This document is a comprehensive set of technical specifications for the rehabilitation of the Canyon Village Wastewater Treatment Plant (WWTP) in Yellowstone National Park. The project involves demolishing existing wastewater treatment infrastructure and constructing new facilities, including a Headworks Facility, Bioreactors and Digester Facility, Process Facility, Dewatering Facility, and associated systems. Key components include new buildings for process equipment, membrane systems, chemical feed systems, UV disinfection, blowers, septage receiving, aeration basins, mixed liquor recycle pumps, and advanced control systems with PLCs and SCADA servers.
The project also encompasses rehabilitating existing holding ponds, constructing new lift stations, installing underground utilities, and performing collection system improvements. The work includes demolition of existing structures, installation of new process piping and equipment, electrical and control systems, and comprehensive commissioning and testing of all systems. The contract is part of a federal solicitation (140P2025R0103) managed by the Department of the Interior National Park Service, with the goal of modernizing and improving wastewater treatment infrastructure at Yellowstone National Park's Canyon Village location.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CANYON VILLAGE WASTEWATER
TREATMENT PLANT
YELLOWSTONE NATIONAL PARK, WYOMING
REHABILITATE CANYON VILLAGE
WASTEWATER TREATMENT PLANT, BRINK OF UPPER
FALLS LIFT STATION, GOVERNMENT LIFT STATION &
INFLUENT SEWER
YELL 326133
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE (NPS)
DENVER SERVICE CENTER (DSC)
NATIONAL PARK SERVICE
YELLOWSTONE NATIONAL PARK, WYOMING
CANYON VILLAGE WASTEWATER TREATMENT PLANT
CONTRACT DOCUMENTS
for the construction of the
YELL 326133
REHABILITATE CANYON VILLAGE
WASTEWATER TREATMENT PLANT, BRINK OF UPPER FALLS LIFT STATION,
GOVERNMENT LIFT STATION AND INFLUENT SEWER
FINAL CONSTRUCTION DOCUMENTS
JACOBS
Loveland, Colorado
August 2025
Project No. D3167668 Copy No.
PW\JA\NPS\D3167668\4\42 TABLE OF CONTENTS
MAY 2025 00 01 10 - 1
YELL 326133
TABLE OF CONTENTS
VOLUME 1
Person Section Responsible Title Pages
SPECIFICATIONS
DIVISION 01—GENERAL REQUIREMENTS
01 11 00 KS Summary of Work ..................................................................... 1- 23 01 12 00 SMS Natural Features Protection ....................................................... 1- 5 01 26 01 KS Contract Modification Procedures ............................................. 1- 7 01 27 00 KS Definition of Contract Line Items ............................................. 1- 11 01 31 00 KS Project Management and Coordination ..................................... 1- 20 01 32 16 KS Construction Schedule ............................................................... 1- 12 01 32 33 KS Photo Documentation ................................................................ 1- 3 01 33 23 KS Submittal Procedures ................................................................. 1- 10
Supplement:
KS Submittal List ............................................................................ 1- 42
01 35 13.22 KS Archeological Resources Protection ......................................... 1- 3 01 35 23 KS Safety Requirements .................................................................. 1- 7 01 40 00 KS Quality Requirements ................................................................ 1- 9
Supplement:
KS Statement of Structural Tests and Special Inspections .............. 1- 22
01 42 00 KS Reference Standards .................................................................. 1- 15 01 45 33 LAS Special Inspection, Observation, and Testing ........................... 1- 6
Supplement:
LAS Contractor’s Statement of Responsibility .................................. 1- 3
01 50 00 KS Temporary Facilities and Controls ............................................ 1- 15 01 57 19.11 KS Indoor Air Quality Management ............................................... 1- 7 01 57 19.12 KS Noise and Acoustics Management ............................................ 1- 3 01 57 23 KS Temporary Storm Water Pollution Prevention .......................... 1- 10 01 57 28 KS Temporary Flow Control ........................................................... 1- 8 01 67 00 KS Product Requirements ............................................................... 1- 11
Supplements:
KS Affirmative Procurement Reporting Form ................................ 1- 2 KS Manufacturer’s Certificate of Proper Installation Form ............ 1- 1 KS Manufacturer’s Certificate of Compliance Form ...................... 1- 1
01 73 29 KS Cutting and Patching ................................................................. 1- 4 01 73 40 KS Execution ................................................................................... 1- 9 01 74 19 KS Construction Waste Management and Disposal ........................ 1- 10
Supplement:
KS Project Waste Management Plan Worksheet Sample ............... 1- 2
Person Section Responsible Title Pages
TABLE OF CONTENTS PW\JA\NPS\D3167668\4\42
00 01 10 - 2 MAY 2025
YELL 326133
01 77 00 KS Closeout Procedures .................................................................. 1- 6 01 78 23 KS Operation and Maintenance Data .............................................. 1- 10
Supplements:
KS Equipment Data Sheet ............................................................... 1- 1 KS Closeout and Operation & Maintenance (O&M)
Requirements Template .......................................................... 1- 1 01 79 00 KS Demonstration and Training ...................................................... 1- 4 01 81 13 KS Sustainable Design Requirements ............................................. 1- 5 01 88 15 LAS Anchorage and Bracing ............................................................. 1- 7 01 91 14 KS Total Building Commissioning ................................................. 1- 14 01 91 15 KS Process Equipment Testing and Facility Startup ....................... 1- 9
Supplements:
Unit Process Startup Form ........................................................ 1- 1 Facility Performance/Demonstration Certification Form .......... 1- 1
DIVISION 02—EXISTING CONDITIONS
02 41 00 KS Demolition ................................................................................. 1- 11 02 65 00 KS Underground Storage Tank Removal ........................................ 1- 10 02 81 00 KS Transportation and Disposal of Hazardous Materials ............... 1- 11
