B08_SOL_Attachment_1_-_SOW_Spray_Injection_V1_0.docx

DOCX document 60 KB Posted

Attached to
Road Repair V2 Federal contract opportunity
Solicitation number
140D0422R0080
Issued by
Department of the Interior Departmental Offices Interior Business Center

View the file

Other files for this federal contract opportunity

Other files attached to Road Repair V2, newest first.
File Type Posted
Sol_140D0422R0080_Amd_0001.pdf PDF
Sol_140D0422R0080.pdf PDF
B03_Wage_Determination_Davis_Bacon_MD20220020.txt TXT text file
B03_Wage_Determination_Davis_Bacon_DC20220001.txt TXT text file
B03_Wage_Determination_Davis_Bacon_VA20220035.txt TXT text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

1. GENERAL

The National Park Service (NPS) requires spray injection pothole repair services on roadways under the jurisdiction of George Washington Memorial Parkway (GWMP). Roadway deterioration due to deferred timely rehabilitation projects has distressed pavement, causing the formation of potholes. The problem is particularly acute during the winter months where freeze and thaw cycles cause the formation of potholes. During the milder seasons of spring, summer and fall, prolonged rainy spells cause additional potholes.

1.1. Introduction / Scope

A. All areas in which work will be performed are under the jurisdiction of the national park service, national capital region, and George Washington Memorial Parkway.

B. The contractor shall visit and inspect each site to verify the estimated quantities provided by the NPS and the complexities of conducting spray injection pothole repair activities in areas containing high densities of vehicles, pedestrians, and structures, and to obtain a true sense of the work being requested.

1.2. General Requirements

In completing this effort, the contractor shall comply with the following general requirements regardless of the specific services to be provided.

A. Spray injection pothole repair services. The Contractor shall provide all the equipment, labor, and materials to complete all assigned work orders for pothole patching and road repair. The Contractor shall furnish equipment in good operating condition and operated by trained personnel. The Contractor is responsible for all costs incurred in the operations and maintenance to the equipment during the contract period, including materials such as aggregate and asphalt emulsion.

B. Work Area: Contractor shall confine the parking of vehicles, daily work activities, and all other operations in connection with the Contract to the areas approved by the COR. The public ways shall not be encumbered with any of the above or any unusual traffic situations created (including road and/or lane closures) by reason of operations without the approval of the COR. All temporary lane closures and work zones in travel lanes will be provided by NPS personnel according to specifications within the Manual of Uniform Traffic Control Devices (MUTCD).

C. Responsibility Regarding Existing Plant Material and other Landscape Features: The contractor shall preserve and protect all existing vegetation such as trees, shrubs, and grass on or adjacent to the work areas. The contractor shall be responsible for all unauthorized cutting or damage to trees and shrubs, including damage resulting from careless operation of equipment, stockpiling of materials, or tracking of grass and other materials on to surfaced areas by equipment. Such damaged areas or materials shall be restored, repaired, or replaced by the contractor at no expense to the NPS prior to acceptance. Irreparable damage to trees will be subject to liquidated damages at the current value for a cross sectional square inch of diameter at breast height (dbh) measured 4 ½ feet above the ground in accordance with the guidelines provided by the Council of Tree and Landscape Appraisers and the International Society of Arboriculture. The most current value is $42.50 per cross sectional square inch putting a base value for a 32-inch elm at $23,919.

D. Patching of Public Sidewalks, Curbs, Drainage culverts and Streets: As directed by the COR and at no additional expense to NPS, the contractor shall patch, repair, or replace portions of sidewalks, curbs, drainage culverts, streets, utility access holes, and other park features that are damaged in connection with work under the contract or as a result of operations there under. Materials and methods shall conform to the current standards for the area damaged, match existing on-site materials, and meet the approval of the COR. All damaged areas shall make smooth, satisfactory, and imperceptible transitions to existing adjacent work.

E. Responsibility Regarding Existing Utilities, Structures, Signposts, Guard Rails, and other Site Features: The contractor will be held liable for any damages to utilities and will be responsible for the protection of existing utilities and site features and related structures. Damages will be quantified and corrected to the satisfaction of the COR. The contractor shall locate utilities in the field prior to engaging in work that could damage utilities by contacting “Miss Utility” at 1-800-257-7777 (District of Columbia and Maryland) or 1-800-552-7001 (Virginia), 48 hours in advance of work. Work involving excavations such as aerating shall not commence until the COR has confirmed the inspection and clearance.

