CONSTRUCTION DRAWINGS
RECOMMENDED:
APPROVED:
DATE
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF DRAWING DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
REVISIONS
NORTH UNIT PAVED WALKWAYS
28OF
LOCATION WITHIN PARK
NAME OF PARK
REGION
REGION 5 - MISSOURI BASIN
COUNTY
MCKENZIE
STATE
NORTH DAKOTA
JUNIPER PICNIC AREA & CAMPGROUNDUNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
THEODORE ROOSEVELT NATIONAL PARK
MARK SHEET DATE INITIALS
PROJECT MANAGER
SUPERINTENDENT DATE
SOUTHWESTERN NORTH DAKOTA
INDEX TO SHEETS
TITLE OF SHEETSUB SHEETSHEET NUMBER
1 N/A COVER SHEET
2 G1 GENERAL PROJECT, REMOVAL, AND REHABILITATION NOTES
3 C1 JUNIPER PICNIC AREA & CAMPGROUND EXISTING SITE PLAN
4 C2 JUNIPER PICNIC AREA & CAMPGROUND REMOVAL PLAN
5 C3 JUNIPER CAMPGROUND VAULT TOILET AREA REMOVAL DETAILS
6 C4 JUNIPER PICNIC AREA COMFORT STATION REMOVAL DETAILS
7 - 10 C5 - C8 JUNIPER PICNIC AREA & CAMPGROUND PROPOSED SITE PLAN
11 C9 12 C10 13 C11
14 - 18 C12 - C16
204 STANDARD SPECIFICATION SUBGRADE PREPARATION
23 - 27
302 STANDARD SPECIFICATION AGGREGATE BASE/SURFACE COURSE
501 STANDARD SPECIFICATION PORTLAND CONCRETE PAVEMENT
601 STANDARD SPECIFICATION CONCRETE SIDEWALKS/WALKWAYS
THIS DRAWING PACKAGE IS INCLUSIVE TO THE GENERAL REQUIREMENTS
SPECIFICATION SECTION 01-10-00. REFER TO GENERAL REQUIREMENTS FOR
ADDITIONAL INFORMATION ON WALKWAY MATERIAL AND INSTALLATION
TOLERANCES.
THEODORE ROOSEVELT NATIONAL PARK
(NORTH UNIT)
0 25 50 75 100 Miles
174976
JUNIPER CAMPGROUND VAULT TOILET AREA DETAILS
CONCRETE WALKWAY DETAILS
CONCRETE GARBAGE CONTAINER PAD DETAILS
CONCRETE WALKWAY VERTICAL PROFILES
19 V1 SURVEY CONTROL COORDINATE DATA
V2 WALKWAY ALIGNMENT GEOMETRY/LAYOUT DATA
PROJECT AREA
JUNIPER PICNIC AREA
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
G1
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
GENERAL PROJECT, REMOVAL,
AND REHABILITATION NOTES 2
28OF
GENERAL NOTES
1. CONTRACTOR RECEIVING AWARD SHALL FIELD VERIFY ALL CONDITIONS AND MEASUREMENTS PRIOR TO COMMENCING WORK.
2. PROJECT AREA IS LOCATED APPROXIMATELY FIVE AND ONE QUARTER (5.25) MILES FROM INTERSECTION WITH U.S. HIGHWAY 85 (PARK ENTRANCE).
3. ALL QUANTITIES NOTED WITHIN THIS PLAN SET ARE APPROXIMATE, AND PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL QUANTITIES PRIOR TO SUBMITTING A BID OR COMMENCING CONSTRUCTION.
4. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION LAYOUT AND STAKING REQUIRED TO COMPLETE THE CONTRACTED WORK.
5. THE CONTRACTOR IS RESPONSIBLE FOR HARDENING ANY EXISTING PAVEMENT, CONCRETE SURFACES, OR BUILDINGS TO PROTECT AGAINST DAMAGE OCCURRING DUE TO ACCESS TO THE PROJECT WORK AREA, MATERIAL STORAGE, REMOVAL, OR CONSTRUCTION ACTIVITIES.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING NATIONAL PARK SERVICE INFRASTRUCTURE DUE TO PROJECT ACCESS, MATERIAL STORAGE, OR CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL COORDINATE ALL REPAIRS WITH THE PROJECT C.O.R., AND REPAIR ALL
DAMAGE PRIOR TO THE COMPLETION OF THE CONTRACTED WORK.
7. THE NATIONAL PARK SERVICE SHALL APPROVE THE FINAL HORIZONTAL, VERTICAL PROFILE, SUBGRADE PREPARATION, AND FORM-WORK PRIOR TO
THE LAYING OF CONCRETE.
8. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS, TRASH, AND MATERIALS FROM PARK PROPERTY RELATED TO THE CONSTRUCTION PROJECT. THE USE OF PARK TRASH CONTAINERS IS NOT PERMISSIBLE. THE CLEANING OF EQUIPMENT WILL BE CONDUCTED OFF PARK PROPERTY DUE
TO ENVIRONMENTAL CONCERNS.
9. ALL SECURITY AND PROTECTION OF THE CONTRACTOR'S EQUIPMENT AND MATERIALS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE GOVERNMENT WILL NOT BE LIABLE FOR DAMAGE OR THEFT OF CONTRACTOR'S TOOLS OR EQUIPMENT IF STAGED ON THE GROUNDS OF THE
NATIONAL PARK.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PUBLIC SAFETY WHEN CONDUCTING WORK ADJACENT TO PUBLICLY ACCESSED AREAS. PROTECTION MAY INCLUDE BUT ARE NOT LIMITED TO BARRICADES, CONSTRUCTION FENCING, SIGNAGE OR A DEDICATED INDIVIDUAL TO MONITOR AND DIRECT WHEN THE PUBLIC IS PRESENT ADJACENT TO ACTIVE WORK AREAS. THE PROJECT C.O.R. RESERVES THE RIGHT TO REQUIRE ADDITIONAL PUBLIC PROTECTION MEASURES IF CONTRACTOR PROVIDED MEASURES DEMONSTRATE A LACK OF REASONABLE PROTECTION.
11. LOCATION OF TEMPORARY SERVICES ALLOWED WITHIN THE IMMEDIATE PROJECT AREA, DUMPSTER OR SATELLITE TOILET, WILL BE IDENTIFIED BY THE PROJECT C.O.R. DURING THE PRE-CONSTRUCTION MEETING. MAINTAINING TEMPORARY SERVICES SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
12. IT IS EXPECTED, ONCE THE CONTRACTOR COMMENCES WITH DISTURBANCE ACTIVITIES AT THE PROJECT AREA; THAT CONSTRUCTION ACTIVITY PERSISTS THROUGH COMPLETION. ANY PROJECT AREA WHICH REMAINS IDLE FOR A PERIOD GREATER THAN 10 CALENDAR DAYS, SHALL HAVE EQUIPMENT AND STOCKPILED MATERIALS REMOVED FROM THE PROJECT AREA. COORDINATION WITH THE PROJECT C.O.R. SHALL BE UTILIZED TO
COMMUNICATE DELAYS ASSOCIATED WITH POOR WEATHER CONDITIONS.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING THE LANDSCAPE ADJACENT TO THE PROJECT AREA FROM SEDIMENT DISCHARGE DUE TO
CONSTRUCTION ACTIVITIES.
14. THE CONTRACTOR SHALL EMPLOY SEDIMENT DISCHARGE PROTECTION DURING ALL PHASES OF CONSTRUCTION. THE CONTRACTOR SHALL BE ALLOWED TO INCORPORATE MITIGATION MEASURES WHICH CAN BE EFFICIENTLY MOVED AS WORK PROGRESSES THROUGH THE SITE, PROVIDED
SUITABLE PROTECTION IS ESTABLISHED WHERE MEASURES ARE REMOVED.
15. THE CONTRACTOR SHALL SWEEP ALL NEWLY CONSTRUCTED CONCRETE NO MORE THAN 24-HOURS BEFORE A SCHEDULED FINAL PROJECT
INSPECTION.
SUB SHEET NO.DESIGNED:
REMOVAL NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS, TRASH, AND MATERIALS FROM PARK PROPERTY RELATED TO THE CONSTRUCTION
PROJECT. THE USE OF PARK TRASH CONTAINERS IS NOT PERMISSIBLE. THE CLEANING OF EQUIPMENT WILL BE CONDUCTED OFF PARK PROPERTY DUE
TO ENVIRONMENTAL CONCERNS.
2. REMOVE EXISTING SLABS, PAVING, CURBS, GUTTERS, AND WALKS AS INDICATED IN PLAN SET.
2.1. UNLESS EXISTING FULL-DEPTH JOINTS COINCIDE WITH THE LINE OF DEMOLITION, NEATLY SAW-CUT ALONG LINE OF EXISTING PAVEMENT TO
REMAIN BEFORE REMOVING ADJACENT PAVEMENT. SAW CUT ALL FACES VERTICALLY.
2.2. PAINT CUT ENDS OF ANY STEEL REINFORCEMENT IN CONCRETE TO REMAIN WITH TWO COATS OF ANTIRUST COATING, FOLLOWING COATING MANUFACTURER'S WRITTEN INSTRUCTIONS. KEEP PAINT OFF SURFACES THAT WILL REMAIN EXPOSED.
3. REMOVE SOD AND GRASS BEFORE STRIPPING TOPSOIL. CONTRACTOR TO IDENTIFY AND DETERMINE DEPTH OF EXISTING TOPSOIL. STRIP TOPSOIL IN A MANNER TO PREVENT INTERMINGLING WITH UNDERLYING SUBSOIL OR OTHER WASTE MATERIALS.
3.1. STOCKPILE LOCATIONS AT PROJECT AREAS WILL BE IDENTIFIED BY THE PROJECT C.O.R. DURING THE PRE-CONSTRUCTION MEETING.
3.1. STOCKPILE TOPSOIL INTERMIXING WITH SUBSOIL OR OTHER MATERIALS. GRADE AND SHAPE STOCKPILES TO DRAIN SURFACE WATER. COVER
STOCKPILE TO PREVENT WINDBLOWN DUST AND EROSION BY WATER.