Supplement:
KS Attachment A: Sample Offsite Policy Certification Memo ...... 1- 1
02 82 00 KS Asbestos Remediation ............................................................... 1- 31 02 83 00 KS Lead Remediation ...................................................................... 1- 18 02 84 16 KS Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury ........................................................................... 1- 7 02 84 33 KS Removal and Disposal of Polychlorinated Biphenyls (PCBs) .. 1- 11
DIVISION 03—CONCRETE
03 01 32 LAS Repair of Vertical and Overhead Concrete Surfaces ................. 1- 12 03 01 33 LAS Repair of Horizontal Concrete Surfaces .................................... 1- 12 03 10 00 LAS Concrete Forming and Accessories ........................................... 1- 7 03 15 00 LAS Concrete Joints and Accessories ............................................... 1- 9 03 21 00 LAS Steel Reinforcement .................................................................. 1- 6 03 30 00 LAS Cast-in-Place Concrete .............................................................. 1- 27
Supplements:
LAS Concrete Mix Design, Class 4500F2S1W1C1 .......................... 1- 2 LAS Concrete Mix Design, Class GM3500F1S1W1C1 .................... 1- 1 LAS Concrete Mix Design, Class 3500F1S1W1C1 .......................... 1- 2
03 39 00 LAS Concrete Curing ........................................................................ 1- 5
PW\JA\NPS\D3167668\4\42 TABLE OF CONTENTS
MAY 2025 00 01 10 - 3
YELL 326133
03 62 00 LAS Grouting ..................................................................................... 1- 10 Supplement:
LAS 24-hour Evaluation of Nonshrink Grout Test Form and Grout Testing Procedures ................................................ 1- 3
03 63 00 LAS Concrete Doweling .................................................................... 1- 4 03 64 23 LAS Epoxy Resin Injection Grouting ................................................ 1- 13 03 64 24 LAS Polyurethane Injection Grouting ............................................... 1- 9
DIVISION 04—MASONRY
04 21 13.13 LAS Masonry Veneer ........................................................................ 1- 12 04 22 00 LAS Concrete Unit Masonry ............................................................. 1- 14
DIVISION 05—METALS
05 05 19 LAS Post-Installed Anchors .............................................................. 1- 9 05 05 23 LAS Welding ..................................................................................... 1- 6
Supplement:
LAS Welding and Nondestructive Testing Table .............................. 1- 1
05 12 00 LAS Structural Steel Framing ............................................................ 1- 13 05 31 00 LAS Steel Decking ............................................................................ 1- 7 05 41 00 LAS Structural Metal Stud Framing .................................................. 1- 7 05 50 00 LAS Metal Fabrications ..................................................................... 1- 17 05 52 16 LAS Aluminum Railings ................................................................... 1- 9 05 53 00 LAS Metal Gratings ........................................................................... 1- 6
DIVISION 06—WOOD, PLASTICS, AND COMPOSITES
06 10 00 GBK Rough Carpentry ....................................................................... 1- 11 06 17 53 LAS Shop-Fabricated Wood Trusses ................................................. 1- 6 06 20 00 GBK Finish Carpentry ........................................................................ 1- 10 06 41 00 GBK Architectural Wood Casework .................................................. 1- 10 06 82 00 LAS Glass-Fiber-Reinforced Plastic .................................................. 1- 12
DIVISION 07—THERMAL AND MOISTURE PROTECTION
07 14 00 GBK Fluid-Applied Waterproofing .................................................... 1- 6 07 15 00 GBK Air and Water Barriers .............................................................. 1- 16 07 19 00 GBK Water Repellents ....................................................................... 1- 4 07 21 00 GBK Thermal Insulation .................................................................... 1- 7 07 41 13 GBK Metal Roof, Wall, and Soffit Panels .......................................... 1- 20 07 62 00 GBK Sheet Metal Flashing and Trim ................................................. 1- 7 07 70 01 GBK Roof Specialties and Accessories .............................................. 1- 4
TABLE OF CONTENTS PW\JA\NPS\D3167668\4\42
00 01 10 - 4 MAY 2025
YELL 326133
07 84 00 GBK Firestopping ............................................................................... 1- 6 07 92 00 GBK Joint Sealants ............................................................................. 1- 10
DIVISION 08—OPENINGS
08 11 00 GBK Metal Doors and Frames ........................................................... 1- 9 08 30 00 GBK Specialty Doors ......................................................................... 1- 7 08 41 13 GBK Aluminum-Framed Windows .................................................... 1- 8 08 45 00 GBK Translucent Wall Assemblies .................................................... 1- 9 08 71 00 GBK Door Hardware .......................................................................... 1- 17 08 80 00 GBK Glazing ...................................................................................... 1- 12 08 90 00 GBK Louvers ...................................................................................... 1- 5
DIVISION 09—FINISHES
09 22 16 GBK Nonstructural Metal Framing .................................................... 1- 4 09 29 00 GBK Gypsum Board ........................................................................... 1- 12 09 30 00 GBK Tiling ......................................................................................... 1- 10 09 51 13 GBK Acoustical Panel Ceilings .......................................................... 1- 5 09 65 00 GBK Resilient Flooring ...................................................................... 1- 9 09 90 00 KS Painting and Coating ................................................................. 1- 30
Supplements:
KS Paint System Data Sheet (PSDS) .............................................. 1- 1 KS Paint Product Data Sheet (PPDS) .............................................. 1- 1 KS Volatile Organic Compound (VOC) Limit List ........................ 1- 2
