B08_Price_Schedule.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- GROUNDS MAINTENANCE BASE +2 OPTION YEARS
- Solicitation number
- 140P1324Q0102
About this file
This document is a pricing schedule template for a federal contract opportunity related to grounds maintenance services at Bandelier National Monument. The contract includes a base year and two option years, covering various work areas such as the entrance road, parking lot, stables, historic core, and native plant garden. Key requirements include vegetation removal, debris cleanup, shrub pruning, and installing a soaker hose water system. Pricing is provided for each work area, and the template includes line items for general requirements such as mobilization, safety plan, and disposal. The related federal contract opportunity is for a solicitation titled "GROUNDS MAINTENANCE BASE +2 OPTION YEARS" issued by the Department of the Interior National Park Service Intermountain Region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B03_Wage_D_2015-5443_rv_23_7-22-24.pdf | ||
| A04_PWS.pdf | ||
| Sol_140P1324Q0102.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BAND
| ESTIMATES |
| PMIS Project: BAND 322939 |
| Trim Vegetation in Historic District |
| Contract Line Item Number (CLIN) | BASE Schedule A CLIN Description | Quantity | Unit of Measure | Unit Price | Unit Sub-Total | CLIN Totoal | TOTALS |
| 1 | Entrance Road, Main Parking Lot | $ - 0 | |||||
| Clear leaves, needle debris, and vegetation from Entrance Road gutters, Manual sweeping of gravel/debris and leaf blowing. Hand pulling of grass clumps. (FALL) | LF | $ - 0 | |||||
| Retrieve log rounds, chip, and mulch parking lot island. One dump load | HR | $ - 0 | |||||
| Chip additional materials at gravel yard and mulch parking lot island. One dump load | CY | $ - 0 |
| 2 | Stables and Agoyo Lane | $ - 0 | ||
| Invasive plant and overgrowth removal (up to 2ft high) | SY | $ - 0 | ||
| Tree and shrub pruning and removal | EA | $ - 0 |
| 3 | Historic Core: Courtyards, Patios, Walkways, and Buildings | $ - 0 | ||
| Remove vegetation debris from specific planters | SF | $ - 0 | ||
| Remove sand/dirt from walkways | SF | $ - 0 | ||
| Weed whack edges courtyard islands | SF | $ - 0 | ||
| Remove 25% of perennial shrubs | EA | $ - 0 | ||
| Prune shrubs away from walkways | EA | $ - 0 | ||
| Remove other young trees within cabin courtyard | EA | $ - 0 |
| 4 | Historic Core Perimeter and Roofs: Defensible Space | $ - 0 | ||
| Manually remove vegetation debris. | SF | $ - 0 | ||
| Mow small forbs and grasses to a height of no less than six inches above the ground surface. Rake and dispose to landfill. | SF | $ - 0 | ||
| Remove 50% of perennial shrubs. | $ - 0 | |||
| Remove needles and vegetation debris from rooftop and canales/gutters of all buildings. | HR | $ - 0 |
| 5 | Native Plant Garden at Visitor Center | $ - 0 | ||
| Deliver and dig in soil amendments | CY | $ - 0 | ||
| Install soaker hose water system | LF | $ - 0 | ||
| Deliver and apply mulch | CY | $ - 0 |
| 6 | General Requirements | $ - 0 | |||
| Mobilization | 1 | LS | $ - 0 | ||
| Safety Plan | 1 | EA | $ - 0 | ||
| Disposal | 1 | LS | $ - 0 |
| Total BASE Schedule A (Bid Items 1 through 6) ------------------------------------ | $ - 0 |
| Contractor Mark Up ------------------------------------ | |
| Total BASE Schedule A + Mark Up ------------------------------------ | $ - 0 |
| Contract Line Item Number (CLIN) | OPTIONAL Schedule B CLIN Description | Quantity | Unit of Measure | Unit Price | Unit Sub-Total | CLIN Totoal | TOTALS |
| 7 | Option Year One - CLIN Strutcure Above | 1 | EA | $ - 0 | |||
| 8 | Option Year Two | ||||||
| 9 | |||||||
| 10 |
| Total OPTIONAL Schedule B (Bid Items 7 thru 10) ------------------------------------ | $ - 0 | |
| Contractor Mark Up (15%) ------------------------------------ | $ - 0 | |
| Total BASE Schedule A + OPTIONAL Schedule B ------------------------------------ | $ - 0 |
BLANK
| CONTRACT PRICE SCHEDULE | |||||
| Bandelier National Monument - Ground Maintenance Base Year Plust 2 Option Years | |||||
| Company Name: | |||||
| UEI: | |||||
| POC/Email/Phone: | |||||
| Contract Line Item Number (CLIN) | CLIN Description | Base Year | Option Year 1 | Option Year 2 | 6 Month Extension Based on Option Year 2 |
| 10 | Work Area 1: Entrance Road, Main Parking Lot | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 20 | Work Area 2: Stables and Agoyo Lane | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 30 | Work Area 3: Historic Core- Walkways and Courtyards | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 40 | Work Area 4: Historic Core- Perimeter and Roofs - Defensible Space | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 50 | Work Area 5: Native Plant Garden at Visitor Center | $ - 0 | NA | NA | NA |
| 60 | Install Soaker Hose Water System @ Work Area 5 | $ - 0 | NA | NA | NA |
| 70 | Soil Amendments supply only. Application shall be covered in specific Work Area | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 80 | Mulch | NA | $ - 0 | $ - 0 | $ - 0 |
| Total CLINS 10-80 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
File details come from the government source that posted it. Updated .