3.2. DISPOSE OF SURPLUS TOPSOIL SHALL BE COORDINATED WITH THE PROJECT C.O.R.
4. REMOVE SURPLUS SOIL MATERIAL, DEMOLISHED MATERIALS, AND WASTE MATERIALS INCLUDING TRASH AND DEBRIS, AND DISPOSE OF THEM OFF
GOVERNMENT PROPERTY, ADHERING TO ALL LOCAL, STATE, AND FEDERAL REGULATIONS.
4.1. THE USE OF PARK TRASH CONTAINERS IS NOT PERMISSIBLE.
4.2. THE CLEANING OF EQUIPMENT WILL BE CONDUCTED OFF PARK PROPERTY DUE TO ENVIRONMENTAL CONCERNS.
SITE REHABILITATION NOTES
1. THE CONTRACTOR SHALL BACKFILL AGAINST THE SIDES OF WALKWAY PADS TO THE TOP OF THE FINISHED CONCRETE SURFACE, AND SLOPE FILL
AWAY FROM THE WALKWAY AT A GRADE NO STEEPER THAN 4' HORIZONTAL TO 1' VERTICAL (4:1 MAX).
2. IMMEDIATELY PRIOR TO PLACING TOPSOIL, THE SUBGRADE SHALL BE LOOSENED BY DISKING OR SCARIFYING TO A DEPTH OF TWO INCHES TO
PROVIDE FOR THE BONDING OF THE TOPSOIL TO THE SUBGRADE.
2.1. TOPSOIL SHALL BE PLACED ON ALL REHABILITATED AREAS TO PROVIDE SOIL CAPABLE OF SUPPORTING GRASS GROWTH.
2.2. TOPSOIL SHALL BE GRADED TO DRAIN THEN MODERATELY COMPACTED BY USE OF A SOIL-ROLLER OR OTHER C.O.R. APPROVED METHOD.
2.3. IRREGULARITIES OR LOW SPOTS RESULTING FROM THE TOPSOILING OR OTHER OPERATIONS SHALL BE CORRECTED IN ORDER TO PREVENT
POCKETS WHERE WATER MAY STAND.
2.4. TOPSOIL SHALL NOT BE PLACED WHEN THE SUBGRADE IS FROZEN, EXCESSIVELY WET, EXTREMELY DRY, OR IN A CONDITION OTHERWISE
DETRIMENTAL TO THE PROPOSED PLANTINGS.
3. THE NATIONAL PARK SERVICE WILL SEED ALL DISTURBED AREAS AT THE COMPLETION OF THE PROJECT.
4. ALL REPAIRS TO NATIONAL PARK INFRASTRUCTURE DUE TO PROJECT ACCESS, MATERIAL STORAGE, OR CONSTRUCTION ACTIVITIES MUST BE
COMPLETED PRIOR TO PROJECT CLOSE-OUT.
5. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS, TRASH, AND MATERIALS FROM PARK PROPERTY RELATED TO THE CONSTRUCTION
PROJECT PRIOR TO PROJECT CLOSE-OUT.
6. PRIOR TO FINAL INSPECTIONS, THE CONTRACTOR SHALL SWEEP ALL NEWLY CONSTRUCTED CONCRETE; ALSO TO INCLUDE WORK AREA ACCESS
ROUTES, STAGING, AND MATERIAL STORAGE AREAS.
174976
JUNIPER PICNIC
AREA PARKING AREA
JUNIPER
CAMPGROUND
ENTRANCE
JUNIPER
CAMPGROUND
ROAD
COMFORT
STATION
REAR PROJECTION
BUILDING
AMPITHEATER
VAULT TOILET
JUNIPER
CAMPGROUND
ROAD
PAVED WALKWAY
PAVED WALKWAY
PAVED WALKWAY
PAVED WALKWAY
PAVED WALKWAY
AC
HEN
BA
CH
T
RA
IL
ACH
EN
BACH
TR
AIL
ACHENBACH
TRAILHEAD
PAVED WALKWAY
CMPRJ-HV
CMPRJ-HV
1959.36
CMPRJ-HV
1960.49
CMPRJ-HV
1959.51
CMPRJ-HV
1961.18
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C1
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
JUNIPER PICNIC AREA &
CAMPGROUND EXISTING
SITE PLAN 3
28OF
SCALE OF FEET
30 600 30
REMOVE
CONCRETE PADS
REMOVE
CONCRETE PADS
REMOVE
CONCRETE PAD
REMOVE
CONCRETE PAD
JUNIPER PICNIC
AREA PARKING AREA
JUNIPER
CAMPGROUND
ENTRANCE
JUNIPER
CAMPGROUND
ROAD
COMFORT STATION
(SEE SHEET C4 FOR DETAILS)
REAR PROJECTION
BUILDING
AMPITHEATER
VAULT TOILET
(SEE SHEET C3 FOR DETAILS)
REMOVE
CONCRETE PADS
REMOVE
CONCRETE
PADS
END OF WALKWAY
REPLACEMENT
BEGINNING OF
WALKWAY
REPLACEMENT
REMOVE
ASPHALT
WALKWAY
JUNIPER
CAMPGROUND
ROAD
REMOVE ASPHALT
WALKWAY
REMOVE ASPHALT
WALKWAY
REMOVE ASPHALT
WALKWAY
REMOVE ASPHALT
WALKWAY
REMOVE ASPHALT
WALKWAY
REMOVE ASPHALT
WALKWAY
AC
HEN
BA
CH
T
RA
IL
ACH
EN
BACH
TR
AIL
ACHENBACH
TRAILHEAD
REMOVE ASPHALT
PAD
CMPRJ-HV
CMPRJ-HV
1959.36
CMPRJ-HV
1960.49
CMPRJ-HV
1959.51
CMPRJ-HV
1961.18
DEMOLITION/REMOVAL NOTES
1. ALL QUANTITIES NOTED WITHIN THIS PLAN SET ARE APPROXIMATE, AND PROVIDED FOR THE
CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL
QUANTITIES PRIOR TO SUBMITTING A BID OR COMMENCING CONSTRUCTION.
2. ALL REMOVED MATERIAL, INCLUDING DEBRIS AND EXISTING BITUMINOUS MATERIAL, SHALL BECOME THE RESPONSIBILITY OF THE CONTRACTOR, AND SHALL BE DISPOSED OF OFF-SITE FOLLOWING ALL APPLICABLE LOCAL, STATE, AND FEDERAL RULES AND REGULATIONS; UNLESS COORDINATED WITH THE
PROJECT C.O.R. FOR ONSITE STOCKPILING.
3. EXISTING GARBAGE COLLECTION CONTAINERS WILL BE REMOVED FROM CONCRETE PADS SCHEDULED FOR DEMOLITION BY THE NATIONAL PARK SERVICE PRIOR TO THE START OF CONSTRUCTION ACTIVITIES.
4. REMOVE ASPHALT WALKWAYS, SIX (6) CONCRETE TRASH CONTAINER PADS, FIVE (5) CONCRETE PADS LOCATED ADJACENT TO THE VAULT TOILET AND COMFORT STATION, AND WOOD TIMBER ASPHALT
WALKWAY EDGING.
5. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS, TRASH, AND MATERIALS FROM PARK PROPERTY RELATED TO THIS CONSTRUCTION PROJECT. THE USE OF PARK TRASH CONTAINERS IS NOT
PERMISSIBLE.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PUBLIC SAFETY WHEN CONDUCTING WORK ADJACENT TO PUBLIC ACCESSED AREAS. PROTECTION MAY INCLUDE, BUT ARE NOT LIMITED TO BARRICADES, CONSTRUCTION FENCING, SIGNAGE OR A DEDICATED INDIVIDUAL TO MONITOR AND DIRECT WHEN THE
PUBLIC IS PRESENT ADJACENT TO ACTIVE WORK AREAS. SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C2
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
JUNIPER PICNIC AREA &
CAMPGROUND REMOVAL PLAN 4
28OF
REMOVAL OF BITUMINOUS SURFACING
REMOVAL QUANTITIES (ESTIMATED)
5,518 SQFT +/-
REMOVAL OF CONCRETE PADS
SCALE OF FEET
30 600 30
171 SQFT +/-
94 FT +/-REMOVAL OF WOOD TIMBERS
REMOVE CONCRETE PADS
(50 SQ. FT. ±)
REMOVE ASPHALT
WALKWAY (282 SQ. FT. ±)
REMOVE ASPHALT WALKWAY
TIMBER BORDER (94 FT. ±)
WINDSCREENS SHALL BE REMOVED BY
NPS PRIOR TO CONSTRUCTION COMMENCEMENT
REMOVE REMNANT OF
WOOD POSTS AND CONCRETE
REMOVE REMNANT OF
WOOD POST AND CONCRETE
SAW CUT ASPHALT
BETWEEN WALKWAY
AND ROAD (4 FT. ±)
VAULT
TOILET
(TO REMAIN)
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C3
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-05
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
JUNIPER CAMPGROUND VAULT
TOILET AREA REMOVAL PLAN 5
28OF
C3 SCALE A
SCALE OF FEET
4 8
ASCALE
0 4
JUNIPER CAMPGROUND VAULT
TOILET AREA REMOVALS
C3
PHOTOGRAPH - VAULT TOILET
NO SCALE
C3
PHOTOGRAPH - VAULT TOILET
NO SCALE
REMOVE
CONCRETE PAD
REMOVE ASPHALT
WALKWAY
REMOVE WOOD
TIMBERS
REMOVE ASPHALT
WALKWAY
REMOVE
CONCRETE PAD
REMOVE WOOD
TIMBERS
174976
REMOVE
CONCRETE
POST PADS
REMOVE
CONCRETE
POST PADS
DEMOLITION/REMOVAL NOTES
1. ALL QUANTITIES NOTED WITHIN THIS PLAN SET ARE APPROXIMATE, AND PROVIDED FOR THE
CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL
QUANTITIES PRIOR TO SUBMITTING A BID OR COMMENCING CONSTRUCTION.
2. ALL REMOVED MATERIAL, INCLUDING DEBRIS AND EXISTING BITUMINOUS MATERIAL, SHALL BECOME THE RESPONSIBILITY OF THE CONTRACTOR, AND SHALL BE DISPOSED OF OFF-SITE FOLLOWING ALL APPLICABLE LOCAL, STATE, AND FEDERAL RULES AND REGULATIONS; UNLESS COORDINATED WITH THE
PROJECT C.O.R. FOR ONSITE STOCKPILING.
