This is a construction design specification document for a ramp extension and landings project, presented as an architectural floor plan drawing. The document outlines the structural requirements for new ramp and landing construction at Padre Island National Seashore Park's cabin facility.
The project specifications include the installation of multiple landings (Landing #2 through Landing #7) with defined structural components: 2x12 beams lag-screwed to 6x6 posts using either two A307 5/8" diameter by 4" lag screws or three 5/16" by 4" GRK structural screws rated for treated wood; minimum 2x8 joists spaced 16" on center; and 2x6 deck boards for the ramp surface. Hand rail requirements specify 4x4 posts lag-screwed to rim joists with 2x4 top, middle, and bottom rails, with the top cap positioned at least 36" minimum in height from the deck board. Additional specifications include ramp and stair tread widths of 46"-48", a ramp slope of 1.5" per foot, an aluminum ramp component, and pressure blocking at connection points with face nailing using 10 penny HD nails. The document references existing ramp and landing conditions shown in Attachment 1 "Pais Cabin 1.25.23 - As Built" drawings and indicates that Landing #7 shall terminate approximately 2 feet above grade, with grade elevation maintenance as the park's responsibility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B12_MISC_Site_Visit_Sign-In_Sheet_0002.pdf | ||
| B12_MISC_QA_0002.docx | DOCX document | |
| Sol_140P6026Q0029_Amd_0002.pdf | ||
| Sol_140P6026Q0029_Amd_0001.pdf | ||
| B08_Solicitation_-_Att_1_-_Specifications.docx | DOCX document | |
| Sol_140P6026Q0029.pdf | ||
| B08_Solicitation_-_Att_3_-_DOL_Wage_Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING RAMP AND LANDING SHOWN
REFER TO "ATTACHMENT 1 PAIS CABIN
1.25.23 - AS BUILTS" FOR DOWN ISLAND
CABIN AS BUILT DRAWINGS
Hand rails shall be supported by 4x4 posts lag screwed to the rim joists with (2) 5" a307 lag screws min. 1/4" diameter or equivalent performing structural screws. 4x4 to prevent excess deflection of rails. 4x4 columns shall extend at least 4" onto rim joists.
Hand rails shall consist of 2x4 top, middle and bottom rail. Top cap should be 36" minimum in height from deck board.
Hand rail not shown but shall be installed as instructed above.
RAMP
TYP
Landing #1
Stairs
Landing #3
Landing #4
2x12 beams to be lag screwed to 6x6 posts with a minimum.
of either:
6X6, TYP.
(2) a307 5/8" diam. x 4" lag screws, or
(3) 5/16"x4" GRK structural screws rated for treated wood typical minimum 2x8 joists 16" o/c; typ.
Other Notes:
Ramp and stair tread shall be 46"- 48" in width.
Ramp slope shall be 1.5" per foot.
Ramp landing #7 shall terminate approximately 2ft above grade.
Grade elevation shall be the responsibility of the park to provide and maintain.
Pressure blocking shall be used where stringers hang on ledgers or rim joists/beams. Pressure blocks shall be face nailed with min. (10) 3" HD nails, per connection type
Landing #2
10x10 piling, RAMP EXTENSION AND LANDINGS
2x6 deck boards, typ
Landing #6
Landing #5
Landing #7
ALUMINUM RAMP
NEW RAMP AND
LANDINGS SHOWN
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
FLOOR PLAN
AutoCAD SHX Text
RAMP EXTENSION
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text
FLECK N.
AutoCAD SHX Text X
AutoCAD SHX Text
04DEC2024
AutoCAD SHX Text
PADRE ISLAND NATIONAL SEASHORE
AutoCAD SHX Text
PAIS
AutoCAD SHX Text X
AutoCAD SHX Text A1
| Sheets and Views |
| RAMP EXT |
File details come from the government source that posted it. Updated .