B08-RFQ Atch 2 DUVRI_20210204.pdf

PDF 3 MB Posted

Attached to
Maintenance and Repair of Photovoltaic Systems within Darby Military Community USAG, Italy
Solicitation number
W58D2M-21-Q-0005
Issued by

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMITTENZA / COMMITTEE

COMANDO USA SETAF

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

STRUTTURA ORGANIZZATIVA NELLA QUALE SARA SVOLTA L ATTIVITA / ORGANIZATIONAL STRUCTURE WHERE ACTIVITY WILL TAKE

PLACE

DATORE DI LAVORO / EMPLOYER

LPW-O

VIA AURELIA SS1

ZONA DEPOSITO

56018 TIRRENIA PISA

COMANDANTE / COMMANDER: COL, DANIEL J. VOGEL

DMC MANAGER: ROBERT J. CHARTIER

RSPP Ufficio SPP / Safety Officer

Ing. Chiara Chelossi UFFICIO /

OFFICE

PUBLIC WORKS OFFICE

(PWO)

Medico Competente / Occupational Health Doctor

_Dr. Raffele Peluso_ Manager del PWO / DWO Manager

__ JACK P. SMITHBACK_

RLS /

Representative

Manrico Bendinelli_ _Massimo Ferrari_ _Michele Bastianelli _Riccardo Kolman

Responsabile di area / Area Supervisor

Committente / Commissioning Employer

Comando USA

SETAF

Addetti al pronto soccorso / First Aid qualified Employees

__DES-FireSection__

Addetti

Building Fire Wardens

DUVRI

DOCUMENTO DI VALUTAZIONE DEI RISCHI DI INTERFERENZA

ART. 26 COMMA 3, D.LGS. 81/08

SINGLE DOCUMENT FOR THE ASSESSMENT OF INTERFERENTIAL RISKS

Article 26, paragraph 3, Legislative Decree 81/08

DESCRIZIONE ATTIVITÀ / DESCRIPTION OF ACTIVITY

Manutenzi Italy DMC (Si prevedono: n.80 giornate di lavoro e n.2 tecnici)

Maintenance and Repair Photovoltaic Systems within USAG Italy DMC (Estimated completion: 80 working days and Nr.2 technicians)

DITTA APPALTATRICE / CONTRACTOR

INDIRIZZO / ADDRESS

DATORE DI LAVORO / EMPLOYER:

Responsabile di cantiere / -site

Representative

Medico competente / OH Doctor

RSPP / Safety Officer _______________ Addetti al pronto soccorso (cantiere) / First Aid qualified Employees (Contractor)

(cantiere) / Fire Wardens (Contractor)

RLS

representative

PWO MANAGER

VERIFICATO/REVIEWED

Safety Office

VERIFICATO/REVIEWED

JACK P. SMITHBACK Date: ____________

Signature: _______________

Ing. Chiara Chelossi Date: _4 Feb 2021___

Signature: ________________

W58D2M-21-Q-0005 Attachment 2

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08

Oggetto del contratto Manutenzione e Riparazione Impianti Fotovoltaici per le aree di Darby Military Community

Edifici interessati 5801-02-03-04-05-06-07, 5882, 5138, 901 Datore di lavoro richiedente COMANDO USA SETAF Numero di contratto

Appaltatore

Anagrafica dell'Appaltatore

Ragione sociale

Legale rappresentante

Sede legale

Sede operativa

Telefono/Fax e-Mail

Codice fiscale

Partita iva

Iscrizione alla C.C.I.A.A

Posizione assicurativa INAIL

Posizione INPS

C.C.N.L. applicato

Responsabile del Servizio di Prevenzione e Protezione (RSPP)

Rappresentante dei Lavoratori per la Sicurezza (RLS)

Medico Competente

Responsabile Prevenzione Incendi

Responsabile Pronto Soccorso

Referente della ditta appaltatrice per il coordinamento e la sicurezza

Periodo di lavoro PERIODO: Lunedi Venerdi ORARIO: dalle 8.00 alle 17.00

W58D2M-21-Q-0005

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08

Oggetto del contratto Manutenzione e Riparazione Impianti Fotovoltaici per le aree di Darby Military Community

Edifici interessati 5801-02-03-04-05-06-07, 5882, 5138, 901 Datore di lavoro richiedente COMANDO USA SETAF Numero di contratto

Appaltatore

RISCHI AMBIENTALI PRESENTI ALL INTERNO DEGLI EDIFICI OGGETTO DELL INTERVENTO / POTENTIAL RISKS PRESENT INSIDE THE

BUILDINGS OBJECT OF THIS WORK CONTRACT

Edifici Bldgs

N. Addetti Descrizione Generale / No. Employees On site/description

Attrezzature Macchinari / Machinery - equipment

Rischi presenti / Risks

Affollamento Tot.: 0-4 addetti/edificio (locale tecnico)

No. Employees 0 - 4 units per bldg (technical room)

Macchinari ed attrezzature:

apparecchi di sollevamento, attrezzature varie / Machines and equipment: various type of elevator, various tools

Rischio di caduta in pozzetti di ispezione cavi.