3. VAULT TOILET WINDSCREENS WILL BE REMOVED BY THE NATIONAL PARK SERVICE PRIOR TO THE START OF
CONSTRUCTION ACTIVITIES.
4. PROTECT/HARDEN THE EXTERIOR SURFACES OF THE VAULT TOILET, ANY DAMAGE TO THE EXTERIOR OF
THE VAULT TOILET BUILDING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
5. NEATLY SAW-CUT (4 FT. ±) BETWEEN THE VAULT TOILET WALKWAY AND JUNIPER CAMPGROUND
ROAD BEFORE REMOVING EXISTING ASPHALT WALKWAY. SAW CUT ALL FACES VERTICALLY.
6. REMOVE ASPHALT WALKWAY (282 SQ. FT. ±), TWO (2) CONCRETE PADS (50 SQ. FT. ±), AND WALKWAY
TIMBER BORDER (94 FT. ±).
7. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS, TRASH, AND MATERIALS FROM PARK PROPERTY RELATED TO THIS CONSTRUCTION PROJECT. THE USE OF PARK TRASH CONTAINERS IS NOT
PERMISSIBLE.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PUBLIC SAFETY WHEN CONDUCTING WORK ADJACENT TO PUBLIC ACCESSED AREAS. PROTECTION MAY INCLUDE, BUT ARE NOT LIMITED TO BARRICADES, CONSTRUCTION FENCING, SIGNAGE OR A DEDICATED INDIVIDUAL TO MONITOR AND DIRECT WHEN THE
PUBLIC IS PRESENT ADJACENT TO ACTIVE WORK AREAS.
REMOVE CONCRETE
PAD (24 SQ. FT.)
REMOVE CONCRETE
PAD (24 SQ. FT.)
REMOVE CONCRETE
PAD (9 SQ. FT.)
REMOVE ASPHALT
WALKWAY
COMFORT
STATION
(TO REMAIN)
DEMOLITION/REMOVAL NOTES
1. ALL QUANTITIES NOTED WITHIN THIS PLAN SET ARE APPROXIMATE, AND PROVIDED FOR THE
CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL
QUANTITIES PRIOR TO SUBMITTING A BID OR COMMENCING CONSTRUCTION.
2. ALL REMOVED MATERIAL, INCLUDING DEBRIS AND EXISTING BITUMINOUS MATERIAL, SHALL BECOME THE RESPONSIBILITY OF THE CONTRACTOR, AND SHALL BE DISPOSED OF OFF-SITE FOLLOWING ALL APPLICABLE LOCAL, STATE, AND FEDERAL RULES AND REGULATIONS; UNLESS COORDINATED WITH THE
PROJECT C.O.R. FOR ONSITE STOCKPILING.
3. PROTECT/HARDEN THE EXTERIOR SURFACES OF THE COMFORT STATION, ANY DAMAGE TO THE EXTERIOR
OF THE COMFORT STATION BUILDING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
4. REMOVE THREE (3) CONCRETE PADS (57 SQ. FT. ±) ADJACENT TO COMFORT STATION.
5. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS, TRASH, AND MATERIALS FROM PARK PROPERTY RELATED TO THIS CONSTRUCTION PROJECT. THE USE OF PARK TRASH CONTAINERS IS NOT
PERMISSIBLE.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PUBLIC SAFETY WHEN CONDUCTING WORK ADJACENT TO PUBLIC ACCESSED AREAS. PROTECTION MAY INCLUDE, BUT ARE NOT LIMITED TO BARRICADES, CONSTRUCTION FENCING, SIGNAGE OR A DEDICATED INDIVIDUAL TO MONITOR AND DIRECT WHEN THE
PUBLIC IS PRESENT ADJACENT TO ACTIVE WORK AREAS.
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C4
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-05
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
JUNIPER PICNIC AREA COMFORT
STATION AREA REMOVAL PLAN 6
28OF
C4 SCALE A
JUNIPER PICNIC AREA COMFORT
STATION AREA REMOVALS
C4
PHOTOGRAPH - COMFORT STATION
NO SCALE
C4
PHOTOGRAPH - COMFORT STATION
NO SCALE
REMOVE
CONCRETE PADS
REMOVE
CONCRETE PADS
SCALE OF FEET
4 8
ASCALE
0 4
CMPRJ-HV
1959.36
CMPRJ-HV
1960.49
CMPRJ-HV
1959.51
CMPRJ-HV
1961.18
INSTALL CONCRETE WALKWAY
SEE PAGE C10 FOR DETAILS
START OF
WALKWAY "A"
END OF
WALKWAY "A"
END OF
WALKWAY "B"
START OF
WALKWAY "B"
START OF
WALKWAY "C"
WALKWAY "H"
WALKWAY "F"
WALKWAY "E"
WALKWAY "G"
END OF
WALKWAY "C"
WALKWAY "D"
JUNIPER PICNIC
AREA PARKING AREA
JUNIPER
CAMPGROUND
ENTRANCE
JUNIPER
CAMPGROUND
ROAD
JUNIPER
CAMPGROUND
ROAD
AC
HEN
BA
CH
T
RA
IL
ACH
EN
BACH
TR
AIL
ACHENBACH
TRAILHEAD
INSTALL
CONCRETE
PAD
INSTALL
CONCRETE
PADINSTALL
CONCRETE
PAD
INSTALL
CONCRETE
PAD
SCALE OF FEET
30 600 30
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C5
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
JUNIPER PICNIC AREA AND
CAMPGROUND PROPOSED
SITE PLAN
28OF
GENERAL SITE CONSTRUCTION NOTES
1. ALL QUANTITIES NOTED WITHIN THIS PLAN SET ARE APPROXIMATE, AND PROVIDED FOR THE
CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL
QUANTITIES PRIOR TO SUBMITTING A BID OR COMMENCING CONSTRUCTION.
2. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION LAYOUT REQUIRED TO COMPLETE THE
CONTRACTED WORK.
3. THE CONTRACTOR SHALL INSTALL NEW CONCRETE WALKWAYS AS DETAILED ON PLAN SET.
4. THE CONTRACTOR SHALL INSTALL FIVE (5) CONCRETE PADS FOR GARBAGE COLLECTION CONTAINERS. ALL GARBAGE COLLECTION CONTAINERS SHALL BE BE INSTALLED BY THE NATIONAL PARK SERVICE, AS
DETAILED ON PLAN SHEETS C6, C7, AND C11.
0+00
0+20
0+
0+
0+
1+
1+
1+
1+
1+
PC: 0+21.52
PC
: 0
+7 9.
PC: 1+44.98
PT
: 0
+3 1.
PT: 1+13.87
PR
C:
+9
0.
CMPRJ-HV
1959.36
CMPRJ-HV
1960.49
0+000+
0+
0+
0+
1+
1+
1+
1+
1+
2+00
2+
2+
2+
2+
3+
PI:
0+
.46
PC: 0+21.08
PC: 0+34.32
PT: 0+27.88
PT
: 0
+46 .89
WALKWAY C - END
STATION: 1+57.66
NORTHING: 114,664.40
EASTING: 114,799.95
WALKWAY A - START
STATION: 0+00.00
NORTHING: 114,595.32
EASTING: 115,084.11
WALKWAY B - START
STATION: 0+00.00
NORTHING: 114,564.71
EASTING: 114,954.23
INTERSECTION
NORTHING: 114,610.28
EASTING: 114,864.44
WALKWAY C - START
STATION: 0+00.00
NORTHING: 114,548.99
EASTING: 114,891.10
INTERSECTION
NORTHING: 114,582.34
EASTING: 114,950.74
INTERSECTION
NORTHING: 114,580.06
EASTING: 114,769.05
INTERSECTION
NORTHING: 114,566.20
EASTING: 114,885.85
INSTALL 3' X 3'
CONCRETE PAD
INSTALL 3' X 12'
CONCRETE PAD
INSTALL 3' X 12'
CONCRETE PAD
C6
C1
L5
L6 L7
C5
C7
C8
L1
L2
L21
L22
C1
C2
0+00
0+20
0+40
0+
0+
1+
1+
1+
1+
EXISTING
PARKING AREA
EXISTING
PARKING AREA
C6
WALKWAY H - END
STATION: 0+18.01
NORTHING: 114,524.41
EASTING: 114,779.92
C6
AMPHITHEATER CONCRETE PAD DETAIL
NOT TO SCALE
A C6
SECTION AMPHITHEATER CONCRETE PAD
NOT TO SCALE
12'-0" 12'-0"
0.5% (MIN) TO 1.5% (MAX.) CROSS SLOPE
COMPACTED
AGGREGATE BASE COURSE
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE SPECIFICATIONS
12'-0"
START OF AMPHITHEATER PAD
STATION: 1+45.66
NORTHING: 114,656.683
EASTING: 114,809.139
TIE ALL REBAR INTERSECTIONS
WITH STEEL WIRE REBAR TIES
6" 6"
5" THICK CONCRETE
2'-6"
2'-6"FINISHED
GRADE
A C6
C6
COMPACTED
CLASS 5 AGGREGATE BASE
2" DIAMETER SMOOTH STEEL DOWEL
18" LONG SPACED 24" O.C. SET MID-DEPTH
GREASE OR CAP ONE END OF THE BAR
TO PREVENT ADHESION OF CONCRETE
C6
TYPICAL CONSTRUCTION JOINT
NOT TO SCALE
CONCRETE
(5" THICKNESS)
4" THICK PREFORMED
EXPANSION JOINT MATERIAL
TERMINATE EXPANSION JOINT MATERIAL NOT LESS
THAN 12" OR MORE THAN 1"BELOW FINISHED SURFACE
INSTALL JOINT SEALANT AS PER
MANUFACTURER'S RECOMMENDATIONS #4 REBAR GRID EMBEDDED
MID-DEPTH OF SLAB
SUB SHEET NO.DESIGNED:
10 0
SCALE OF FEET
10 20
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C6
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
JUNIPER PICNIC AREA AND
CAMPGROUND PROPOSED
SITE PLAN 8
28OF
GENERAL SITE CONSTRUCTION NOTES
1. ALL QUANTITIES NOTED WITHIN THIS PLAN SET ARE APPROXIMATE, AND PROVIDED FOR THE
CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL
QUANTITIES PRIOR TO SUBMITTING A BID OR COMMENCING CONSTRUCTION.
2. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION LAYOUT REQUIRED TO COMPLETE THE
CONTRACTED WORK.
3. THE CONTRACTOR SHALL INSTALL NEW CONCRETE WALKWAYS AS DETAILED ON PLAN SET.
4. THE CONTRACTOR SHALL INSTALL FIVE (5) CONCRETE PADS FOR GARBAGE COLLECTION CONTAINERS. ALL GARBAGE COLLECTION CONTAINERS SHALL BE BE INSTALLED BY THE NATIONAL PARK SERVICE, AS
DETAILED ON PLAN SHEETS C6, C7, AND C11.
1+
1+
2+
2+
2+
2+
2+
3+
3+
3+
3+
3+ 804+
4+
4+
4+60
4+80
5+
PI: 2+70.50
PC: 1+44.98
PC: 3+31.67
PC: 3+52.38
PC
: 4
+1 2.
PC: 4+56.14
PC: 4+91.01
PT: 2+45.43
PT: 3+44.41
PT
: 3
+7 0.
PT: 4+28.15
PT: 4+62.77
PR
C:
+9
0.
0+40
0+00
0+20
0+40
PC: 0+14.99
PT: 0+35.37
0+22
0+00
0+20
PC: 0+03.91
PT: 0+13.33
0+00
0+
0+
PC: 0+07.72
PT: 0+17.15
CMPRJ-HV
1960.49
4+23
2+
2+
3+
3+
3+
3+
3+ 804+
4+20
CO
MFO
RT
ST
ATIO
N
WALKWAY A - END
STATION: 4+23.09
NORTHING: 114,522.71
EASTING: 114,681.80
INTERSECTION
NORTHING: 114,580.06
EASTING: 114,769.05
INTERSECTION
NORTHING: 114,567.31
EASTING: 114,744.72
INTERSECTION
NORTHING: 114,514.37
EASTING: 114,721.66
INSTALL 3' X 3'
CONCRETE PAD
C6
L1
L2
L3
C2
C3 C4
L8
L9
L10
L11
L12
L1
C8
C9
C1
C11C12
C1
L2
L24
C2
L25
L26
C2
L27L28
C23
EXISTING
PARKING AREA
0+00
0+18
PRC: 3+52.93PT
: 3
+6 2.8
PC
: 3
+7 8.2
PT
: 3
+9 1.
PC
: 4
+0 9.
PT: 4+19.49
0+00
0+07
WALKWAY H - END
STATION: 0+18.01
NORTHING: 114,524.41
EASTING: 114,779.92
WALKWAY H - START
STATION: 0+00.00
NORTHING: 114,508.27
EASTING: 114,787.90
INTERSECTION
NORTHING: 114,551.64
EASTING: 114,722.51
SUB SHEET NO.DESIGNED:
10 0
SCALE OF FEET
10 20
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C7
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
JUNIPER PICNIC AREA AND
CAMPGROUND PROPOSED
SITE PLAN 9
28OF
8+
4+
4+60
4+80
5+
5+
5+
5+
5+
6+00
6+20
6+
6+ 606+
7+
7+
7+
7+
7+
8+
PC: 4+56.14
PC: 4+91.01
PC
: 5
+2 4.3
PC
: 5
+73 .53
PC: 6+25.33
PC: 7+49.01
PT: 4+62.77
PT
: 5
+1 0.4
PT
: 5
+45 .26
PT: 5+90.99
PT: 7+08.01
PT
: 7
+7 8.
CMPRJ-HV
1959.51
CMPRJ-HV
1961.18
WALKWAY B - END
STATION: 8+11.36
NORTHING: 114,494.51
EASTING: 114,281.25
L12
L1
L14
L15
L16
L17
L18
C1
C14
C15
C16
C17
C18
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C8
NPS PMIS NO: XXXXXXX THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
JUNIPER PICNIC AREA AND
CAMPGROUND PROPOSED
SITE PLAN 10
28OF
10 0
SCALE OF FEET
10 20
0.5% (MIN) TO 1.5% (MAX.) CROSS SLOPE
COMPACTED
AGGREGATE BASE COURSE
5" THICK CONCRETE6'-0"
7'-0"
6" 1'-0" #4 REBAR PLACED MID-DEPTHFINISHED
GRADE
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE SPECIFICATIONS
A C9
SECTION CONCRETE WALKWAY (6'-0" FINISHED WIDTH)
NOT TO SCALE
6" FINISHED
GRADE
1'-0"
COMPACTED
CLASS 5 AGGREGATE BASE
2" DIAMETER SMOOTH STEEL DOWEL
18" LONG SPACED 24" O.C. SET MID-DEPTH
GREASE OR CAP ONE END OF THE BAR
TO PREVENT ADHESION OF CONCRETE
C9
TYPICAL CONSTRUCTION JOINT
NOT TO SCALE
CONCRETE
(5" THICKNESS)
4" THICK PREFORMED
EXPANSION JOINT MATERIAL
TERMINATE EXPANSION JOINT MATERIAL NOT LESS
THAN 12" OR MORE THAN 1"BELOW FINISHED SURFACE
INSTALL JOINT SEALANT AS PER
MANUFACTURER'S RECOMMENDATIONS
COMPACTED
CLASS 5 AGGREGATE BASE
CONCRETE (5" THICKNESS)
TOOLED JOINT 14" RADIUS
COMPACTED
CLASS 5 AGGREGATE BASE
CONCRETE (5" THICKNESS)
SAWED JOINT 18" KERF TO A DEPTH
OF 13 CONCRETE THICKNESS
C9
TYPICAL TOOLED CONTRACTION JOINT
NOT TO SCALE
C9
TYPICAL SAWED CONTRACTION JOINT
NOT TO SCALE
0.5% (MIN) TO 1.5% (MAX.) CROSS SLOPE
COMPACTED
AGGREGATE BASE COURSE
5" THICK CONCRETE13'-6"
14'-6"
6" 1'-0" #4 REBAR PLACED MID-DEPTHFINISHED
GRADE
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE SPECIFICATIONS
B C9
SECTION CONCRETE PAD (13'-6" FINISHED WIDTH)
NOT TO SCALE
6" FINISHED
GRADE
1'-0"
V A U
LT
TO
IL
E T
13'-6"
6'-0"
6'-0"
13'-6"
31'-5"
MATCH ELEVATION
OF EXISTING ROAD
MATCH ELEVATION OF
VAULT FLOOR AT
DOOR THRESHOLD
3'-0"
17'-0"
INSTALL 3 4" EXPANSION JOINT
MATERIAL BETWEEN CONCRETE PAD
AND VAULT TOILET FOUNDATION
TIE ALL REBAR INTERSECTIONS
WITH STEEL WIRE REBAR TIES
TIE ALL REBAR INTERSECTIONS
WITH STEEL WIRE REBAR TIES
#4 REBAR INSTALLED 1'-0" FROM
CONCRETE EDGE
#4 REBAR GRID INSTALLED 1'-0"
FROM CONCRETE EDGE
2'-6"
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C9
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
JUNIPER PICNIC AREA AND
CAMPGROUND PROPOSED
SITE PLAN 11
28OF
CONSTRUCTION/INSTALLATION NOTES
1. CONCRETE WALKWAY RUNNING SLOPE SHALL NOT EXCEED 5.0% AND CROSS SLOPE SHALL NOT EXCEED 1.5%. CONCRETE PAD SURROUNDING VAULT TOILET SHALL
SLOPE AWAY FROM THE VAULT TOILET BUILDING AT A RATE OF 0.5% TO 1.0%.
2. LONGITUDINAL REINFORCEMENT OF CONCRETE WALKWAY SHALL CONSIST OF TWO RUNS OF #4 REBAR INSTALLED WITHIN WALKWAY OFFSET 1'-0" INSIDE THE
FORM-WORK UNLESS NOTED ON PLANS.
3. LATERAL REINFORCEMENT OF CONCRETE WALKWAY SHALL CONSIST OF 5'-0" LONG #4 REBAR SPACED AT 2'-6" INTERVALS PLACED PERPENDICULAR TO LONGITUDINAL
REINFORCEMENT UNLESS NOTED ON PLANS.
4. ALL REBAR REINFORCEMENT SHALL BE INSTALLED MID-DEPTH WITHIN CONCRETE WALKWAYS.
5. ALL REBAR INTERSECTIONS SHALL BE TIED WITH STEEL WIRE REBAR TIES.
6. USE THE SAME CEMENT MATERIALS, TYPE, BRAND, AND SOURCE FOR THE DURATION OF THE PROJECT.
7. WALKWAY SHALL BE CONSTRUCTED USING PORTLAND CEMENT MEETING ASTM C150 TYPE 1/II.
8. CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH (28 DAYS) OF 3500 PSI.
9. CONCRETE WALKWAY SHALL INCLUDE COLOR PIGMENT MEETING ASTM C 979/ C979M COLORANT SPECIFICATIONS.
10. COLORANT SHALL BE ADDED TO CONCRETE MIX USING THE PIGMENT MANUFACTURER'S WRITTEN INSTRUCTIONS. THE PIGMENT COLOR SHALL BE DAVIS #641 "SEQUOIA SAND" OR EQUIVALENT. CONTRACTOR MUST SUBMIT COLORANT SAMPLE TO C.O.R. FOR FINAL COLOR SELECTION BEFORE INSTALLATION OF CONCRETE
WALKWAY.
11. CONTRACTION JOINTS SHALL BE POSITIONED SO AS TO DIVIDE THE WALKWAY AND CONCRETE PAD INTO SQUARE SLABS. THE CONTRACTION JOINTS ON WALKWAYS
MAYBE SAWED OR TOOLED.
12. CONCRETE WALKWAY SHALL BE FINISHED WITH A LIGHT BROOM FINISH, APPLIED PERPENDICULAR TO TRAVEL PATH.
13. THE HORIZONTAL ALIGNMENT, VERTICAL PROFILE, COMPACTED AGGREGATE BASE, AND FORM WORK SHALL BE INSPECTED AND APPROVED BY THE PROJECT C.O.R.
PRIOR TO LAYING CONCRETE.
