This document is a pricing schedule template for a federal contract opportunity related to grounds maintenance services at Bandelier National Monument. The contract includes a base year and two option years, covering various work areas such as the entrance road, parking lot, stables, historic core, and native plant garden. Key requirements include vegetation removal, debris cleanup, shrub pruning, and installing a soaker hose water system. Pricing is provided for each work area, and the template includes line items for general requirements such as mobilization, safety plan, and disposal. The related federal contract opportunity is for a solicitation titled "GROUNDS MAINTENANCE BASE +2 OPTION YEARS" issued by the Department of the Interior National Park Service Intermountain Region.
The file's text, extracted by GovTribe without its formatting.
BAND
ESTIMATES
PMIS Project: BAND 322939
Trim Vegetation in Historic District
Contract Line Item Number (CLIN)
BASE Schedule A CLIN Description
Quantity
Unit of Measure
Unit Price
Unit Sub-Total
CLIN Totoal
TOTALS
1
Entrance Road, Main Parking Lot
$ - 0
Clear leaves, needle debris, and vegetation from Entrance Road gutters, Manual sweeping of gravel/debris and leaf blowing. Hand pulling of grass clumps. (FALL)
LF
$ - 0
Retrieve log rounds, chip, and mulch parking lot island. One dump load
HR
$ - 0
Chip additional materials at gravel yard and mulch parking lot island. One dump load
CY
$ - 0
2
Stables and Agoyo Lane
$ - 0
Invasive plant and overgrowth removal (up to 2ft high)
SY
$ - 0
Tree and shrub pruning and removal
EA
$ - 0
3
Historic Core: Courtyards, Patios, Walkways, and Buildings
$ - 0
Remove vegetation debris from specific planters
SF
$ - 0
Remove sand/dirt from walkways
SF
$ - 0
Weed whack edges courtyard islands
SF
$ - 0
Remove 25% of perennial shrubs
EA
$ - 0
Prune shrubs away from walkways
EA
$ - 0
Remove other young trees within cabin courtyard
EA
$ - 0
4
Historic Core Perimeter and Roofs: Defensible Space
$ - 0
Manually remove vegetation debris.
SF
$ - 0
Mow small forbs and grasses to a height of no less than six inches above the ground surface. Rake and dispose to landfill.
SF
$ - 0
Remove 50% of perennial shrubs.
$ - 0
Remove needles and vegetation debris from rooftop and canales/gutters of all buildings.
HR
$ - 0
5
Native Plant Garden at Visitor Center
$ - 0
Deliver and dig in soil amendments
CY
$ - 0
Install soaker hose water system
LF
$ - 0
Deliver and apply mulch
CY
$ - 0
6
General Requirements
$ - 0
Mobilization
1
LS
$ - 0
Safety Plan
1
EA
$ - 0
Disposal
1
LS
$ - 0
Total BASE Schedule A (Bid Items 1 through 6) ------------------------------------
$ - 0
Contractor Mark Up ------------------------------------
Total BASE Schedule A + Mark Up ------------------------------------
$ - 0
Contract Line Item Number (CLIN)
OPTIONAL Schedule B CLIN Description
Quantity
Unit of Measure
Unit Price
Unit Sub-Total
CLIN Totoal
TOTALS
7
Option Year One - CLIN Strutcure Above
1
EA
$ - 0
8
Option Year Two
9
10
Total OPTIONAL Schedule B (Bid Items 7 thru 10) ------------------------------------
$ - 0
Contractor Mark Up (15%) ------------------------------------
$ - 0
Total BASE Schedule A + OPTIONAL Schedule B ------------------------------------
$ - 0
BLANK
CONTRACT PRICE SCHEDULE
Bandelier National Monument - Ground Maintenance Base Year Plust 2 Option Years
Company Name:
UEI:
POC/Email/Phone:
Contract Line Item Number (CLIN)
CLIN Description
Base Year
Option Year 1
Option Year 2
6 Month Extension Based on Option Year 2
10
Work Area 1: Entrance Road, Main Parking Lot
$ - 0
$ - 0
$ - 0
$ - 0
20
Work Area 2: Stables and Agoyo Lane
$ - 0
$ - 0
$ - 0
$ - 0
30
Work Area 3: Historic Core- Walkways and Courtyards
$ - 0
$ - 0
$ - 0
$ - 0
40
Work Area 4: Historic Core- Perimeter and Roofs - Defensible Space
$ - 0
$ - 0
$ - 0
$ - 0
50
Work Area 5: Native Plant Garden at Visitor Center
$ - 0
NA
NA
NA
60
Install Soaker Hose Water System @ Work Area 5
$ - 0
NA
NA
NA
70
Soil Amendments supply only. Application shall be covered in specific Work Area
$ - 0
$ - 0
$ - 0
$ - 0
80
Mulch
NA
$ - 0
$ - 0
$ - 0
Total CLINS 10-80
$ - 0
$ - 0
$ - 0
$ - 0