSOR
CONC CONCRETE
CONF CONFERENCE
CONN CONNECTION
CONSTR CONSTRUCTION
CONSTR
JT
CONSTRUCTION JOINT
CONT CONTINUOUS
(CONTINUATION)
CONTR CONTRACTOR
COR CORNER
CORR COVERED
COV CORRIDOR
CPL CEMENT PLASTER
CPS CYCLES PER SECOND
(HERTZ)
CPT CARPET
CR CONDENSER WATER
RETURN
CRES CORROSIVE RESISTANT
STEEL
CRG CARRIAGE
CRSE COURSE
CS CONDENSER WATER
SUPPLY
CS COUNTER SINK
CSMT CASEMENT
CT CERAMIC TILE
CT CURRENT TRANSFORMER
CTL CARPET TILE
CU CONDENSING UNIT
CU YD CUBIC YARDS
CUH CABINET UNIT HEATER
CV CEILING VENT
CW COLD WATER
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
CYL CYLINDER
D DEPTH (DEEP)
D DIFFUSER
d PENNY (as in nail - 10d)
D&M DRESSED AND MATCHED
DA DOUBLE ACTING
DB DRY BULB
dB DECIBEL
DBL DOUBLE
DC DIRECT CURRENT
DCJ DOWELED CONTROL
JOINT
DCJT DUMMY CONTROL JOINT
DCL DOOR CLOSER
DCW DOMESTIC COLD WATER
DEG DEGREE
DEMO DEMOLITION
DEPR DEPRESSION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DHW DOMESTIC HOT WATER
DI DEIONIZED WATER
DIA DIAMETER
CLO CLOSET
FR FIRE RATED
U/C UNDER CABINET
SYMBOL LEGEND
PLAN VIEW
SECTION / ELEVATION VIEW
SHEAR WALL
MASONRY-CMU
CONCRETE
GRAVEL
EARTH / COMPACTED
EARTH /
NONCOMPACTED
RIGID INSULATION
JOINT FILLER
STEEL
GYPSUM
MASONRY-VENEER
STUD WALL
FLEXIBLE INSULATION
GROUT
PLYWOOD
WOOD (FINISH)
MASONRY-CMU FACE
MASONRY-CMU
MASONRY-VENEER
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 - Division 01 Short Form General Requirements Section 01 78 00 - Closeout Submittals
DIVISION 04 – CONCRETE
Section 03 30 00 Cast-in-Place Concrete
DIVISION 08 – OPENINGS
Section 08 14 16 Flush Wood Doors Section 08 71 00 Door Hardware
DIVISION 09 – FINISHES
Section 09 21 16 Gypsum Board Assemblies Section 09 30 00 Tiling
DIVISION 10 – SPECIALTIES
Section 10 21 13 Metal Toilet Compartments Section 10 28 00 Toilet Accessories
DIVISION 23 HVAC
Section 23 31 13 Metal Ducts Section 23 33 00 Air Duct Accessories Section 23 32 23 HVAC Power Ventilators
DIVISION 26 ELECTRICAL
Section 26 05 00 Common Results Section 26 05 19 Low-Voltage Power and Control Conductors and Cables Section 26 05 33 Aboveground Raceways and Boxes Section 26 09 23 Lighting Control Devices Section 26 27 26 Wiring Devices Section 26 28 13 Fuses Section 26 28 16 Enclosed Switches Section 26 29 13.03 Manual and Magnetic Motor Controllers Section 26 51 19 LED Interior Lighting
SECTION 01 10 00
DIVISION 1 SHORT FORM GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1 - DESCRIPTION OF WORK
1.1 Background: This project is at Fort Scott National Historic Site Infantry Barracks - HS-6. The scope covers upgrades to the mechanical system and revisions to the restrooms to provide ABA compliance. This building houses the park’s main event center, largest bathrooms and the living history clothing
1.2 Work Covered by the Contract Documents:
A. Project Location: 199 Old Fort Blvd, Fort Scott, KS 66701
B. Work consists of: This work will also include revisions to both men’s and women’s stalls for improved efficiency and ABA compliance. Approximately 550 SF Remodel existing Men and Women restrooms to provide a minimum of one ABA and two standard toilet compartments for each. Provide three laves each sex. This contract will remove and replace four air handlers/Furnaces, four heat pumps/condensing units with their line sets and electrical components. These units are located in the Infantry Barracks (HS-6).
