CONSTRUCTION DRAWINGS
RECOMMENDED:
APPROVED:
DATE
NPS PMIS NO: 254306 THRO DRAWING NUMBER 2020-08
SHEETPKG. NO.
TITLE OF DRAWING DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
REVISIONS
NORTH UNIT PAVED WALKWAYS
21OF
LOCATION WITHIN PARK
NAME OF PARK
REGION
REGION 5 - MISSOURI BASIN
COUNTY
MCKENZIE
STATE
NORTH DAKOTA
OXBOW OVERLOOKUNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
THEODORE ROOSEVELT NATIONAL PARK
MARK SHEET DATE INITIALS
PROJECT MANAGER
SUPERINTENDENT DATE
SOUTHWESTERN NORTH DAKOTA
INDEX TO SHEETS
TITLE OF SHEETSUB SHEETSHEET NUMBER
1 N/A COVER SHEET
2 G1 GENERAL PROJECT, REMOVAL, AND REHABILITATION NOTES
3 C1 OXBOW OVERLOOK PARKING AREA EXISTING SITE PLAN
4 C2 OXBOW OVERLOOK PARKING AREA REMOVAL PLAN
5 C3 OXBOW OVERLOOK PARKING AREA PROPOSED SITE PLAN
6 C4 OXBOW OVERLOOK PARKING AREA VAULT TOILET DETAILS
7 C5 OXBOW OVERLOOK WALKWAY OVERLOOK DETAILS
8 C6 CONCRETE WALKWAY DETAILS
9 C7 TYPICAL STEEL PARK BENCH DETAILS
10 - 11 C8 - C9 OXBOW OVERLOOK WALKWAY VERTICAL PROFILES
13 V2
THIS DRAWING PACKAGE IS INCLUSIVE TO THE GENERAL REQUIREMENTS
SPECIFICATION SECTION 01-10-00. REFER TO GENERAL REQUIREMENTS FOR
ADDITIONAL INFORMATION ON WALKWAY MATERIAL AND INSTALLATION
TOLERANCES.
THEODORE ROOSEVELT NATIONAL PARK
(NORTH UNIT)
0 25 50 75 100 Miles
175102
SURVEY CONTROL COORDINATE DATA
WALKWAY ALIGNMENT GEOMETRY/LAYOUT DATA
14 204 STANDARD SPECIFICATIONS FOR SUBGRADE PREPARATION
15 302 STANDARD SPECIFICATION AGGREGATE BASE/SURFACE COURSE
16 -20 501 STANDARD SPECIFICATION PORTLAND CONCRETE PAVEMENT
601 STANDARD SPECIFICATION CONCRETE SIDEWALKS/WALKWAYS
V1
PROJECT AREA
OXBOW OVERLOOK
1. CONTRACTOR RECEIVING AWARD SHALL FIELD VERIFY ALL CONDITIONS AND MEASUREMENTS PRIOR TO COMMENCING WORK.
2. PROJECT AREA IS LOCATED APPROXIMATELY FOURTEEN (14) MILES FROM INTERSECTION WITH U.S. HIGHWAY 85 (PARK ENTRANCE).
3. ALL QUANTITIES NOTED WITHIN THIS PLAN SET ARE APPROXIMATE, AND PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL QUANTITIES PRIOR TO SUBMITTING A BID OR COMMENCING CONSTRUCTION.
4. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION LAYOUT AND STAKING REQUIRED TO COMPLETE THE CONTRACTED WORK.
5. STAGING AREAS ADJACENT TO PROJECT AREA WILL BE IDENTIFIED DURING PRECONSTRUCTION MEETING.
6. THE CONTRACTOR IS RESPONSIBLE FOR HARDENING ANY EXISTING PAVEMENT, CONCRETE SURFACES, OR BUILDINGS TO PROTECT AGAINST DAMAGE OCCURRING DUE TO ACCESS TO THE PROJECT WORK AREA, MATERIAL STORAGE, REMOVAL, OR CONSTRUCTION ACTIVITIES.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING NATIONAL PARK SERVICE INFRASTRUCTURE DUE TO PROJECT ACCESS, MATERIAL STORAGE, OR CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL COORDINATE ALL REPAIRS WITH THE PROJECT C.O.R., AND REPAIR ALL DAMAGE PRIOR
TO THE COMPLETION OF THE CONTRACTED WORK.
8. THE NATIONAL PARK SERVICE SHALL APPROVE THE FINAL HORIZONTAL, VERTICAL PROFILE, SUBGRADE PREPARATION, AND FORM-WORK PRIOR TO THE
LAYING OF CONCRETE.
9. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS, TRASH, AND MATERIALS FROM PARK PROPERTY RELATED TO THE CONSTRUCTION PROJECT.
THE USE OF PARK TRASH CONTAINERS IS NOT PERMISSIBLE. THE CLEANING OF EQUIPMENT WILL BE CONDUCTED OFF PARK PROPERTY DUE TO
ENVIRONMENTAL CONCERNS.
10. ALL SECURITY AND PROTECTION OF THE CONTRACTOR'S EQUIPMENT AND MATERIALS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE GOVERNMENT WILL NOT BE LIABLE FOR DAMAGE OR THEFT OF CONTRACTOR'S TOOLS OR EQUIPMENT IF STAGED ON THE GROUNDS OF THE NATIONAL
PARK.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PUBLIC SAFETY WHEN CONDUCTING WORK ADJACENT TO PUBLICLY ACCESSED AREAS. PROTECTION MAY INCLUDE BUT ARE NOT LIMITED TO BARRICADES, CONSTRUCTION FENCING, SIGNAGE OR A DEDICATED INDIVIDUAL TO MONITOR AND DIRECT WHEN THE PUBLIC IS PRESENT ADJACENT TO ACTIVE WORK AREAS. THE PROJECT C.O.R. RESERVES THE RIGHT TO REQUIRE ADDITIONAL PUBLIC PROTECTION MEASURES IF CONTRACTOR PROVIDED MEASURES DEMONSTRATE A LACK OF REASONABLE PROTECTION.
12. LOCATION OF TEMPORARY SERVICES ALLOWED WITHIN THE IMMEDIATE PROJECT AREA, DUMPSTER OR SATELLITE TOILET, WILL BE IDENTIFIED BY THE PROJECT C.O.R. DURING THE PRE-CONSTRUCTION MEETING. MAINTAINING TEMPORARY SERVICES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
13. IT IS EXPECTED, ONCE THE CONTRACTOR COMMENCES WITH DISTURBANCE ACTIVITIES AT THE PROJECT AREA; THAT CONSTRUCTION ACTIVITY PERSISTS THROUGH COMPLETION. ANY PROJECT AREA WHICH REMAINS IDLE FOR A PERIOD GREATER THAN 10 CALENDAR DAYS, SHALL HAVE EQUIPMENT AND STOCKPILED MATERIALS REMOVED FROM THE PROJECT AREA. COORDINATION WITH THE PROJECT C.O.R. SHALL BE UTILIZED TO COMMUNICATE DELAYS
ASSOCIATED WITH POOR WEATHER CONDITIONS.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING THE LANDSCAPE ADJACENT TO THE PROJECT AREA FROM SEDIMENT DISCHARGE DUE TO
CONSTRUCTION ACTIVITIES.
15. THE CONTRACTOR SHALL EMPLOY SEDIMENT DISCHARGE PROTECTION DURING ALL PHASES OF CONSTRUCTION. THE CONTRACTOR SHALL BE ALLOWED TO INCORPORATE MITIGATION MEASURES WHICH CAN BE EFFICIENTLY MOVED AS WORK PROGRESSES THROUGH THE SITE, PROVIDED SUITABLE
PROTECTION IS ESTABLISHED WHERE MEASURES ARE REMOVED.
16. THE CONTRACTOR SHALL SWEEP ALL NEWLY CONSTRUCTED CONCRETE NO MORE THAN 24-HOURS BEFORE A SCHEDULED FINAL PROJECT INSPECTION.
REMOVAL NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS, TRASH, AND MATERIALS FROM PARK PROPERTY RELATED TO THE CONSTRUCTION PROJECT.
THE USE OF PARK TRASH CONTAINERS IS NOT PERMISSIBLE. THE CLEANING OF EQUIPMENT WILL BE CONDUCTED OFF PARK PROPERTY DUE TO
ENVIRONMENTAL CONCERNS.
2. REMOVE EXISTING SLABS, PAVING, CURBS, GUTTERS, AND WALKS AS INDICATED IN PLAN SET.
2.1. UNLESS EXISTING FULL-DEPTH JOINTS COINCIDE WITH THE LINE OF DEMOLITION, NEATLY SAW-CUT ALONG LINE OF EXISTING PAVEMENT TO REMAIN
BEFORE REMOVING ADJACENT PAVEMENT. SAW CUT ALL FACES VERTICALLY.
2.2. PAINT CUT ENDS OF ANY STEEL REINFORCEMENT IN CONCRETE TO REMAIN WITH TWO COATS OF ANTIRUST COATING, FOLLOWING COATING MANUFACTURER'S WRITTEN INSTRUCTIONS. KEEP PAINT OFF SURFACES THAT WILL REMAIN EXPOSED.
3. REMOVE SOD AND GRASS BEFORE STRIPPING TOPSOIL. CONTRACTOR TO IDENTIFY AND DETERMINE DEPTH OF EXISTING TOPSOIL. STRIP TOPSOIL IN A MANNER TO PREVENT INTERMINGLING WITH UNDERLYING SUBSOIL OR OTHER WASTE MATERIALS.
3.1. STOCKPILE LOCATIONS AT PROJECT AREAS WILL BE IDENTIFIED BY THE PROJECT C.O.R. DURING THE PRE-CONSTRUCTION MEETING.
3.1. STOCKPILE TOPSOIL INTERMIXING WITH SUBSOIL OR OTHER MATERIALS. GRADE AND SHAPE STOCKPILES TO DRAIN SURFACE WATER. COVER
STOCKPILE TO PREVENT WINDBLOWN DUST AND EROSION BY WATER.
3.2. DISPOSE OF SURPLUS TOPSOIL SHALL BE COORDINATED WITH THE PROJECT C.O.R.
4. REMOVE SURPLUS SOIL MATERIAL, DEMOLISHED MATERIALS, AND WASTE MATERIALS INCLUDING TRASH AND DEBRIS, AND DISPOSE OF THEM OFF
GOVERNMENT PROPERTY, ADHERING TO ALL LOCAL, STATE, AND FEDERAL REGULATIONS.