Utilizzo di utensili rumorosi e prova di motori rumorosi.

Presenza in stoccaggio di lubrificanti facilmente combustibili.

Presenza di lavorazioni che comportano la proiezione di schegge.

Movimentazione eseguita con carrelli elevatori.

Spostamento di veicoli e mezzi tattici.

Movimentazione di carichi con carroponte.

Movimentazione di oggetti pesanti.

Rischio dovuto ad elementi elettrici in tensione.

Rischio Generico.

Risk of falling.

Risk of falling into electrical and inspection pits.

Noisy equipment and engine test (ground hop).

Bulk Flammable / Combustible lubricants present.

Risk of flying particles by using machines / tools.

MHE movement on site.

Tactical vehicle traffic.

Overhead crane movement.

Manual handling of heavy loads.

Risk of electrical equipments under voltage.

Generic Risk.

ALTRI RISCHI PRESENTI nelle Aree/ OTHER GENERAL HAZARDS PRESENT IN THE AREAS

1. Traffico veicolare; automezzi privati, muletti, (talvolta questi ultimi sprovvisti di segnalatori acustici e/o ottici), cisterne rifornimento serbatoi di olio combustibile o GPL esterni agli edifici, veicoli per la raccolta dei rifiuti. / Vehicular Traffic: POVs, forklifts, (sometimes with no regular yellow/orange blinking light and backward maneuvering beeper), shuttle bus, military vehicles, refueling tanks for combustible oil or LPG, trash collection dumpers.

Rischi: collisione schiacciamento interferenza con operazioni di rifornimento/raccolta rifiuti. / Risks: collision crushing interference with refueling/trash collection operations.

2. Traffico pedonale // pedestrian traffic Rischi: investimento. / Risks: hitting a pedestrian.

W58D2M-21-Q-0005

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08

Oggetto del contratto Manutenzione e Riparazione Impianti Fotovoltaici per le aree di Darby Military Community

Edifici interessati 5801-02-03-04-05-06-07, 5882, 5138, 901 Datore di lavoro richiedente COMANDO USA SETAF Numero di contratto

Appaltatore

3. Segnaletica si sicurezza non sempre conforme alle vigenti norme di sicurezza e non sempre bilingue. / Road signs / marking not always IAW traffic code and not always bilingual.

Rischi: fraintendimento dei segnali. / Risks: misinterpretation of road signs / marking.

4. Presenza di personale di lingua non Italiana. / Presence of non-Italian speaking personnel.

Rischi: fraintendimento nelle comunicazioni verbali. / Risks:

verbal communication misinterpretation.

5. Possibile interazione con personale della sicurezza mi esigenze di carattere operativo. / Potential interaction with security personnel in the area/facility due to operational contingencies.

Rischi: interferenza con operazioni di pubblica sicurezza -fraintendimento nelle comunicazioni verbali. / Risks:

interference with security forces operations - verbal communication misinterpretation.

6. Gli edifici circondati da prato possono ospitare nelle adiacenze nidi di insetti, (vespe ad esempio), o altri animali. / Green area surrounding facilities

Rischi: biologico. / Risks: biological.

7. Presenza di alberi intorno i parcheggi e/o lungo le vie di passaggio. / Trees surrounding parking areas and/or along cross ways.

Rischi: esposizione alle pine che cadono dagli alberi. / Risks:

exposure to pine cones falling.

8. Presenza di cassoni porta rifiuti e relative operazioni periodiche di svuotamento con mezzi pesanti. / Presence of trash collectors on related removal operations performed with dumpers.

Rischi: collisione schiacciamento interferenza con operazioni di rimozione rifiuti. / Risks: collision crushing interference with trash collection.

9. Segnaletica stradale orizzontale non sempre chiaramente leggibile. / Marking on the roads signs not always readable.

Rischi: collisione. / Risks: collision.

ATTIVITA SVOLTA DALL PPALTATORE E FASI LAVORATIVE / CONTRACTOR WORK ACTIVITIES

Italy DMC (Si prevedono: n.80 giornate di lavoro e n.2 tecnici)

Maintenance and Repair Photovoltaic Systems within USAG Italy DMC (Estimated completion: 80 working days and Nr.2 technicians)

Fasi lavorative previste / Scheduled Work Phases:

a) Arrivo della ditta ingress

Arrival of Contractor at Depot entrance gate. The Contractor personnel shall be already in possession of authorization and relative passes and it can proceed to buildings were the works should be done on its own. In order to reach the building the Contractor must take the shortest route and travel at a speed not to exceed 40km/h and observe all traffic regulations including compulsory wearing of seat belts.

b) responsabile di area o da un suo rappresentante, per coo . / Once arrivaed at the building a representative of the Contractor, before starting any work, must meet with the person responsible or representative for that area, to coordinate all activity.

