B08_RFQ_Att4_LAMR_SOW.pdf

PDF 50 KB Posted

Attached to
Mussel Dog BPA RFQ Federal contract opportunity
Solicitation number
140P1323Q0010
Issued by
Department of the Interior National Park Service Intermountain Region

View the file

Other files for this federal contract opportunity

Other files attached to Mussel Dog BPA RFQ, newest first.
File Type Posted
B08_RFQ_Att2_AMIS_SOW.pdf PDF
B08_RFQ_Att6_Price_List_for_Evaluation.xlsx XLSX spreadsheet
B08_RFQ_Att3_AMIS_WD_2015-5303_Rev22_dated_27Dec22.pdf PDF
B08_RFQ_Att1_Statement_of_Need_BPA_Terms.pdf PDF
B08_RFQ_Att5_LAMR_WD_2015-5269_Rev22_dated_27Dec22.pdf PDF
Sol_140P1323Q0010.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

24 January 2023

Utilization of Detection K9 for Watercraft Inspections to Detect Zebra and Quagga Mussels and Educate

Visitors About Invasive Mussels

Lake Meredith National Recreation Area Fritch, Texas

1 Project Introduction

Utilization of Detection K9 for Watercraft Inspections to Detect Zebra and Quagga

Mussels and Educate Visitors About Invasive Mussels

2023 Summer Prevention Effort in Cooperation with Canadian River Municipal Water

Authority (CRMWA)

Park Name and Address:

Lake Meredith National Recreation Area 419 East Broadway

Fritch, Texas 79036

Superintendent: Eric R. Smith

1.1 Location and Facilities

Service location will be at Lake Meredith National Recreation Area Sanford Yake Road near the Ranger Station in Fritch, Texas

1.2 Short Project Description

The purpose of this project is to bring a canine and handler to inspect watercraft for the presence of zebra and quagga mussels at designated boat ramps and provide publicity and educational opportunities about the dangers of invasive mussels.

See: Detailed Project Description 4.3

1.3 NPS Points of Contact

Eric R. Smith

419 East Broadway

Fritch, TX 79036

(O) 806-857-0300

Grenade Fiedler

Chief of Resource Management

419 East Broadway

(O) 806-857-3151

Dayna Lehrman

Certifying Funds Approver

419 East Broadway

Paul Jones

Chief Ranger

419 East Broadway

Fritch, Texas 79036

2 Project Requirements

2.0 Scope of Work and Project Summary/Requirements

Lake Meredith National Recreation Area (LAMR) is working in cooperation with

CRMWA during the 2023 boating season for a targeted Zebra and Quagga Mussel prevention and education effort. We are targeting weekends with tournament special use permits scheduled and two mid-summer weekends. Two tournament weekends have already been contracted for detection dogs by CRMWA. This piece of the partnership is for two additional mid-summer weekend inspection visits.

2.1 Minimize Impacts

No environmental impacts.

2.2 Project Coordination

The Contracting Officer (CO) will provide all necessary written notification and/or direction to the contractor.

2.3 Quality Control

The quality of all work shall be the responsibility of the Contractor.

2.4 Working Hour Restrictions

Detection canine and handler will provide inspections services at designated location for two (2) periods. June 10-13, 2023 four (4) days, and August 26-29, 2023 four (4) days.

Inspection dates are June 10-13 and August 26-29, 2023. Time at the inspection location can range from 6 to 8 hours per day (inspection day) depending on boat traffic and weather.

Canine and handler are expected to work 4 days during each session. In the event that poor weather conditions are anticipated in advance the inspection periods can be moved to other weekends agreeable to NPS, CRMWA and the contractor but inspection periods should all be completed prior to October 09, 2023.

3 Performance Requirements

3.1 Protection

During boat inspections at designated location safety equipment is required.

Safety equipment and standards shall be required and followed as per OSHA regulations.

Safety Equipment includes:

Traffic cones

Orange traffic safety vests

Chocks for the trailer (optional)

First Aid Kit

3.2 Vendor Support

Zebra and quagga mussel educational material for the public.

Final report detailing the number of inspections carried out and a field log of field research activities for mussel shoreline searches.

4 Project Description

4.1 Watercraft Inspection

Detection canine and handler shall provide inspections services at designated site for two visits totaling eight (8) inspection days. The inspection location will be selected on site by

NPS and CRMWA staff.

4.2 Shoreline Inspections

Detection canine and handler may inspect shorelines, marina facilities, dam facilities or water pumping stations in the event boat traffic is not present or weather precludes outdoor boat inspection.

4.3 Detailed Project Description

Lake Meredith NRA requires a certified canine (trained to detect zebra and quagga mussels) and handler to perform watercraft inspections (Watercraft Inspection Training, WIT 2 certified).

Canine boat inspections are required during the two weekend periods for a total of eight (8) inspection days.

4.4 Overall Requirement

• One (1) mussel certified detection canine and one (1) dog handler shall provide inspection services at designated inspection site.

• Contractor shall attend media events as requested.

• Contractor shall attend meet and greets with the public as requested, for example campground walk through.

• Dogs shall be certified in mussel detection and accompanied by a certified dog handler.

• Safety equipment and standards shall be required and followed as per OSHA regulations.

• Any findings from either shoreline searches or watercraft inspections will be shared with

LAMR staff first and must seek approval before releasing information to the general public through social media or other outlets.

The contractor shall provide a final report detailing the number of inspections carried out and a field log of field research activities for mussel shoreline searches.

4.5 Deliverables

Detection canine and handler contractor deliverables:

• Schedule should be June 10-13, 2023 and August 26-29, 2023

• Provide out brief to the park superintendent and Canadian River Municipal Water authority director or their alternate.

• Provide summary report of visitor contacts, media contacts, and demonstrations performed upon completion of contract.

• Prove field logs of field activities (shoreline searches) and results of surveys

Total anticipated hours for the project: 40-48 hours for the project or approximately 5-6 hours per day for Eight (8) inspection days.