C. All work will be performed under a single contract.
D. Period of performance: Work shall be completed within 120 calendar days of the start date provided on the Notice to Proceed.
a. Clarification: The Notice to Proceed will be issued with a period of performance that is all inclusive of supply lead times, material deliveries, decommissioning, installation, anticipated average weather days for location, final commissioning, and acceptance of completed work. The contractor will be expected to provide a project schedule with adequate critical path details to ensure all work is completed within the stated calendar days from issuance of the Notice to Proceed. If weather impacts project beyond typical average weather patterns, contractor shall provide documentation in request for additional days.
1.3 Existing Condition Protections:
A. Preservation of Historical and Archeological Fabric:
a. The Historic and Archeological Data Preservation Act of 1974 provides for the preservation of historical and archeological data that might otherwise be lost as the result of alterations to the terrain caused by a federal or federally licensed activity or program.
b. IF, in connection with operations under this contract, the Contractor, subcontractors, or employees of any of them, discovers, encounters or becomes aware of any possible historical or archeological remains or data, objects or sites of cultural value on the project area, such as historical ruins, graves or grave markers, fossils, or artifacts not specifically noted within the contract. The Contractor shall immediately suspend all operations in the vicinity and continue work in other areas outside a 50 foot radius of discovery and notify the Contracting Officer immediately. When safe to do so, follow up in writing with photographs within 2 days, giving the location and nature of the findings. No objects of cultural resource value may be removed. Contracting Officer will contact other entities as required.
c. Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with Changes clause.
d. The Contractor will be responsible for protecting the cultural resources within and adjacent to the project area from damage. In addition, the Contractor will be liable for all damage to the cultural resources caused by their actions or the actions of their agents or representatives. The Contractor shall immediately notify the Contracting Officer or their representative if any damage occurs to any cultural resource and immediately suspend work in the area in which damage has occurred until authorized to proceed.
e. The Contractor agrees to include this language within all subcontracts.
B. The structure involved in the work of this Contract is a designated historic structure listed in the National Register of Historic Places. Every precaution shall be taken by the Contractor to prevent damage to existing historical materials, structural components of the building and to the surrounding area. Should any damage be incurred as a result of the Contractor’s operations at the site, it shall be repaired, or the damaged materials replaced in kind by the Contractor to the satisfaction of the Contracting Officer at no additional expense to the Government.
C. Protection of Landscaping and Surrounding Structures: No disturbance is anticipated.
All Ground Disturbance at this project shall have oversite by an Owner provided Archeologist. Coordinate schedules as required. The Contractor shall take all necessary measures to provide protection for all trees, fencing, walks and other landscape features and surrounding structures near the work site as noted with the contract. Any such surrounding features damaged, scarred or broken as a result of the Contractor’s operations at the site outside of agreed upon documented extents, shall be treated, repaired or replaced in kind to the satisfaction of the Contracting Officer at no additional expense to the Government.
ITEM 2 – PROTECTING EXISTING UTILITIES
2.1 Protecting Existing Utilities: Notify Contracting Officer (CO), Contracting Officer’s Representative (COR) and utility companies as required to request location services prior to and to coordinate any excavation/digging operations, and/or for demolition if within Scope of Work.
2.2 Contractor shall be responsible for locating and preventing damage to known utilities on site or indoors. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the Government. If damage occurs to an unknown utility, contact CO and COR as soon as safely possible.
2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated below:
A. Notify CO and COR not less than two business days in advance of proposed utility interruptions.
B. Hours for Utility Shutdowns: Shutdowns shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance or if required for critical systems as determined by COR.
ITEM 3 - CONTRACTOR’S USE OF PREMISES
3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.
https://www.nps.gov/fila/learn/management/superintendents-compendium.htm
A. Communications: Contractor shall provide the Contracting Officer and COR with methods of communications including land and/or cell phone numbers (note some areas of work have limited service coverage), email and in case of emergency 24-hour contact options for duration of time operations.
B. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
C. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.
D. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public.
3.2 On-site work hours: Work shall be generally performed during normal business working hours of 7 a.m. to 3:30 p.m., Monday through Friday, except when otherwise indicated. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.
The following Federal holidays are observed by the National Park Service:
New Year’s Day Inauguration Day Martin Luther King, Jr’s Birthday Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
• Note: Any of the above holidays falling on a Saturday will be observed on the preceding Friday; holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is recognized for each year can be found at the following site: Federal Holidays (opm.gov).
3.3 Contractor Use of Site:
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area as shown on site plan. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
Schedule deliveries to minimize use of driveways and entrances.