F. Responsibility Regarding Existing Memorials, Statues, and other Special Features: The Contractor is advised that structures are located close to the proposed work and that turf maintenance activities shall be conducted so as to preclude damage to same.

1. The Contractor shall be responsible for any damage caused by his activities.

2. The contractor shall exercise all due diligence and take all reasonable and necessary precautions to preserve the natural and cultural resources and values of the National Park system, protecting all existing Memorials and Special features/ Statues on or adjacent to the work areas. The contractor shall be responsible for all damage to the above-mentioned structures, as well as, other Site Features, including damage resulting from careless operation of equipment, stockpiling of materials, or tracking of grass and other materials on to surfaced areas by equipment. Such damaged structural areas shall be restored, repaired, or replaced by the contractor at no expense to the NPS prior to acceptance.

3. The contractor will be held liable for any damages caused by the contractor during the performance of the work, whether intentional or not, to structures and will be responsible for the protection of existing Memorials, Statues, and site special features and related structures. Damages will be quantified and corrected to the satisfaction of the COR. The contractor will assume the responsibility for damage caused to property as a result of performing the required services. An example of damage may include scarred / chipped marble from mowers decks or tires.

4. When or where any direct or indirect damage is done to park property by or on account of any act, omission, neglect, or otherwise of the Contractor, they shall make good such damage in an acceptable manner.

5. As directed by the COR and at no additional expense to NPS, the contractor shall be liable for the cost to patch, repair, or replace portions of park structures that are damaged in connection with work under the Contract or as a result of operations there under. Materials and methods shall conform to the current standards for the structure damaged, match existing on-site materials, and meet the approval of the COR. All damaged shall make smooth, satisfactory, and imperceptible transitions to existing adjacent work.

6. Costs may include a professional conservation firm be contracted to attempt the cleaning and repairs, materials/supplies, labor, equipment, etc. Several days effort would include things like mobilization and set up, testing to determine the best cleaning solution to remove the marks and not harm the statuary material, performing the multiple steps cleaning process, cleaning up, etc.

G. Air and Water Pollution Control: The contractor shall take all necessary measures to prevent runoff, soil erosion, and air and water pollution by any material and/or equipment used during the course of work. The contractor shall keep the site clean and free of trash and debris.

H. Pre-Existing Damage: In instances where the contractor finds pre-existing conditions or damage to park resources which may reflect upon the quality of his work or cause him undue liability, the contractor shall not start work until the contractor and COR have agreed on the responsibility for these pre-existing conditions.

I. Cleanup and Restoration: The contractor will be required to furnish all labor, materials, and equipment for cleanup and restoration of all disturbed areas, surfaces or features which have been damaged during the course of work. The contractor shall be prepared to sweep and wash paved surfaces daily or as needed.

J. Personal Property Damage: The contractor will assume the responsibility for accidents or damage caused to property as a result of performing the required services. An example of damage may include wheel ruts in the turf, damage to trees caused by contractor’s vehicles and equipment and damage to passing vehicles caused by flying objects from contractor’s operations.

1.3. Scheduling and Coordination

A. The COR will establish contact with the contractor so that mutually agreeable time frames for scheduling and performing the prescribed work can be established. The contractor will identify a single point of contact to ensure efficient and safe operations.

Note: The COR shall notify the contractor to verify when work is to begin and notify the contractor of the agreeable date and locations. If the COR has not initiated work and the contractor determines that work is required per the specifications herein, the contractor may contact the COR to request scheduled work to begin. The COR shall confirm the date the contractor may begin work. The COR and the contractor shall agree upon a ground’s maintenance schedule.

B. Within 2 working days of receiving a request for work, the contractor shall establish contact with the designated park representative indicated on the request so that mutually agreeable time frames for scheduling and performing the requested work can be established.

C. Work shall be scheduled and arranged so as not to interfere with the normal activities of the park. Advanced notice will be given to the contractor if a conflict is expected.

