B08_Price_Schedule.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- AMIS-Outdoor Picnic Supplies and Equipment
- Solicitation number
- 140P1325Q0047
About this file
The file is a Price Schedule for Amistad National Recreation Area (NRA) detailing outdoor equipment and supplies. The document lists various items including 45 picnic tables, 45 barbeque grills, 7 pre-fabricated metal shelters, and additional construction-related materials such as concrete mix, concrete patch, concrete wedge anchors, hammer drill bits, and concrete grind wheels. The pricing for all listed items is currently shown as $0.00, with a total line item cost of $0.00, suggesting this may be a preliminary or placeholder pricing document.
The Price Schedule is associated with Solicitation Number 140P1325Q0047 for "AMIS-Outdoor Picnic Supplies and Equipment" issued by the Department of the Interior National Park Service Intermountain Region. The document specifies FOB Destination delivery shall be included in each line item, indicating that transportation costs to the delivery point are to be factored into the pricing. The comprehensive list of items suggests the procurement is for equipping or renovating outdoor recreational spaces at the Amistad National Recreation Area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1325Q0047_Amd_0001.pdf | ||
| A06_Specs_Amended_June_24_0001.docx | DOCX document | |
| Sol_140P1325Q0047.pdf | ||
| A06_Specs.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
PRICE SCHEDULE
Amistad NRA Tables, Shelters, Grills, and Accessories
| COST | QUANTITY | AMOUNT | |
| Picnic Tables | $0.00 | 45 | $0.00 |
| Concrete Mix | $0.00 | 45 | $0.00 |
| Concrete Patch | $0.00 | 10 | $0.00 |
| Barbeque Grills | $0.00 | 45 | $0.00 |
| Concrete Wedge Anchors | $0.00 | 100 | $0.00 |
| Hammer Drill Bit | $0.00 | 1 | $0.00 |
| Pre-Fabricated Metal Shelter | $0.00 | 7 | $0.00 |
| Concrete Grind Wheel | $0.00 | 10 | $0.00 |
| TOTAL | $0.00 | ||
| FOB Desitnation delivery shall be included in each line item |
Sheet2
File details come from the government source that posted it. Updated .