This document is a Price Schedule for replacing HVAC systems at Building 32 in the Gateway National Recreation Area's Sandy Hook Unit. The bid schedule requires contractors to submit pricing for direct labor hours, including supervisors, HVAC technicians, and electricians, as well as material and supply costs. Specific materials to be priced include electric runs and relays, three 4-ton condenser/heat pump systems with air handlers, line sets, thermostats, refrigerant, and miscellaneous installation supplies.

The associated federal contract opportunity is Solicitation Number 140P4525Q0053, issued by the Department of the Interior National Park Service Northeast Region for HVAC system replacement at Building 32 in Fort Hancock, New Jersey. The price schedule provides a structured template for vendors to calculate and submit their total base bid by itemizing labor hours and material costs, with space for contractors to add additional line items if needed.

View the file

Other files for this federal contract opportunity

Other files attached to GATE-REPLACE HVAC SYSTEMS-BLDG 32-SAHO, newest first.
File Type Posted
Sol_140P4525Q0053_Amd_0001.pdf PDF
A04_REVISED_SOW_GATE_AC_Replacement_B32_0001.docx DOCX document
B03_NJ20250037_dated_070425.pdf PDF
A06_Photos_of_HVAC_systems_at_B32.docx DOCX document
Sol_140P4525Q0053.pdf PDF
References_Worksheet_(1)_(1).doc DOC document
A04_2025-03_SOW_AC_Replacement_B32.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT BID SCHEDULE

Replace HVAC Systems at Building 32 Gateway National Recreation Area - Sandy Hook Unit

Submit bid for all items: Failure to do so may render the bid non-responsive. If there is an item that is not below that you would like to itemize out, please insert it in the appropriate area and calculate it in the totals.

Direct Labor Hours:

Supervisor _______Total Hours x $_____/hr = $__________

HVAC Tech(s) _______Total Hours x $_____/hr = $__________

Electrician(s) _______Total Hours x $_____/hr = $__________

Direct Labor Hours: $ _________ TOTAL

MATERIAL/SUPPLIES:

Material for Electric runs and Relays = $__________

3 x 4-ton Condenser/Heat Pump, air Handler, line sets And thermostats ` = $__________

Refrigerant = $__________

Miscellaneous material/supplies for the installation and startup = $__________

Material/Supplies: $ _________ TOTAL

TOTAL BASE BID = $____________________