D. Once the time frames for performing the work are established, the contractor shall notify the COR designated park representative 48 hours prior to beginning any work. Work shall be performed between the hours of 6:30 a.m. and 3:00 p.m. (dusk), Monday through Friday (-Saturday), federal holidays excluded unless authorized otherwise in writing by the COR.

E. Work is not permitted during rush hours; however, operations shall not interfere with the normal flow of traffic or result in any unusual traffic situations. Morning rush hours are 6:00 am to 10:00 am, and evening rush hours are from 2:45 pm to 7:15 pm, Monday through Friday, holidays excluded F. Emergency Response may be required of the Contractor to respond to request for spray injection pothole repair services during off duty hours and weekends. Once contacted by the COR the Contractor shall report to the NPS Maintenance Facility within four hours to begin patch work.

G. Once work begins the contractor shall be on the job site each day in which weather conditions are favorable as determined by the COR until work is complete.

H. Work shall only be performed under favorable weather and soil conditions as determined by the COR.

I. All work within a designated area shall be completed, inspected, and accepted by the COR in accordance with the procedures stated herein before beginning work in another area.

J. The time stated for completion shall include final cleanup of the premises.

K. The COR will be responsible for acting on behalf of the CO on all matters of work within the scope of the contract. Approval of work beyond the scope of the contract is reserved for the CO. The contractor is responsible for notifying the COR in writing for all work that is beyond the scope of the Contract. Notification shall include a proposal for performing the prescribed work that includes a breakdown with unit prices for labor, materials, equipment required and time frame(s) for completion. The COR will assess the proposal and if valid will seek approval from the CO. Failure of the contractor to obtain the approval of the CO for work beyond the scope of the Contract will release the NPS from any compensation for services claimed.

L. If, at any time, the COR determines that the work performance is unsatisfactory or being conducted in an unsafe manner, the contractor will be notified and shall immediately cease all work activities.

M. On occasion, the contractor may be required to provide personnel on weekends and other unscheduled work hours on a short-term basis. If such a need arises, the CO or COR will notify the contractor no less than three (3) business days prior to the planned requirement or no less than one (1) business day prior to any unscheduled requirement. This unscheduled work may result from special events or seasonal peaks in work volume. NPS and contractor shall coordinate for the availability and compensation for services on weekends or other periods of time outside of normal working hours.

N. All approvals shall be in writing.

1.4. Emergency Situations

A. The contractor shall report emergency situations, such as accidents involving personal injury or death, fires, bomb threats, medical emergencies, power outages, water damage, Office of Personnel Management (OPM) declared emergency, or other unforeseen circumstances and shall follow required emergency reporting procedures. Emergency reporting procedures will be delineated in writing by the CO before any work awarded under the contract begins.

B. Emergency situations and contingency operations at NPS may require the contractor to operate at times not considered normal operating hours, as directed by the COR. This normally involves utility outages, weather driven contingencies, or any work involving support for significant NPS services. In the event of an emergency identified by the contractor, the contractor shall inform the CO of the emergency.

1.5. Emergency Notification

A. Within 3 calendar days prior to performance start date and not later than one (1) business day after changes are implemented, the contractor shall provide the CO a written list of key Points of Contact (POC) responsible for responding to emergency operations.

B. Terrorist Threat Reporting: The contractor shall be aware terrorist threat levels and the requirements and procedures for reporting suspicious activities to Park Dispatch, United States Park Police (USPP). NPS will provide the contractor with the park’s Incident Command System document that addresses the policies and procedures regarding Terrorist Threat Reporting within the park.

C. The contractor shall immediately report acts of vandalism to trees, turf, and other park resources to the COR.

1.6. Records and Reports

A. The NPS will provide the contractor with an Acceptance Report to document completed work per Section C-8.C Acceptance of Services.

B. The NPS will have access at all times, upon written request, to all records and reports during work hours. All records are the property of the NPS. All records and copies of reports will be turned over to the COR no more than five (5) calendar days after Contract termination or completion. No records, reports, or any documents or submittals related to the Contract will be disposed of without prior approval by the CO. The contractor shall maintain copies of all submitted records, reports, and forms throughout the life of the Contract.