4.1. THE USE OF PARK TRASH CONTAINERS IS NOT PERMISSIBLE.
4.2. THE CLEANING OF EQUIPMENT WILL BE CONDUCTED OFF PARK PROPERTY DUE TO ENVIRONMENTAL CONCERNS.
SITE REHABILITATION NOTES
GENERAL NOTES
1. THE CONTRACTOR SHALL BACKFILL AGAINST THE SIDES OF WALKWAY PADS TO THE TOP OF THE FINISHED CONCRETE SURFACE, AND SLOPE FILL AWAY FROM THE WALKWAY AT A GRADE NO STEEPER THAN 4' HORIZONTAL TO 1' VERTICAL (4:1 MAX).
2. IMMEDIATELY PRIOR TO PLACING TOPSOIL, THE SUBGRADE SHALL BE LOOSENED BY DISKING OR SCARIFYING TO A DEPTH OF TWO INCHES TO PROVIDE
FOR THE BONDING OF THE TOPSOIL TO THE SUBGRADE.
2.1. TOPSOIL SHALL BE PLACED ON ALL REHABILITATED AREAS TO PROVIDE SOIL CAPABLE OF SUPPORTING GRASS GROWTH.
2.2. TOPSOIL SHALL BE GRADED TO DRAIN THEN MODERATELY COMPACTED BY USE OF A SOIL-ROLLER OR OTHER C.O.R. APPROVED METHOD.
2.3. IRREGULARITIES OR LOW SPOTS RESULTING FROM THE TOPSOILING OR OTHER OPERATIONS SHALL BE CORRECTED IN ORDER TO PREVENT POCKETS
WHERE WATER MAY STAND.
2.4. TOPSOIL SHALL NOT BE PLACED WHEN THE SUBGRADE IS FROZEN, EXCESSIVELY WET, EXTREMELY DRY, OR IN A CONDITION OTHERWISE DETRIMENTAL
TO THE PROPOSED PLANTINGS.
3. ALL AREAS OF DISTURBED SOIL, EITHER CUT OR FILL, SHALL BE COVERED WITH EROSION BLANKET AND STAPLED TO THE GROUND IN ACCORDANCE WITH THE EROSION BLANKET MANUFACTURER'S WRITTEN INSTRUCTIONS. A SAMPLE OF THE EROSION BLANKET SHALL BE SUBMITTED TO THE PROJECT C.O.R.
FOR APPROVAL BEFORE INSTALLATION.
4. THE NATIONAL PARK SERVICE SHALL BE RESPONSIBLE FOR SEEDING ALL AREAS DISTURBED BY THIS PROJECT.
5. ALL REPAIRS TO NATIONAL PARK INFRASTRUCTURE DUE TO PROJECT ACCESS, MATERIAL STORAGE, OR CONSTRUCTION ACTIVITIES MUST BE COMPLETED
PRIOR TO PROJECT CLOSE-OUT.
6. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS, TRASH, AND MATERIALS FROM PARK PROPERTY RELATED TO THE CONSTRUCTION PROJECT
PRIOR TO PROJECT CLOSE-OUT.
7. PRIOR TO FINAL INSPECTIONS, THE CONTRACTOR SHALL SWEEP ALL NEWLY CONSTRUCTED CONCRETE; ALSO TO INCLUDE WORK AREA ACCESS ROUTES, STAGING, AND MATERIAL STORAGE AREAS.
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
C. L. SEXTON
C. L. SEXTON
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
OF
MARCH 26TH, 2021
T. BENTLEY G1
NPS PMIS NO: 254306 THRO DRAWING NUMBER 2020-08
GENERAL PROJECT, REMOVAL,
AND REHABILITATION NOTES 2
175102
2,390
2,395
2,400
2,405
2,410
2,415
2, 2, 2, 2,3 502, 2,3 602, 2, 2, 2,3 802,3
852, 2,3 952,4
2, 2, 52,3
2,3 452,3
502, 52, 02,3
2, 02, 2,380
2,385
2,390
2,395
2,400 2,405
2,4052,400
2,410
SCENIC LOOP
DRIVE
VAULT
TOILET
TRAILHEAD
SIGN
CONCRETE
PAD
EXISTING PARKING
AREAS
UNOFFICIAL
SOCIAL TRAIL
UNPAVED
TRAIL
INFORMATION
SIGNS
ASPHALT PAVED
WALKWAY
ASPHALT PAVED
WALKWAY
CMPR
M-H
V
.12
CMPR
J-H
V
.05
CMPR
J-H
V
.48
CONCRETE
PAD
CONCRETE
PARKING STOPS
CONCRETE
PARKING STOPS
SUB SHEET NO.DESIGNED:
20 0 20 40
SCALE OF FEET
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C1
NPS PMIS NO: 254306 THRO DRAWING NUMBER 2020-08
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
OXBOW OVERLOOK
PARKING AREA
EXISTING SITE PLAN 3
21OF
INFORMATION
SIGNS (REMOVED BY NPS)
2,390
2,395
2,400
2,405
2,410
2,415
2, 2, 2, 2,3 502, 2,3 602, 2, 2, 2,3 802,3
852, 2,3 952,4
2, 2, 52,3
2,3 452,3
502, 52, 02,3
2, 02, 2,380
2,385
2,390
2,395
2,400 2,405
2,4052,400
2,410
SCENIC LOOP
DRIVE
VAULT
TOILET
EXISTING PARKING
AREAS
UNOFFICIAL
SOCIAL TRAIL
UNPAVED
TRAIL
REMOVE
CONCRETE PAD
REMOVE PAVED
WALKWAY
TRAILHEAD SIGN
(REMOVED BY NPS)
REMOVE
CONCRETE
PARKING STOPS
CMPR
M-H
V
.12
CMPR
J-H
V
.05
CMPR
J-H
V
.48
REMOVE PAVED
WALKWAY
SUB SHEET NO.DESIGNED:
20 0 20 40
SCALE OF FEET
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C2
NPS PMIS NO: 254306 THRO DRAWING NUMBER 2020-08
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
OXBOW OVERLOOK
PARKING AREA
REMOVAL PLAN 4
21OF
175102
DEMOLITION/REMOVAL NOTES
1. ALL QUANTITIES NOTED WITHIN THIS PLAN SET ARE APPROXIMATE, AND PROVIDED FOR THE
CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL
QUANTITIES PRIOR TO SUBMITTING A BID OR COMMENCING CONSTRUCTION.
2. ALL REMOVED MATERIAL, INCLUDING DEBRIS AND EXISTING BITUMINOUS MATERIAL, SHALL BECOME THE RESPONSIBILITY OF THE CONTRACTOR, AND SHALL BE DISPOSED OF OFF-SITE FOLLOWING ALL APPLICABLE LOCAL, STATE, AND FEDERAL RULES AND REGULATIONS; UNLESS COORDINATED WITH THE
PROJECT C.O.R. FOR ONSITE STOCKPILING.
3. EXISTING GARBAGE COLLECTION CONTAINER, TRAILHEAD AND INFORMATION SIGNS WILL BE REMOVED FROM SITE BY THE NATIONAL PARK SERVICE PRIOR TO THE START OF CONSTRUCTION ACTIVITIES.
4. REMOVE ASPHALT WALKWAY, ONE (1) CONCRETE TRASH CONTAINER PAD AND TWO (2) CONCRETE
WHEEL STOPS.
5. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS, TRASH, AND MATERIALS FROM PARK PROPERTY RELATED TO THIS CONSTRUCTION PROJECT. THE USE OF PARK TRASH CONTAINERS IS NOT
PERMISSIBLE.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PUBLIC SAFETY WHEN CONDUCTING WORK ADJACENT TO PUBLIC ACCESSED AREAS. PROTECTION MAY INCLUDE, BUT ARE NOT LIMITED TO BARRICADES, CONSTRUCTION FENCING, SIGNAGE OR A DEDICATED INDIVIDUAL TO MONITOR AND DIRECT WHEN THE PUBLIC IS PRESENT ADJACENT TO ACTIVE WORK AREAS. THE PROJECT C.O.R. RESERVES THE RIGHT TO
REQUIRE ADDITIONAL PUBLIC PROTECTION MEASURES IF CONTRACTOR PROVIDED MEASURES
DEMONSTRATE A LACK OF REASONABLE PROTECTION.
REMOVAL OF BITUMINOUS SURFACING 3,152 SQFT +/-
REMOVAL OF CONCRETE PAD 9 SQFT +/-
REMOVAL QUANTITIES (ESTIMATED)
REMOVAL OF CONCRETE WHEEL STOPS 2
2,390
2,395
2,400
2,405
2,410
2,415
2, 2, 2, 2,3 502, 2,3 602, 2, 2, 2,3 802,3
852, 2,3 952,4
2, 2, 52,3
2,3 452,3
502, 52, 02,3
2, 02, 2,380
2,385
2,390
2,395
2,400 2,405
2,4052,400
2,410
SCENIC LOOP
DRIVE
VAULT
TOILET
EXISTING PARKING
AREAS
UNOFFICIAL
SOCIAL TRAIL
UNPAVED
TRAIL
PC
: 0
+32 .29
PC: 1+45.02
PC: 3+24.15
PC
: 4
+3 6.
PT: 1+01.84
PT: 3+12.76
PT
: 4
+1 8.