14. THE CONTRACTOR SHALL BACKFILL AGAINST THE SIDES OF THE WALKWAY AND OBSERVATION PADS TO THE TOP OF THE FINISHED CONCRETE SURFACE, AND SLOPE FILL AWAY FROM THE WALKWAY AT A GRADE NO STEEPER THAN 4 FEET HORIZONTAL TO 1 FOOT VERTICAL (4:1 MAX).
SCALE OF FEET
4 8
ASCALE
0 4
C9
JUNIPER CAMPGROUND VAULT TOILET AREA DETAIL
SCALE A
A C9
B C9
C9
COMPACTED
CLASS 5 AGGREGATE BASE
2" DIAMETER SMOOTH STEEL DOWEL
18" LONG SPACED 24" O.C. SET MID-DEPTH
COMPACTED
CLASS 5 AGGREGATE BASE
CONCRETE (5" THICKNESS)
TOOLED JOINT 14" RADIUS
COMPACTED
CLASS 5 AGGREGATE BASE
CONCRETE (5" THICKNESS)
SAWED JOINT 18" KERF TO A DEPTH
OF 13 CONCRETE THICKNESS
GREASE OR CAP ONE END OF THE BAR
TO PREVENT ADHESION OF CONCRETE
C10
TYPICAL CONSTRUCTION JOINT
NOT TO SCALE
C10
TYPICAL TOOLED CONTRACTION JOINT
NOT TO SCALE
C10
TYPICAL SAWED CONTRACTION JOINT
NOT TO SCALE
COMPACTED
CLASS 5 AGGREGATE BASE
CONCRETE
(5" THICKNESS)
3 4" THICK PREFORMED
EXPANSION JOINT MATERIAL
TERMINATE EXPANSION JOINT MATERIAL NOT LESS
THAN 12" OR MORE THAN 1"BELOW FINISHED SURFACE
C10
TYPICAL ISOLATION JOINT (NON-DOWELED)
NOT TO SCALE
INSTALL JOINT SEALANT AS PER
MANUFACTURER'S RECOMMENDATIONS
CONCRETE
(5" THICKNESS)
3 4" THICK PREFORMED
EXPANSION JOINT MATERIAL
TERMINATE EXPANSION JOINT MATERIAL NOT LESS
THAN 12" OR MORE THAN 1"BELOW FINISHED SURFACE
INSTALL JOINT SEALANT AS PER
MANUFACTURER'S RECOMMENDATIONS
0.5% (MIN) TO 1.5% (MAX.) CROSS SLOPE
COMPACTED
AGGREGATE BASE COURSE
5" THICK CONCRETE6'-0"
7'-0"
6" 1'-0" #4 REBAR PLACED MID-DEPTHFINISHED
GRADE
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE SPECIFICATIONS
A C10
SECTION CONCRETE WALKWAY (6'-0" FINISHED WIDTH)
NOT TO SCALE
6" FINISHED
GRADE
1'-0"
2'-6"
6'-0" 6'-0" 6'-0"6'-0"
2'-6"
4' -0
1'
-0
1' -0
5' -0
5' -0
6' -0
C10
TYPICAL CONCRETE WALKWAY REINFORCEMENT
NOT TO SCALE
A C10
SAWED OR TOOLED
CONTRACTION JOINT
#4 REBAR INSTALLED 1'-0" FROM
CONCRETE EDGE
TIE ALL REBAR INTERSECTIONS
WITH STEEL WIRE REBAR TIES
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C10
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
CONCRETE WALKWAY DETAILS
28OF
CONSTRUCTION/INSTALLATION NOTES
1. CONCRETE WALKWAY RUNNING SLOPE SHALL NOT EXCEED 5.0% AND CROSS SLOPE SHALL NOT EXCEED 1.5%.
2. LONGITUDINAL REINFORCEMENT OF CONCRETE WALKWAY SHALL CONSIST OF TWO RUNS OF #4 REBAR INSTALLED WITHIN WALKWAY OFFSET 1'-0" INSIDE THE
FORM-WORK UNLESS NOTED ON PLANS.
3. LATERAL REINFORCEMENT OF CONCRETE WALKWAY SHALL CONSIST OF 5'-0" LONG #4 REBAR SPACED AT 2'-6" INTERVALS PLACED PERPENDICULAR TO LONGITUDINAL
REINFORCEMENT UNLESS NOTED ON PLANS.
4. ALL REBAR REINFORCEMENT SHALL BE INSTALLED MID-DEPTH WITHIN CONCRETE WALKWAYS.
5. ALL REBAR INTERSECTIONS SHALL BE TIED WITH STEEL WIRE REBAR TIES.
6. USE THE SAME CEMENT MATERIALS, TYPE, BRAND, AND SOURCE FOR THE DURATION OF THE PROJECT.
7. WALKWAY SHALL BE CONSTRUCTED USING PORTLAND CEMENT MEETING ASTM C150 TYPE 1/II.
8. CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH (28 DAYS) OF 3500 PSI.
9. CONCRETE WALKWAY SHALL INCLUDE COLOR PIGMENT MEETING ASTM C 979/ C979M COLORANT SPECIFICATIONS.
10. COLORANT SHALL BE ADDED TO CONCRETE MIX USING THE PIGMENT MANUFACTURER'S WRITTEN INSTRUCTIONS. THE PIGMENT COLOR SHALL BE DAVIS #641 "SEQUOIA SAND" OR EQUIVALENT. CONTRACTOR MUST SUBMIT COLORANT SAMPLE TO C.O.R. FOR FINAL COLOR SELECTION BEFORE INSTALLATION OF CONCRETE
WALKWAY.
11. CONTRACTION JOINTS SHALL BE POSITIONED SO AS TO DIVIDE THE WALKWAY INTO SQUARE SLABS. THE CONTRACTION JOINTS ON WALKWAYS MAYBE SAWED OR
TOOLED (SEE PAGE G8 FOR DETAILS).
12. CONCRETE WALKWAY SHALL BE FINISHED WITH A LIGHT BROOM FINISH, APPLIED PERPENDICULAR TO TRAVEL PATH.
13. THE HORIZONTAL ALIGNMENT, VERTICAL PROFILE, COMPACTED AGGREGATE BASE, AND FORM WORK SHALL BE INSPECTED AND APPROVED BY THE PROJECT C.O.R.
PRIOR TO LAYING CONCRETE.
14. THE CONTRACTOR SHALL BACKFILL AGAINST THE SIDES OF THE WALKWAY AND OBSERVATION PADS TO THE TOP OF THE FINISHED CONCRETE SURFACE, AND SLOPE FILL AWAY FROM THE WALKWAY AT A GRADE NO STEEPER THAN 4 FEET HORIZONTAL TO 1 FOOT VERTICAL (4:1 MAX).
FINISHED
GRADE
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE
SPECIFICATIONS
3'-0"
5" THICK CONCRETE
WALKWAY
6"
5" THICK CONCRETE
TRASH RECEPTACLE INSTALLED BY
NATIONAL PARK SERVICE
BEAR-SAVER MODEL HB1G-UP
(SUPPLIED BY NATIONAL PARK SERVICE)
3'-0"
3' -0
12'-0"
3' -0
A C11
A C11
A C11
SECTION - TYPICAL TRASH CONTAINER PAD
NOT TO SCALE
C11
COMPACTED
CLASS 5 AGGREGATE BASE
2" DIAMETER SMOOTH STEEL DOWEL
18" LONG SPACED 24" O.C. SET MID-DEPTH
GREASE OR CAP ONE END OF THE BAR
TO PREVENT ADHESION OF CONCRETE
C11
TYPICAL CONSTRUCTION JOINT
NOT TO SCALE
CONCRETE
(5" THICKNESS)
3 4" THICK PREFORMED
EXPANSION JOINT MATERIAL
TERMINATE EXPANSION JOINT MATERIAL NOT LESS
THAN 12" OR MORE THAN 1"BELOW FINISHED SURFACE
INSTALL JOINT SEALANT AS PER
MANUFACTURER'S RECOMMENDATIONS
C11
C11
TYPICAL 3'-0" x 12'-0" TRASH RECEPTACLE PAD
PLAN VIEW - NOT TO SCALE
PLAN VIEW - NOT TO SCALE
TYPICAL 3'-0" x 3'-0" TRASH RECEPTACLE PAD
6'-0" 6'-0"
SAWED OR TOOLED
CONTRACTION JOINT
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C11
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
CONCRETE GARBAGE
CONTAINER PAD DETAILS 13
28OF
CONSTRUCTION/INSTALLATION NOTES
1. INSTALL TWO (2) 3'-0" x 3'-0" CONCRETE TRASH RECEPTACLE PADS AT LOCATIONS DETAILED ON PLAN SHEETS C5-C7.
2. INSTALL TWO (2) 3'-0" x 12'-0" CONCRETE TRASH RECEPTACLE PADS AT LOCATIONS DETAILED ON PLAN SHEETS C5-C7.
3. CONTRACTION JOINTS SHALL BE POSITIONED SO AS SHOWN ON PLAN SHEET. THE CONTRACTION JOINTS ON TRASH RECEPTACLE PADS MAYBE SAWED OR TOOLED..
4. TRASH RECEPTACLE PADS SHALL BE FINISHED WITH A LIGHT BROOM FINISH, APPLIED IN THE SAME FASHION (DIRECTION AND DEPTH) AS THE ADJACENT CONCRETE
WALKWAY.
5. THE CONTRACTOR SHALL BACKFILL AGAINST THE SIDES OF THE TRASH RECEPTACLE PADS TO THE TOP OF THE FINISHED CONCRETE SURFACE, AND SLOPE FILL AWAY FROM THE PAD AT A GRADE NO STEEPER THAN 4 FEET HORIZONTAL TO 1 FOOT VERTICAL (4:1 MAX).
6. THE NATIONAL PARK SERVICE SHALL SUPPLY AND INSTALL THE TRASH RECEPTACLES.
Profile of Walkway A From 2+80 To 4+40
2+
3+
3+
3+
3+
3+
4+
4+
4+
EG
=1
9.
FG
=1
9.
EG
=1
9.
FG
=1
9.
EG
=1
9.
FG
=1
9.
EG
=1
9.
FG
=1
0.
EG
=1
9.
FG
=1
0.
EG
=1
0.
FG
=1
0.
EG
=1
0.
FG
=1
1.