c) Al fine di evitare le interferenze l In order to avoid interference work will be accomplished adopting the following precautions:

W58D2M-21-Q-0005

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08

Oggetto del contratto Manutenzione e Riparazione Impianti Fotovoltaici per le aree di Darby Military Community

Edifici interessati 5801-02-03-04-05-06-07, 5882, 5138, 901 Datore di lavoro richiedente COMANDO USA SETAF Numero di contratto

Appaltatore

- La zona prospicente il si responsabile di area; / Prior to any work activity the zone overlooking the system on which work is to be performed must be cleared by the person responsible for that area;

- ossano determinare rischi ; / The person responsible for the area will prevent any particular activity that can put at risk anyone present in the cordoned off work area;

- Considerando i possibili rischi presenti n antinfortunistici; / Considering the possible risks present into the building, transit is only permitted wearing safety shoes;

- nto di manutenzione previsto in autonomia utilizzando le proprie attrezzature; / On the inside of the cordoned off area the Contractor can perform the maintenance work as scheduled in autonomy and with the use of its own tools;

- Il responsabile di cantiere he Contractor responsible for the work site must avoid performing any activity which may be of risk for the work areas outside of the cordoned off area for which he/she is responsible.

d) Esecuzione degli interventi di manutenzione richiesti. / Perform maintenance work required.

e) Terminati gli interventi il responsabile di cantiere comunichera la fine dei lavori al responsabile di area che Once tests and inspections have been completed the Contractor responsible for the work site will inform the person responsible for the area of work completion so that he may proceed to reopen the area.

ATTREZZATURE UTILIZZATE DALL PPALTATORE / CONTRACTOR SPECIAL TOOLS

Tester, Strumenti Elettrci di Misura, Attrerzzature Varie / Testers, Electrical Measurements Instruments, Various Tools Ogni altra attrezzatura idonea per effettuare lavori di manutenzione inerenti il servizio. / Any other instruments adequate to perform maintenance works under the service.

Non sono previste ulteriori misure di prevenzione e protezione oltre alla perimetrazione delle aree. / Use of machinery and equipment by the Contractor do not pose any risks outside of the cordoned area. No other preventive or protective measures apart from cordoning off the work area are prospected.

RISCHI DI INTERFERENZA DELL ATTIVITÀ OGGETTO DELL APPALTO, SVOLTA ALL INTERNO DELLE ARRE DI LAVORO, DERIVANTI

DA UTENSILI/ATTREZZATURE/SOSTANZE/MEZZI UTILIZZATI / SUMMARY OF RISKS DUE TO USE OF TOOLS / EQUIPMENT /

CHEMICALS / VEHICLES

N. DESCRIZIONE / HAZARD DESCRIPTION RISCHIO / RISK

MISURE DI PREVENZIONE-PROTEZIONE /

PREVENTIVE-PROTECTIVE MEASURES

MOVIMENTAZIONE MANUALE DEI CARICHI /

MANUAL HANDLING OF HEAVY LOADS

La movimentazione manuale dei carichi non comporta interferenza

DPI / DPI

AGENTI FISICI: Rischi utilizzo utensili/attrezzature VIBRANTI PHYSICAL AGENTS: use of vibrating tools / equipment

Assenti / Not applicable Non necessarie / Not applicable

AGENTI FISICI: Rischio di utilizzo attrezzature che emettono CAMPI ELETTROMAGNETICI

PERICOLOSI

PHYSICAL AGENTS: use of tools / equipment emitting dangerous electromagnetic fields

Assenti / Not applicable Non necessarie / Not applicable

W58D2M-21-Q-0005

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08

Oggetto del contratto Manutenzione e Riparazione Impianti Fotovoltaici per le aree di Darby Military Community

Edifici interessati 5801-02-03-04-05-06-07, 5882, 5138, 901 Datore di lavoro richiedente COMANDO USA SETAF Numero di contratto

Appaltatore

N. DESCRIZIONE / HAZARD DESCRIPTION RISCHIO / RISK

MISURE DI PREVENZIONE-PROTEZIONE /

PREVENTIVE-PROTECTIVE MEASURES

AGENTI FISICI: Rischio di utilizzo attrezzature che emettono RADIAZIONI OTTICHE

PERICOLOSE

PHYSICAL AGENTS: use of tools / equipment emitting dangerous radiation / optic fields

Assenti / Not applicable Non necessarie / Not applicable

SOSTANZE PERICOLOSE: Rischi utilizzo sostanze/preparati chimici pericolosi CHEMICALS: use of hazardous chemicals

Assenti / Not applicable Non necessarie / Not applicable

SOSTANZE PERICOLOSE: Rischi utilizzo sostanze/preparati chimici cancerogeni/mutageni CHEMICALS: use of cancerous / mutagen chemicals

Assenti / Not applicable Non necessarie / Not applicable

AGENTI BIOLOGICI: Rischi di utilizzo agenti biologici pericolosi BIOLOGICAL AGENTS: use of hazardous biological agents