PT: 4+56.29
CMPR
M-H
V
.12
CMPR
J-H
V
.05
CMPR
J-H
V
.48
L1
L2
L3
L4
L5
C1
C2
C3
C4
BE
GIN
NIN
G O
F P
AD
ST
ATIO
N: 1 +90
.72
C/L
OFF
SE
T:
R- 3.0
N: 2
,10 5.4
9'
E::
,18 4.1
5'
4+60
0+00
0+20
0+40
0+60
0+80
1+00
1+20
1+40
1+60
1+80
2+00
2+20
2+40
2+60
2+80
3+00
3+20
3+
3+
3+
4+ 004+
4+
ST
ATIO
N: 2 +05
.72
C/L
OFF
SE
T:
R- 7.0
N: 2
,10 4.2
8'
E::
,20 0.3
8'
ST
ATIO
N: 2 +25
.72
C/L
OFF
SE
T:
R- 7.0
N: 2
,11 1.7
8'
E:
,22 0.4
6'
EN
D O
F P
AD
ST
ATIO
N: 2 +60
.35
C/L
OFF
SE
T:
R- 3.0
N: 2
,13 6.7
2'
E:
,24 7.0
7'
INFORMATION SIGNS
(INSTALLED BY NPS)
TRAILHEAD SIGN
(INSTALLED BY NPS)
INSTALL PARK BENCH
SEE SHEET C5)
INSTALL CONCRETE PAD
(SEE SHEET C5)
INSTALL CONCRETE PAD
(SEE SHEET C4)
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C3
NPS PMIS NO: 254306 THRO DRAWING NUMBER 2020-08
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
OXBOW OVERLOOK
PARKING AREA
PROPOSED SITE PLAN 5
21OF
175102
20 0 20 40
SCALE OF FEET
GENERAL SITE CONSTRUCTION NOTES
1. ALL QUANTITIES NOTED WITHIN THIS PLAN SET ARE APPROXIMATE, AND PROVIDED FOR THE
CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL
QUANTITIES PRIOR TO SUBMITTING A BID OR COMMENCING CONSTRUCTION.
2. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION LAYOUT REQUIRED TO COMPLETE THE
CONTRACTED WORK.
3. THE CONTRACTOR SHALL INSTALL NEW CONCRETE PADS, WALKWAY AND STEEL PARK BENCH AS
DETAILED WITHIN PLAN SET.
4. THE NATIONAL PARK SERVICE SHALL SUPPLY AND INSTALL ALL TRASH COLLECTION CONTAINERS.
5. THE NATIONAL PARK SERVICE SHALL INSTALL ONE TRAILHEAD AND TWO INFORMATIONAL SIGNS.
24'-0"
C4
OXBOW OVERLOOK VAULT TOILET AREA DETAIL
NOT TO SCALE
A C4
COMPACTED
CLASS 5 AGGREGATE BASE
CONCRETE
(5" THICKNESS)
TERMINATE EXPANSION JOINT MATERIAL NOT LESS
THAN 12" OR MORE THAN 1"BELOW FINISHED SURFACE
C4
TYPICAL ISOLATION JOINT (NON-DOWELED)
NOT TO SCALE
INSTALL JOINT SEALANT AS PER
MANUFACTURER'S RECOMMENDATIONS
COMPACTED
CLASS 5 AGGREGATE BASE
2" DIAMETER SMOOTH STEEL DOWEL
18" LONG SPACED 24" O.C. SET MID-DEPTH
GREASE OR CAP ONE END OF THE BAR
TO PREVENT ADHESION OF CONCRETE
C4
TYPICAL CONSTRUCTION JOINT
NOT TO SCALE
CONCRETE
(5" THICKNESS)
3 4" THICK PREFORMED
EXPANSION JOINT MATERIAL
TERMINATE EXPANSION JOINT MATERIAL NOT LESS
THAN 12" OR MORE THAN 1"BELOW FINISHED SURFACE
INSTALL JOINT SEALANT AS PER
MANUFACTURER'S RECOMMENDATIONS
0.5% (MIN) TO 1.0% (MAX.) CROSS SLOPE
COMPACTED
AGGREGATE BASE COURSE
5" THICK CONCRETE
6'-0"
6'-6"
6" 1'-0" #4 REBAR PLACED MID-DEPTHFINISHED
GRADE
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE SPECIFICATIONS
A C4
SECTION VAULT TOILET CONCRETE PAD
NOT TO SCALE
1'-0"
INSTALL 3 4" THICK PREFORMED EXPANSION
JOINT WITH SEALANT, FULL DEPTH OF
CONCRETE, AS PER DETAIL X ON PLAN SHEET CX
SCREEN WALL OF EXISTING
VAULT TOILET BUILDING
FLOOR OF EXISTING
VAULT TOILET BUILDING
INSTALL 3 4" THICK PREFORMED EXPANSION
JOINT WITH SEALANT, FULL DEPTH OF
CONCRETE, AS PER DETAIL 3
EXISTING
VAULT
TOILET
(FF: 2,397.0')
MATCH FINISHED ELEVATION OF NEW
CONCRETE TO TOP OF EXISTING
ASPHALT PARKING AREA, NOT TO
EXCEED 14" CHANGE IN ELEVATION
BETWEEN SURFACES
6' -0
15'-0"
R 5'-0"
R 5'-0'
TIE ALL REBAR INTERSECTIONS WITH
STEEL WIRE REBAR TIES
#4 REBAR GRID INSTALLED
MID-DEPTH OF SLAB; 1'-0"
FROM CONCRETE EDGE
4'-0"
4' -0
0.5% (MIN) TO 1.5% (MAX.) CROSS SLOPE
COMPACTED
AGGREGATE BASE COURSE
5" THICK CONCRETE6'-0"
7'-0"
6" 1'-0" #4 REBAR PLACED MID-DEPTHFINISHED
GRADE
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE SPECIFICATIONS
B C4
SECTION CONCRETE WALKWAY (6'-0" FINISHED WIDTH)
NOT TO SCALE
6" FINISHED
GRADE
1'-0"
B C4
TERMINATE EXPANSION JOINT MATERIAL
NOT LESS THAN 12" OR MORE THAN 1"
BELOW FINISHED SURFACE
WALL OF EXISTING
VAULT TOILET BUILDING
FLOOR OF EXISTING
VAULT TOILET BUILDING
R 2'-6"
4'-0"
14'-6"
'-4
R 2'-6"
COMPACTED
CLASS 5 AGGREGATE BASE
CONCRETE (5" THICKNESS)
TOOLED JOINT 14" RADIUS
COMPACTED
CLASS 5 AGGREGATE BASE
CONCRETE (5" THICKNESS)
SAWED JOINT 18" KERF TO A DEPTH
OF 13 CONCRETE THICKNESS
C4
TYPICAL TOOLED CONTRACTION JOINT
NOT TO SCALE
C4
TYPICAL SAWED CONTRACTION JOINT
NOT TO SCALE
0.5-1.0%
CRO
SS SLO
PE
0.5-1.0%
SLOPE AWAY FROM BUILDING
3 4" THICK PREFORMED
EXPANSION JOINT MATERIAL
10'-4 3/8"
MATCH FINISHED ELEVATION OF NEW
CONCRETE TO FINISHED FLOOR
ELEVATION OF EXISTING VAULT TOILET
BUILDING, NOT TO EXCEED 14" CHANGE
IN ELEVATION BETWEEN SURFACES
SEE PLAN SHEET C6 FOR
ADDITIONAL WALKWAY
INFORMATION
COVER EXPOSED TOPSOIL
WITH EROSION CONTROL
BLANKET STAPLED
TO GROUND
COVER EXPOSED TOPSOIL
WITH EROSION CONTROL
BLANKET STAPLED
TO GROUND
COVER EXPOSED TOPSOIL
WITH EROSION CONTROL
BLANKET STAPLED
TO GROUND
START OF 6'-0"
WIDE WALKWAY
STATION 0+0.00
INSTALL CONSTRUCTION JOINT;
PER DETAIL 2
INSTALL 5" THICK REINFORCED
CONCRETE (3500 PSI) ACCESS PAD
(604 SQ. FT.)
SL
OP
E
SLO
PE
SLOPE
SLOPE
SL
O
PE
SLOPE BREAKLINE
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C4
NPS PMIS NO: 254306 THRO DRAWING NUMBER 2020-08
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
OXBOW OVERLOOK
PARKING AREA
VAULT TOILET DETAILS 6
21OF
175102
CONSTRUCTION/INSTALLATION NOTES
1. CONCRETE WALKWAY RUNNING SLOPE SHALL NOT EXCEED 5.0% AND CROSS SLOPE SHALL NOT EXCEED 1.5%, UNLESS NOTED ON PLAN SHEETS. CONCRETE PAD SURROUNDING VAULT TOILET
SHALL SLOPE AWAY FROM THE VAULT TOILET BUILDING AT A RATE OF 0.5% TO 1.0%.
2. CONCRETE PAD ADJACENT TO VAULT TOILET SHALL HAVE A #4 REBAR GRID INSTALLED MID-DEPTH WITHIN CONCRETE. REBAR GRID SHALL HAVE A 4'-0" SPACING, WITH REBAR RUNS SET PERPENDICULAR TO EACH OTHER. THE FIRST REBAR RUN SHALL BE SET 1'-0" INSIDE THE PERIMETER OF THE PAD, WITH ALL REBAR INTERSECTIONS TIED WITH STEEL REBAR TIES. FINAL INSPECTION OF REBAR GRID SHALL BE CONDUCTED BY THE PROJECT C.O.R. PRIOR TO LAYING CONCRETE.
3. CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH (28 DAYS) OF 3500 PSI, AND SHALL INCLUDE A COLOR PIGMENT MEETING ASTM C 979 COLORANT SPECIFICATIONS. COLORANT SHALL BE ADDED TO CONCRETE MIX USING THE PIGMENT MANUFACTURER'S WRITTEN INSTRUCTIONS. THE PIGMENT COLOR SHALL BE DAVIS #641 "SEQUOIA SAND" OR EQUIVALENT. THE CONTRACTOR MUST SUBMIT COLORANT SAMPLE TO C.O.R. FOR FINAL COLOR SELECTION BEFORE INSTALLATION OF CONCRETE WALKWAY.
4. CONTRACTION JOINTS SHALL BE POSITIONED SO AS TO DIVIDE THE WALKWAY AND CONCRETE PAD INTO SQUARE SLABS. THE LAYOUT OF CONTRACTION JOINTS SHALL BE APPROVED BY THE PROJECT C.O.R. PRIOR TO LAYING CONCRETE. THE CONTRACTION JOINTS MAYBE SAWED OR TOOLED SEE DETAILS 4 AND 5 ON PLAN SHEET.
5. ALL CONCRETE SURFACES SHALL BE FINISHED WITH A LIGHT BROOM FINISH, APPLIED PERPENDICULAR TO TRAVEL PATH.
6. THE HORIZONTAL ALIGNMENT, VERTICAL PROFILE, COMPACTED AGGREGATE BASE, FORM WORK, AND PROPOSED CONTRACTION JOINTS SHALL BE INSPECTED AND APPROVED BY THE PROJECT
C.O.R. PRIOR TO LAYING CONCRETE.