09 96 35 KS Chemical-Resistant Coatings .................................................... 1- 12 Supplements:
KS Chemical-Resistant Coating System Data Sheet (CRCSDS) .... 1- 1 KS Chemical-Resistant Coating Product Data Sheet (CRCPDS) ... 1- 1
DIVISION 10—SPECIALTIES
10 14 00 GBK Signage ...................................................................................... 1- 8 Supplement:
GBK Sign Schedule ............................................................................ 1- 5 10 28 00 GBK Toilet and Bath Accessories ...................................................... 1- 8 10 44 00 GBK Fire Protection Specialties and Safety Equipment .................... 1- 4 10 51 00 GBK Lockers and Benches ................................................................. 1- 4 10 80 00 GBK Miscellaneous Specialties .......................................................... 1- 4
DIVISION 11—EQUIPMENT
11 31 00 GBK Appliances ................................................................................. 1- 2 11 53 00 GBK Laboratory Equipment ............................................................... 1- 13
PW\JA\NPS\D3167668\4\42 TABLE OF CONTENTS
MAY 2025 00 01 10 - 5
YELL 326133
DIVISION 12—FURNISHINGS
12 35 53 GBK Laboratory Casework ................................................................ 1- 21 12 49 00 GBK Roller Shades ............................................................................. 1- 6 12 50 00 GBK Furniture .................................................................................... 1- 3
Supplement:
GBK Furniture Data Sheets ................................................................ 1- 8
DIVISION 13—SPECIAL CONSTRUCTION
13 34 19 LAS Metal Building Systems ............................................................ 1- 15
DIVISION 14 THROUGH DIVISION 20 (NOT USED)
DIVISION 21—FIRE SUPPRESSION
21 13 13 KS Hybrid Fire-Extinguishing Systems .......................................... 1- 21
DIVISION 22—PLUMBING
22 05 48 KS Vibration Isolation and Seismic Control for Plumbing Piping and Equipment ............................................................ 1- 13
22 07 00 KS Plumbing Piping Insulation ....................................................... 1- 7 22 10 01 KS Plumbing Piping and Accessories ............................................. 1- 25 22 10 01.02 KS Polyvinyl Chloride Drain Waste and Vent (PVC-DWV)
Pipe and Fittings Data Sheet .................................................. 1- 1 22 10 01.10 KS Carbon Steel Tubing and Fittings Data Sheet ........................... 1- 1 22 10 01.13 KS High-Density Polyethylene (HDPE) Pipe and Fittings—
Propane and LPG Service ........................................................ 1- 3 22 30 00 KS Plumbing Equipment ................................................................. 1- 12
Supplements:
KS Gas Water Heater (Commercial) Data Sheet ............................ 1- 1 KS Domestic Water Expansion Tank Data Sheet ........................... 1- 1 KS Domestic Hot Water Circulating Pump Data Sheet .................. 1- 1 KS Duplex, Submersible Sump Pump Data Sheet .......................... 1- 1 KS Backflow Preventers with Salient Characteristics Data Sheet .. 1- 1 KS Pressure Reducers with Salient Characteristics Data Sheet ...... 1- 1
22 40 00 KS Plumbing Fixtures ..................................................................... 1- 12
DIVISION 23—HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 14 KS HVAC Adjustable Frequency Drives ........................................ 1- 12 23 05 48 KS Vibration Isolation and Seismic Control for HVAC Piping and Equipment ........................................................................ 1- 13
TABLE OF CONTENTS PW\JA\NPS\D3167668\4\42
00 01 10 - 6 MAY 2025
YELL 326133
23 05 93 KS Testing, Adjusting, and Balancing for HVAC .......................... 1- 6 23 07 00 KS HVAC Insulation ....................................................................... 1- 12 23 09 00 KS Instrumentation and Control Devices for HVAC ...................... 1- 15 23 09 13 KS HVAC Controls, Field Components, and Instruments .............. 1- 13 23 09 23 KS Direct-Digital Control System for HVAC ................................. 1- 10 23 23 00 KS Refrigerant Piping ..................................................................... 1- 8 23 31 13 KS Metal Ducts and Accessories .................................................... 1- 33 23 34 00 KS HVAC Fans ............................................................................... 1- 20 23 37 00 KS Air Outlets and Inlets ................................................................ 1- 4 23 77 00 KS Air Handling Units .................................................................... 1- 28 23 81 00 KS Unitary Air-Conditioning Equipment ....................................... 1- 21 23 82 00 KS Terminal Heating and Cooling Units ........................................ 1- 9
DIVISION 24 AND DIVISION 25 (NOT USED)
DIVISION 26—ELECTRICAL
26 05 02 JJ Basic Electrical Requirements ................................................... 1- 7 26 05 04 JJ Basic Electrical Materials and Methods .................................... 1- 12 26 05 05 JJ Conductors ................................................................................. 1- 10 26 05 26 JJ Grounding and Bonding for Electrical Systems ........................ 1- 7 26 05 33 JJ Raceway and Boxes ................................................................... 1- 28 26 05 70 JJ Electrical Systems Analysis ...................................................... 1- 8
Supplement:
JJ Figure 1: Example Arc Flash Label .......................................... 1- 1
26 08 00 JJ Commissioning of Electrical Systems ....................................... 1- 20 26 09 13 JJ Power Measurement and Control .............................................. 1- 4 26 14 13 JJ Switchboards ............................................................................. 1- 9 26 20 00 JJ Low-Voltage AC Induction Motors .......................................... 1- 9 26 22 00 JJ Low-Voltage Transformers ....................................................... 1- 5 26 24 16 JJ Panelboards ............................................................................... 1- 7 26 24 19 JJ Low-Voltage Motor Control ..................................................... 1- 14 26 27 26 JJ Wiring Devices .......................................................................... 1- 12 26 29 23 JJ Low-Voltage Adjustable Frequency Drive System ................... 1- 9 26 32 13.13 JJ Diesel Engine Generator Set ..................................................... 1- 14 26 32 13.16 JJ Propane Engine Generator Set .................................................. 1- 14 26 33 53 JJ Static Uninterruptible Power Supply ......................................... 1- 13 26 36 23 JJ Automatic Transfer Switches .................................................... 1- 6 26 42 01 KS Pipe Bonding and Test Stations ................................................. 1- 14