Assenti / Not applicable Non necessarie / Not applicable

ATMOSFERE ESPLOSIVE: Rischi di sviluppo di atmosfere esplosive durante svolgimento attività EXPLOSIVE ATMOSPHERES: Development of explosive atmospheres during operations

Assenti / Not applicable Non necessarie / Not applicable

ATMOSFERE ESPLOSIVE: Rischio utilizzo di utensili, attrezzature, mezzi che possono innescare atmosfere esplosive EXPLOSIVE ATMOSPHERES: use of tools, equipment, vehicles that could ignite explosive atmospheres

Presente / Present

Nelle condizioni di lavoro previste non si rendono necessarie misure di sicurezza particolari / No particular safety measures are expected for this work

Rischi utilizzo sostanze infiammabili/facilmente combustibili Use of flammables / combustibles

Assenti / Not applicable Non necessarie / Not applicable

Rischi caduta m Risk of falling objects

Presente / Present

The work performed in the area and by the Contractor can pose a risk of falling objects from above.

oggetto dedegli interventi di manutenzione / To avoid such risks of interference the area object of maintenance work will be cordoned off.

Rischi utilizzo corrente elettrica Electrical equipments

Presente / Present fuori tensione / could operate only after assure the system without power

Attrezzature idonee a verificare la presenza di

/ Contractor shall utilize special equipments to verify the voltage presence inside plants equipment before operate

Rischio apparecchi sotto tensione (moduli fotovoltaici) Risk of equipment under voltage (PV modules)

Presente / Present

Gli operatori dovranno esssere qualificati ai lavori sotto tensione e dovranno utilizzare idonei DPI ed idonee attrezzature isolate / Operators shall be qualified and certified to perform works under voltage and they shall use proper DPI and special tools

Rischio spostamento con automezzi Moving traffic

Presente / Present lla base devono essere preventivamente autorizzati dalla committente. Devono essere seguite scrupolosamente le regole di circolazione interna. In assenza di indicazioni particolari, parcheggiare davanti a mezzi di salvataggio, soccorso, antincendio / All internal traffic needs to be previously authorized by the Commissioning Employer. All rules governing traffic will be observed. In the absense of signs, procede at walking pace (5 Km/h). Parking in front of emergency vehicles is prohibited

W58D2M-21-Q-0005

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08

Oggetto del contratto Manutenzione e Riparazione Impianti Fotovoltaici per le aree di Darby Military Community

Edifici interessati 5801-02-03-04-05-06-07, 5882, 5138, 901 Datore di lavoro richiedente COMANDO USA SETAF Numero di contratto

Appaltatore

N. DESCRIZIONE / HAZARD DESCRIPTION RISCHIO / RISK

MISURE DI PREVENZIONE-PROTEZIONE /

PREVENTIVE-PROTECTIVE MEASURES

Rischio Caduta Risk of falling

Presente/Present di idone certificate. The contractor shall use a certified truck for the access to the work area and

MISURE DI TUTELA SPECIFICHE PER IL CONTENIMENTO DELLA DIFFUSIONE DEL COVID-19 / SPECIFIC MEASURES TO CONTAIN

THE SPREAD OF THE COVID 19 VIRUS

La seguente informativa si applica a tutti gli appaltatori, commissionati dalle stazioni appaltanti di USAG Italy. Si fa riferimento al DPCM 26 aprile 2020 Allegato 7 Protocollo condiviso di regolamentazione per il contenimento della diffusione del COVID-19.

The following information applies to all contractors commissioned by USAG Italy Contracting Agencies. This document refers to the Italian Decree of 26 April 2020 Annex 7 - Shared Protocol for the regulation of the measures to contain the spread of the COVID 19 virus.

PRECAUZIONI GENERALI - ENTRANCE IN THE WORKPLACE

rimanere al proprio domicilio se:

- la temperatura corporea è maggiore o uguale a 37.5ºC,

- se la persona ha avuto contatti con persone positive al virus nei 14 giorni precedenti.

- se la persona si è recata o proviene da zone a rischio nei 14 giorni precedenti

Access is not allowed to the installation and the worker must remain at home if:

- if the person had contact with positive cases in the past 14 days.

- if the person has gone to or comes from risk areas in the previous 14 days

È c

Access is allowed only to required personnel.

ridotto al minimo, per quanto possibile, in funzione del lavoro da svolgere.

depending on the work to be done.

Se non si è in possesso di un pass personale temporaneo, per o secondo le disposizioni anti-contagio.

If you do not have a temporary personal pass, for access, contact instructions for access according to the anti-contagion provisions.

Se si è in possesso di un pass personale temporaneo, porgerlo alla guardia dedicata al controllo degli accessi che provvede alla lettura del codice senza toccare il pass.

If you already have a valid installation pass, show it to the access guard who reads the code without letting the guard touch it.

le modalità di lavoro a distanza.

Minimize the installation of construction site offices by favoring remote working methods.