1.7. Submittals

A. Safety Plan: The contractor shall provide a Safety Plan for review and approval by the NPS. The contractor will submit the plan within thirty (30) days of performance start date. Work along the Parkway is hazardous. All MUTCD directed safety precautions are required. Good consistent communication and coordination with park staff is necessary to maximize risk management

1.8. Referenced Standards

A. Traffic Control: The most current edition revision of:

1. Federal Highway Administration Manual on Uniform Traffic Control Devices (MUTCD) for Streets and Highways

2. American National Standards Institute (ANSI) Standard D6.1.

B. Safety Garments: The most current edition revision of:

1. Federal Highway Administration MUTCD Section 6D.03 Worker Safety Considerations, B - Worker Safety Apparel

1.9. Project Manager Authority

The PM or alternate shall have full authority to act for the contractor on matters relating to the daily operation of this effort.

1.10. Project Manager Availability

A. The PM shall be available during normal hours of operation to plan, direct, and control the overall management and operational functions. The PM or alternate may be required to attend briefings, and other government designated meetings as directed by the COR.

B. The PM or designated key personnel shall be available within two (2) hours after notification during business hours to meet with the COR. In certain cases, as approved by the COR, telephone contact with the COR to discuss problem areas will be acceptable. After business hours, the PM or designated key personnel shall be available within one (1) hour after notification to perform or initiate emergency functions. After normal working hours, the contractor shall provide the COR with an after-hours telephone contact number for the PM to receive requests for emergency work from the COR. In non-emergency situations after business hours, the PM or designated key personnel shall be available within four (4) hours.

1.11. Identification of Employees

A. All workers shall be recognizable as employees of the contractor by wearing distinctive clothing bearing the name of the company and by wearing appropriate patches which show the contractor’s company name and employee name.

1.12. Rules and Regulations

A. The PM or alternate shall be responsible for providing the contractor employees with detailed instruction on the rules and regulations related to the NPS operations specified in the Contract. The contractor shall comply with all applicable federal, state, and local rules and regulations as well as Federal Privacy Act regulations governing personal and confidential information.

B. The contractor shall work within NPS directives laws, regulations, and Service-wide polices and management objectives governing the management of natural and cultural resources.

C. In the instance a conflict is found between NPS service-wide policies, standards and/or these guidelines, the contractor shall raise this issue to the COR for review. The contractor shall resolve routine problems, recommend solutions, and bring unusual situations to the attention of a COR for resolution. The contractor shall ensure qualified personnel provide coverage to perform the functions listed in the sections below in accordance with the workload and performance standards as well as in the event of a staffing shortage.

1.13. Quality Assurance

A. NPS personnel will record all surveillance specified in the PRS. When the surveillance indicates defective performance, the COR will require the Contractor’s POC or alternate at the worksite to initial the observation. Initialing the observation document does not necessarily constitute concurrence with the observation, but only acknowledges that the contractor has been made aware of the defective performance.

B. NPS surveillance of tasks not listed in the PRS may occur. Such surveillance will be done according to the inspection procedures identified in the PRS.

C. The COR shall perform quality assurance to ensure that the contractor follows the contract. The NPS QASP is not a substitute for quality control by the contractor.

D. The NPS reserves the right to choose the inspection methods to be used in implementing its QASP and to vary inspection methods without notice to the contractor.

E. Well-maintained turf areas are the NPS’s goals and while surveillance adjustments are designed to protect the NPS’s interests, it is not a desirable substitute for accomplishing the job through the normal process. Adjustments are designed only to assure the NPS receives the specified services and is fairly compensated for damage(s) and/or deficiencies resulting from such operations.

F. Failure to perform the required services as indicated in the specifications herein shall constitute a deficiency. All work will be regularly inspected by the COR and deficiencies will be reported to the Contractor’s Supervisor. Deficiencies in daily tasks shall be completed within the day the deficiency is noted. All other deficiencies shall be corrected within 24 hours, or the period indicated by the COR. If such deficiencies are of a nature that precludes satisfactory re-accomplishment within the specified period, no further opportunity will be provided to the contractor to cure the deficiencies and the provisions for compensation will apply.

1.14. Occupational Safety and Health Protections

A. The contractor shall exert every effort to reduce the number of occupational safety and health hazards. The contractor shall comply with the following legislative, executive, and regulatory directives:

1. Public Law 91-596, Occupational Safety and Health Act of 1970, Sec. 19 (a), Federal Agency Safety Programs and Responsibilities (29 U.S.C. § 668).