7. THE CONTRACTOR SHALL BACKFILL, USING TOP SOIL, AGAINST THE SIDES OF THE WALKWAY AND PAD TO THE TOP OF THE FINISHED CONCRETE SURFACE, AND SLOPE FILL AWAY FROM THE WALKWAY AT A GRADE NO STEEPER THAN 4 FEET HORIZONTAL TO 1 FOOT VERTICAL (4:1 MAX), AREAS EXCEEDING A 4:1 SLOPE SHALL BE APPROVED BY THE PROJECT C.O.R..
8. ALL AREAS OF DISTURBED SOIL, EITHER CUT OR FILL, SHALL BE COVERED WITH EROSION BLANKET AND STAPLED TO THE GROUND IN ACCORDANCE WITH THE EROSION BLANKET
MANUFACTURER'S WRITTEN INSTRUCTIONS.
MOUNT BENCH WITH
STAINLESS STEEL HARDWARE1
C5
OVERLOOK CONCRETE PAD DETAIL
NOT TO SCALE
BEGINNING OF PAD
STATION: 1+90.72
C/L OFFSET: R-3.0'
N: 200,105.49' E:: 50,184.15'
STATION: 2+05.72
C/L OFFSET: R-7.0'
N: 200,104.28' E:: 50,200.38'
END OF PAD
STATION: 2+60.35
C/L OFFSET: R-3.0'
N: 200,136.72' E: 50,247.07'
STATION: 2+45.72
C/L OFFSET: R-7.0'
N: 200,123.31' E: 50,238.53'
MIDPOINT OF PAD
STATION: 2+25.72
C/L OFFSET: R-7.0'
N: 200,111.78' E: 50,220.46''
INFORMATION SIGN
(TO BE INSTALLED BY NPS)
INFORMATION SIGN
(TO BE INSTALLED BY NPS)
INSTALL CONSTRUCTION JOINT
SEE DETAIL 2
A C5
#4 REBAR GRID INSTALLED
MID-DEPTH OF SLAB; 1'-0"
FROM CONCRETE EDGE TIE ALL REBAR INTERSECTIONS WITH
STEEL WIRE REBAR TIES
0.5% (MIN) TO 1.5% (MAX.) CROSS SLOPE
COMPACTED
AGGREGATE BASE COURSE
5" THICK CONCRETE10'-0"
11'-0"
6" 1'-0" #4 REBAR PLACED MID-DEPTHFINISHED
GRADE
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE SPECIFICATIONS
A C5
SECTION CONCRETE PAD (10'-0" FINISHED WIDTH)
NOT TO SCALE
6" FINISHED
GRADE
1'-0"
B C5
7" THICK CONCRETE
6"
7'-0"
4'-0"
INSTALL CONSTRUCTION JOINT
SEE DETAIL 2
CC5
BENCH MOUNTING
LOCATION
B C5
SECTION THROUGH BENCH MOUNTING LOCATION
NOT TO SCALE
C C5
SECTION THROUGH BENCH MOUNTING LOCATION
NOT TO SCALE
6"FINISHED
GRADE
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE SPECIFICATIONS
COVER EXPOSED TOPSOIL
WITH EROSION CONTROL
BLANKET STAPLED
TO GROUND
COVER EXPOSED TOPSOIL
WITH EROSION CONTROL
BLANKET STAPLED
TO GROUND
6"
1'-0" #4 REBAR PLACED MID-DEPTH
COVER EXPOSED TOPSOIL
WITH EROSION CONTROL
BLANKET STAPLED
TO GROUND
5" THICK
CONCRETE
7" THICK
CONCRETE
5" THICK
CONCRETE
7'-0"
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE SPECIFICATIONS
5" THICK CONCRETE
7" THICK
CONCRETE
6" 6"
MOUNT BENCH WITH
STAINLESS STEEL HARDWARE
MOUNT BENCH WITH
STAINLESS STEEL HARDWARE
COMPACTED
CLASS 5 AGGREGATE BASE
2" DIAMETER SMOOTH STEEL DOWEL
18" LONG SPACED 24" O.C. SET MID-DEPTH
GREASE OR CAP ONE END OF THE BAR
TO PREVENT ADHESION OF CONCRETE
C5
TYPICAL CONSTRUCTION JOINT
NOT TO SCALE
CONCRETE
(5" THICKNESS)
3 4" THICK PREFORMED
EXPANSION JOINT MATERIAL
TERMINATE EXPANSION JOINT MATERIAL NOT LESS
THAN 12" OR MORE THAN 1"BELOW FINISHED SURFACE
INSTALL JOINT SEALANT AS PER
MANUFACTURER'S RECOMMENDATIONS
4'-0"
#4 REBAR GRID INSTALLED
MID-DEPTH OF SLAB; 1'-0"
FROM CONCRETE EDGE
4'-0"
4'-0"
WALKWAY ALIGNMENT
CENTERLINE
4'-0"
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C5
NPS PMIS NO: 254306 THRO DRAWING NUMBER 2020-08
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
OXBOW OVERLOOK
WALKWAY OVERLOOK DETAILS 7
21OF
175102
CONSTRUCTION/INSTALLATION NOTES
1. THE OVERLOOK CONCRETE PAD INSTALLATION SHALL BEGIN AT STATION 1+90.72 AND END AT STATION 2+60.35 (CENTER OF PAD IS LOCATED AT STATION 2+25.72). RUNNING
SLOPE OF OVERLOOK PAD SHALL NOT EXCEED 1.0% AND CROSS SLOPE SHALL NOT EXCEED 1.0%.
2. THE OVERLOOK CONCRETE PAD SHALL HAVE A #4 REBAR GRID INSTALLED MID-DEPTH WITHIN CONCRETE. REBAR GRID SHALL HAVE A 4'-0" SPACING, WITH REBAR RUNS SET PERPENDICULAR TO EACH OTHER. THE FIRST REBAR RUN SHALL BE SET 1'-0" INSIDE THE PERIMETER OF THE PAD, WITH ALL REBAR INTERSECTIONS TIED WITH STEEL REBAR TIES.
FINAL INSPECTION OF REBAR GRID SHALL BE CONDUCTED BY THE PROJECT C.O.R. PRIOR TO LAYING CONCRETE.
3. CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH (28 DAYS) OF 3500 PSI, AND SHALL INCLUDE A COLOR PIGMENT MEETING ASTM C 979 COLORANT SPECIFICATIONS.
COLORANT SHALL BE ADDED TO CONCRETE MIX USING THE PIGMENT MANUFACTURER'S WRITTEN INSTRUCTIONS. THE PIGMENT COLOR SHALL BE DAVIS #641 "SEQUOIA SAND" OR EQUIVALENT. THE CONTRACTOR MUST SUBMIT COLORANT SAMPLE TO PROJECT C.O.R. FOR FINAL COLOR SELECTION BEFORE INSTALLATION OF CONCRETE PAD.
4. CONTRACTION JOINTS SHALL BE POSITIONED SO AS TO DIVIDE THE CONCRETE PAD INTO SQUARE SLABS. THE LAYOUT OF CONTRACTION JOINTS SHALL BE APPROVED BY THE PROJECT C.O.R. PRIOR TO LAYING CONCRETE. THE CONTRACTION JOINTS MAYBE SAWED OR TOOLED SEE DETAILS 3 AND 4 ON PLAN SHEET C6.
5. ALL CONCRETE SURFACES SHALL BE FINISHED WITH A LIGHT BROOM FINISH, APPLIED PERPENDICULAR TO TRAVEL PATH.
6. THE HORIZONTAL ALIGNMENT, VERTICAL PROFILE, COMPACTED AGGREGATE BASE, FORM WORK, AND PROPOSED CONTRACTION JOINTS SHALL BE INSPECTED AND APPROVED BY
THE PROJECT C.O.R. PRIOR TO LAYING CONCRETE.
7. THE CONTRACTOR SHALL BACKFILL, USING TOP SOIL, AGAINST THE SIDES OF THE OVERLOOK PAD TO THE TOP OF THE FINISHED CONCRETE SURFACE, AND SLOPE FILL AWAY FROM THE WALKWAY AT A GRADE NO STEEPER THAN 4 FEET HORIZONTAL TO 1 FOOT VERTICAL (4:1 MAX).
8. ALL AREAS OF DISTURBED SOIL, EITHER CUT OR FILL, SHALL BE COVERED WITH EROSION BLANKET AND STAPLED TO THE GROUND IN ACCORDANCE WITH THE EROSION BLANKET MANUFACTURER'S WRITTEN INSTRUCTIONS. A SAMPLE OF THE EROSION BLANKET SHALL BE SUBMITTED TO THE PROJECT C.O.R. FOR APPROVAL BEFORE INSTALLATION.
COMPACTED
CLASS 5 AGGREGATE BASE
2" DIAMETER SMOOTH STEEL DOWEL
18" LONG SPACED 24" O.C. SET MID-DEPTH
COMPACTED
CLASS 5 AGGREGATE BASE
CONCRETE (5" THICKNESS)
TOOLED JOINT 14" RADIUS
COMPACTED
CLASS 5 AGGREGATE BASE
CONCRETE (5" THICKNESS)
SAWED JOINT 18" KERF TO A DEPTH
OF 13 CONCRETE THICKNESS
GREASE OR CAP ONE END OF THE BAR
TO PREVENT ADHESION OF CONCRETE
C6
TYPICAL CONSTRUCTION JOINT
NOT TO SCALE
C6
TYPICAL TOOLED CONTRACTION JOINT
NOT TO SCALE
C6
TYPICAL SAWED CONTRACTION JOINT
NOT TO SCALE
CONCRETE
(5" THICKNESS)
3 4" THICK PREFORMED
EXPANSION JOINT MATERIAL
TERMINATE EXPANSION JOINT MATERIAL NOT LESS
THAN 12" OR MORE THAN 1"BELOW FINISHED SURFACE
INSTALL JOINT SEALANT AS PER
MANUFACTURER'S RECOMMENDATIONS
0.5% (MIN) TO 1.5% (MAX.) CROSS SLOPE
COMPACTED
AGGREGATE BASE COURSE
5" THICK CONCRETE6'-0"
7'-0"
6" 1'-0" #4 REBAR PLACED MID-DEPTH
FINISHED
GRADE
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE SPECIFICATIONS
A C6
SECTION CONCRETE WALKWAY (6'-0" FINISHED WIDTH)
NOT TO SCALE
6" FINISHED
GRADE
1'-0"
2'-6"
6'-0" 6'-0" 6'-0"6'-0"
2'-6"
4' -0
1'
-0
1' -0
5' -0
6' -0
C6
TYPICAL CONCRETE WALKWAY REINFORCEMENT
NOT TO SCALE
A C6
SAWED OR TOOLED
CONTRACTION JOINT
#4 REBAR INSTALLED 1'-0" FROM
CONCRETE EDGE
TIE ALL REBAR INTERSECTIONS
WITH STEEL WIRE REBAR TIES
5' -0
COVER EXPOSED TOPSOIL
WITH EROSION CONTROL
BLANKET STAPLED
TO GROUND
COVER EXPOSED TOPSOIL
WITH EROSION CONTROL
BLANKET STAPLED
TO GROUND
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C6
NPS PMIS NO: 254306 THRO DRAWING NUMBER 2020-08
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
CONCRETE WALKWAY DETAILS
21OF
175102
CONSTRUCTION/INSTALLATION NOTES
1. CONCRETE WALKWAY RUNNING SLOPE SHALL NOT EXCEED 5.0% AND CROSS SLOPE SHALL NOT EXCEED 1.5%, UNLESS NOTED ON PLAN SHEETS.