Collaborare con il COR allo scopo di riorganizzare le fasi di temporale delle lavorazioni, degli spostamenti.

Cooperate with the COR in order to reorganize the construction phases of the work and optimize the space-time management of the workschedule, movements.

Assicurare un piano di turnazione del personale con lo scopo di ridurre al minimo I contatti e creare gruppi autonomi distinti e riconoscibili.

Ensure a staff shift plan with the aim of minimizing contacts and creating distinct and recognizable autonomous groups.

La ditta affidataria fonisce informazioni relative alle corrette modalità di comportamento da adottare.

The contractor company provides information relating to the correct methods of conduct to be adopted.

Il rispetto delle misure anti-contagio è verificato periodicamente. Compliance with anti-infection measures is periodically checked.

DISTANZA INTERPERSONALE E ASSEMBRAMENTI - PHYSICAL DISTANCING AND GATHERINGS

È obbligatorio rispettare la distanza interpersonale di 2 m dal personale interno.

It is mandatory to maintain the physical distancing of 2 meters from the installation personnel.

La distanza interpersonale deve essere rispettata il più possibile compatibilmente con la tipologia di lavorazione e la dimensione del cantiere.

The interpersonal distance must be respected as far as possible compatibly with the type of work and the size of the construction site.

Non sono consentiti assembramenti di persone. Avoid gatherings, they are not allowed.

W58D2M-21-Q-0005

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08

Oggetto del contratto Manutenzione e Riparazione Impianti Fotovoltaici per le aree di Darby Military Community

Edifici interessati 5801-02-03-04-05-06-07, 5882, 5138, 901 Datore di lavoro richiedente COMANDO USA SETAF Numero di contratto

Appaltatore

Non sono consentiti assembramenti di persone durante gli spostamenti.

Assemblies of people during travel are not allowed.

Quando possibile, per le lavorazioni in solitaria e che non necessitano di particolari attrezzature, posizionare il lavoratore in spazi definiti ed opportunamente segnalati.

Whenever possible, for solo work that does not require special equipment, position the worker in defined and suitably marked spaces.

PRECAUZIONI IGIENICHE PERSONALI - PERSONAL HYGENIC PRECAUTIONS

I lavoratori devono adottare tutte le precauzioni igieniche, con particolare attenzione alla detersione delle mani, anche durante

Workers must take all hygienic precautions, with particular attention to hand cleansing, even during the execution of the work.

Le mani devono essere lavate frequentemente con acqua e sapone. Qualora non fosse possibile, i lavoratori devo essere in possesso di gel disinfettante a base alcolica per uso umano.

Frequent hands washing with soap and water is recommended. If percentage.

Detergere mani e cute secondo le indicazioni del Ministero della salute.

Clean hands and skin according to the indications of the Ministry of Health.

DISPOSITIVI DI PROTEZIONE INDIVIDUALE - PERSONAL PROTECTIVE EQUIPMENT

I lavoratori devono essere in possesso di dispositivi di protezione (DPI) per il contenimento della diffusione del COVID- 19.

Workers must be in possession of Personal Protective Equipment (PPE) in order to contain the spread of COVID-19.

Le mascherine devono essere utilizzati in conformità con le

Surgical masks and disposable filtering facepiece respirators must be used in accordance with the indications provided by the World Health Organization.

La tipologia dei DPI deve corrispondere alle indicazioni

The type of PPE must correspond to the indications of the health authority and the CSE, where appointed.

La mascherina deve essere indossata qualora la lavorazione da eseguire in cantiere imponga di lavorare a distanza interpersonale minore di 1 metro, in tutte le aree comuni e in presenza di personale in

Respiratory devices must be worn if the work to be carried out on site requires working at an interpersonal distance of less than 1 meter, in all common areas and in the presence of internal installation personnel.

È necessari disposizioni delle autorità scientifiche.

The use of respiratory devices and other PPE compliant with the provisions of the scientific authorities is necessary.

In mancanza di idonei DPI, le lavorazioni devono essere sospese. In the absence of suitable PPE, processing must be suspended.

I DPI devono essere smaltiti dalla ditta esecutrice. PPE must be disposed of by the executing company.

Gli addetti al primo soccorso sono adeguatamente formati e forniti delle dotazioni necessarie con rifermento alle misure di contenimento della diffusione del virus COVID-19.

First aid workers are adequately trained and provided with the necessary equipment with reference to the measures to contain the spread of the COVID-19 virus.

Nei cantieri con più di 250 occupanti deve essere attivo il presidio apposito pronto intervento.

On construction sites with more than 250 occupants, health supervision must be active and, where mandatory, the appropriate medical service and special prompt intervention.

SERVIZI IGIENICI - TOILETS

Il personale delle ditte esecutrici utilizzano i servizi igienici messi a li appaltatori/lavoratori esterni

The staff of the contractors use the toilets made available in the construction site area / specifically installed for the contractors/external workers.

Deve essere garantita la pulizia giornaliera dei servizi igienici portatili.

Daily cleaning of portable toilets must be guaranteed.