2. Executive Order 12196, Occupational Safety and Health Programs for Federal Employees, February 26, 1980.

3. 29 CFR Sec. 1960, et seq., Basic Program Elements for Federal Employee Occupational Safety and Health Programs.

B. In addition to OSHA requirements, the contractor shall develop, implement, and execute a safety plan.

C. All equipment must meet all federal, OSHA, state and local safety requirements and must be properly licensed.

D. All operations shall be conducted in accordance with all national and local safety codes, laws, rules, regulations, and OSHA safety requirements.

E. When conducting services operations near or adjacent to roadways all employees shall wear reflective, bright orange or lime garment while conducting operations adjacent to roadways. Garment shall be an orange or lime ANSI/ISEA (International Safety Equipment Association) Class 3 Garment (AVY725SC2) with a minimum of 201 square inches of refectories or high-visibility material.

F. On occasion services requested under may require road or lane closures. On such occasions closure will be the responsibility of the NPS. Such closures shall require a minimum of five (5) working days’ notice from the contractor to the COR. Such closures will be subject to rush hour restrictions. Closure of a road or lane without the approval of the COR is prohibited. There shall be no requests for lane closures on the Friday before a Monday Federal holiday and the Wednesday before the Thanksgiving holiday.

G. No one except the operator shall be within 5 feet of any operating equipment.

2. Government-Furnished Property and Services A. The Government will provide all necessary temporary work zones where a travel lane must be closed to permit worker and visitor safety. Work zones requiring lane closures will be erected and removed by trained NPS personnel according to the Manual of Uniform Traffic Control Devices. Work Zones will be but not limited to Mobile Work Zones and Temporary Traffic Control work zones as defined by the MUTCD.

B. The Government will provide the contractor with access to government or NPS–related policies and management guidelines, asset inventories, files/records, and maps as necessary to meet the requirements of the contract as it relates to performance of turf maintenance activities.

3. SERVICE PROVIDER Furnished Items A. The contractor shall provide all labor, equipment, tools, and services necessary to perform prescribed spray injection pothole patching and all related incidental work. The name or logo of the contractor must be clearly displayed on all vehicles used on the job.

B. The contractor shall not perform any routine or preventative equipment repairs on NPS property unless previously approved by the COR. Only emergency repairs may be performed.

C. Contractor Furnished Training: The contractor shall ensure that all employees have been trained and are qualified to perform all required tasks. This includes all mandatory industry standard (MUTCD) safety and equipment training and personal protective equipment and NPS advisory safety training.

D. The contractor shall maintain all certifications and/or records of all training and ensure they are available for Government review.

E. The Table C-4-1 identifies load restrictions that shall not be exceeded:

Table C-4-1: Vehicle Load Restriction

UNIT
GROSS VEHICLE WEIGHT

Single Unit

2 axles
40,000 lbs. (18,100 kg)
3 axles
48,000 lbs. (21,800 kg)
4 axles
52,000 lbs. (23,600 kg)

Combination Unit

3 axles
57,000 lbs. (25,900 kg)
4 axles
62,000 lbs. (28,100 kg)
5 or more axles
66,000 lbs. (29,900 kg)

4. EXECUTION/ Service Requirements This Statement of Work encompasses the performance requirements, workload, and performance standards necessary to perform the services required in support of spray injection pothole repair services.

4.1. Spray Injection pothole patching Services

The contractor shall comply with the following general requirements regardless of the specific services to be provided.

A. The Contractor shall provide all the equipment, labor, and materials to complete all assigned work orders for pothole patching and road repair. The Contractor shall furnish equipment in good operating condition and operated by trained personnel.

B. The Contractor shall be responsible for all costs incurred in the operations and maintenance to the equipment during the contract period, including materials such as aggregate and asphalt emulsion.