2. LONGITUDINAL REINFORCEMENT OF CONCRETE WALKWAY SHALL CONSIST OF TWO RUNS OF #4 REBAR INSTALLED WITHIN WALKWAY OFFSET 1'-0" INSIDE THE
FORM-WORK.
3. LATERAL REINFORCEMENT OF CONCRETE WALKWAY SHALL CONSIST OF 5'-0" LONG #4 REBAR SPACED AT 2'-6" INTERVALS PLACED PERPENDICULAR TO LONGITUDINAL
REINFORCEMENT.
4. ALL REBAR REINFORCEMENT SHALL BE INSTALLED MID-DEPTH WITHIN CONCRETE WALKWAYS.
5. ALL REBAR INTERSECTIONS SHALL BE TIED WITH STEEL WIRE REBAR TIES.
6. CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH (28 DAYS) OF 3500 PSI, AND SHALL INCLUDE A COLOR PIGMENT MEETING ASTM C979 COLORANT SPECIFICATIONS.
COLORANT SHALL BE ADDED TO CONCRETE MIX USING THE PIGMENT MANUFACTURER'S WRITTEN INSTRUCTIONS. THE PIGMENT COLOR SHALL BE DAVIS #641 "SEQUOIA SAND" OR EQUIVALENT. THE CONTRACTOR MUST SUBMIT COLORANT SAMPLE TO PROJECT C.O.R. FOR FINAL SELECTION BEFORE INSTALLATION OF
CONCRETE WALKWAY.
7. CONTRACTION JOINTS SHALL BE POSITIONED SO AS TO DIVIDE THE WALKWAY INTO SQUARE SLABS. THE CONTRACTION JOINTS ON WALKWAYS MAYBE SAWED OR
TOOLED.
8. CONCRETE WALKWAY SHALL BE FINISHED WITH A LIGHT BROOM FINISH, APPLIED PERPENDICULAR TO TRAVEL PATH.
9. THE HORIZONTAL ALIGNMENT, VERTICAL PROFILE, COMPACTED AGGREGATE BASE, AND FORM WORK SHALL BE INSPECTED AND APPROVED BY THE PROJECT C.O.R.
PRIOR TO LAYING CONCRETE.
10. THE CONTRACTOR SHALL BACKFILL AGAINST THE SIDES OF THE WALKWAY TO THE TOP OF THE FINISHED CONCRETE SURFACE, AND SLOPE FILL AWAY FROM THE WALKWAY AT A GRADE NO STEEPER THAN 4 FEET HORIZONTAL TO 1 FOOT VERTICAL (4:1 MAX).
11. ALL AREAS OF DISTURBED SOIL, EITHER CUT OR FILL, SHALL BE COVERED WITH EROSION BLANKET AND STAPLED TO THE GROUND IN ACCORDANCE WITH THE EROSION BLANKET MANUFACTURER'S WRITTEN INSTRUCTIONS. A SAMPLE OF THE EROSION BLANKET SHALL BE SUBMITTED TO THE PROJECT C.O.R. FOR APPROVAL
BEFORE INSTALLATION.
6'-0"
6'-0"
2'-8"
2'-2"
2'-8"
1'-5"
2'-4"
C10
TOP VIEW - TYPICAL PARK BENCH
NOT TO SCALE
C10
FRONT VIEW - TYPICAL PARK BENCH
NOT TO SCALE
C10
SIDE VIEW - TYPICAL PARK BENCH
NOT TO SCALE
C7
ISOMETRIC VIEW - TYPICAL PARK BENCH
NOT TO SCALE
C7
TYPICAL PARK BENCH MOUNT DETAIL
NOT TO SCALE
C7
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C7
NPS PMIS NO: 254306 THRO DRAWING NUMBER 2020-08
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
TYPICAL STEEL PARK
BENCH DETAILS 9
21OF
175102
CONSTRUCTION/INSTALLATION NOTES
1. CONTRACTOR SHALL PROVIDE AND MOUNT ONE 6 FOOT STEEL PARK BENCH. SEE PLAN SHEET C5 FOR
DETAILED INSTALLATION LOCATIONS.
2. THE PARK BENCHES SHALL BE 6'-0" PETERSEN MANUFACTURING COMPANY LEMARS SERIES RIBBED PARK BENCH (MODEL #LB72) OR EQUIVALENT. CONTRACTOR MUST SUBMIT DETAILED SPECIFICATIONS OF BENCH MAKE
AND MODEL FOR C.O.R. APPROVAL PRIOR TO INSTALLATION.
3. PARK BENCHES SHALL BE CONSTRUCTED OF 1-INCH THICK PLATE STEEL LEGS AND 1-1
2-INCH WIDE STEEL RIBS.
4. PARK BENCHES SHALL HAVE CONTINUOUSLY WELDED SEAMS, AND BE COATED WITH 7 (MIN.) TO 15 MILS
(MAX.) OF HEAVY DUTY POWDER-COAT.
5. PARK BENCHES SHALL BE POWDER-COATED IN A PETERSEN MANUFACTURING COMPANY "RAPID TAN" COLOR OR EQUIVALENT. CONTRACTOR MUST SUBMIT BENCH POWDER COAT COLOR SPECIFICATIONS FOR C.O.R.
APPROVAL PRIOR TO INSTALLATION.
6. PARK BENCHES SHALL BE MOUNTED TO CONCRETE OBSERVATION PADS USING CORROSION-RESISTANT 316
STAINLESS STEEL MOUNTING HARDWARE.
Profile of Alignment - Walkway From 0+00 To 2+40
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
EG
=2
8.
FG
=2
8.
EG
=2
9.
FG
=2
9.
EG
=2
0.
FG
=2
0.
EG
=2
2.
FG
=2
1.
EG
=2
3.
FG
=2
3.
EG
=2
4.
FG
=2
4.
EG
=2
5.
FG
=2
5.
EG
=2
6.
FG
=2
6.
EG
=2
7.
FG
=2
7.
EG
=2
8.
FG
=2
8.
EG
=2
9.
FG
=2
9.
EG
=2
9.
FG
=2
9.
EG
=2
9.
FG
=2
9.
PROPOSED TOP
OF CONCRETE
EXISTING GROUND
WALKWAY RESTING INTERVAL 1% MAX.
CROSS SLOPE. (PREVIOUS SEGMENT
RUNNING SLOPE EXCEEDS 5%)
MATCH ELEVATION OF VAULT TOILET
CONCRETE PAD; INSTALL CONSTRUCTION
JOINT AT STATION 0+00.0.
7.00%
1.00%
7.00%
1.00%
6.50%
1.00% 5.00%
1.00%
ST
A
0+
.0
EL
EV
,3
.0
ST
A
0+
.0
EL
EV
,4
.5
ST
A
0+
.0
EL
EV
,4
.6
ST
A
1+
.0
EL
EV
,4
.1
ST
A
1+
.0
EL
EV
,4
.2
ST
A
1+
.0
EL
EV
,4
.4
ST
A
1+
.0
EL
EV
,4
.5
ST
A
1+
.7
EL
EV
,4
.0
ST
A
2+
.7
EL
EV
,4
.4
INSTALL
CONSTRUCTION JOINT
AT STATION 1+00.0
START WALKWAY
WIDENING; INSTALL
CONSTRUCTION JOINT
WALKWAY RESTING INTERVAL 1% MAX.
CROSS SLOPE. (PREVIOUS SEGMENT
RUNNING SLOPE EXCEEDS 5%)
PROPOSED TOP
OF CONCRETE
WALKWAY RESTING INTERVAL 1% MAX.
CROSS SLOPE. (PREVIOUS SEGMENT
RUNNING SLOPE EXCEEDS 5%)
CENTER OF
WALKWAY
WIDENING
EXISTING GROUND
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
C. L. SEXTON
C. L. SEXTON
C8
NPS PMIS NO: 254306 THRO DRAWING NUMBER 2020-08
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
OXBOW OVERLOOK
WALKWAY PROFILE STATION
0+00.0 TO 2+40.0 10
21OF
175102
MARCH 26TH, 2021
T. BENTLEY
Profile of Alignment - Walkway From 2+40 To 4+80
2+
2+
2+
3+
3+
3+
3+
3+
4+
4+
4+
4+
4+
EG
=2
9.
FG
=2
9.
EG
=2
9.
FG
=2
9.
EG
=2
9.
FG
=2
8.
EG
=2
9.
FG
=2
8.
EG
=2
8.
FG
=2
8.
EG
=2
8.
FG
=2
7.
EG
=2
7.
FG
=2
7.
EG
=2
7.
FG
=2
6.
EG
=2
6.
FG
=2
6.
EG
=2
5.
FG
=2
5.
EG
=2
4.
FG
=2
4.
EG
FG
EG
FG
WALKWAY RESTING INTERVAL 1% MAX.