SPAZI COMUNI (MENSA, SPOGLIATOI) - COMMON SPACES (CANTEEN, CHANGING ROOMS)

sospeso.

The MENSA service inside the installation is temporarily suspended.

interpersonale è rispettata.

Access to the changing rooms is contingent and interpersonal distance is respected.

ACCESSO AREE UFFICI - ACCESS TO THE OFFICE AREA

Access to office areas is not allowed.

AREE RELAX E DISTRIBUTORI AUTOMATICI - BREAK AREAS AND AUTOMATIC VENDING MACHINES bevande (calde e fre necessità contattare il COR di riferimento.

Access to break areas and automatic vending machines for food and drinks (hot and cold) is forbidden, if necessary, contact the reference POC.

W58D2M-21-Q-0005

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08

Oggetto del contratto Manutenzione e Riparazione Impianti Fotovoltaici per le aree di Darby Military Community

Edifici interessati 5801-02-03-04-05-06-07, 5882, 5138, 901 Datore di lavoro richiedente COMANDO USA SETAF Numero di contratto

Appaltatore

MISURE DI PREVENZIONE-PROTEZIONE AGGIUNTIVE / OTHER PREVENTIVE-PROTECTIVE MEASURES

1.

effettuazione delle attività e formalizzare le misure di prevenzione e protezione concordate. / Before entering the premises subject to the contract work, coordination with Contract COR must be done in order to establish the procedures of performance activities and the agreed on preventive and protective measures.

2. Esporre la tessera di riconoscimento corredata di fotografia contenente le generalità del lavoratore e l'indicazione

. / Wear a badge equipped with photograph, name and address of contractor during the entire permanence inside the premises (IAW art. 26 para 8 of Law 81/08).

3. Localizzare i percorsi di emergenza e le vie di uscita. / Locate emergency exits.

4. In caso di evacuazione attenersi alle procedure vigenti. / In case of evacuation of bldg follow emergency evacuation plan.

5. Indossare i dispositivi di Protezione Individuale ove siano prescritti. / Wear personal Protective Equipment as prescribed.

6. Non ingombrare le vie di fuga con strumenti e attrezzature. / Do not block emergency exits with instruments and equipment.

7. Non operare su macchine, impianti e attrezzature se non autorizzati. / Do not operate machinery, equipment and tools if not authorized.

8.

percezione dei segnali acustici di allarme in caso di emergenza (allarme incendio, allarme evacuazione, cicalini dei mezzi e delle macchine, ecc.). / Refrain from using headphones or earphones while working because they could prevent hearing emergency alarms (i.e. fire alarm, evacuation alarm, equipment and machinery buzzers, etc.).

9.

nto di manutenzione. / The activities object of the contract will be performed after having previously cordoned off the area object of the maintenance intervention.

10. e movimentazione eseguite con il carroponte. / In all cases it is forbidden to walk about the workshops when equipment/vehicles are being moved or the overhead crane is being operated.

11.

della zona di lavoro perimetrata. / The person responsible for the area will prevent any particular activity that can put at risk anyone present in the cordoned off work area.

12. Il

. / The Contractor responsible

W58D2M-21-Q-0005

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08

Oggetto del contratto Manutenzione e Riparazione Impianti Fotovoltaici per le aree di Darby Military Community

Edifici interessati 5801-02-03-04-05-06-07, 5882, 5138, 901 Datore di lavoro richiedente COMANDO USA SETAF Numero di contratto

Appaltatore for the work site must avoid performing any activity which may be of risk for the work areas outside of the cordoned off area for which he/she is responsible.

COSTI DELLA SICUREZZA

Sono quantificabili come costi della sicurezza tutte quelle misure preventive e protettive neces la riduzione dei rischi interferenti individuate, così come indicativamente riportato di seguito:

gli apprestamenti previsti nel DUVRI (come ponteggi, trabattelli, etc.);

le misure preventive e protettive e dei dispositivi di protezione individuale eventualmente previsti nel DUVRI per lavorazioni interferenti;

gli eventuali impianti di terra e di protezione contro le scariche atmosferiche, degli impianti antincendio, degli impianti di evacuazione fumi previsti nel DUVRI;

i mezzi e servizi di protezione collettiva previsti nel DUVRI (come segnaletica di sicurezza, avvisatori acustici, etc.);

le procedure contenute nel DUVRI e previste per specifici motivi di sicurezza;

gli eventuali interventi finalizzati alla sicurezza e richiesti per lo sfasamento spaziale o temporale delle lavorazioni interferenti previsti nel DUVRI;

le misure di coordinamento previste nel DUVRI relative all'uso comune di apprestamenti, attrezzature, infrastrutture, mezzi e servizi di protezione collettiva.

La stima, analitica per voci singole, a corpo o a misura (quindi NON A PERCENTUALE), viene riferita ad elenchi prezzi standard o specializzati, oppure basata su prezziari o listini ufficiali vigenti nell'area interessata, o sull'elenco prezzi delle misure di sicurezza del committente; nel caso in cui un elenco prezzi non sia applicabile o non disponibile, si farà riferimento ad analisi costi complete e desunte da indagini di mercato.

