B08_-_RFQ_140PS126Q0047_Addendum.pdf
PDF 220 KB Posted
- Solicitation number
- 140PS126Q0047
About this file
This is a Request for Quotation (RFQ) for the procurement of two Ferris IS 6200 zero turn mowers for the National Park Service's Natchez Trace Parkway, Kosciusko District. The requirement is for brand-name specific Ferris products that must originate from either the company or an authorized certified reseller. The solicitation is being conducted under FAR Part 12 for commercial products with a small business set-aside. The NAICS code is 333112 (Lawn and Garden Tractor and Home Lawn and Garden Equipment Manufacturing) with a small business size standard of 1,500 employees, and the PSC is 2420 (Tractors, Wheeled).
Quotations must be submitted via email to Dave Villani at david_villani@ios.doi.gov by 5:00 P.M. Eastern Time on July 31, 2026, with questions due by 12:00 P.M. Eastern Time on July 17, 2026. The award will be made on a Lowest Price Technically Acceptable (LPTA) basis to the responsible offeror whose quotation meets or exceeds the technical requirements and provides the lowest evaluated price. The mowers must include specific configurations, including a Caterpillar Turbo Diesel 48 HP engine, 72-inch side discharge mowing deck, suspension with dual hydro pumps and wheel motors, and digital display instrument panel. Delivery must be completed within 180 days of award on an FOB destination basis, coordinated with the designated point of contact at least 72 hours in advance. Payment will be made via the Invoice Processing Platform (IPP) after acceptance of all deliverables. Offerors must be Original Equipment Manufacturer authorized dealers, distributors, or resellers; maintain SAM registration prior to award; and provide a signed SF 18 with their quotation. The quotation must remain valid for 60 days from the due date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_-_RFQ_140PS126Q0047_Synopsis.pdf | ||
| Sol_140PS126Q0047.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NPS/Natchez Trace Parkway/Kosciusko District 140PS126Q0047 Ferris IS 6200 Mowers Page 3 of 16
SECTION 1
PRICING
1.1 GENERAL
The United States Department of the Interior, Office of Acquisition and Property Management, Bureau of Safety and Environmental Enforcement/Bureau of Ocean Energy Management/Office of Surface Mining Reclamation and Enforcement (BSEE/BOEM/OSMRE) Programs, Acquisition Operations Branch (AOB), on behalf of the National Park Service (NPS), anticipates awarding a Firm Fixed Price (FFP) Purchase Order for two (2) brand-name specific, Ferris IS 6200 zero turn mowers to support the landscaping maintenance of the Kosciusko District of the Natchez Trace Parkway. The North American Industry Classification System (NAICS) code for this requirement is 333112, Lawn and Garden Tractor and Home Lawn and Garden Equipment Manufacturing, with a small business size of 1,500 employees. The applicable Product Service Code (PSC) is 2420, Tractors, Wheeled.
This acquisition is being conducted in accordance with FAR Part 12 – Acquisition of Commercial Products and Commercial Services as specified in the Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO).
1.2 CONTRACT LINE ITEM NUMBER/PRICING
The specific details and descriptions of the Contract Line Item Numbers (CLINs) are described as follows (offeror shall fill in * and provide information as part of their quote):
This is a Brand Name requirement for Ferris products.
CLIN DESCRIPTION
TOTAL
FFP PRICE
00010 Two (2) Ferris IS 6200 Zero Turn Mowers TBD*
Ferris IS 6200 Mowers Page 4 of 16
SECTION 2
STATEMENT OF WORK
National Park Service (NPS), Natchez Trace Parkway, Kosciusko District Two (2) Ferris IS 6200 Zero Turn Mowers
2.1 BACKGROUND
The Department of the Interior (DOI), National Parks Service (NPS), Natchez Trace Parkway is a 444-mile recreational road and scenic drive through three (3) states. It roughly follows the “Old Natchez Trace”, a historic travel corridor used by American Indians, “Kaintucks,” European settlers, slave traders, soldiers, and future presidents. The Kosciusko Welcome Center doubles as a Natchez Trace Parkway welcome center and a welcome center for the town of Kosciusko, Mississippi, the only town in the United States named after General Thaddeus Kosciuszko, a Polish engineer who helped the Patriot cause during the American Revolution by designing forts and earthworks.