CROSS SLOPE. (PREVIOUS SEGMENT
RUNNING SLOPE EXCEEDS 5%)
MATCH ELEVATION OF PARKING LOT
ASPHALT; INSTALL TACTILE DOT PANEL
AT END OF CONCRETE WALKWAY
-7.00%
-1.00%
-0.50%
-1.98%
ST
A
2+
.3
EL
EV
,4
.2
ST
A
4+
.0
EL
EV
,4
.4
ST
A
4+
.0
EL
EV
,4
.3
ST
A
4+
.9
EL
EV
,4
.9
END WALKWAY
WIDENING; INSTALL
CONSTRUCTION JOINT
PROPOSED TOP
OF CONCRETE
EXISTING GROUND
EXISTING GROUND
PROPOSED TOP
OF CONCRETE
INSTALL
CONSTRUCTION JOINT
AT STATION 3+60.0
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
C. L. SEXTON
C. L. SEXTON
C9
NPS PMIS NO: 254306 THRO DRAWING NUMBER 2020-08
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
OXBOW OVERLOOK
WALKWAY PROFILE STATION
2+40.0 TO 4+69.21 11
21OF
175102
MARCH 26TH, 2021
T. BENTLEY
SURVEY CONTROL COORDINATE DATA
1. HORIZONTAL DATUM: NORTH AMERICAN DATUM OF 1983 (2011) AS REALIZED BY TYING TO EXISTING PRIMARY NATIONAL
PARK SERVICE CONTROL MONUMENT MCP2016-01. ALL DATA IS PROJECTED TO A CUSTOM LOW-DISTORTION PROJECTION
(SEE PROJECTION PARAMETERS INCLUDED ON THIS PLAN SHEET).
2. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 AS REALIZED BY APPLYING GEOID MODEL 2012B TO
ELLIPSOID HEIGHTS OF MCP2016-01.
3. ALL COORDINATES AND MEASUREMENTS ARE GRID DISTANCES, USING THE INTERNATIONAL FOOT DEFINITION.
4. AVOID DAMAGE TO ALL SURVEY MONUMENTS FOUND IN PROXIMITY TO THE CONSTRUCTION AREA.
5. IMMEDIATELY REPORT AND SURVEY MONUMENTS DAMAGED DURING PROJECT DEMOLITION OR CONSTRUCTION TO THE
PROJECT C.O.R.
6. ANY SURVEY MONUMENTS DAMAGED DURING PROJECT DEMOLITION OR CONSTRUCTION SHALL BE REPLACED AT THE
CONTRACTOR'S EXPENSE UNLESS NOTED ON THE PLAN SET.
LOW DISTORTION PROJECTION PARAMETERS
GEODETIC DATUM: NORTH AMERICAN DATUM OF 1983 (2011) EPOCH 2010.00
VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 AS REALIZED BY
USING GEOID2012B
SYSTEM: THEODORE ROOSEVELT NATIONAL PARK
ZONE NAME: LDP NORTH UNIT OXBOW OVERLOOK AREA
PROJECTION NAME: NAD83 (2011) THRO-NU LDP ZONE 04 - OXBOW OVERLOOK AREA
PROJECTION TYPE: LAMBERT CONFORMAL CONIC (ONE-PARALLEL)
STANDARD PARALLEL / LATITUDE OF GRID ORIGIN: 47° 36' 09.0" N (47.6025°)
LONGITUDE OF CENTRAL MERIDIAN: 103° 26' 33.0" W (-103.4425°)
NORTHING AT GRID ORIGIN: 200,000 Intl. Ft. (60,960 m) EASTING AT Central MERIDIAN: 50,000 Intl. Ft. (15,240 m) SCALE FACTOR ON CENTRAL MERIDIAN: 1.000112 (Exact)
SURVEY CONTROL POINTS
POINT #
NORTHING
(INTL. FT.)
200,166.046'
200,345.188'
200,486.905'
EASTING
(INTL. FT.)
50,125.478'
50,300.681'
49,928.667'
ELEVATION
(INTL. FT.)
2,410.12'
2,414.05'
2,380.48'
LATITUDE
N 047° 36' 10.6385"
N 047° 36' 12.4063"
N 047° 36' 13.8048"
LONGITUDE
W 103° 26' 31.1692"
W 103° 26' 28.6128"
W 103° 26' 34.0408"
ELLIPSOID HEIGHT
(INTL. FT.)
2352.766'
2356.689'
2323.127'
CONVERGENCE ANGLE
0° 00' 01.35"
0° 00' 03.24"
-0° 00' 00.77"
COMBINED SCALE
FACTOR
0.99999959
0.99999941
1.00000010
MONUMENT DESCRIPTION
600-MM FENO MONUMENT WITH 3.5" DIAMETER ALUMINUM CAP STAMPED "MCP2016-01"
30" LONG #4 REBAR WITH GREEN PLASTIC CAP STAMPED "CONTROL POINT"
30" LONG #4 REBAR WITH GREEN PLASTIC CAP STAMPED "CONTROL POINT"
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
V1
NPS PMIS NO: 254306 THRO DRAWING NUMBER 2020-08
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
SURVEY CONTROL
COORDINATE DATA 12
21OF
ALIGNMENT - WALKWAY
SEGMENT NUMBER
L1
L2
L3
L4
L5
C1
C2
C3
C4
LENGTH
32.29'
43.18'
11.39'
18.00'
3.63'
69.55'
167.74'
94.25'
19.90'
RADIUS
60.00'
95.00'
100.00'
20.00'
LINE/CHORD DIRECTION
S01° 25' 00.0"E
S67° 50' 00.0"E
N11° 00' 00.0"E
N43° 00' 00.0"W
S80° 00' 00.0"W
S34° 37' 30.0"E
N61° 35' 00.0"E
N16° 00' 00.0"W
N71° 30' 00.0"W
START STATION
0+00.00
1+01.84
3+12.76
4+18.40
4+56.29
0+32.29
1+45.02
3+24.15
4+36.39
END STATION
0+32.29
1+45.02
3+24.15
4+36.39
4+59.92
1+01.84
3+12.76
4+18.40
4+56.29
START COORDINATES
N: 200,217.74'; E: 50,060.97'
N: 200,131.37'; E: 50,099.11'
N: 200,184.93'; E: 50,268.19'
N: 200,283.39'; E: 50,245.34'
N: 200,302.61'; E: 50,214.96'
N: 200,185.46'; E: 50,061.76'
N: 200,115.08'; E: 50,139.09'
N: 200,196.11'; E: 50,270.37'
N: 200,296.56'; E: 50,233.06'
END COORDINATES
N: 200,185.46'; E: 50,061.76'
N: 200,115.08'; E: 50,139.09'
N: 200,196.11'; E: 50,270.37'
N: 200,296.56'; E: 50,233.06'
N: 200,301.98'; E: 50,211.39'
N: 200,131.37'; E: 50,099.11'
N: 200,184.93'; E: 50,268.19'
N: 200,283.39'; E: 50,245.34'
N: 200,302.61'; E: 50,214.96'
ALIGNMENT COORDINATE DATA
1. HORIZONTAL DATUM: NORTH AMERICAN DATUM OF 1983 (2011) AS REALIZED BY TYING TO EXISTING PRIMARY NATIONAL
PARK SERVICE CONTROL MONUMENT MCP2016-01. ALL DATA IS PROJECTED TO A CUSTOM LOW-DISTORTION PROJECTION
(SEE PROJECTION PARAMETERS INCLUDED ON THIS PLAN SHEET).
2. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 AS REALIZED BY APPLYING GEOID MODEL 2012B TO
ELLIPSOID HEIGHTS OF MCP2016-01.
3. ALL COORDINATES AND MEASUREMENTS ARE GRID DISTANCES, USING THE INTERNATIONAL FOOT DEFINITION.
LOW DISTORTION PROJECTION PARAMETERS
GEODETIC DATUM: NORTH AMERICAN DATUM OF 1983 (2011) EPOCH 2010.00
VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 AS REALIZED BY
USING GEOID2012B
SYSTEM: THEODORE ROOSEVELT NATIONAL PARK
ZONE NAME: LDP NORTH UNIT OXBOW OVERLOOK AREA
PROJECTION NAME: NAD83 (2011) THRO-NU LDP ZONE 04 - OXBOW OVERLOOK AREA
PROJECTION TYPE: LAMBERT CONFORMAL CONIC (ONE-PARALLEL)
STANDARD PARALLEL / LATITUDE OF GRID ORIGIN: 47° 36' 09.0" N (47.6025°)
LONGITUDE OF CENTRAL MERIDIAN: 103° 26' 33.0" W (-103.4425°)
NORTHING AT GRID ORIGIN: 200,000 Intl. Ft. (60,960 m) EASTING AT Central MERIDIAN: 50,000 Intl. Ft. (15,240 m) SCALE FACTOR ON CENTRAL MERIDIAN: 1.000112 (Exact)
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
V2
NPS PMIS NO: 254306 THRO DRAWING NUMBER 2020-08
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
WALKWAY ALIGNMENT
GEOMETRY/LAYOUT DATA 13
21OF
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
NPS PMIS NO: 254306 THRO DRAWING NUMBER 2020-08
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
STANDARD SPECIFICATIONS
SUBGRADE PREPARATION 14
21OF
SECTION 204 - SUBGRADE PREPARATION
204-1 DESCRIPTION
· THIS WORK SHALL CONSIST OF SCARIFYING, SHAPING, COMPACTING, AND MAINTAINING THE SUBGRADE PRIOR TO CONSTRUCTION OF AN
AGGREGATE BASE, AC BASE COURSE, OR SURFACE COURSE AND SHALL INCLUDE EXCAVATION AND/OR SHIFTING OF MATERIALS RESULTING
FROM ROUGH GRADING, TRENCHING, OR OTHER PRIOR CONSTRUCTION ACTIVITIES. SUBGRADE PREPARATION SHALL INCLUDE ALL WORK
TO DEPTHS SPECIFIED ON THE PLAN SHEETS OR IN THE SPECIAL PROVISIONS. WHEN SUBGRADE PREPARATION DEPTHS ARE NOT SPECIFIED, THE DEPTH SHALL BE ASSUMED TO BE A MINIMUM OF 6 INCHES BELOW THE SURFACE OF THE FINISHED SUBGRADE
204-2 CONSTRUCTION REQUIREMENTS
204-2.1 GENERAL
· IN ALL AREAS, PRIOR TO PLACING ANY OF THE BASE COURSE MATERIAL SPECIFIED ON THE PLAN SHEETS, THE ENTIRE SUBGRADE SURFACE
SHALL BE SCARIFIED TO A SPECIFIED DEPTH OF NOT LESS THAN 6 INCHES AND DRIED OR UNIFORMLY MOISTENED TO OBTAIN REQUIRED
COMPACTION.