Stima dei costi della sicurezza per le situazioni di rischio interferenti (Selezionare il paragrafo pertinente tra i due sotto elencati)

PER L APPALTO IN OGGETTO, È RAGIONEVOLE RITENERE CHE I RISCHI DA INTERFERENZA POSSONO ESSERE RESI

COMPATIBILI, RIDOTTI O ELIMINATI APPLICANDO CORRETTAMENTE LE MISURE GENERALI DI TUTELA CHE L APPALTATORE

DEVE ORDINARIAMENTE ADOTTARE PER L ESECUZIONE DELLA FORNITURA/SERVIZIO; PERTANTO I RELATIVI COSTI SONO

RICONDUCIBILI AI COSTI DELLA SICUREZZA PROPRI DELL APPALTATORE DETERMINATI IN SEDE DI APPALTO QUINDI NON SI RILEVANO

COSTI SPECIFICI DERIVANTI DALLE MISURE PER ELIMINARE I RISCHI DA INTERFERENZA DELLE LAVORAZIONI.

PER L APPALTO IN OGGETTO, È RAGIONEVOLE RITENERE CHE I RISCHI DA INTERFERENZA POSSONO ESSERE RESI

COMPATIBILI, RIDOTTI O ELIMINATI ADOTTANDO MISURE CHE DANNO LUOGO A COSTI AGGIUNTIVI RISPETTO A QUELLI PROPRI

DELL APPALTATORE. PERTANTO LA SEGUENTE STIMA DEI COSTI È EFFETTUATA SULLA BASE DELLE RILEVAZIONI DEI RISCHI

INTERFERENTI IN FASE PROGETTUALE DI APPALTO, DI CUI ALLA MATRICE DELLE INTERFERENZE (ALLEGATO I). I COSTI SONO

INDIVIDUATI FACENDO RIFERIMENTO AL PREZZARIO APPROVATO DALLA REGIONE TOSCANA. NEL CASO IN CUI NON SI RITROVINO

VOCI ATTINENTI NEL PREZZARIO, LA STIMA È IN RELAZIONE AI CORRENTI PREZZI DI MERCATO.

GESTIONE DELLE EMERGENZE / EMERGENCY MANAGEMENT

Vicenza DMC appalto. / In case of emergency and/or injury, follow the procedures contained in the Emergency plan for the evacuation of injured people for USAG Vicenza DMC areas.

X

W58D2M-21-Q-0005

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08

Oggetto del contratto Manutenzione e Riparazione Impianti Fotovoltaici per le aree di Darby Military Community

Edifici interessati 5801-02-03-04-05-06-07, 5882, 5138, 901 Datore di lavoro richiedente COMANDO USA SETAF Numero di contratto

Appaltatore

TIPO EMERGENZA

EMERGENCY TYPE

DESCRIZIONE

DESCRIPTION

RIFERIMENTI

REFERENCES

Sicurezza Security

La gestione della sicurezza è assicurata dal servizio interno di polizia militare.

Security services are the responsibility of the internal military police.

Servizi Interni/ Internal Services

MILITARY POLICE DSN 633-7575

Commercial 050-54-7575

CARABINIERI DSN633-8701/8711

Commercial 050-54-8701/8711 Servizi esterni / External Services

CARABINIERI tel. 112 Incendio-

Esplosione Fire-Explosion

La gestione delle emergenze legate agli incendi/esplosioni è affidato agli addetti alla lotta saranno affiancati gli addetti alla lotta antincendio presenti nei repati e al dipartimento interno per la lotta antincendio.

Fire/explosion emergency management is the wardens, supported by the building fire wardens present in the area

Servizi Interni/ Internal Services Addetti di reparto / BFW:

FIRE DEPARTEMENT DSN 117

Commercial 050-54-7117

Servizi esterni / External Services Vigili del Fuoco tel. 115

Infortunio malore Accident Illness

La gestione delle emergenze legate ad infortunio/malore è affidato agli addetti designati quali potranno essere affiancati gli addetti presenti nei repati.

Medical emergency management is the qualified employees, supported by the area firs aid qualified employees

Servizi Interni/ Internal Services Addetti al primo soccorso / First-Aiders Servizi esterni / External Services

Pronto Soccorto (esterno) First Aid (external)

Tel. Fisso/From fixed telephone: 118Tel Cellulare /From Cell Phone: 800011800

Others general dispositions to eliminate interference / interferenze.

Utilizzare solo le area autorizzate Non accedere in altri locali o edifici uenza di alcool, medicinali o sostanze psicotrope

Non manomettere e/o escludere protezioni, dispositivi di sicurezza o sistemi di segnalazione e controllo.

Non oltrepassare o disattivare le protezioni.