Supplement:
Joint Bond Continuity Test Schematic ...................................... 1- 1
26 42 02 KS Galvanic Anode Cathodic Protection System ........................... 1- 8 26 42 03 KS Under Tank Cathodic Protection System .................................. 1- 7
ELKINSA
Sticky Note Marked set by ELKINSA
PW\JA\NPS\D3167668\4\42 TABLE OF CONTENTS
MAY 2025 00 01 10 - 7
YELL 326133
26 43 00 JJ Surge Protective Devices ........................................................... 1- 6 26 50 00 JJ Lighting ..................................................................................... 1- 11
DIVISION 27—COMMUNICATIONS
27 13 13 JJ Communications Copper Cabling Systems ............................... 1- 12
DIVISION 28—ELECTRONIC SAFETY AND SECURITY
28 31 00 JJ Fire Detection and Alarm .......................................................... 1- 25 Supplement:
JJ Sequence of Operations Matrix ................................................. 1- 1
DIVISION 29 AND DIVISION 30 (NOT USED)
DIVISION 31—EARTHWORK
31 10 00 SMS Site Clearing .............................................................................. 1- 10 31 23 13 KS Subgrade Preparation ................................................................ 1- 3 31 23 16 KS Excavation ................................................................................. 1- 4 31 23 19.01 KS Dewatering ................................................................................ 1- 4 31 23 23 KS Fill and Backfill ......................................................................... 1- 10 31 23 23.15 KS Trench Backfill .......................................................................... 1- 12 31 32 19.16 KS Geotextile .................................................................................. 1- 9 31 37 00 KS Riprap ........................................................................................ 1- 6 31 41 00 KS Shoring ...................................................................................... 1- 2
DIVISION 32—EXTERIOR IMPROVEMENTS
32 11 23 KS Aggregate Base and Subbase Courses ....................................... 1- 7 32 12 16 KS Asphalt Paving .......................................................................... 1- 14 32 31 26 KS Woven Wire Fences and Gates ................................................. 1- 9 32 91 19.13 KS Topsoil Placement and Grading ................................................ 1- 6 32 92 00 SMS Turf and Grasses ........................................................................ 1- 4
DIVISION 33—UTILITIES
33 01 30.16 KS Television Inspection of Sewer Pipelines ................................. 1- 10 Supplements:
KS Inspection Summary Sheet ........................................................ 1- 1 KS NASSCO PACP Quality Control Procedure ............................. 1- 3
33 01 30.51 KS Gravity Sewer Pipeline Cleaning .............................................. 1- 7 Supplement:
KS Sanitary Sewer Cleaning Form .................................................. 1- 2
TABLE OF CONTENTS PW\JA\NPS\D3167668\4\42
00 01 10 - 8 MAY 2025
YELL 326133
33 05 01.10 KS High-Density Polyethylene (HDPE) Pressure Pipe and Fittings ............................................................................. 1- 13
33 05 01.12 KS Gravity Sewer Pipe and Fittings ................................................ 1- 13 Supplements:
KS WDEQ Policy 13.9.11 ............................................................... 1- 2 KS WDEQ Policy 13.9.13 ............................................................... 1- 2
33 05 01.12.01 KS Ductile Iron Pipe (DIP)—Gravity Sanitary Sewer Data Sheet ............................................................................... 1- 3
33 05 01.12.03 KS Polyvinyl Chloride (PVC) Pipe—Gravity Sanitary Sewer Data Sheet .................................................................... 1- 1
33 05 13 KS Manholes ................................................................................... 1- 14 33 05 16.13 KS Precast Concrete Utility Structure ............................................. 1- 6 33 05 23.13 KS Horizontal Directional Drilling ................................................. 1- 6 33 12 16 KS Water Utility Distribution Valves ............................................. 1- 6 33 12 19 KS Water Utility Distribution Fire Hydrants .................................. 1- 4 33 13 00 KS Disinfection of Water Utility Distribution Facilities ................. 1- 4 33 21 13.16 KS Monitoring Well Drilling and Construction .............................. 1- 6 33 41 01 KS Storm Drain, Sanitary Sewer, and Drainage Piping .................. 1- 5 33 41 01.03 KS Polyvinyl Chloride (PVC) Data Sheet ....................................... 1- 2 33 41 01.05 KS Reinforced Concrete Data Sheet ............................................... 1- 3 33 41 01.08 KS Corrugated Polyethylene (CPE) Data Sheet .............................. 1- 1 33 44 13.13 KS Catch Basins .............................................................................. 1- 4 33 46 00 KS Subsurface Drainage .................................................................. 1- 9 33 47 13.02 KS Pond and Reservoir Liners—Polypropylene ............................. 1- 17
Supplement:
KS Geomembrane Installer’s Certification of Subsurface
Acceptability .......................................................................... 1- 1 33 52 00 KS Fuel System ............................................................................... 1- 16
Supplements:
KS Underground Fuel Oil Storage Tank Data Sheet ....................... 1- 1 KS Day Tank Data Sheet ................................................................. 1- 1 KS Day Tank Fuel Oil Pump Data Sheet ........................................ 1- 1
33 54 00 KS Propane Systems ........................................................................ 1- 10 Supplement:
KS Propane Tank Schedule – Canyon WWTP ............................... 1- 1
DIVISION 34 THROUGH DIVISION 39 (NOT USED)
DIVISION 40—PROCESS INTERCONNECTIONS
40 05 15 KS Piping Support Systems .............................................................. 1- 17 40 05 33 KS Pipe Heat Tracing ....................................................................... 1- 6 40 27 00 KS Process Piping—General ............................................................ 1- 25
PW\JA\NPS\D3167668\4\42 TABLE OF CONTENTS
MAY 2025 00 01 10 - 9
YELL 326133
40 27 00.01 KS Ceramic-Epoxy-Lined, Glass-Lined, and Phenolic-Epoxy-Lined Ductile Iron Pipe and Fittings Data Sheet................................ 1- 6
40 27 00.03 KS Carbon Steel Pipe and Fittings—General Service Data Sheet ................................................................................ 1- 6
40 27 00.07 KS Galvanized Steel Pipe and Malleable Iron Fittings Data Sheet ................................................................................ 1- 3
40 27 00.08 KS Stainless Steel Pipe and Fittings—General Service Data Sheet ................................................................................ 1- 5
40 27 00.10 KS Polyvinyl Chloride (PVC) Pipe and Fittings Data Sheet ............ 1- 3 40 27 00.11 KS Chlorinated Polyvinyl Chloride (CPVC) Pipe and Fittings
Data Sheet ................................................................................ 1- 3 40 27 00.13 KS Copper and Copper Alloy Pipe, Tubing, and Fittings
Data Sheet ................................................................................ 1- 2 40 27 00.15 KS Double Wall Containment Piping Data Sheet ............................ 1- 3 40 27 00.20 KS Stainless Steel Pipe and Fittings—Thin Wall Data Sheet .......... 1- 3 40 27 01 KS Process Piping Specialties........................................................... 1- 20 40 27 02 KS Process Valves and Operators ..................................................... 1- 37 40 42 13 KS Process Piping Insulation ............................................................ 1- 8
Supplement:
KS Service and Insulation Thickness Table ..................................... 1- 2
40 80 01 KS Process Piping Leakage Testing ................................................. 1- 6 40 90 00 JJ Instrumentation and Control for Process Systems ...................... 1- 41
Supplements:
JJ Control Descriptions ................................................................... 1- 45 JJ Control Panel Schedule ............................................................... 1- 1 JJ Instrument List ............................................................................ 1- 8 JJ PLC Input/Output List ................................................................ 1- 8 JJ Preparation for Testing and Functional Test Forms ................... 1- 3 JJ Performance Test Sheet .............................................................. 1- 1
40 91 00 JJ Instrumentation and Control Components .................................. 1- 60 40 95 80 JJ Fiber Optic Communication System ........................................... 1- 20
Supplements:
JJ On-Reel Fiber Optic Cable Test Summary Form ....................... 1- 1 JJ Fiber Optic Attenuation Performance Test Form ....................... 1- 1 JJ Post-Installation Fiber Optic Cable Test Summary Form........... 1- 2
40 96 00 JJ Applications Software ................................................................. 1- 20 40 99 90 JJ Package Control Systems ............................................................ 1- 38
TABLE OF CONTENTS PW\JA\NPS\D3167668\4\42
00 01 10 - 10 MAY 2025
YELL 326133
DIVISION 41—MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.13 KS Overhead Cranes ......................................................................... 1- 10 Supplements:
KS Facility 370 Process Facility Bridge Crane Data Sheet .............. 1- 1 KS Facility 370 Process Facility Bridge Crane Dimension Sheet .... 1- 1
41 22 23.19 KS Monorail Hoists, Davit Cranes, and Gantry Cranes ................... 1- 10 Supplements:
KS Screw Press and Polymer Totes Monorail Data Sheet................ 1- 1 KS Screw Press and Polymer Totes Monorail Dimension Sheet ...... 1- 1 KS Screw Press and Polymer Totes Trolley Motor Data Sheet ........ 1- 1 KS Headworks Monorail Data Sheet ................................................ 1- 1 KS Headworks Monorail Dimension Sheet ...................................... 1- 1 KS Headworks Monorail Trolley Motor Data Sheet ........................ 1- 1
DIVISION 42 (NOT USED)
DIVISION 43—PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND
STORAGE EQUIPMENT
43 22 56.01 KS Submersible Propeller Pumps ..................................................... 1- 9 Supplement:
KS Mixed Liquor Return Pumps 1 and 2 Data Sheet ....................... 1- 3 43 32 55 KS Membrane Equipment System .................................................... 1- 23 43 40 01 KS Polyethylene Storage Tank ......................................................... 1- 16
Supplements:
KS Bulk Poly Aluminum Chloride Storage Tank Data Sheet .......... 1- 1 KS Bulk Magnesium Hydroxide Storage Tank Data Sheet .............. 1- 1 KS Screw Press Feed Tank Data Sheet ............................................. 1- 1
DIVISION 44—POLLUTION AND WASTE CONTROL EQUIPMENT
44 42 19.04 KS Rotary Positive Displacement Blower ...................................... 1- 13 Supplements:
KS Bioreactor Blowers 1, 2, and 3 Induction Motor Data Sheet .... 1- 1 KS Digester Blowers 1 and 2 Induction Motor Data Sheet............. 1- 1 KS Septage Blower Induction Motor Data Sheet ............................ 1- 1 KS Air Scour Blowers 1, 2, 3, and 4 Induction Motor Data Sheet . 1- 1
44 42 24.04 KS Rotating Scum Pipes ................................................................. 1- 7 44 42 30 KS Cylindrical Perforated Plate Fine Screens ................................. 1- 16
Supplement:
KS Fine Screens 1 and 2 Induction Motor Data Sheet .................... 1- 1
44 42 31 KS Septage Receiving System ........................................................ 1- 16
PW\JA\NPS\D3167668\4\42 TABLE OF CONTENTS
MAY 2025 00 01 10 - 11
YELL 326133
44 42 35 KS Floating Decanters ..................................................................... 1- 5 44 42 48.04 KS Automatic Composite Sampler ................................................. 1- 8 44 42 56.02 KS Vertical Centrifugal Pumps ....................................................... 1- 6