2.2 REQUIREMENTS
The purpose of this project is to procure two (2) brand-name specific, Ferris IS 6200 zero turn mowers to support the landscaping maintenance of the Kosciusko District of the Natchez Trace Parkway
The requested vehicle configuration includes:
Mid-mount, zero turn mower with suspension and duel hydro pumps and wheel motors Caterpillar Turbo Diesel, 48 HP Turbo/1700cc engine Remote centrifugal dry air cleaner with replaceable element 15-gallon fuel capacity 72” side discharge mowing deck Hydraulic power lift, foot operated quick pin adjust height control of 1.5” to 6” Independent front control arms with large adjustable coil-over-shocks and independent, dual wishbone rear with dual adjustable coil over shocks suspension Premium high-back suspension w/armrests seat package 26 X 12 – 12 tires Digital display instrument panel Adjustable ergonomic twin steel operator-controlled sticks control system Hand operated external drum parking brake
Warranty:
Min. Standard Manufacturer’s Warranty
Delivery:
180 days or less after receipt of award Shall be coordinated with the Designated Delivery Point of Contact (POC) at least 72 hours in advance
Ferris IS 6200 Mowers Page 5 of 16
Please see Section 3.2 below for the delivery address and POC information.
2.3 BRAND NAME REQUIREMENT
This requirement is Brand Name Specific for Ferris Products that must originate from either the company itself or one of its certified resellers.
Ferris IS 6200 Mowers Page 6 of 16
SECTION 3
TERMS AND CONDITIONS
3.1 SCOPE / TYPE OF ORDER
This is a Firm Fixed Price (FFP) purchase order in accordance with RFO FAR 12 for the delivery of the requirement as described in section 2.
3.2 DELIVERY REQUIREMENTS
3.2.1 Delivery Date / Period of Performance:
180 days after award (FOB destination).
3.2.2 Items: The items shall be delivered to the Contracting Officer’s Representative (COR) at the address below:
COR NAME: TBD at Award 118 Natchez Trace Parkway Kosciusko, MS 38804 Site Point of Contact: TBD at Award
Note: Vendor is to contact NPS POC 3-4 days prior delivery to confirm delivery details.
3.2.3 General Delivery Requirements:
All components of this requirement shall be delivered FOB. The Contractor is responsible for all costs associated with transportation, handling, crating, protective packaging, and shipment.
All deliveries shall fully comply with the receiving site’s shipping, scheduling, and off-loading instructions. Shipments that do not meet the detailed delivery and receiving requirements may be refused. Any additional expenses incurred as a result of improper, incomplete, or non-compliant delivery—including redelivery, repackaging, storage fees, scheduling conflicts, or carrier surcharges—shall be the sole responsibility of the Contractor.
Any anticipated delivery delays, logistical issues, or changes to the scheduled delivery must be communicated in advance and receive written approval from the Contracting Officer prior to taking effect.
The Contractor shall provide all delivery documentation, including shipment confirmations, logistics coordination details, bills of lading, and carrier tracking information, to both the Contracting Officer’s Representative (COR)/the designated Site Point of Contact prior to delivery.
3.2.4 Delivery Instructions:
The Contractor shall coordinate delivery scheduling with the COR/Site Point of Contact to ensure appropriate personnel and equipment are available to receive the shipment. All documentation
Ferris IS 6200 Mowers Page 7 of 16 accompanying the requirement (including manuals, warranty documentation, certificates, and inspection/sea-trial reports) shall be provided at time of delivery.
3.3 CONTRACT ADMINISTRATION/GOVERNMENT POINTS OF CONTACT
3.3.1 Contracting Officer (CO): The CO for this effort is as follows:
Dave Villani U.S. Department of the Interior Office of Acquisition and Property Management 45600 Woodland Road, Sterling, VA 20166 Phone: 703-787-1756 Email: david_villani@ios.doi.gov
3.3.2 The Contracting Officer’s Representative is:
To be announced at the time of award.