C. Contractor shall not disturb areas outside the defined project work limits. Site disturbance requirements related to earthwork, vegetation clearing, turf matting, and soil compaction remediation are not anticipated for this project; however, if such disturbance becomes necessary, the Contractor shall obtain prior approval from the NPS before proceeding
D. Utilities
a. General: Cost or use charges for temporary facilities shall be included in the
Contract Sum as required.
b. Water Service: Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water.
c. Electric Power Service: Electric power from existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Power may or may not meet your construction power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.
d. Sanitary Operations:
1. Contractor shall be able to use the existing park restroom facilities, specific location to be discussed during the preconstruction meeting. The restroom facilities shall be kept in immaculate condition. At the discretion of Park personnel and/or COR; contractor may lose the use of the restroom facilities if they are not kept clean and orderly. Restroom use will be a “One strike and you’re out” policy. If restroom privileges are revoked Contractor will be required to provide a toilet for contracting personnel, sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible (if required), sturdy enclosures with privacy locks. Coordinate with COR for approved location.
2. Waste Removal / Recycling: Contractor must provide dumpster for waste removal. Contractor is responsible for removing all waste created by the project.
E. Security and Protection facilities:
a. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
b. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area. Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material.
Disassembly of equipment components or specialized inspection tools are not required.
c. Tree and Plant Protection is not required for this project.
d. Pest Control: Follow best practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at project completion. Perform control operations lawfully, using environmentally safe materials.
e. Temporary Enclosures: Provide and maintain temporary enclosures such as snow fence as required for protection of construction in progress and from access by visitors or staff, other construction operations, and similar activities.
f. Storage - Staging Areas: Contractor shall confine storage of materials and equipment to areas approved by the Park. No project staging areas are shown on the plans. The Contractor shall propose storage locations for review and approval during the preconstruction briefing. Any storage units provided by the Contractor shall be clean, in acceptable condition to the COR, and maintained in a secure manner. The Contractor is responsible for the security of all materials and equipment on site
3.4 Storage - Staging Areas:
A. Confine Storage of materials and equipment to the project staging area noted on the plans/aerial. Specific storage units shall be provided by the contractor and exact location within staging area shown in appendix A below may be discussed at the preconstruction briefing. All storage units provided by the contractor shall be in a clean and acceptable condition to the COR. Security of the materials and equipment on site is the Contractor’s responsibility.
3.5 Preservation of Natural Features: N/A
3.6 Hauling Restrictions: Contractor shall verify and be responsible for the path accessing the site and obtaining / maintaining all local, state and federal permits/licenses associated with hauling/road requirements and dumping of materials associated with the project.
3.7 Waste Removal, Recycling, and General Housekeeping:
A. Keep project site in a neat, orderly, and safe condition at all times.
1. Contractor is responsible for providing dumpsters for waste and recycling and for removing all waste created by the project. Contractor shall recycle to the highest degree possible and empty dumpsters as necessary to avoid debris on site. Coordinate with COR for approved dumpster locations prior to commencing construction.
2. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters.
3. Address Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use sustainable methods to the extent possible during this project, recycling material as much as possible within local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.
4. For all waste and recycling removals offsite, contractors shall provide estimates and/or tickets to quantify material weights and report back to the park, submit to COR for review and record filing.
3.8 Occupancy Requirements for Buildings:
A. Existing Buildings:
1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage.
Perform the Work so as not to interfere with Government's day-to-day operations.
Maintain existing exits, unless otherwise indicated.
B. New /Existing Buildings Unoccupied:
1. Contractor shall be responsible for and protect the entire facility and construction site from notice to proceed through final acceptance.
3.9 Photo Documentation:
A. Contractor must provide existing condition, progress, and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted preferably electronically by email or optional via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.
B. Existing Condition Images:
1. Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic.
Include existing items to remain or be salvaged from different vantage points and with context for location identification.
C. Construction Progress Images:
1. Document all sub-surface work/ trenches etc. prior to backfill with photos covering enough overall field view to show location and then zoom in for details. (Locations and dimensions shall also be noted on as built drawing set.)
2. Maintain organized index for photos with date, description, etc.
3. Additional images as needed when questions or emergency situations occur.
Submit within 24 hours.
D. Completion Images:
1. Document all completed work within scope of work.
2. Maintain organized index for photos with date, description, etc..
3. Additional images as needed when questions or emergency situations occur.
Submit within 24 hours.