· EXCESS SUITABLE EXCAVATED MATERIAL SHALL BE STOCKPILED AND REUSED WHENEVER POSSIBLE IN THE PROJECT. IF MATERIAL CANNOT
BE REUSED OR IS SURPLUS TO THE PROJECT, COORDINATE DISPOSAL OR ONSITE STOCKPILING WITH PROJECT C.O.R.
· ALL ROCKS LARGER THAN 2 INCHES IN SIZE AND OTHER UNSUITABLE MATERIAL SHALL BE REMOVED AND REPLACED WITH APPROVED
BACKFILL MATERIAL.
· ANY PORTIONS OF THE SUBGRADE NOT EASILY ACCESSIBLE TO MACHINE OPERATIONS, SUCH AS VALLEY GUTTERS, SHALL BE BROUGHT TO
THE PROPER ELEVATION AND COMPACTED BY METHODS APPROVED BY THE PROJECT C.O.R.
· DURING THE COURSE OF PREPARING THE SUBGRADE AND UNTIL THE ASPHALT PAVEMENT OR CONCRETE COURSES HAVE BEEN
CONSTRUCTED, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROTECT THE SUBGRADE AGAINST, AND REPAIR, ANY DAMAGE CAUSED
BY ADVERSE WEATHER, PUBLIC TRAFFIC, AND THE CONTRACTOR'S OWN OPERATIONS.
· THE SUBGRADE SHALL AT ALL TIMES BE COMPLETED FOR A SUFFICIENT DISTANCE AHEAD OF HAULING AND SPREADING BASE OR SURFACE
MATERIAL TO ALLOW ADEQUATE OPPORTUNITY FOR INSPECTION.
· NO MATERIALS SHALL BE PLACED ON THE SUBGRADE UNTIL IT HAS BEEN CHECKED AND APPROVED BY THE PROJECT C.O.R.
204-2.2 COMPACTION
· THE SUBGRADE SHALL BE COMPACTED BY APPROVED COMPACTION EQUIPMENT. APPROVED COMPACTION EQUIPMENT SHALL INCLUDE
SHEEPSFOOT ROLLERS, PNEUMATIC PACKERS, MECHANICAL PACKERS, MECHANICAL RAMMERS, VIBRATORY EQUIPMENT, TRUCKS, TRACTORS, SCRAPERS, MOTOR GRADERS, AND ALL OTHER TYPES OF EQUIPMENT USED IN EXCAVATING, TRANSPORTING, AND PLACING THE
SUBGRADE.
· SUBGRADE PREPARATION DEPTHS SPECIFIED ON THE PLAN SHEETS, SPECIAL PROVISIONS, OR THE MINIMUM OF 6 INCHES REQUIRED BELOW
THE SURFACE OF THE FINISHED SUBGRADE SHALL BE COMPACTED TO 95 PERCENT OF MAXIMUM DRY DENSITY AS DETERMINED BY ASTM
D1557 WITH A MOISTURE CONTENT FALLING WITHIN PLUS OR MINUS 3 PERCENT OF THE OPTIMUM MOISTURE CONTENT AS DETERMINED
BY SAID TESTING METHOD.
· THE SURFACE AFTER COMPACTION SHALL BE TRUE TO LINE, GRADE, AND CROSS SECTION.
· IF INSTABILITY OF SUITABLE MATERIALS BELOW THE SPECIFIED SUBGRADE PREPARATION DEPTH IS A RESULT OF EXCESSIVE MOISTURE FROM
RAINS, SURFACE RUNOFF, OR FROST ACTION, THE PROJECT C.O.R. MAY SUSPEND THE WORK TO ALLOW THE MATERIALS TO RECOVER
STRENGTH.
204-2.3 TOLERANCES
· IN THOSE AREAS UPON WHICH A SUBBASE, BASE, OR SURFACE COURSE IS TO BE PLACED, THE TOP OF THE SUBGRADE SHALL BE OF SUCH
SMOOTHNESS THAT WHEN TESTED WITH A 16 FOOT STRAIGHTEDGE APPLIED PARALLEL AND AT RIGHT ANGLES TO THE CENTERLINE, IT
SHALL NO SHOW ANY DEVIATION IN EXCESS OF 12 INCHES, OR SHALL NOT BE MORE THAN 0.05 OF A FOOT FROM TRUE GRADE ESTABLISHED
BY HUBS OR PINS.
· THE CONTRACTOR SHALL PERFORM ALL SURVEYING REQUIRED TO PREPARE THE SUBGRADE, TO THE TOLERANCES SPECIFIED.
SUB SHEET NO.DESIGNED:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
NPS PMIS NO: 254306 THRO DRAWING NUMBER 2020-08
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
STANDARD SPECIFICATION
AGGREGATE BASE/SURFACE
COURSES 15
21OF
SECTION 302 - AGGREGATE BASE AND AGGREGATE SURFACE COURSES
302-1 DESCRIPTION
· THIS ITEM SHALL CONSIST OF AGGREGATE BASE AND AGGREGATE SURFACE COMPOSED OF CRUSHED, PARTIALLY CRUSHED. OR UNCRUSHED COARSE AGGREGATE BONDED WITH EITHER SOIL OR FINE AGGREGATE OR BOTH. IT SHALL BE CONSTRUCTED ON A PREPARED UNDERLYING COURSE IN ACCORDANCE TO THESE SPECIFICATIONS AND SHALL CONFORM TO THE DIMENSIONS AND TYPICAL CROSS SECTION SHOWN
ON THE PLAN SHEETS.
302-2 MATERIALS
· IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FURNISH MATERIAL WHICH, WHEN COMPACTED, WILL SUPPORT THE
CONSTRUCTION EQUIPMENT WITHOUT SHOWING SIGNS OF DISPLACEMENT.
302-2.1 GRADATION
· THE GRADATION OF THE AGGREGATE BASE AND AGGREGATE SURFACE MATERIAL SHALL MEET THE REQUIREMENTS OF THE GRADATIONS
GIVEN IN THE FOLLOWING TABLE WHEN TESTED IN ACCORDANCE WITH ASTM C136.
SUB SHEET NO.DESIGNED:
· BLENDED BASE SHALL BE DEPOSITED, SPREAD, AND SHAPED SO THE MOIST AND COMPACTED COURSE CONFORMS TO THE REQUIRED GRADE AND CROSS SECTION. THE DESIRED DEGREE OF COMPACTION WILL BE ACCEPTABLE WHEN THE SURFACE IS TIGHTLY BOUND AND SHOWS NO
RUTTING OR DISPLACEMENT UNDER ROLLER OPERATIONS.
302-3 CONSTRUCTION REQUIREMENTS
302-3.1 PREPARING UNDERLYING COURSE
· THE UNDERLYING COURSE SHALL BE INSPECTED AND ACCEPTED BY THE PROJECT C.O.R. BEFORE PLACING AND SPREADING OPERATIONS ARE STARTED. ANY RUTS OR SOFT, YIELDING PLACES DUE TO IMPROPER DRAINAGE CONDITIONS, HAULING, OR ANY OTHER CAUSE SHALL BE CORRECTED AND ROLLED TO THE REQUIRED DENSITY BEFORE THE BASE COURSE IS PLACED THEREON.
· TO PROTECT THE UNDERLYING COURSE AND TO INSURE PROPER DRAINAGE, THE SPREADING OF THE BASE SHALL BEGIN ALONG THE CENTERLINE OF THE PAVEMENT ON A CROWNED SECTION OR ON THE HIGH SIDE OF THE PAVEMENT WITH ONE-WAY SLOPE.
302-3.2 METHODS OF SPREADING
· THE AGGREGATE BASE AND AGGREGATE SURFACE MATERIAL THAT IS CORRECTLY PROPORTIONED SHALL BE PLACED ON THE PREPARED UNDERLYING COURSE AND COMPACTED IN LAYERS OF THE THICKNESS SHOWN ON THE PLAN SHEETS.
· THE AGGREGATE BASE AND AGGREGATE SURFACE SHALL BE CONSTRUCTED IN LAYERS NOT LESS THAN 3 INCHES NOR MORE THAN 4 INCHES OF
COMPACTED THICKNESS.
· THE AGGREGATE AS SPREAD SHALL BE OF UNIFORM GRADING WITH NO POCKETS OF FINE OR COURSE MATERIALS.
· NO MATERIAL SHALL BE PLACED IN SNOW OR ON A SOFT, MUDDY, OR FROZEN COURSE.
· DURING THE MIXING AND SPREADING, SUFFICIENT CAUTION SHALL BE EXERCISED TO PREVENT THE INCORPORATION OF SUBGRADE, SUBBASE, OR SHOULDER MATERIAL IN THE BASE COURSE MIXTURE.
302-3.3 FINISHING AND COMPACTING
· WHILE SPREADING, THE AGGREGATE SHALL BE THOROUGHLY COMPACTED BY ROLLING. THE ROLLING SHALL PROGRESS GRADUALLY FROM THE SIDES TO THE CENTER OF LANE UNDER CONSTRUCTION, OR FROM ONE SIDE TOWARD PREVIOUSLY PLACED MATERIAL BY LAPPING UNIFORMLY
EACH PROCEEDING REAR WHEEL TRACK BY ONE-HALF THE WIDTH OF SUCH TRACK.
· ROLLING SHALL CONTINUE UNTIL THE ENTIRE AREA OF THE COURSE HAS BEEN ROLLED BY THE REAR WHEELS. THE ROLLING SHALL CONTINUE UNTIL THE AGGREGATE IS THOROUGHLY SET, THE INTERSTICES OF THE MATERIAL REDUCED TO A MINIMUM, AND UNTIL CREEPING OF THE
MATERIAL AHEAD OF THE ROLLER IS NO LONGER VISIBLE.
· ROLLING SHALL CONTINUE UNTIL THE AGGREGATE BASE AND AGGREGATE SURFACE MATERIAL HAS BEEN COMPACTED TO NO LESS THAN 95 PERCENT OF THE MAXIMUM DRY DENSITY AT OPTIMUM MOISTURE AS DETERMINED BY THE COMPACTION CONTROL TESTS SPECIFIED IN ASTM D1557 WITH A MOISTURE CONTENT FALLING WITHIN PLUS OR MINUS 3 PERCENT OR OPTIMUM MOISTURE CONTENT.
