This document is a Performance Work Statement (PWS) for a federal contract opportunity to clean debris and sediment from designated water control structures (WCS) and build debris catch structures in the canals in front of the WCS's on the Alligator River National Wildlife Refuge in North Carolina.

The key objectives are to: 1) clean each designated WCS (riser, outlet pipe and valve) to restore proper functioning, 2) install debris catch structures to limit future debris accumulation, and 3) remove sediment and debris upstream and downstream of the WCS's. The contract is a firm-fixed price award with a 1-year period of performance starting September 1, 2024. The government will secure necessary permits and mow the sites prior to contractor mobilization. The contractor is responsible for providing all personnel, equipment, materials, water control, and other services to complete the work. Payment will be processed through the Invoice Processing Platform System.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior U.S. FISH & WILDLIFE SERVICE – Alligator River NWR

PO Box 1969, Manteo, NC 27954

Performance Work Statement

IRA Funded Water Control Structures Cleaning On Alligator River National Wildlife Refuge 13518 Milltail Road, East Lake, NC 27953

1. GENERAL INFORMATION

1.1. General: This is a non-personal services contract funded through the Inflation Reduction Act of 2022 to clean debris and sediment from designated water control structures (WCS) and build debris catch structures in the canals in front of the WCS’s on Alligator River National Wildlife Refuge (NWR) in Dare County, North Carolina. The government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn, is responsible to the government.

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform work services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

Payment will be processed online through the Invoice Processing Platform System (IPP) at http://www.ipp.gov.

1.2. Purpose: As part of the U.S. Fish and Wildlife Service (Service) and the National Wildlife Refuge System, Alligator River NWR was established to protect wetlands and their associated wildlife habitat. The organic, peat soils found on much of the refuge is critical to this mission.

These peat soils however, are vulnerable to decomposition caused by exposure to saltwater that can travel through the many canals and ditches found on the refuge. The WCS’s in the Point Peter and Lake Worth canals are equipped with specialized valves to keep saltwater from following from the Sound into the refuge. We believe that these valves are not functioning properly due to debris and sediment clogging the WCS’s. This contract will restore proper function to these WCS’s and help to prevent clogging of the WCS’s in the future.

1.3. Objective: The contract objectives are to clean out each designated WCS’s and install debris catch structures to limit future debris accumulation and facilitate cleaning of the structres.

Cleaning out the WCS’s will include 1) removing debris and sediment from each WCS (riser, outlet pipe, and valve), 2) ensuring the WCS is in a functioning state (e.g., any valves removed are properly reinstalled, boards can be added and removed from the structure, or no major leaks inside the structure), and 3) removing sediment and debris upstream and downstream of the WCS’s as necessary to a depth level with the structure inverts.

http://www.ipp.gov/

1.4. Place of Performance: The designated WCS’s are located in canals along Point Peter and Lake Worth Roads on the Alligator River NWR in Dare County, North Carolina as delineated on included map, Attachment 2. Both areas are open to the public and seasonal hunting. Road closures, if necessary, must be coordinated several days in advance to allow proper notifications to affected user groups.

1.4.1. Lake Worth Road is dirt and can get very sloppy in wet conditions. The WCS’s are located approximately 0.2 miles west of US-264. The distance from the traffic light in Manns Harbor, NC to the WCS’s on Lake Worth Road is approximately 15 miles.

1.4.2. Point Peter Road is graveled. The WCS’s are located approximately 1 mile east of US-

264. The distance from the traffic light in Manns Harbor, NC to the WCS’s on Lake Worth Road is approximately 10 miles.

1.5. Period of Performance: The period of performance shall be for 1 year from Notice to Proceed or approximately September 1, 2024 to August 31, 2025.

1.6. General Information

1.6.1. Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he/she assures that the work complies with the requirements of the contract.

1.6.2. Recognized Holidays: The contractor is not required nor permitted to perform services on these holidays:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day

1.6.3. Hours of Operation: Hours of work are sunrise to sunset, Monday thru Friday, excluding Federal Holidays, or when the government facility is closed due to local or national emergencies, administrative closings, or similar directed government closings. The contractor shall provide the Contracting Officer’s Representative (COR)/Government Representative (GR) contact information in the event of emergencies.

1.6.4. Contractor Qualifications: The contractor, its employees, and any subcontractors performing work under this contract shall comply with all Federal, State, and local laws and regulations applicable to the contract work and to the products and material used by the contractor in performing that work.

1.6.5. Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend a post award conference, or any progress meetings, convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5.

These meetings shall be at no additional cost to the government. The pre-construction meeting will cover construction plans, water control, matters of safety, quality control, coordination, access to site, environmental compliance, and contractual compliance.

2. GOVERNMENT FURNISHED ITEMS AND SERVICES

2.1. Services:

2.1.1. The Service will secure the permits necessary to perform the work outlined in this PWS.

Work cannot begin until all permits have been obtained.