EG
=1
1.
FG
=1
1.
EG
FG
2.00%
1.60%
ST
A
3+
.1
EL
EV
,9
.6
ST
A
3+
.0
EL
EV
,9
.6
ST
A
4+
.0
EL
EV
,9
.5
INTERSECTION
WITH WALKWAY H
INTERSECTION
WITH WALKWAY D
INTERSECTION
WITH WALKWAY B
EXISTING GROUND
EXISTING GROUND
PROPOSED TOP
OF CONCRETE
PROPOSED TOP
OF CONCRETE
Profile of Walkway A From 0+00 To 2+80
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
EG
=1
8.
FG
EG
=1
8.
FG
=1
9.
EG
=1
8.
FG
=1
9.
EG
=1
8.
FG
=1
9.
EG
=1
8.
FG
=1
9.
EG
=1
8.
FG
=1
9.
EG
=1
8.
FG
=1
9.
EG
=1
8.
FG
=1
9.
EG
=1
8.
FG
=1
9.
EG
=1
8.
FG
=1
9.
EG
=1
9.
FG
=1
9.
EG
=1
9.
FG
=1
9.
EG
=1
9.
FG
=1
9.
EG
=1
9.
FG
=1
9.
EG
=1
9.
FG
=1
9.
0.00% 0.75%
0.09%
ST
A
0+
.0
EL
EV
,9
.0
ST
A
1+
.2
EL
EV
,9
.0
ST
A
2+
.1
EL
EV
,9
.5
INTERSECTION
WITH WALKWAY CINTERSECTION
WITH WALKWAY B
PROPOSED TOP
OF CONCRETE
EXISTING GROUND
EXISTING GROUND
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C12
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
JUNIPER CAMPGROUND
WALKWAY "A" PROFILE
STATION 0+00.0 TO 4+23.1 14
28OF
Profile of Walkway B From 2+80 To 5+60
2+
3+
3+
3+
3+
3+
4+
4+
4+
4+
4+
5+
5+
5+
5+
EG
=1
1.
FG
=1
1.
EG
=1
1.
FG
=1
1.
EG
=1
1.
FG
=1
1.
EG
=1
1.
FG
=1
1.
EG
=1
1.
FG
=1
1.
EG
=1
1.
FG
=1
1.
EG
=1
1.
FG
=1
1.
EG
=1
1.
FG
=1
0.
EG
=1
0.
FG
=1
0.
EG
=1
1.
FG
=1
0.
EG
=1
0.
FG
=1
0.
EG
=1
9.
FG
=1
0.
EG
=1
9.
FG
=1
0.
EG
=1
0.
FG
=1
0.
EG
=1
0.
FG
=1
0.
-1.00%
-0.58%
ST
A
3+
.4
EL
EV
,9
.5
ST
A
5+
.0
EL
EV
,9
.4
PROPOSED TOP
OF CONCRETE
PROPOSED TOP
OF CONCRETE
EXISTING GROUND
EXISTING GROUND
INTERSECTION
WITH WALKWAY A
Profile of Walkway B From 0+00 To 2+80
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
EG
=1
9.
FG
=1
9.
EG
=1
8.
FG
=1
9.
EG
=1
8.
FG
=1
9.
EG
=1
9.
FG
=1
9.
EG
=1
9.
FG
=1
9.
EG
=1
9.
FG
=1
9.
EG
=1
9.
FG
=1
9.
EG
=1
0.
FG
=1
0.
EG
=1
0.
FG
=1
0.
EG
=1
0.
FG
=1
1.
EG
=1
1.
FG
=1
1.
EG
=1
1.
FG
=1
2.
EG
=1
1.
FG
=1
2.
EG
=1
1.
FG
=1
2.
EG
=1
1.
FG
=1
1.
INTERSECTION
WITH WALKWAY C
-2.23% 0.82%
2.26%
0.46% -0.41%0.00% 0.00%
ST
A
0+
.0
EL
EV
,9
.4
ST
A
0+
.9
EL
EV
,9
.0
ST
A
1+
.4
EL
EV
,9
.8
ST
A
2+
.7
EL
EV
,9
.0
ST
A
2+
.3
EL
EV
,9
.1
ST
A
2+
.5
EL
EV
,9
.0
PROPOSED TOP
OF CONCRETE
PROPOSED TOP
OF CONCRETE
EXISTING GROUND
EXISTING GROUND
INTERSECTION
WITH WALKWAY A
INTERSECTION
WITH WALKWAY F
INTERSECTION
WITH WALKWAY G
INTERSECTION
WITH WALKWAY E
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C13
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
JUNIPER CAMPGROUND
WALKWAY "B" PROFILE
STATION 0+00.0 TO 5+60.0 15
28OF
Profile of Walkway B From 5+60 To 8+20
5+
5+
6+
6+
6+
6+
6+
7+
7+
7+
7+
7+
8+
8+
EG
=1
0.
FG
=1
0.
EG
=1
0.
FG
=1
0.
EG
=1
0.
FG
=1
1.
EG
=1
1.
FG
=1
1.
EG
=1
1.
FG
=1
1.
EG
=1
1.
FG
=1
1.
EG
=1
1.
FG
=1
1.
EG
=1
1.
FG
=1
1.
EG
=1
1.
FG
=1
1.
EG
=1
1.
FG
=1
2.
EG
=1
1.
FG
=1
2.
EG
=1
2.
FG
=1
2.
EG
=1
2.
FG
=1
2.
EG
FG
0.73%
ST
A
8+
.3
EL
EV
,9
.6
PROPOSED TOP
OF CONCRETE
PROPOSED TOP
OF CONCRETE
EXISTING GROUND
EXISTING GROUND
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C14
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
JUNIPER CAMPGROUND
WALKWAY "B" PROFILE
STATION 6+00.0 TO 7+93.4 16
28OF
PANEL LEFT BLANK
INTENTIONALLY
Profile of Walkway C From 0+00 To 1+60
0+
0+
0+
0+
0+
1+
1+
1+
1+
EG
=1
9.
FG
=1
9.
EG
=1
9.
FG
=1
9.
EG
=1
9.
FG
=1
9.
EG
=1
9.
FG
=1
9.
EG
=1
9.
FG
=1
9.
EG
=1
0.
FG
=1
0.
EG
=1
0.
FG
=1
0.
EG
=1
0.
FG
=1
0.
EG
FG
-0.50%
0.00% 0.65% 0.94%
ST
A
-0
+0 0.
EL
EV
,9
.5
ST
A
0+
.2
EL
EV
,9
.5
ST
A
0+
.4
EL
EV
,9
.8
ST
A
1+
.9
EL
EV
,9
.5
ST
A
1+
.6
EL
EV
,9
.4
EXISTING GROUND
INTERSECTION
WITH WALKWAY A
INTERSECTION
WITH WALKWAY B
START OF
12'-0" WIDE PAD
PROPOSED TOP
OF CONCRETE
PROPOSED TOP
OF CONCRETE
Profile of Walkway D From 0+00 To 0+60
0+
0+
0+
0+
EG
=1
0.
FG
EG
=1
0.
FG
=1
1.
EG
=1
1.
FG
=1
1.
EG
FG
3.37%
ST
A
0+
.0
EL
EV
,9
.6
ST
A
0+
.3
EL
EV
,9
.0
EXISTING GROUND
INTERSECTION
WITH WALKWAY B
PROPOSED TOP
OF CONCRETE
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C15
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
JUNIPER CAMPGROUND
WALKWAY "C" & "D" PROFILES 17
28OF
Profile of Walkway F From 0+00 To 0+40
0+
0+
0+
EG
=1
1.
FG
EG
=1
2.
FG
=1
2.
EG
FG
2.29%
ST
A
0+
.0
EL
EV
,9
.0
ST
A
0+
.1
EL
EV
,9
.6
EXISTING GROUND
PROPOSED TOP
OF CONCRETE
COMFORT STATION
DOOR ENTRANCE
MATCH ELEVATION
INTERSECTION
WITH WALKWAY B
Profile of Walkway E From 0+00 To 0+40
0+
0+
0+
COMFORT STATION
DOOR ENTRANCE
MATCH ELEVATION
EG
=1
1.
FG
EG
=1
2.
FG
=1
2.
EG
FG
2.69%
ST
A
0+
.0
EL
EV
,9
.0
ST
A
0+
.3
EL
EV
,9
.6
EXISTING GROUND
PROPOSED TOP
OF CONCRETE
INTERSECTION
WITH WALKWAY B
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C16
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
JUNIPER CAMPGROUND
WALKWAY "E" & "F" PROFILES 18
28OF
SURVEY CONTROL COORDINATE DATA
1. HORIZONTAL DATUM: NORTH AMERICAN DATUM OF 1983 (2011) AS REALIZED BY TYING TO EXISTING PRIMARY NATIONAL
PARK SERVICE CONTROL MONUMENTS MCP2016-04, MCP2016-07, AND MCP2016-08. ALL DATA IS PROJECTED TO A CUSTOM
LOW-DISTORTION PROJECTION (SEE PROJECTION PARAMETERS INCLUDED ON THIS PLAN SHEET).
2. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 AS REALIZED BY APPLYING GEOID MODEL 2012B TO ELLIPSOID
HEIGHTS OF MCP2016-04, MCP2016-07, AND MCP2016-08.
3. ALL COORDINATES AND MEASUREMENTS ARE GRID DISTANCES, USING THE INTERNATIONAL FOOT DEFINITION.
4. AVOID DAMAGE TO ALL SURVEY MONUMENTS FOUND IN PROXIMITY TO THE CONSTRUCTION AREA.
5. IMMEDIATELY REPORT AND SURVEY MONUMENTS DAMAGED DURING THE PROJECT DEMOLITION OR CONSTRUCTION TO THE
PROJECT C.O.R.
6. ANY SURVEY MONUMENTS DAMAGED DURING THE PROJECT DEMOLITION OR CONSTRUCTION SHALL BE REPLACED AT THE
CONTRACTOR'S EXPENSE UNLESS NOTED ON THE PLAN SET.