Supplement:
KS Nonpotable Water Booster Pump Data Sheet ........................... 1- 3
44 42 56.04 KS Submersible Pumps ................................................................... 1- 10 Supplements:
KS RAS Pumps 1, 2, and 3 Submersible Pump Data Sheet ............ 1- 2 KS WAS Pumps 1 and 2 Submersible Pump Data Sheet ................ 1- 2 KS Sludge Transfer Pumps 1 and 2 Submersible Pump Data
Sheet ....................................................................................... 1- 2 KS NPW Pumps 1 and 2 Submersible Pump Data Sheet ................ 1- 3 KS Intraplant Pumps 1 and 2 Plus Shelf Spare Submersible
Pump Data Sheet .................................................................... 1- 2 KS Intraplant Pump 3 Submersible Pump Data Sheet .................... 1- 2 KS Government Lift Station Pumps 1 and 2 Plus Shelf Spare
Submersible Pump Data Sheet ............................................... 1- 2 KS Brink of Upper Falls Lift Station Pumps 1 and 2 Plus Shelf
Spare Submersible Pump Data Sheet ..................................... 1- 2 44 42 56.14 KS Lobe Pumps ............................................................................... 1- 10
Supplements:
KS Septage Metering Pump 1 and 2 Data Sheet ............................. 1- 2 KS Screw Press Feed Pump Plus Shelf Spare Data Sheet............... 1- 2
44 42 56 16 KS Peristaltic Pump ......................................................................... 1- 13 Supplements:
KS Magnesium Hydroxide Feed Pumps 1, 2, and 3 Data Sheet ..... 1- 2 KS Polyaluminum Chloride Feed Pumps 1 and 2 Data Sheet......... 1- 2 KS Glycerin Feed Pumps 1 and 2 Data Sheet ................................. 1- 2
44 44 63.01 KS Polymer Feed System, Liquid ................................................... 1- 9 44 45 16.01 KS Coarse Bubble Air Diffuser System .......................................... 1- 12 44 45 16.02 KS Fine Bubble Air Diffuser System .............................................. 1- 18 44 45 16.10 KS Compressed Gas Mixing System .............................................. 1- 19 44 46 13.02 KS Screw Conveyor System ........................................................... 1- 8
Supplement:
KS Shaftless Screw Conveyor Induction Motor Data Sheet ........... 1- 1
44 46 22 KS Dewatering Screw Press ............................................................ 1- 26 Supplements:
KS Screw Press Induction Motor Data Sheet .................................. 1- 1 KS Screw Press Washwater Booster Pump Data Sheet .................. 1- 1 KS Screw Press Air Compressor Induction Motor Data Sheet ....... 1- 1
TABLE OF CONTENTS PW\JA\NPS\D3167668\4\42
00 01 10 - 12 MAY 2025
YELL 326133
DIVISION 45 (NOT USED)
DIVISION 46—WATER AND WASTEWATER EQUIPMENT
46 66 20 KS Ultraviolet Disinfection Equipment .......................................... 1- 20
DIVISION 47 THROUGH DIVISION 49 (NOT USED)
VOLUME 2
DRAWINGS
VOLUME 3
DESIGN DETAILS
END OF SECTION
SPECIFICATIONS
PW\JA\NPS\D3167668\4\42 SUMMARY OF WORK
AUGUST 2025 01 11 00 - 1
YELL 326133
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY
A. Section includes the following:
1. Work Covered by Contract Documents.
2. Work Under Other Contracts.
3. Materials and Work by Others.
4. Contractor Use of Sites.
5. Public Use of Sites.
6. Administrative Access During Construction.
7. Access During Construction.
8. Occupancy Requirements for Buildings.
9. Conduct of Operations.
10. Work Restrictions.
11. Special Construction Requirements.
12. Soils Investigation Report.
13. Unexpected Discovery of Archeological Resources.
14. Construction Materials.
15. Project Clean Up.
1.2 DEFINITIONS
A. Demolish: Means to remove and dispose.
B. Provide: Means to furnish and install.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location:
1. Yellowstone National Park: Canyon Village, Park County Wyoming. Canyon Wastewater Treatment Plant, Government Lift Station, and Brink of Upper Falls Lift Station.
B. Contractor shall procure all items they are providing. “Provide” means to furnish and install and provide complete in place.
C. Project will be constructed under a single prime contract.
D. Project is designed to comply with requirements as specified in Section 01 81 13, Sustainable Design Requirements.
SUMMARY OF WORK PW\JA\NPS\D3167668\4\42
01 11 00 - 2 AUGUST 2025
YELL 326133
E. Completion of each item includes all materials, labor, transportation, material processing plants, equipment, royalties, warranties, O&M manuals, and incidentals necessary to complete the Work as described in the Construction Drawings and these Specifications.
F. The Work required in the base scope as described in Section 01 27 00, Definition of Contract Line Items, includes the following work as described herein, but not limited to:
1. General Conditions: Include General Requirements, Mobilization/Demobilization, Permitting, Erosion Control, Maintenance of Traffic, and Surface Restoration required to complete the Work per the Specifications and Drawings.
2. Canyon Village Wastewater Treatment Plant (WWTP) Site:
a. Demolish the following existing structures within the construction and sequencing constraints:
1) Headworks Building, AWT Building, Blower and Generator Building, Lagoon 2, Drying Beds, Sludge Storage Basin, Storage Building, yard piping, underground diesel storage tank, underground propane tanks.
b. Construct new buildings and facilities including, but not limited to: Site civil and yard piping, Headworks Facility, Process Facility, Bioreactors and Digesters Facility, Dewatering Facility, Drying Beds, Intraplant Pump Station, Generator Building, O&M Storage Building, and new underground diesel and propane storage systems.
c. Apply to and coordinate with the serving telephone utility to provide service to the new facilities.
d. Apply to and coordinate with the serving electric utility to provide service to the new facilities.
e. Restore all landscape disturbed by construction and temporary facilities:
Preparing topsoil, fine grading, mulching, and weed control.
f. Restore all landscape disturbed by demolition including preparing topsoil, fine grading, and mulching.
g. Protect existing trees and wetlands as shown on the Drawings.
h. Provide cathodic protection system on new propane tanks and on the buried ductile iron low pressure air (ALP) piping.
i. Rehabilitation of existing Lagoon 1, renamed Holding Pond 1, includes the following work described herein, but not limited to:
1) Replace subsurface diffusers.