3.10 Fire and Life Safety:
A. As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.
B. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.
C. Store and handle hazardous materials in accordance with manufacturers and OSHA 29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
1. Immediately report all spills of hazardous materials to the CO, COR, and park.
2. Maintain a spill emergency response kit.
3. Train employees how to respond to a spill and use the emergency response kit.
3.11 Noise and Acoustics Management
A. Contractor shall not have personal radios or other media sources and they shall not be broadcast within NPS property.
B. Noise Control: Perform operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week as directed by the Contracting Officer or COR.
C. Repetitive and/or intermittent, high-level noise: Permitted only during Daytime.
a. Do not exceed the following dB(A) limitations at 50 feet:
ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.
Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.
ITEM 5 - EXAMINATION OF THE SITE
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.
Contractors will be accountable for understanding existing conditions. No cost changes for items visible during site visit will be allowed.
ITEM 6 - ABBREVIATIONS
6.1 The list of abbreviations, standards and organizations which may be used in/referred within the Construction Specifications or Special Provisions, may be found linked from the listed page below.
On the home page, follow the link under “Contracting and Procurement” labeled “NPS Reference Standards.” https://www.nps.gov/orgs/1671/do-business-with-us.htm
ITEM 7 - ACCIDENT PREVENTION
7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.
7.2 Submittals:
A. Accident Prevention (Safety) Plan (APP): Submit a site-specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:
1. Name and qualifications of responsible supervisor to carry out the program.
2. First aid and rescue procedures.
3. Training, both initial and continuing.
4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample JHA template may be provided upon request.
5. Planning for possible emergency situations, such as cave-ins, earthquake, explosions, fires, floods, power outages, slides, and windstorms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.
6. Contractor to identify nearest location of medical facility for emergencies
7. Recognition that works will be performed in remote areas with limited communication or cell phone coverage if applicable.
8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.
B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.
7.3 Qualification of Employees:
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.
7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.
7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA 29CFR 1926 Subpart E.
B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.
C. All PPE will be serviceable at all times. At a minimum, maintain 2 sets of PPE including hard hats and all other Accident Prevention Plan required equipment.
7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state, and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.
A. If a spill, leak, or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the local 911 Emergency Response, COR and or the National Park Service Emergency Dispatch.
ITEM 8 - PRECONSTRUCTION CONFERENCE
8.1 If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed. See Item 9.1C below.
ITEM 9 - SUBMITTALS
9.1 General Contracting Submittal Procedures:
A. General: Prepare and submit submittals required by individual Technical Specification Sections. Types of submittals are indicated in individual specific sections.
1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR
B. Submittal List: administrative required submittals are listed below in 9.1.C and does not include technical section submittal requirements included in each technical section.
C. Preconstruction Conference Submittal: Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10 calendar days of Notice of Award. The following items are to be submitted prior to the Preconstruction Conference or as specified at the CO’s discretion. The timeline for the documents to be submitted will be addressed at the pre-construction conference for those items that were not received and approved prior. Notice to Proceed may not be issued, and the Contracting Officer will consider other contractual remedies if not resolved as directed. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference:
1. Letter designating Project Superintendent.
2. Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention (Safety) Plan (see section 7 of this document).
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).
7. Quality Control Plan.
8. Waste Management Plan. Required
9. Temporary Storm Water Pollution Prevention Plan (SWPPP or UPPP) Submitted to AHJ (Authority Having Jurisdiction).
10. Indoor Air Quality (IAQ) Management Plan. Required
11. Contractors Commissioning Plan. Required
12. Historic Preservation Treatment Plan Submitted to AHJ (Authority Having
Jurisdiction). Required
13. List of Construction Permits. Include the following information for each permit:
Required
a. Name of Permit.
b. The Agency(ies) with Jurisdiction issuing the permit.
c. Information required from the Government to complete the permit application.
9.2 Project Submittal Process (Shop Drawings, Product Data, and Samples): Contracting Officer will provide sample cover sheet and a list of required submittals is included in each technical specification or attached at the end of this document.
A. Shop Drawings: Indicate all coordinating materials and work impacting the installation coordination, connection details, anchorage requirements, hardware locations, and installation details and locations.
1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.
B. Product Data: Provide component construction and specification data sheets, anchorage requirements and any other product specific data.
2. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.
C. Samples: Submit 2 color samples 4” x 6” minimum in size for all product color selections. Paint samples shall be actual paint finish drawdown for all project colors.
3. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one…