LOW DISTORTION PROJECTION PARAMETERS
GEODETIC DATUM: NORTH AMERICAN DATUM OF 1983 (2011) EPOCH 2010.00
VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 AS REALIZED BY
USING GEOID2012B
SYSTEM: THEODORE ROOSEVELT NATIONAL PARK
ZONE NAME: LDP NORTH UNIT JUNIPER CAMPGROUND AREA
PROJECTION NAME: NAD83 (2011) THRO-NU LDP Zone 03 - Juniper Campground Area
PROJECTION TYPE: LAMBERT CONFORMAL CONIC (ONE-PARALLEL)
STANDARD PARALLEL / LATITUDE OF GRID ORIGIN: 47° 35' 42.0" N (47.595° N)
LONGITUDE OF CENTRAL MERIDIAN: 103° 20' 15.0" W (-103.3375° W)
NORTHING AT GRID ORIGIN: 35,000 m (114,829.396 Intl. Ft.)
EASTING AT Central MERIDIAN: 35,000 m (114,829.396 Intl. Ft.)
SCALE FACTOR ON CENTRAL MERIDIAN: 1.000091 (Exact)
SURVEY CONTROL POINTS
POINT #
NORTHING
(INTL. FT.)
116,546.411'
115,157.237'
114,435.702'
114,814.261'
114,564.682'
114,538.844'
114,611.476'
114,418.132'
114,547.348'
114,075.111'
114,723.941'
114,960.318'
114,485.491'
114,501.159'
114,650.181'
114,508.679'
114,567.323'
EASTING
(INTL. FT.)
114,120.470'
116,698.256'
115,335.706'
115,746.470'
114,226.276'
115,085.979'
114,816.139'
114,536.282'
114,399.112'
114,485.762'
114,085.561'
114,132.478'
115,853.401'
116,047.722'
116,148.659'
116,119.027'
116,096.560'
ELEVATION
(INTL. FT.)
1,995.44'
1,982.17'
1,958.64'
1,958.82'
1,962.09'
1,959.36'
1,960.49'
1,959.51'
1,961.18'
1,960.90'
1,962.59'
1,960.77'
1,956.55'
1,957.38'
1,956.92'
1,957.26'
1,956.69'
LATITUDE
N 047° 35' 58.9454"
N 047° 35' 45.2346"
N 047° 35' 38.1145"
N 047° 35' 41.8504"
N 047° 35' 39.3874"
N 047° 35' 39.1324"
N 047° 35' 39.8493"
N 047° 35' 37.9411"
N 047° 35' 39.2163"
N 047° 35' 34.5558"
N 047° 35' 40.9591"
N 047° 35' 43.2919"
N 047° 35' 38.6056"
N 047° 35' 38.7601"
N 047° 35' 40.2308"
N 047° 35' 38.8343"
N 047° 35' 39.4131"
LONGITUDE
W 103° 20' 25.3442"
W 103° 19' 47.7329"
W 103° 20' 07.6131"
W 103° 20' 01.6199"
W 103° 20' 23.7995"
W 103° 20' 11.2566"
W 103° 20' 15.1935"
W 103° 20' 19.2765"
W 103° 20' 21.2778"
W 103° 20' 20.0135"
W 103° 20' 25.8526"
W 103° 20' 25.1682"
W 103° 20' 00.0601"
W 103° 19' 57.2250"
W 103° 19' 55.7522"
W 103° 19' 56.1846"
W 103° 19' 56.5124"
ELLIPSOID HEIGHT
(INTL. FT.)
1,937.933'
1,924.668'
1,901.143'
1,901.325'
1,904.669'
1,901.863'
1,903.021'
1,902.068'
1,903.682'
1,903.494'
1,905.240'
1,903.395'
1,899.052'
1,899.879'
1,899.423'
1,899.764'
1,899.190'
CONVERGENCE ANGLE
-0° 00' 07.64"
0° 00' 20.13"
0° 00' 05.45"
0° 00' 09.88"
-0° 00' 06.50"
0° 00' 02.76"
-0° 00' 00.14"
-0° 00' 03.16"
-0° 00' 04.64"
-0° 00' 03.70"
-0° 00' 08.01"
-0° 00' 07.51"
0° 00' 11.03"
0° 00' 13.13"
0° 00' 14.21"
0° 00' 13.89"
0° 00' 13.65"
COMBINED SCALE
FACTOR
0.99999842
0.99999905
1.00000017
1.00000016
1.00000000
1.00000014
1.00000008
1.00000013
1.00000005
1.00000006
0.99999997
1.00000006
1.00000027
1.00000023
1.00000025
1.00000024
1.00000026
MONUMENT DESCRIPTION
600-MM FENO MONUMENT WITH 3.5" DIAMETER ALUMINUM CAP STAMPED "MCP2016-04"
600-MM FENO MONUMENT WITH 3.5" DIAMETER ALUMINUM CAP STAMPED "MCP2016-07"
600-MM FENO MONUMENT WITH 3.5" DIAMETER ALUMINUM CAP STAMPED "MCP2016-08"
30" LONG #5 REBAR WITH NPS ALUMINUM CAP STAMPED "CP2020-01"
30" LONG #5 REBAR WITH NPS ALUMINUM CAP STAMPED "CP2020-02"
30" LONG #5 REBAR WITH NPS ALUMINUM CAP STAMPED "CP2020-03"
30" LONG #5 REBAR WITH NPS ALUMINUM CAP STAMPED "CP2020-04"
30" LONG #5 REBAR WITH NPS ALUMINUM CAP STAMPED "CP2020-05"
30" LONG #5 REBAR WITH NPS ALUMINUM CAP STAMPED "CP2020-06"
30" LONG #5 REBAR WITH NPS ALUMINUM CAP STAMPED "CP2020-07"
30" LONG #5 REBAR WITH NPS ALUMINUM CAP STAMPED "CP2020-08"
30" LONG #5 REBAR WITH NPS ALUMINUM CAP STAMPED "CP2020-09"
30" LONG #4 REBAR WITH GREEN PLASTIC CAP STAMPED "CONTROL POINT"
30" LONG #4 REBAR WITH GREEN PLASTIC CAP STAMPED "CONTROL POINT"
30" LONG #4 REBAR WITH GREEN PLASTIC CAP STAMPED "CONTROL POINT"
30" LONG #4 REBAR WITH GREEN PLASTIC CAP STAMPED "CONTROL POINT"
30" LONG #4 REBAR WITH GREEN PLASTIC CAP STAMPED "CONTROL POINT"
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
V1
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
SURVEY CONTROL
COORDINATE DATA 19
28OF
WALKWAY A
SEGMENT NUMBER
C1
C2
L1
C3
L2
C4
L3
LENGTH
352.93
9.90
15.37
12.91
18.45
9.94
3.60
RADIUS
685.00
10.00
25.00
10.00
LINE/CHORD DIRECTION
S75° 17' 47.6"W
S88° 53' 35.8"W
N62° 45' 00.0"W
N77° 32' 30.0"W
S87° 40' 00.0"W
N63° 52' 05.9"W
N35° 24' 11.8"W
START STATION
0+00.00
3+52.93
3+62.82
3+78.20
3+91.10
4+09.55
4+19.49
END STATION
3+52.93
3+62.82
3+78.20
3+91.10
4+09.55
4+19.49
4+23.09
START COORDINATES
N: 114,595.32; E: 115,084.11
N: 114,506.72; E: 114,746.50
N: 114,506.54; E: 114,737.00
N: 114,513.58; E: 114,723.34
N: 114,516.33; E: 114,710.87
N: 114,515.58; E: 114,692.44
N: 114,519.78; E: 114,683.88
END COORDINATES
N: 114,506.72; E: 114,746.50
N: 114,506.54; E: 114,737.00
N: 114,513.58; E: 114,723.34
N: 114,516.33; E: 114,710.87
N: 114,515.58; E: 114,692.44
N: 114,519.78; E: 114,683.88
N: 114,522.71; E: 114,681.80
WALKWAY B
SEGMENT NUMBER
L5
C5
L6
C7
L7
C6
C8
C9
L8
L9
C10
L10
C11
L11
C12
L12
C13
L13
C14
L14
C15
L15
C16
L16
C17
L17
C18
L18
LENGTH
21.52
9.91
47.58
34.86
31.11
45.95
45.95
54.49
25.07
61.17
12.74
7.98
18.41
41.38
15.97
27.99
6.63
28.24
19.48
13.83
20.94
28.27
17.45
34.34
82.68
41.00
29.29
33.06
RADIUS
10.00
45.00
200.00
200.00
120.00
50.00
20.00
20.00
20.00
12.00
100.00
100.00
55.00
60.00
LINE/CHORD DIRECTION
N11° 11' 28.8"W
N39° 35' 44.4"W
N68° 00' 00.0"W
S89° 48' 37.4"W
S67° 37' 14.8"W
S74° 12' 11.5"W
S74° 12' 11.5"W
S67° 46' 35.3"W
S54° 46' 02.4"W
S54° 35' 48.2"W
S47° 17' 54.1"W
S40° 00' 00.0"W
S66° 22' 30.0"W
N87° 15' 00.0"W
S69° 52' 30.0"W
S47° 00' 00.0"W
S37° 30' 00.0"W
S28° 00' 00.0"W
S74° 30' 00.0"W
N59° 00' 00.0"W
N53° 00' 00.0"W
N47° 00' 00.0"W
N42° 00' 00.0"W
N37° 00' 00.0"W
N80° 04' 00.0"W
S56° 52' 00.0"W
S70° 51' 00.0"W
S84° 50' 00.0"W
START STATION
0+00.00
0+21.52
0+31.44
0+79.02
1+13.87
1+44.98
1+44.98
1+90.93
2+45.43
2+70.50
3+31.67
3+44.41
3+52.38
3+70.80
4+12.18
4+28.15
4+56.14
4+62.77
4+91.01
5+10.49
5+24.32
5+45.26
5+73.53
5+90.99
6+25.33
7+08.01
7+49.01
7+78.30
END STATION
0+21.52
0+31.44
0+79.02
1+13.87
1+44.98
1+90.93
1+90.93
2+45.43
2+70.50
3+31.67
3+44.41
3+52.38
3+70.80
4+12.18
4+28.15
4+56.14
4+62.77
4+91.01
5+10.49
5+24.32
5+45.26
5+73.53
5+90.99
6+25.33
7+08.01
7+49.01
7+78.30
8+11.36
START COORDINATES
N: 114,564.71; E: 114,954.23
N: 114,585.83; E: 114,950.05
N: 114,593.16; E: 114,943.99
N: 114,610.98; E: 114,899.87
N: 114,610.87; E: 114,865.88