· BLADING AND ROLLING SHALL BE DONE ALTERNATELY AS REQUIRED OR DIRECTED TO OBTAIN A SMOOTH, EVEN, AND UNIFORMLY COMPACTED
BASE.
· THE COURSE SHALL NOT BE ROLLED WHEN THE UNDERLYING COURSE IS SOFT OR YIELDING OR WHEN THE ROLLING CAUSES UNDULATION IN THE BASE COURSE. WHEN THE ROLLING DEVELOPS IRREGULARITIES THAT EXCEED 12 INCH WHEN TESTED WITH A 16 FOOT STRAIGHTEDGE, THE IRREGULAR SURFACE SHALL BE LOOSENED, REFILLED WITH THE SAME KIND FO MATERIAL AS THAT USED IN CONSTRUCTING COURSE, AND
ROLLED AGAIN AS REQUIRED.
· IN AREAS INACCESSIBLE TO ROLLERS, THE AGGREGATE BASE AND AGGREGATE SURFACE MATERIAL SHALL BE TAMPED THOROUGHLY WITH
APPROVED MECHANICAL TAMPERS.
302-3.4 SURFACE TEST
· AFTER THE COURSE HAS BEEN COMPACTED, THE SURFACE SHALL BE TESTED FOR SMOOTHNESS AND ACCURACY OF GRADE AND CROWN. ANY PORTION LACKING THE REQUIRED SMOOTHNESS OR FAILING IN ACCURACY OF GRADE OR CROWN SHALL BE SCARIFIED, RESHAPED, RECOMPACTED, AND OTHERWISE MANIPULATED AS THE PROJECT C.O.R. MAY DIRECT UNTIL THE REQUIRED SMOOTHNESS AND ACCURACY ARE
OBTAINED.
· THE FINISHED SURFACE SHALL NOT VARY MORE THAN 12 INCH FROM A 16 FOOT STRAIGHTEDGE WHEN APPLIED TO THE SURFACE PARALLEL AND
AND AT RIGHT ANGLES TO THE CENTERLINE.
302-3.5 PROTECTION
· WORK ON AGGREGATE BASE AND AGGREGATE SURFACE SHALL NOT BE ACCOMPLISHED DURING FREEZING TEMPERATURES NOR WHEN THE SUBGRADE IS WET. WHEN THE AGGREGATES CONTAIN FROZEN MATERIALS OR WHEN UNDERLYING COURSE IS FROZEN, THE CONSTRUCTION
SHALL BE STOPPED.
302-3.6 MAINTENANCE
· FOLLOWING THE COMPLETION OF THE AGGREGATE BASE AND AGGREGATE SURFACE, THE CONTRACTOR SHALL PERFORM ALL MAINTENANCE WORK NECESSARY TO KEEP THE AGGREGATE BASE AND AGGREGATE SURFACE IN A CONDITION SATISFACTORY FOR PRIMING.
· AFTER PRIMING, THE SURFACE SHALL BE KEPT CLEAN AND FREE OF FOREIGN MATERIAL.
· THE BASE COURSE SHALL BE PROPERLY DRAINED AT ALL TIMES.
AGGREGATE SPECIFICATIONS
SIEVE SIZE OR TESTING
METHOD
AGGREGATE CLASS
2 3 3M 4 5 7 8 13
PERCENT PASSING OR TESTING REQUIREMENT
3 INCH 100
1-1/2 INCH 100
1 INCH 100 100 100 100
3/4 INCH 100 80-100 80-100 100 90-100 95-100 70-100
1/2 INCH 85-100
3/8 INCH 50-95 60-90
NO. 4 35-85 35-85 35-85 35-70 15-25 35-80 35-75
NO. 8 2-10 22-62
NO. 10 0-15
NO. 30 0-4 20-50 20-50 10-50 16-40 12-45
NO. 200 0-15 4-10 7-17 4-10 0-3 7-15
ND T 113, SHALE (MAX %) 12.0% 12.0% 15.0% 12.0% 8.0% 20.0% 12.0%
AASHTO T 96, L.A.
ABRASION (MAX %) 50% 50% 40% 50%
NDDOT 4, FRACTURED
FACES* 10% 10% 85% 10%
* MINIMUM WEIGHT PERCENTAGE ALLOWABLE FOR THE PORTION OF THE AGGREGATE RETAINED ON A NO. 4 SIEVE HAVING AT LEAST ONE FRACTURED
FACE FOR CLASSES 4, 5, AND 13 AND AT LEAST TWO FRACTURED FACES FOR CLASS 7.
· THE MAXIMUM ALLOWABLE PLASTICITY INDEX (PI) OF AGGREGATE SHALL BE BASED ON THE MATERIAL GRADATION AND COMPUTED BY THE
FOLLOWING FORMULA:
MAX PI = 10 - (PERCENT PASSING THE NO. 40 SIEVE / 10)
· THE GRADATIONS IN THE ABOVE TABLE REPRESENT THE LIMITS WHICH SHALL DETERMINE THE SUITABILITY OF AGGREGATE FOR USE FROM THE SOURCES OF SUPPLY. THE FINAL GRADATIONS DECIDED ON WITHIN THE LIMITS DESIGNATED IN THE TABLE SHALL BE WELL GRADED FROM COURSE TO FINE AND SHALL NOT VARY FROM THE LOW LIMIT ON ONE SIEVE TO THE HIGH LIMIT ON THE ADJACENT SIEVES, OR VICE
VERSA.
· ALL NATURAL MATERIAL PASSING AN 8-INCH RING AND RETAINED ON THE 1-INCH SIEVE SHALL BE CRUSHED AND UNIFORMLY MIXED WITH
THE UNCRUSHED MATERIAL.
· THE AMOUNT OF THE FRACTION OF MATERIAL PASSING THE NO. 200 MESH SIEVE SHALL NOT EXCEED ONE-HALF THE FRACTION PASSING
THE NO. 40 MESH SIEVE.
· THE SELECTION OF ANY OF THE GRADATIONS SHOWN IN THE ABOVE TABLE SHALL BE SUCH THAT THE MAXIMUM SIZE AGGREGATE USED IN ANY COURSE SHALL NOT BE MORE THAN TWO-THIRDS THE THICKNESS OF THE LAYER OF THE COURSE BEING CONSTRUCTED.
· IF FILLER MATERIAL TO THAT NATURALLY PRESENT IN THE AGGREGATE BASE AND AGGREGATE SURFACE MATERIAL IS NECESSARY FOR SATISFACTORY BONDING OF THE MATERIAL FOR CHANGING SOIL CONSTANTS OF THE MATERIAL PASSING THE NO. 40 MESH SIEVE, OR FOR CORRECTING THE GRADATION TO THE LIMITATIONS OF THE SPECIFIED GRADATION, IT SHALL BE UNIFORMLY BLENDED WITH THE AGGREGATE BASE AND AGGREGATE SURFACE MATERIAL AT THE CRUSHING AND/OR MIXING PLANT.
· THE ADDITIONAL FILLER MATERIAL MAY BE COMPOSED OF SAND, BUT THE AMOUNT OF SAND SHALL NOT EXCEED 20 PERCENT BY WEIGHT OF THE TOTAL COMBINED BASE AGGREGATE. THE SAND SHALL PASS A NO. 4 MESH SIEVE, AND NOT MORE THAN 5 PERCENT BY WEIGHT
SHALL PASS A NO. 200 MESH SIEVE.
302-2.2 BLENDED BASE
· THIS ITEM SHALL CONSIST OF A UNIFORMLY BLENDED MATERIAL CONTAINING UP TO 50 PERCENT RECYCLED ASPHALT BY VOLUME WITH UP TO 100 PERCENT CRUSHED CONCRETE OR CLASS 5 AGGREGATE. RECYCLED MATERIALS SHALL CONFORM TO CLASS 5 GRADATION.
· BLENDED BASE SHALL BE CONSTRUCTED ON A PREPARED SUBGRADE IN CONFORMITY WITH THE DIMENSIONS AND TYPICAL SECTION
SHOWN ON PLAN SHEETS.
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
NPS PMIS NO: 254306 THRO DRAWING NUMBER 2020-08
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
STANDARD SPECIFICATIONS
PORTLAND CEMENT
CONCRETE PAVEMENT 16
21OF
SECTION 501 - PORTLAND CEMENT CONCRETE PAVEMENT
501-1 DESCRIPTION
· THIS ITEM SHALL CONSIST OF A PAVEMENT COMPOSED OF AIR-ENTRAINED PORTLAND CEMENT CONCRETE, WITH OR WITHOUT REINFORCEMENT AS SPECIFIED, CONSTRUCTED ON PREPARED SUBGRADE OR AGGREGATE BASE COURSE IN ACCORDANCE WITH THESE SPECIFICATIONS, AND IN CONFORMITY WITH THE LINES, GRADES, THICKNESS, AND TYPICAL CROSS SECTIONS SHOWN ON THE PLAN SHEETS.
501-2 MATERIALS
501-2.1 GENERAL
· THE AGGREGATE SHALL CONSIST OF CRUSHED STONE, CRUSHED GRAVEL, GRAVEL, SAND GRAVEL, SAND, OR OTHER NATURAL GRANULAR AND APPROVED MATERIAL WHICH HAVE THE SAME QUALITIES AND MEET ALL REQUIREMENTS WHEN COMBINED WITHIN THE LIMITS FOR
GRADATION.
501-2.2 PORTLAND CEMENT
· THE PORTLAND CEMENT USED IN THE WORK SHALL BE TYPE IIA, MEETING THE REQUIREMENTS OF ASTM C150.
501-2.2 FLY ASH
· THE CONTRACTOR SHALL HAVE THE OPTION OF SUBSTITUTING FLY ASH FOR PORTLAND CEMENT IN THE CONCRETE MIXTURE UP TO A
MAXIMUM OF 25 PERCENT BY WEIGHT.
· EACH SOURCE OF FLY ASH SHALL BE APPROVED BY THE PROJECT C.O.R. PRIOR TO USE.
· FLY ASH SHALL CONFORM TO THE REQUIREMENTS OF ASTM C311, ASTM C618, AND ASTM C684, CLASS C FLY ASH, OR…