3.4 INVOICING REQUIREMENT FREQUENCY AND PAYMENTS
One invoice per performance period shall be submitted after acceptance of all deliverables by the Government via the Internet Payment Platform (IPP) as delineated in Section 3.4.1 below.
3.4.1 Invoice Submission Instructions
Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (February 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: Documentation required by FAR 32.905(b) (company invoice)
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
Ferris IS 6200 Mowers Page 8 of 16
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
3.5 AVAILABILITY OF CLAUSES
3.5.1 Clauses Incorporated by Reference
In accordance with FAR 52.252-2, this solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. The Contractor shall comply with these clauses unless the circumstances do not apply. Upon request, the Contracting Officer will make their full text available. The full text of a clause may be accessed electronically at https://www.acquisition.gov/far/.
The FAR Part 12 clauses are in accordance with the Revolutionary FAR Overhaul (RFO) Class Deviation for Part 12 and can be found: FAR Overhaul - Part 12 | Acquisition.GOV
Clause Title Date 52.203-6, Alt 1 Restrictions on Subcontractor Sales to the Government JUN 2020 52.203-17 Contractor Employee Whistleblower Rights NOV 2023 52.203-19 Prohibition on Requiring Certain Internal Confidentiality
Agreements or Statements
JAN 2017
52.204-13 System for Award Management – Maintenance MAR 2026 52.204-19 Incorporation by Reference of Representations and
Certifications
DEC 2014
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded
MAR 2026
52.209-10 Prohibition on Contracting with Inverted Domestic MAY 2026 52.212-4 Contract Terms and Conditions – Commercial Products and
Commercial Services
MAR 2026
52.219-8 Utilization of Small Business Concerns JAN 2026 52.222-3 Convict Labor JUN 2003 52.222-19 Child Labor-Cooperation with Authorities and Remedies MAY 2026 52.222-36 Equal Opportunity for Workers with Disabilities. MAY 2026 52.222-50 Combating Trafficking in Persons MAY 2026 52.222-90 Addressing DEI Discrimination by Federal Contractors. MAY 2026 52.225-1 Buy American – Supplies OCT 2022 52.232-33 Payment by Electronic Funds Transfer – System for Award
Management
OCT 2018
52.240-91 Security Prohibitions and Exclusions MAR 2026
3.6 FAR CLAUSES INCLUDED IN FULL TEXT
The following Federal Acquisition Regulation (FAR) clauses are included in full text. The Contractor shall comply with these clauses unless the circumstances do not apply.
Ferris IS 6200 Mowers Page 9 of 16
3.6.1 FAR 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (JAN 2026)
(a) Definition. Small business concern, as used in this clause—
(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the size standards in this solicitation.
(2) Affiliates, as used in paragraph (a)(1) of this clause, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.
(b) Applicability. This clause applies only to-
(1) Contracts that have been set aside for small business concerns; and
(2) Orders set aside for small business concerns under multiple-award contracts as described in 8.4 and 16.5.
(c) General.(1) Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.
(2) Any award resulting from this solicitation will be made to a small business concern.
3.6.2 FAR 52.252-6 Authorized Deviations in Clauses. (Apr 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter
1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any Federal Acquisition Regulation (FAR) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
3.7 DEPARTMENT OF THE INTERIOR ACQUISITION REGULATIONS (DIAR)
1452.201-70 – AUTHORITIES AND DELEGATIONS (SEP 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished
Ferris IS 6200 Mowers Page 10 of 16 to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence.
Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the
COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
3.8 NOTICE REGARDING LATE/DELAYED PERFORMANCE
a) In the event the Contractor anticipates difficulty in meeting performance requirements, or when it anticipates difficulty in complying with any requirements, or whenever the Contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this effort, the Contractor shall immediately notify in writing the CO and COR, giving pertinent details, provided this data shall be informational only in character and that this provision shall not be construed as a waiver by the DOI of any requirements, or date or any rights or remedies provided by law under this task order.
b) If the Contractor fails to respond in a timely manner to any requirements of the purchase order, delay will be attributed to the Contractor. Although the period of performance may change due to the delay, the price may also be subject to a downward adjustment only.
Ferris IS 6200 Mowers Page 11 of 16
3.9 CONTRACTORS TECHNICAL QUOTATION
The Contractor’s technical quotation may be incorporated by reference into the resulting delivery order. In the event of inconsistencies, discrepancies or/and conflicts between the terms and conditions of the resulting delivery order and the contractor’s technical quotation, the terms and conditions of the resulting delivery shall take precedence.
Ferris IS 6200 Mowers Page 12 of 16
SECTION 4
QUOTATION PREPARATION INSTRUCTIONS
NOTICE: The failure to submit any of the information requested in this RFQ may lead to the rejection of your quotation without further consideration.
4.1 INSTRUCTIONS FOR DELIVERY OF QUOTATIONS
Quotations in response to this RFQ shall be submitted via email to Dave Villani at david_villani@ios.doi.gov no later than 5:00 P.M. Eastern Time, on July 31, 2026.
4.2 SUBMISSION OF QUESTIONS
Any questions regarding this RFQ must be emailed to david_villani@ios.doi.gov no later than 12:00 P.M. Eastern Time on, July 17, 2026. You must include the Request for Quote number (140PS126Q0047) in the email subject line. Please be advised that questions and/or comments may not be protected as proprietary, and the Government reserves the right to transmit those questions and answers of a common interest to all prospective Offerors. PHONE CALLS ARE STRONGLY
DISCOURAGED.
4.3 QUOTATION DUE DATE
Be advised that it is the quoter’s responsibility to ensure that its response is sent by the specified quotations due date and time. Any responses or submissions received after the specified quotations due date and time may NOT be considered for award.
4.4 QUOTATION INSTRUCTIONS
This RFQ does not obligate the Government to issue or award a contract. The Government is not responsible for any costs incurred in preparing or submitting a response. Contractors may participate by submitting a quotation in accordance with these instructions.
4.4.1 Technical/Price Quotations
The quoter shall submit a quotation that meets or exceeds the technical requirements and quantities identified in Section 2: Specifications and shall provide pricing in accordance with Section 1.2:
Contract Line Item Number/Pricing. The quotation shall remain valid for 60 days from the quotation due date.
Quoters must submit information that clearly demonstrates that the proposed items comply with all solicitation requirements and list the anticipated delivery date. Documentation shall be provided to verify that the items meet the physical, functional, and performance characteristics specified in Section 2, along with any other supporting materials needed to confirm capability.
Failure to submit any required information may result in rejection of the quotation without further discussion.
Ferris IS 6200 Mowers Page 13 of 16
The quoter shall provide a pricing structure compliant with Section 1.2 and a technical quotation demonstrating the ability to meet the requirements of Section 2. Pricing shall be based on open-market pricing, inclusive of any available discounts.
The quoter is required to sign, date, and return the SF 18 with the quotation.
4.4.2 Assumptions, Conditions and/or Exceptions
A quoter shall highlight any of its assumptions, conditions or/and exceptions to clauses, provisions or/and requirements that conflict with this RFQ. This information will be reviewed by the Government. Any terms and conditions or conflicting information that is considered unacceptable by the Government and cannot be resolved may result in the quoter being removed from consideration. If a quoter’s assumptions, conditions or/and exceptions to clauses, provisions or/and requirements conflict with this RFQ and are NOT noted in a separately titled section of the quoter’s quotation, then it will be assumed that the Offeror proposes no assumptions, conditions or/and exceptions to clauses, provisions or/and requirements. Therefore, it will be assumed that the quoter agrees to comply with all of the terms and conditions as set forth herein in this RFQ. It is not the responsibility of the Government to seek out and identify assumptions, conditions or/and exceptions to clauses, provisions or/and requirements that are buried within the quotation.