N: 114,599.02; E: 114,837.12
N: 114,599.02; E: 114,837.12
N: 114,586.54; E: 114,793.00
N: 114,566.11; E: 114,742.98
N: 114,551.64; E: 114,722.51
N: 114,516.21; E: 114,672.64
N: 114,507.59; E: 114,663.31
N: 114,501.48; E: 114,658.18
N: 114,494.36; E: 114,641.90
N: 114,496.35; E: 114,600.57
N: 114,491.00; E: 114,585.97
N: 114,471.91; E: 114,565.50
N: 114,466.67; E: 114,561.48
N: 114,441.73; E: 114,548.22
N: 114,437.08; E: 114,531.44
N: 114,444.21; E: 114,519.59
N: 114,456.79; E: 114,502.89
N: 114,476.07; E: 114,482.22
N: 114,489.02; E: 114,470.55
N: 114,516.45; E: 114,449.88
N: 114,529.41; E: 114,375.90
N: 114,507.00; E: 114,341.57
N: 114,497.48; E: 114,314.17
END COORDINATES
N: 114,585.83; E: 114,950.05
N: 114,593.16; E: 114,943.99
N: 114,610.98; E: 114,899.87
N: 114,610.87; E: 114,865.88
N: 114,599.02; E: 114,837.12
N: 114,586.54; E: 114,793.00
N: 114,586.54; E: 114,793.00
N: 114,566.11; E: 114,742.98
N: 114,551.64; E: 114,722.51
N: 114,516.21; E: 114,672.64
N: 114,507.59; E: 114,663.31
N: 114,501.48; E: 114,658.18
N: 114,494.36; E: 114,641.90
N: 114,496.35; E: 114,600.57
N: 114,491.00; E: 114,585.97
N: 114,471.91; E: 114,565.50
N: 114,466.67; E: 114,561.48
N: 114,441.73; E: 114,548.22
N: 114,437.08; E: 114,531.44
N: 114,444.21; E: 114,519.59
N: 114,456.79; E: 114,502.89
N: 114,476.07; E: 114,482.22
N: 114,489.02; E: 114,470.55
N: 114,516.45; E: 114,449.88
N: 114,529.41; E: 114,375.90
N: 114,507.00; E: 114,341.57
N: 114,497.48; E: 114,314.17
N: 114,494.51; E: 114,281.25
WALKWAY C
SEGMENT NUMBER
L19
C19
L20
C20
L21
L22
LENGTH
21.08
6.80
6.44
12.57
26.58
84.20
RADIUS
10.00
10.00
LINE/CHORD DIRECTION
N16° 59' 03.5"W
N02° 30' 28.3"E
N22° 00' 00.0"E
N14° 00' 00.0"W
N50° 00' 00.0"W
N50° 00' 00.0"W
START STATION
0+00.00
0+21.08
0+27.88
0+34.32
0+46.89
0+73.46
END STATION
0+21.08
0+27.88
0+34.32
0+46.89
0+73.46
1+57.66
START COORDINATES
N: 114,548.99; E: 114,891.10
N: 114,569.15; E: 114,884.94
N: 114,575.82; E: 114,885.24
N: 114,581.79; E: 114,887.65
N: 114,593.19; E: 114,884.80
N: 114,610.28; E: 114,864.44
END COORDINATES
N: 114,569.15; E: 114,884.94
N: 114,575.82; E: 114,885.24
N: 114,581.79; E: 114,887.65
N: 114,593.19; E: 114,884.80
N: 114,610.28; E: 114,864.44
N: 114,664.40; E: 114,799.95
WALKWAY D
SEGMENT NUMBER
L23
C21
L24
LENGTH
14.99
20.39
5.01
RADIUS
20.00
LINE/CHORD DIRECTION
N23° 00' 00.0"E
N06° 12' 05.9"W
N35° 24' 11.8"W
START STATION
0+00.00
0+14.99
0+35.37
END STATION
0+14.99
0+35.37
0+40.38
START COORDINATES
N: 114,514.37; E: 114,721.66
N: 114,528.16; E: 114,727.52
N: 114,547.56; E: 114,725.41
END COORDINATES
N: 114,528.16; E: 114,727.52
N: 114,547.56; E: 114,725.41
N: 114,551.64; E: 114,722.51
WALKWAY E
SEGMENT NUMBER
L25
C22
L26
LENGTH
3.91
9.42
9.00
RADIUS
6.00
LINE/CHORD DIRECTION
N35° 24' 11.8"W
N09° 33' 58.8"E
N54° 32' 09.5"E
START STATION
0+00.00
0+03.91
0+13.33
END STATION
0+03.91
0+13.33
0+22.34
START COORDINATES
N: 114,551.64; E: 114,722.51
N: 114,554.84; E: 114,720.24
N: 114,563.20; E: 114,721.65
END COORDINATES
N: 114,554.84; E: 114,720.24
N: 114,563.20; E: 114,721.65
N: 114,568.42; E: 114,728.98
WALKWAY F
SEGMENT NUMBER
L27
C23
L28
LENGTH
7.72
9.42
9.00
RADIUS
6.00
LINE/CHORD DIRECTION
N35° 24' 11.8"W
N80° 23' 33.0"W
S54° 37' 05.8"W
START STATION
0+00.00
0+07.72
0+17.15
END STATION
0+07.72
0+17.15
0+26.15
START COORDINATES
N: 114,580.06; E: 114,769.05
N: 114,586.36; E: 114,764.58
N: 114,587.77; E: 114,756.21
END COORDINATES
N: 114,586.36; E: 114,764.58
N: 114,587.77; E: 114,756.21
N: 114,582.56; E: 114,748.87
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
V2
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
WALKWAY ALIGNMENT
GEOMETRY/LAYOUT DATA 20
28OF
DATE:
MARCH 26TH, 2021
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
NPS PMIS NO: 254305 THRO DRAWING NUMBER 2020-06
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
STANDARD SPECIFICATIONS
SUBGRADE PREPARATION 21
28OF
SECTION 204 - SUBGRADE PREPARATION
204-1 DESCRIPTION
· THIS WORK SHALL CONSIST OF SCARIFYING, SHAPING, COMPACTING, AND MAINTAINING THE SUBGRADE PRIOR TO CONSTRUCTION OF AN
AGGREGATE BASE, AC BASE COURSE, OR SURFACE COURSE AND SHALL INCLUDE EXCAVATION AND/OR SHIFTING OF MATERIALS RESULTING
FROM ROUGH GRADING, TRENCHING, OR OTHER PRIOR CONSTRUCTION ACTIVITIES. SUBGRADE PREPARATION SHALL INCLUDE ALL WORK
TO DEPTHS SPECIFIED ON THE PLAN SHEETS OR IN THE SPECIAL PROVISIONS. WHEN SUBGRADE PREPARATION DEPTHS ARE NOT SPECIFIED, THE DEPTH SHALL BE ASSUMED TO BE A MINIMUM OF 6 INCHES BELOW THE SURFACE OF THE FINISHED SUBGRADE
204-2 CONSTRUCTION REQUIREMENTS
204-2.1 GENERAL
· IN ALL AREAS, PRIOR TO PLACING ANY OF THE BASE COURSE MATERIAL SPECIFIED ON THE PLAN SHEETS, THE ENTIRE SUBGRADE SURFACE
SHALL BE SCARIFIED TO A SPECIFIED DEPTH OF NOT LESS THAN 6 INCHES AND DRIED OR UNIFORMLY MOISTENED TO OBTAIN REQUIRED
COMPACTION.
· EXCESS SUITABLE EXCAVATED MATERIAL SHALL BE STOCKPILED AND REUSED WHENEVER POSSIBLE IN THE PROJECT. IF MATERIAL CANNOT
BE REUSED OR IS SURPLUS TO THE PROJECT, COORDINATE DISPOSAL OR ONSITE STOCKPILING WITH PROJECT C.O.R.
· ALL ROCKS LARGER THAN 2 INCHES IN SIZE AND OTHER UNSUITABLE MATERIAL SHALL BE REMOVED AND REPLACED WITH APPROVED
BACKFILL MATERIAL.
· ANY PORTIONS OF THE SUBGRADE NOT EASILY ACCESSIBLE TO MACHINE OPERATIONS, SUCH AS VALLEY GUTTERS, SHALL BE BROUGHT TO
THE PROPER ELEVATION AND COMPACTED BY METHODS APPROVED BY THE PROJECT C.O.R.
· DURING THE COURSE OF PREPARING THE SUBGRADE AND UNTIL THE ASPHALT PAVEMENT OR CONCRETE COURSES HAVE BEEN
CONSTRUCTED, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROTECT THE SUBGRADE AGAINST, AND REPAIR, ANY DAMAGE CAUSED
BY ADVERSE WEATHER, PUBLIC TRAFFIC, AND THE CONTRACTOR'S OWN OPERATIONS.
· THE SUBGRADE SHALL AT ALL TIMES BE COMPLETED FOR A SUFFICIENT DISTANCE AHEAD OF HAULING AND SPREADING BASE OR SURFACE
MATERIAL TO ALLOW ADEQUATE OPPORTUNITY FOR INSPECTION.
· NO MATERIALS SHALL BE PLACED ON THE SUBGRADE UNTIL IT HAS BEEN CHECKED AND APPROVED BY THE PROJECT C.O.R.
204-2.2 COMPACTION
· THE SUBGRADE SHALL BE COMPACTED BY APPROVED COMPACTION EQUIPMENT. APPROVED COMPACTION EQUIPMENT SHALL INCLUDE
SHEEPSFOOT ROLLERS, PNEUMATIC PACKERS, MECHANICAL PACKERS, MECHANICAL RAMMERS, VIBRATORY EQUIPMENT, TRUCKS, TRACTORS, SCRAPERS, MOTOR GRADERS, AND ALL OTHER TYPES OF EQUIPMENT USED IN EXCAVATING, TRANSPORTING, AND PLACING THE
SUBGRADE.
· SUBGRADE PREPARATION DEPTHS SPECIFIED ON THE PLAN SHEETS, SPECIAL PROVISIONS, OR THE MINIMUM OF 6…