C. The Contractor shall use self-contained spray injection patchers. The spray injection patcher shall conform in strength and quality of material and workmanship to meet the George Washington Memorial Parkway’s requirement and to comply with all Federal Motor Vehicles Safety Standards (FMVSS) Regulations applicable to the specified equipment D. The spray injection patcher shall be designed and constructed to repair potholes, large cracks, and broad areas. The spray injection patching machine shall be completely controlled by one person from the driver's position of the cab with no support equipment necessary. This machine must be capable of patching at temperatures as low as 0° F. Operational features. of the equipment provided shall use low pressure air at a high volume to clean, track fill and dry coat.

E. All operator controls shall be at easy access from the driver's position. The unit shall be designed so equipped with programming and communications with field office, two-way text messaging F. Unit shall have on-board a receiver/transmitter. Base unit shall be capable of tracking and dispatching messages to unit in the field, 24 hours a day.

4.2. Procedure

A. The Contractor shall use a spray injection patching process consisting of a) Blowing out of water and debris of areas to be repaired; b) Spraying of tack coat of asphalt emulsion on the sides and bottom of pothole and areas to be repaired.; c) Blowing of emulsion and aggregate into pothole and areas to be repaired and d) Covering the repaired area with a thin layer of aggregate.

4.3. Material

A. The Contractor shall supply asphalt emulsion that meets, at minimum, the following requirements:

1. Material supplied for the spray injection shall work during and between summer and winter conditions.

2. For summer applications, for temperature above 10° C (50°F), the material shall be CRS-2, RS-2, or HFRS-2 grades. The penetration of the residue shall be a maximum of 135 within the range allowed in the asphalt emulsion specification

3. For winter applications (colder than 10° C (50° F), the material shall be CMS-2, MS-2 or HFMS-2 asphalt emulsions. The penetration of the residue shall be a minimum of 135 psi within the range allowed in the emulsion specifications.

B. The Contractor shall supply aggregate to fill the potholes that meets, at minimum, the following requirements:

1. Aggregate coating under temperature condition, summer or winter, the emulsion temperature shall be about 65° C (150°), and the asphalt emulsion's Saybolt Furol test viscosity at 50° C (122°) shall be limited to 250 seconds.

2. Aggregate sizes for spray injection shall be AASHTO or ASTM size No.9 [4.75 to 1.18 mm (No.4 to No. 16)] with no more than 3 percent passing the 75 urn (no. 200) sieve. Crushed aggregate material recommended for spray injection

4.4. Measurement and Payment

A. Measurement will be made in tons of material placed per day.

B. Payment for spray injection pothole patching will be made at the applicable unit price per ton for aggregate placed. This payment will be full compensation for spray injection pothole patching and all labor, materials, equipment, tools, and incidentals necessary to complete the Work.

4.5. Warranty

A. The warranty period for spray injection pothole patching shall be five (5) years.

5. Recorded Data National Park Service units managed by the George Washington Memorial Parkway:

1. George Washington Memorial Parkway*

1. Arlington House (The Robert E. Lee Memorial)

1. Clara Barton National Historic Site

1. Lyndon Baines Johnson Memorial Grove on the Potomac

1. Theodore Roosevelt Island Park *The park, the George Washington Memorial Parkway, is currently administered by four separate park offices consisting of portions of the parkway found in the City of Alexandria, Arlington County and Fairfax County.

A. Total Acreage of GWMP and Associated Parks As recorded by National Capitol Region

1. Arlington House (ARHO): 28.08

1. Clara Barton National Historic Site (CLBA): 8.59

1. George Washington Memorial Parkway (GWMP): 7,007

1. Lyndon Baines Johnson Memorial Grove (LYBA): 17

1. Theodore Roosevelt Island (THIS): 88.5 B. Acreage by County Breakdown Alexandria City, VA George Washington Memorial Parkway (GWMP): 76.86

Arlington County, VA Arlington House (ARHO): 28.08 George Washington Memorial Parkway (GWMP):1030.18

Fairfax County, VA George Washington Memorial Parkway (GWMP): 3100.33

Montgomery County, MD Clara Barton National Historic Site (CLBA): 8.59 George Washington Memorial Parkway (GWMP): 1693.05

Prince George’s County, MD George Washington Memorial Parkway (GWMP): 1100.32

Washington, District of Columbia Lyndon Baines Johnson Memorial Grove (LYBA): 17 Theodore Roosevelt Island (THIS): 88.5

File details come from the government source that posted it. Updated .