B08_Solicitation_Atch_2_Propane_tank_Current_SPEC_.pdf

PDF 15 MB Posted

Attached to
Jewel Cave National Monument Remove and Replace Pr Federal contract opportunity
Solicitation number
140P6323Q0022
Issued by
Department of the Interior National Park Service Midwest Region

View the file

Other files for this federal contract opportunity

Other files attached to Jewel Cave National Monument Remove and Replace Pr, newest first.
File Type Posted
Sol_140P6323Q0022_Amd_0001.pdf PDF
Questions_and_Answers_0001.docx DOCX document
B08_Solicitation_Atch_3_Propane_Tank_Location_Maps_Combined.pdf PDF
Sol_140P6323Q0022.pdf PDF
B08_Solicitation_Atch_1_Specifications.docx DOCX document
B08_Solicitation_Atch_4__Experience_Questionnaire.xls XLS spreadsheet
B08_Solicitation_Atch_5_Wage_Determination_SD_SD20230025.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JECA 5000 Gallon Propane Tank Detail

JECA PROPANE TANK DETAIL

. LI

LI

5" Concrete Tank Pad

#4 REBAR at 1 2" Center to Center Each Way

<1

AGGREGATE BASE

8" SCARIFIED AND

RE-COMPACTED SUBGRADE

AGGREGATE BASE: SD DOT ROCK BASE COURSE,

SECTION 882 OF THE STANDARD SPECIFICATIONS.

CONCRETE PAD SECTION

NO SCALE

Jewal Cave New Propane Tank Concrete Pad

Jewel Cave New Propane Tank Steel Pipe Bollards (Six Total)

10 feet Wide by 100 Feet Long

2" COMPACTED DEPTH

GRAVEL SURFACING

SDDOT SECTION 882

111 1

11 r

--8" SCARIFIED AND

RE-COMPACTED SUBGRADE

GRAVEL PATH

Jewel Cave New Propane Tank Access

JEWEL CAVE NEW PROPANE GAS LINE

z

Cf) � w n::::

<( 0 > I

D

0+2'-0"

SELECT BACKFILL

TRACER WIRE ATTACHED TO PIPE

TRENCH DETAIL

JECA Propane Tank
JECA New Propane Tank Location
concrete pad
bollard
gravel path
JECA Propane PIPE TRENCH DETAIL (1)
JECA Existing 500 Tank
JECA Existing 1000 Tank

File details come from the government source that posted it. Updated .