This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract to clean water control structures (WCS) on the Alligator River National Wildlife Refuge in North Carolina. The key details are:

The contract number is unspecified. The contractor, Contracting Officer, and Inspector are also unspecified. The QASP outlines the required tasks, including notification prior to mobilization, installation of water diversion and cleaning of pumps, removal of sediment and debris from the WCS, inspection of the WCS for proper function, disposal of sediment, installation of debris catch structures, and ensuring the roads and road shoulders are left in pre-work conditions. The work is to be performed at the project sites on the Alligator River National Wildlife Refuge. The QASP provides the specific methods, timelines, and responsible parties for each task.

The related federal contract opportunity is solicitation number 140FS324Q0141 for the "NC ALLIGATOR RIV NWR CANAL CLEAN UP" project, issued by the Department of the Interior Fish and Wildlife Service.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

IRA Funded Water Control Structures Cleaning

CONTRACT NO.: Specify contract number

CONTRACTOR: Specify name of contractor

CONTRACTING OFFICER: Specify name of Contracting Officer

INSPECTOR(S): Kelley Van Druten

TASK / DESCRIPTION

WHAT

WHO

WHEN

WHERE

METHOD

Coordination
Notification prior to mobilization
POC
2 weeks prior to mobilization
Verbal or phone text
Direct observation
Water control
· Installation of water diversion

· Clean pumps

POC
· Prior to cleaning structures

· Prior to mobilization and before leaving

Project sites
· Direct observation

· Inspection before use and inspection before demobilization

Clean WCS
· Remove any sediment and debris from WCS
POC
· Prior to start cleaning

· During work Project sites

· Direct observation/inspection of WCS prior to work

· Direct observation

Ensure functional WCS
· Inspect WCS for proper function
POC
Prior to demobilization
Project sites
Direct observation
Sediment Removal and Disposal
Sediment Removal and Disposal per PWS
POC
During work
Project sites and Spoil Site
Direct observation
Installation of Debris Catch Structures
· Install treated posts

Install and anchor sediment curtaion

POC
After WCS clean out
Project sites
Direct observation; comparison to PWS
Site Conditions
Roads and road shoulders left in pre-work conditions
POC
Prior to demobilization
Project sites
Direct observation