2.1.2. With a minimum of two weeks’ notice, the Service will mow the project sites prior to contractor mobilization. At this time, the COR/GR will take photographs to document the site conditions prior to the start of construction.

2.2. Facilities, Utilities, and Equipment: The work sites are along roads with no bathrooms or other amenities.

2.2.1 The government will allow access to the gated Stumpy Point Spoil Site to dispose of debris should the contractor choose that option. The government will designate a spot at the site for debris to be piled.

2.2.2 The government will not provide any utilities, or equipment.

3. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES

3.1. General: The contractor shall provide all personnel, labor, equipment, supplies, transportation, tools, materials, supervision, and other non-personal services necessary to perform the requirements of this contract order and shall plan, schedule, coordinate, and ensure effective performance of required services for the entire duration of contract.

NOTE: The Contracting Officer reserves the right to require the contractor to replace any operating personnel or equipment used in the performance of this contract if the personnel or equipment are violating, or have violated, any state or federal laws; or are unsafe; or for any valid reason. In this event, the contractor shall as soon as reasonably possible, upon written or verbal notice (to be later reduced to writing) from the Contracting Officer, provide replacements satisfactory to the Contracting Officer at no additional cost.

3.1.1. Contractor will be responsible for erosion control, fire protection, and personal safety measures. Contract work shall comply with local, tribal, State, and Federal safety, health, and environmental requirements. At the end of the project, all roads and road shoulders must meet conditions present prior to the start of construction.

3.1.2. Water Control: Water remains in these canals year-round. The contractor will be responsible for the control of surface water, as necessary, to perform the clean out of the WCS’s.

Water control, as needed, shall include: 1) constructing, installing, building and maintaining all necessary temporary water containment facilities and diversions; 2) furnishing, installing, and operating all necessary pumps, piping, and other equipment; and 3) removing all such temporary works and equipment after their intended function is no longer required. All pumping equipment will be flushed and cleaned before mobilization and before leaving the work sites to prevent the spread of invasive species.

3.2. Materials and Equipment: The contractor shall provide all materials, equipment, PPE (personal protective equipment), and any other supplies needed to complete the requirements of this PWS. The contractor will be responsible for site preparation if the Service is not given adequate lead time, as requested, for mowing the sites.

4. SCOPE/ SPECIFIC TASKS

4.1. Treatment Areas: The WCS’s are in the canals adjacent to Point Peter and Lake Worth Roads on the Alligator River NWR. See map, Attachment 2.

a) Lake Worth Road: The canal is approximately 40-ft wide. There are four water control structures located side by side.

b) Point Peter Road: The canal is approximately 35-ft wide. There are three water control structures located side by side.

4.2. Basic Services: The basic contract tasks are:

a) to clean each WCS (riser, outlet pipe and duck bill valve) in such a manner that the WCS is not damaged and sediment and debris are removed so that water can flow freely through the structures as designed,

b) to build/install debris catch structures that will reduce the likelihood of debris building up in the WCS’s, and

c) to remove sediment and debris in the canals between the debris catch posts and the WCS’s and for 10-ft downstream of the WCS’s, level with the bottom of the structures.

The debris catch structures will consist of a combination of posts and a permanent boom. See Attachment 3 for a possible arrangement.

a) Posts will be 4-in X 6-in X 20-ft of treated wood, buried 6.5-7 feet deep. Posts should be placed in a ‘V’ formation with the point of the ‘V’ 35-ft in front of the WCS’s, angling back towards them. Posts should be spaced approximately 5-ft apart across the canal.

b) The permanent boom should have an overall height of 24-in with 9-10 inches freeboard and 14-15 foot draft. A specification sheet for a permanent boom in use at Mattamuskeet NWR (Swan Quarter, NC) is included in Attachment 4 as an example.

i. Floats: Coast Guard approved marine-grade closed cell foam floats, International Orange, UV resistant

ii. Belting: same or equivalent to 175 oz PVC treated with UV and Marine inhibitors, galvanized steel weights.

iii. Equipped with stainless steel, universal connectors.

c) The boom should be securely anchored to the land on the either side of the canal at an angle such that debris will be funneled to the roadside for easier removal. Roadside anchor should be 5-ft in front of the WCS’s and the opposite anchor should be in line with the posts.

4.2.2. Contractor shall remove sediment and debris for the entire width of the canal for a distance of 35-ft out to where debris catch posts will be installed to a depth level with the bottom of the structures. Contractor shall remove sediment and debris for the entire width of the canal for a distance of 10-ft downstream of the WCS’s. Contractor will be responsible for disposal of the material at an appropriate location off-refuge or at the refuge’s Stumpy Point spoil site (see Attachment 2).

4.3. Special Considerations: The contractor will coordinate with the COR/GR no less than 48 hours prior to mobilization. Permits must be in place before the contractor can begin work.

