B08_Project_Experience_Questionnaire.docx
DOCX document 40 KB Posted
- Attached to
- NEZ PERCE NHP VC RESTROOM REHAB.
- Solicitation number
- 140P8325R0001
About this file
This is a Project Experience Questionnaire template (Attachment #5) for solicitation 140P8325R0001 related to the Nez Perce National Historical Park Visitor Center restroom rehabilitation project. The questionnaire requires offerors to submit details about at least three similar projects completed within the past 5 years.
The template asks contractors to provide information about previous projects including project title, location, period of performance, project owner details, and contractor roles (prime/sub). For each referenced project, contractors must describe the work performed, explain how it relates to the elements in Section L, detail any price or schedule changes, discuss problems encountered and resolutions, describe successful methods used, and provide additional relevant information. The template includes fields for both original and final pricing, as well as original and final performance periods in calendar days for each contractor's specific work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 140P8325R0001NEZ_PERCE_NATIONAL_HISTORICAL_PARK_questions_0001.docx | DOCX document | |
| Sol_140P8325R0001_Amd_0001.pdf | ||
| A06_SPECS_100_Project_Manual_NEPE_V16.pdf | ||
| Construction_Contract_Administration.docx | DOCX document | |
| B08_Offeror_s_representations_and_certificates_to_be_provided_with_proposal.pdf | ||
| B08_Price_Schedule_Sheet_.xlsx | XLSX spreadsheet | |
| Sol_140P8325R0001.pdf | ||
| B08_Current_TCP110816_Attachment_10.pdf | ||
| B03_Davis_Bacon_Act_WD_ID20250007_SAM_attachmnet__6.pdf | ||
| B08_Sub_contracting_form_12_9_24.xlsx | XLSX spreadsheet | |
| B08_PAST_PERFORMANCE_QUESTIONNAIRE.docx | DOCX document | |
| A06_Drawings_100_CDs_NEPE_V16.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 140P8325R0001 NEPE Rehab Restroom Attachment #5 Project Experience Questionnaire Solicitation: 140P8325R0001
Submit responses to the questions below that demonstrate your relevant experience successfully completing projects of a similar nature and scope as this requirement per the instructions provided in Section L of the Solicitation. Limit submittals to the quantity of projects and timeframes required in the solicitation. Expand the response sections shown below as needed to adequately address each question (this questionnaire may be expanded to multiple pages if needed).
| Offeror |
| Company Name |
REFERENCED PROJECT INFORMATION
| Project Title |
| Title |
| Project Location |
| City, State |
| Period of Performance: |
| MM/DD/YYYY – MM/DD/YYYY |
| Brief Project Description |
| Description |
| Project Owner |
| Company Name |
| POC: |
| First & Last Name |
| Phone: |
| (XXX) XXX-XXXX |
CONTRACTOR LIST
List Contractor(s) whose experience on the referenced project is being submitted for evaluation on this proposed project. If more than one contractor is listed (i.e. prime and subcontractors), provide information specific to that contractor.
| Contractor Name |
| Role on Referenced Project |
(Prime or Sub)
| Trade |
| Price |
(list for each contractor’s specific work) Performance Period (calendar days) (list for each contractor’s specific work)
| Original |
| Final |
| Original |
| Final |
Choose an item.
| $XXX,XXX |
| $X,XXX,XXX |
| XX |
| XX |
Choose an item.
| $X,XXX,XXX |
| $X,XXX,XXX |
| XXX |
| XXX |
Choose an item.
PROJECT EXPERIENCE QUESTIONS
1. Describe the project work performed by all contractors listed above.
Response
2. Identify which Project Experience elements listed in section L of the solicitation each contractor’s work addresses.
Response
3. Describe & provide reasons for any changes to the original price for the work described in question 2 above.
Response
4. Describe and provide reasons for any changes to the original schedule for the work described in question 2 above.
Response
5. Describe problems, associated with the work described in question 2 above, which were encountered and how they were resolved. Describe how the offeror’s proposal accounts for similar issues.
Response
6. Describe the means and methods, associated with the work described in question 2 above, which were successful. Would you implement the same means and methods on the proposed project? Why or why not?
Response
7. Provide any other additional project information you believe should be presented.
Response
Provide at least 3 projects within the last 5 years.
File details come from the government source that posted it. Updated .