2) Construct drain line from pond to the Intraplant Pump Station.
3) Flange cap existing drain pipe and lines that go to the AWT building.
AUGUST 2025 01 11 00 - 3
YELL 326133
4) Add bollards for visual indication of lagoon level.
5) Repair damaged liner sections caused by project work and replace portions of underlying existing geotextile (if present) caused by project work.
6) Provide power connections and associated underground utilities for aerators at Holding Pond 1.
j. Rehabilitation of existing Lagoon 3, renamed Holding Pond 2, includes the following work described herein, but not limited to:
1) Construct drain line from pond to the Intraplant Pump Station.
2) Relocate existing Lagoon 2 surface aerator to Holding Pond 2.
3) Flange cap existing drain pipe and lines that go to the AWT building.
4) Add bollards for visual indication of lagoon level.
5) Repair damaged liner sections caused by project work and replace portions of underlying existing geotextile (if present) caused by project work.
6) Provide power connections and associated underground utilities for aerators at Holding Pond 2.
k. Demolition of existing structures includes the following work described herein, but not limited to:
1) Demolish yard piping, utilities, underground diesel storage tanks, and underground propane storage tanks, and as shown on the Drawings.
2) Demolition of Existing Headworks Building:
a) Demolish and properly dispose of remaining items in the building including, but not limited to, electrical equipment, HVAC equipment, chemical tanks, process equipment, and furniture.
b) Demolish the building structure to 5 feet below grade and properly dispose of material. Fill in all below ground void spaces and cover and compact to match existing grades. Prior to backfilling, make remaining below grade structures capable of sufficiently draining to ground to prevent underground pooling.
c) Disconnect piping from demolished Headworks building walls and plug. Any piping remaining below the 5-foot depth shall be plugged at the face of the walls.
3) Demolition of Existing AWT Building:
a) Demolish and properly dispose of remaining items in the building including, but not limited to, electrical equipment, 01 11 00 - 4 AUGUST 2025
YELL 326133
HVAC equipment, chemical tanks, process equipment, and furniture.
b) Demolish the building structure to 5 feet below grade and properly dispose of material. Fill in all below ground void spaces and cover and compact to match existing grades. Prior to backfilling, make remaining below grade structures capable of sufficiently draining to ground to prevent underground pooling.
c) Remove and dispose of wastewater treatment contents (liquids and solids).
d) Assume the roof contains asbestos.
e) Disconnect piping from demolished building walls and plug.
Any piping remaining below the 5-foot depth shall be plugged at the face of the walls.
4) Demolition of Existing Blower and Generator Building:
a) Demolish and properly dispose of remaining items in the building including, but not limited to, electrical equipment, HVAC equipment, chemical tanks, process equipment, and furniture.
b) Demolish the building structure to 5 feet below grade and properly dispose of material. Fill in all below ground void spaces and cover and compact to match existing grades. Prior to backfilling, make remaining below grade structures capable of sufficiently draining to ground to prevent underground pooling.
c) Assume the roof contains asbestos.
d) Disconnect piping from demolished building walls and plug.
Any piping remaining below the 5-foot depth shall be plugged at the face of the walls.
5) Demolition of Existing Lagoon 2:
a) Demolish liner, piping, and valves.
b) Remove contents and properly dispose of outside the Park.
c) Demolish concrete access ramp, concrete pads, and anchor posts.
d) Salvage the existing surface aerators and appurtenances for reuse in the new Holding Pond 2.
6) Demolition of Existing Drying Beds:
a) Demolish existing drying beds.
b) Remove contents and properly dispose of outside of the Park.
AUGUST 2025 01 11 00 - 5
YELL 326133
7) Demolition of Existing Sludge Storage Basin:
a) Demolish liner, piping, and valves.
b) Remove contents and properly dispose of outside of the Park.
c) Demolish concrete access ramp, concrete pads, and anchor posts.
8) Demolition of Existing Storage Building:
a) Demolish and properly dispose of remaining items in the building including, but not limited to, electrical equipment, HVAC equipment, and furniture.
b) Demolish the building structure to 5 feet below grade and properly dispose of material. Fill in all below ground void spaces and cover and compact to match existing grades. Prior to backfilling, make remaining below grade structures capable of sufficiently draining to ground to prevent underground pooling.
c) Assume the roof contains asbestos.
d) Disconnect piping from demolished building walls and plug.
Any piping remaining below the 5-foot depth shall be plugged at the face of the walls.
3. Headworks Facility includes the following work described herein, but not limited to:
a. Construct a new CMU building on new reinforced concrete foundation, parshall flume, channels, septage receiving wetwell, equipment rooms, mechanical room, and electrical room.
b. Provide the following process equipment:
1) Septage receiving system, septage feed pumps, septage blower, coarse bubble diffuser in septage wetwell, removal bar racks and fine screens, and a composite sampler.
c. Provide interior and exterior piping, pipe supports, gates, gate operators, valves, valve operators, and valve supports.
d. Provide control panels, instrumentation, and analyzers as shown including flow meters, pressure gages, pressure transmitters, level indicators and transmitters, sensors, and analyzers.