4.5 FAR 52.252-1 – SOLICITATION PROVISIONS INCORPORATED BY
REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The Quoter is cautioned that the listed provisions may include blocks that must be completed by the Quoter and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the Quoter may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address: https://www.acquisition.gov/far/.
The FAR Part 12 provisions are in accordance with the Revolutionary FAR Overhaul (RFO) Class Deviation for Part 12 and can be found: FAR Overhaul - Part 12 | Acquisition.GOV
Provision Title Date 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal
Confidentiality Agreements or Statements--Representation
JAN 2017
52.204-7 System for Award Management MAR 2026 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations-
Representation
MAY 2026
52.209-5 Certification Regarding Responsibility Matters MAY 2026 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law
MAY 2026
52.209-12 Certification Regarding Tax Matters OCT 2025 52.212-1 Instructions to Offerors – Commercial Products and Commercial
Services
MAR 2026
52.225-2 Buy American Certificate OCT 2022
Ferris IS 6200 Mowers Page 14 of 16
52.240-90 Security Prohibitions and Exclusions Representations and Certifications
MAR 2026
Ferris IS 6200 Mowers Page 15 of 16
SECTION 5
EVALUATION OF QUOTATIONS
5.1 GENERAL INSTRUCTIONS
The quote shall be prepared and submitted in accordance with the instructions contained in Section 4 of this RFQ. The Government will evaluate offers on the basis of information furnished by the offeror and shall not be responsible for locating or obtaining any information not identified in the offer.
5.2 BASIS FOR AWARD
Award shall be made to the responsible offeror whose quotation, in conforming to this RFQ, provides the Lowest Price Technically Acceptable (LPTA) offer to the Government. The evaluation shall be performed on the basis of the lowest evaluated price of quotes, meeting or exceeding the acceptability standards for non-cost factors. The LPTA source selection process shall not involve tradeoffs between technical and cost details. Quotations received will be evaluated for acceptability or unacceptability, but not ranked using the non-cost/price factors.
The Government will first evaluate the total proposed prices. Thereafter, the Government will evaluate the non-price factors of the two lowest overall priced quotes. If the lowest priced quote is determined to be rated as Acceptable, the Government may make award to that contractor without further evaluation of the remaining quotes. If the lowest price quote is determined to be rated Unacceptable, then the Government may evaluate the next lowest price quote, and so forth and so on, until the Government reaches the lowest price quote that is determined to be rated as Acceptable. The Government reserves the right to evaluate all quotes should it be desired or determined to be in the best interest of the Government.
The Government also reserves the right not to make an award as a result of this competition if, in the opinion of the Government, none of the submissions would provide satisfactory performance at a price that is considered fair and reasonable..
5.3 FAR 52.212-2 EVALUATION – COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (MAR 2026)
(a) Evaluation factors. The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors will be used to evaluate offers:
Price. The Offeror is expected to propose a fair and reasonable price in accordance with the information provided in this RFQ.
Technical Acceptability. Technical acceptability will be evaluated by determining whether the Offeror’s quotation meets or exceeds the technical requirements and quantities listed in Section 2 of this RFQ.
Ferris IS 6200 Mowers Page 16 of 16
Offeror shall be an Original Equipment Manufacturer (OEM) authorized dealer, authorized distributor or authorized reseller for the proposed equipment such that OEM warranty and service are provided and maintained by the OEM. All warranty and service associated with the equipment/system shall be in accordance with the OEM terms and conditions.
(b) Options (if applicable). The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. The evaluation of options does not obligate the Government to exercise the option(s).
(c) Notice of award. A written notice of award or acceptance of an offer furnished to the successful Offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
5.4 ADDITIONAL REQUIREMENTS
Items must be new, unless specified otherwise SAM registration required prior to award Government reserves the right not to make an award This acquisition does not follow FAR 15 procedures, and the Government may elect to reach out to one or more vendors at its own discretion to clarify aspects of their quote.
File details come from the government source that posted it. Updated .