4.3.1. Careful management of fluids and solid wastes during construction operations is needed to protect water quality. Contractor should collect and dispose of trash and other wastes. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids, or other toxic materials. Construction shall be staged in order to minimize the exposure of equipment to surface waters to the maximum extent practicable. Fueling, lubrication and general equipment maintenance shall be performed in a manner to prevent, to the maximum extent practicable, contamination of surface waters by fuels and oils.

4.3.2. The contractor shall immediately report any spills or accidents to the COR/GR, who will handle appropriate State and Federal notifications. This especially true of any spills occurring within 100 feet of surface waters or any spills that cause a sheen on surface waters. The contractor will be required to clean up any spills, regardless of size.

4.4. Safety: Point Peter and Lake Worth Roads are open to the public. If roads need to be closed to ensure public safety or safety of the contractor’s employees, it is the responsibility of the contractor to put up road barricades and inform the COR/GR prior to closing the road. The Service will post informational notices to the public on refuge website and social media and contact any Special Use Permit holders that could be impacted by a road closure.

5. DELIVERABLES

• seven clean, functioning water control structures

• debris catch structures in each canal as described in this PWS

• sediment/debris removal in each canal as described in this PWS, including proper disposal of material

• roads and road shoulders left in pre-work condition

6. EVALUATION AND ACCEPTANCE

6.1. Evaluation:

6.1.1. The COR/GR will evaluate the WCS’s for damage and the amount of sediment/debris removal once the contractor informs the COR/GR that clean out is complete. This should occur before any equipment is removed from the site. Any contractor-caused damages to the WCS’s must be repaired as soon as possible at the contractor’s expense.

6.1.2. The debris catch structures will be checked for number of posts, distance between posts, and placement of the floating curtain.

6.1.3. Sediment and debris must be disposed of properly and as agreed during post-award construction meeting. Roads and road shoulders should be left in pre-work condition.

6.1.4. If the above critieria is met, work will be accepted after observing water flow through the structures to ensure that the duck values are operating properly.

6.2 Surveillance Methods: The COR/GR will perform periodic, on-site visual inspections of work or as arranged with the contractor.

7. BID PROPOSAL

7.1 Contract is a Firm-Fixed price contract.

7.2 Bids should have costs broken down by treatment site and include a brief description of how the work will be performed. Include specifications of debris curtain in the description or as an attachment to the bid. Should submitted bids exceed available funding, one treatment site may be dropped.

8. ATTACHMENTS

8.1 Attachment 1 – Quote/Proposal Sheet

8.2 Attachment 2 –Treatment Map

8.3 Attachment 3 – Debris Catch Structure Diagram

8.4 Attachment 4 – Mattamuskeet NWR Permanent Boom Specification Sheet

Attachment 1 – Quote/ Proposal Sheet (Firm Fixed Price)

Cost by treatment area:

1) Lake Worth Canal: ______________________________________________________

2) Pt. Peter Canal: _________________________________________________________

3) Project Total: ___________________________________________________________

Please briefly describe how you will conduct the project (equipment, materials, timing, etc.):

Attachment 2

Attachment 3

CONTAINMENT SPILLMASTER ORIGINAL PERM BOOM

The SpillMaster Original Permanent Oil Spill Containment Boom is built tough to provide the maximum in protection with a minimum or maintenance. SpillMaster Original is designed with a semi-rigid material, which provides a vertical screen barrier against contaminates, floating oil and debris. It is free to bend with the horizon plane as well as to conform to water movements resulting in a better ability to withstand the ma-rine environments. This system, features easy deployment, high visibility, durability and abrasion resis-tance.

SPECIFICATIONS

SpillMaster Original Perm Boom

- Choice of 175 oz. PVC, 80 oz. or 100 oz.

Urethane coated polyester belting

- Floats made with molded polyethylene UV inhibited shell filled with Coast Guard approved marine grade closed-cell foam. Floats measure 42” x 4” x 9 1/2”

- Choice of ASTM Serrated Slide Universal, ASTM Z Quick Connect, Lightweight Univer-sal or Navy connectors

- 11 oz. hot galvanized steel weights

- Choice of 18, 24 or 36 inches overall height

- Choice of 50’ or 100’ sections standard

APPLICATIONS

- Ship repair, storage and fueling

- Oil containment

- Any waterfront facility

- Long-term continuous use

Due to the many variables to be considered at a site, we recom-mend that you consult with our field tested experts to obtain the best possible results.

Parker Systems, Inc.

PO Box 6380, Chesapeake VA 23323

(757) 485-2952 Toll Free 1-866-4PARKER

Earth Anchors

Wrapped Cable

Wire Rope Clips

Shackles

Chain

Boom

GSM

Earth Anchor Assembly

Performance Work Statement

File details come from the government source that posted it. Updated .