4. Bioreactors and Digester Facility includes the following work described herein, but not limited to:
a. Construct a new pre-engineered metal building over new reinforced concrete bioreactors, aerobic digesters with a concrete top slab, and a mechanical/electrical room.
01 11 00 - 6 AUGUST 2025
YELL 326133
b. Provide the following process equipment for the bioreactors:
1) Large bubble mixing system, fine bubble diffusers, glycerin totes with containment and a dual skid feed system, fine bubble diffusers, scum removal troughs, and mixed liquor recycle pumps.
c. Provide the following process equipment for the aerobic digesters:
1) Floating decanters, coarse bubble diffusers, and sludge transfer pumps.
d. Provide interior and exterior piping, pipe supports, gates, gate operators, valves, valve operators, valve supports, and davit crane bases and a portable davit crane.
e. Provide control panels, instrumentation, and analyzers as shown including flow meters, total suspended solids meters, pressure gages, pressure transmitters, level indicators and transmitters, sensors, and analyzers.
5. Process Facility includes the following work described herein, but not limited to:
a. Construct a new CMU building above new reinforced concrete, below-grade mechanical space consisting of membrane tanks and room, chemical storage rooms, laboratory, control room, restroom/locker/shower, mechanical room, electrical room, break room, maintenance room, and equipment room.
b. Provide the following process equipment:
1) Membrane system, double-walled magnesium hydroxide tanks and dual skid feed system, double-walled polyaluminum chloride tank and dual skid feed system, sodium hydroxide tote, citric acid tote, inline-UV system, process blowers and digester blowers.
c. Provide interior and exterior piping, pipe supports, gates, gate operators, valves, valve operators, and valve supports.
d. Provide control panels, instrumentation, and analyzers as shown including flow meters, pressure gages, pressure transmitters, level indicators and transmitters, sensors, and analyzers.
e. Provide a Process Control System (PCS) including but not limited to the main plant PLC, SCADA servers, operator workstations, network switches and firewalls.
AUGUST 2025 01 11 00 - 7
YELL 326133
6. Dewatering Facility includes the following work described herein, but not limited to:
a. Construct a new CMU building on new reinforced concrete foundation with a dewatering room, mechanical room, and electrical room.
b. Provide the following process equipment:
1) Inclined screw press system, shaftless screw conveyor, polymer totes with secondary containment, polymer feed system, screw press feed tank, and screw press feed pump.
c. Provide interior and exterior piping, pipe supports, gates, gate operators, valves, valve operators, and valve supports.
d. Provide control panels, instrumentation, and analyzers as shown including flow meters, pressure gages, pressure transmitters, level indicators and transmitters, sensors, and analyzers.
7. Drying Beds include the following work described herein, but not limited to:
a. Construct four new asphalt drying beds with reinforced concrete divider walls, ramps, underdrains, and a concrete pad for a 30-yard dumpster on drying bed next to Dewatering Facility
b. Provide piping, pipe supports, gates, gate operators, valves, valve operators, and valve supports.
8. Intraplant Pump Station includes the following work described herein, but not limited to:
a. Construct a three-chamber reinforced concrete structure consisting of two wetwells and a dry valve vault, with hatches and railings.
b. Provide three submersible pumps.
c. Provide interior and exterior piping, pipe supports, gates, gate operators, valves, valve operators, valve supports, a davit crane base and a davit crane for pump removal.
d. Provide control panels, instrumentation, and analyzers as shown including flow meters, pressure gages, pressure transmitters, level indicators and transmitters, sensors, and analyzers.
9. Generator Building includes the following work described herein, but not limited to:
a. Construct new pre-engineered metal building on a reinforced concrete foundation with CMU wainscot as shown.
b. Provide associated underground utilities.
01 11 00 - 8 AUGUST 2025
YELL 326133
c. Power and communications duct bank between the Process Facility and the Generator Building.
1) 480V power from 370-MCC-100 in the Process Facility electrical room to a mini power center in the Generator Building.
2) 480V power between the generator and an automatic transfer switch in the Process Facility electrical room.
3) Control circuits from the automatic transfer switch in the Process Facility electrical room to the generator.
d. Propane gas meter, and propane gas lines from underground propane tanks.
e. Diesel fuel piping from site underground diesel storage tank(s) to diesel day tank in generator building.
f. Provide a new generator with required accessories, generator exhaust silencer, HVAC equipment, controls, miniature power center, and diesel day tank with spill containment.
g. Provide an automatic transfer switch in the Process Facility electrical room.
10. Government Force Main includes the following work described herein, but not limited to:
a. Cap and abandon in place existing force main from the existing lift station building.
b. Provide a 4-inch HDPE force main from the new Government Lift Station Building to an existing manhole near the Canyon Visitors Center.
c. Complete two horizontal directional drill road crossings to install the force main.
d. Provide traffic control where needed along Norris Canyon Road, Grand Loop Road and the Canyon Visitor Center entrance drive.
e. Protect existing wetlands as shown on the Drawings.
11. Rehabilitate Existing Government Lift Station Generator Building includes the following work described herein, but not limited to:
a. Remove and salvage generator in existing generator building to Owner.
b. Provide a new generator and install in existing generator building.
c. Construct modifications to existing building to accommodate ventilation as shown on the Drawings.
d. Remove and arrange for salvage or disposal of existing meter/service entrance enclosure, manual transfer switch, electrical lighting panel, and pump control panel.
e. Provide Meter Socket enclosure and CT Cabinet meeting Northwestern Energy (NWE) requirements.
f. Provide new electrical distribution equipment as shown on the Drawings.
AUGUST 2025 01 11 00 - 9
YELL 326133
12. Government Area Lift Station includes the following work described herein, but not limited to:
a. Demolish Existing Lift Station and overflow tank.
b. Salvage the existing explosion proof heater from the existing lift…
This is the start of the file's text. The full file is on GovTribe.