Non usare fiamme libere in azienda se non ESPRESSAMENTE AUTORIZZATI (tramite

È

È

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08

Oggetto del contratto Manutenzione e Riparazione Impianti Fotovoltaici per le aree di Darby Military Community

Edifici interessati 5801-02-03-04-05-06-07, 5882, 5138, 901 Datore di lavoro richiedente COMANDO USA SETAF Numero di contratto

Appaltatore

È vietato arrampicarsi su scaffali, ripiani, macchinari e comunque su qualsiasi altra alla normativa vigente, di proprietà.

È vietato toccare gli apparati elettrici alle persone non autorizzate e qualificate.

È obbligatorio:

furgoni mezzi ed esporre il pass sul mezzo;

camminare percorrendo solo le aree pedonali segnalate;

rispettare la segnaletica orizzontale e verticale (percorsi pedonali e carrabili, aree di stoccaggio merci, vie di hine e/o impianti di Ns.

proprietà;

utilizzare esclusivamente Vs. macchine o attrezzature, previa Ns. autorizzazione scritta, conformi ai requisiti antinfortunistici;

rispettare le procedure di sicurezza aziendali;

mantenere ordinate e pulite le zone di passaggio, deposito e lavoro riprestinando le condizioni presenti prima provvedere in proprio al trasporto e smaltimento dei rifiuti decadenti dallo svolgimento del/i Vs. incarico/i, salvo Ns. diversa disposizione da comunicarvi per iscritto;

segnalare a Ns. addetto qualsiasi situazione ritenuta a rischio, oltre che di altre condizioni di pericolo di cui si è a conoscenza;

prendersi cura della propria sicurezza e della propria salute e di quella delle altre persone presenti, conformemente alla propria formazione ed alle istruzioni e ai mezzi forniti dal datore di lavoro.;

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08

Oggetto del contratto Manutenzione e Riparazione Impianti Fotovoltaici per le aree di Darby Military Community

Edifici interessati 5801-02-03-04-05-06-07, 5882, 5138, 901 Datore di lavoro richiedente COMANDO USA SETAF Numero di contratto

Appaltatore

RISCHI INTRODO (DA COMPILARE UNA V PPALTATORE):

N. DESCRIZIONE / HAZARD DESCRIPTION MISURE DI PREVENZIONE-PROTEZIONE ADOTTATE / PREVENTIVE-PROTECTIVE MEASURES

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08

Oggetto del contratto Manutenzione e Riparazione Impianti Fotovoltaici per le aree di Darby Military Community

Edifici interessati 5801-02-03-04-05-06-07, 5882, 5138, 901 Datore di lavoro richiedente COMANDO USA SETAF Numero di contratto

Appaltatore

CONSIDERAZIONI CONCLUSIVE / CONCLUSIONS:

The Commissioning Employer provided the Contractor with:

sui rischi specifici all the technical info regarding the status of the work places and detailed information on the specific risks in the locations where the Contractor is going to work and the safety and emergency measures adopted;

le informazioni per evitare inutili rischi e per lavorare in sicurezza in relazione alla contemporanea presenza sul luogo di lavoro o nelle immediate vicinanze di altre imprese appaltatrici e sui rischi specifici relativi. / all the information to avoid unnecessary risks and to work in safety, in relation to the contemporary presence on the work-place, or in the immediate vicinities, of other contractors and relative specific risks.

Con la firma riportata in calce la ditta appaltatrice attesta / With the following signature the contractor states:

ad operare e sulle understood the detailed information received regarding the specific risks in the workplace where is going to perform the activity and regarding the prevention measures and corrective actions adopted in relation to will cooperate for the implementation of the prevention and protection measusres regarding the on the job risks and injuries on the work activity subject of the contract.

copia, al fine di eliminare i rischi dovuti alle eventuali interferenze tra i lavori svolti dalle parti; / the mutual exchange of information, through the attached documents, to avoid the risks/hazards due to potential interferences between works performed by the involved contractors and committing part.

inerenti i rischi della propria attività. / the contractor has the responsability for the evaluation and implemenatation of the required prevention and protection measusres for the own activity.

informare the contractor has to monitor the correct execution of the contract and, in case of needing of additional preventive measures and not initially planned, must immediately inform the committing part; the committing part will promote all the necessary actions in order to eliminate potential risks indicated by the contractor.

nuova situazione potrebbe comportare. / During the contract activity, in case the conditions above axplained change, the Contractor has the responsability to implement action for the coordination and cooperation in order to eliminate the risks rised from the new condition.

W58D2M-21-Q-0005

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08

Oggetto del contratto Manutenzione e Riparazione Impianti Fotovoltaici per le aree di Darby Military Community

Edifici interessati 5801-02-03-04-05-06-07, 5882, 5138, 901 Datore di lavoro richiedente COMANDO USA SETAF Numero di contratto

Appaltatore

Data / Date: _______________

FIRME / SIGNATURES:

Per la Commitenza (POC) / For the Commissioning Employer

For the Contractor

File details come from the government source that posted it. Updated .