B08_-_QASP_IRA_Funded_WCS_Clean_Out.docx
DOCX document 27 KB Posted
- Attached to
- NC ALLIGATOR RIV NWR CANAL CLEAN UP
- Solicitation number
- 140FS324Q0141
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract to clean water control structures (WCS) on the Alligator River National Wildlife Refuge in North Carolina. The key details are:
The contract number is unspecified. The contractor, Contracting Officer, and Inspector are also unspecified. The QASP outlines the required tasks, including notification prior to mobilization, installation of water diversion and cleaning of pumps, removal of sediment and debris from the WCS, inspection of the WCS for proper function, disposal of sediment, installation of debris catch structures, and ensuring the roads and road shoulders are left in pre-work conditions. The work is to be performed at the project sites on the Alligator River National Wildlife Refuge. The QASP provides the specific methods, timelines, and responsible parties for each task.
The related federal contract opportunity is solicitation number 140FS324Q0141 for the "NC ALLIGATOR RIV NWR CANAL CLEAN UP" project, issued by the Department of the Interior Fish and Wildlife Service.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
IRA Funded Water Control Structures Cleaning
CONTRACT NO.: Specify contract number
CONTRACTOR: Specify name of contractor
CONTRACTING OFFICER: Specify name of Contracting Officer
INSPECTOR(S): Kelley Van Druten
TASK / DESCRIPTION
WHAT
WHO
WHEN
WHERE
METHOD
| Coordination |
| Notification prior to mobilization |
| POC |
| 2 weeks prior to mobilization |
| Verbal or phone text |
| Direct observation |
| Water control |
| · Installation of water diversion |
· Clean pumps
| POC |
| · Prior to cleaning structures |
· Prior to mobilization and before leaving
| Project sites |
| · Direct observation |
· Inspection before use and inspection before demobilization
| Clean WCS |
| · Remove any sediment and debris from WCS |
| POC |
| · Prior to start cleaning |
· During work Project sites
· Direct observation/inspection of WCS prior to work
· Direct observation
| Ensure functional WCS |
| · Inspect WCS for proper function |
| POC |
| Prior to demobilization |
| Project sites |
| Direct observation |
| Sediment Removal and Disposal |
| Sediment Removal and Disposal per PWS |
| POC |
| During work |
| Project sites and Spoil Site |
| Direct observation |
| Installation of Debris Catch Structures |
| · Install treated posts |
Install and anchor sediment curtaion
| POC |
| After WCS clean out |
| Project sites |
| Direct observation; comparison to PWS |
| Site Conditions |
| Roads and road shoulders left in pre-work conditions |
| POC |
| Prior to demobilization |
| Project sites |
| Direct observation |