B08_-_Past_Performance_Questionnaire.pdf

PDF 231 KB Posted

Attached to
VA-CHN-SIDING REPLACEMENT-ADMIN BLDG AND Federal contract opportunity
Solicitation number
140FC225Q0047
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This document is a Past Performance Questionnaire used to evaluate a contractor's performance across multiple dimensions for a federal contract. The form is designed for a client to provide a comprehensive rating of a contractor's performance using a standardized set of criteria, including quality, schedule/timeliness, customer satisfaction, management/personnel, cost/financial management, safety/security, and general performance metrics. Ratings range from Outstanding (O) to Unsatisfactory (U), with detailed definitions provided for each rating level to ensure consistent and objective evaluation.

The questionnaire is specifically linked to Solicitation Number 140FC225Q0047 for a VA-CHN-SIDING REPLACEMENT project by the Department of the Interior Fish and Wildlife Service, involving siding replacement on the Bateman Visitor Center and Administration Building. The form requires detailed input from the client, covering aspects such as technical performance, adherence to schedules, responsiveness, management effectiveness, cost control, safety compliance, and overall project execution. It provides a structured mechanism for capturing nuanced feedback that can be used in future contract evaluations and source selection processes.

View the file

Other files for this federal contract opportunity

Other files attached to VA-CHN-SIDING REPLACEMENT-ADMIN BLDG AND, newest first.
File Type Posted
B03_-_Wage_Determination_-_VA20250007_-_Rev_03-28-2025_-_6.pdf PDF
Sol_140FC225Q0047.pdf PDF
B08_-_Request_for_Information.pdf PDF
B08_-_Statement_of_Work_-_CHN_Siding_Replacment_Final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name:

Address:

CAGE Code:

UEID Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Competitive Contract: __ Yes ___No Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Period of Performance:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable): Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: CO REQUESTS THAT THE CLIENT COMPLETE THIS QUESTIONNAIRE AND SUBMIT IT DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO THE CO WITH THEIR PROPOSAL.

CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO THE CO. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY

ANY AND ALL INFORMATION ON THIS FORM.

Solicitation No. / PR No.

RATING DEFINITION NOTE

(O) Outstanding Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Outstanding rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Outstanding rating. Also, there should have been NO significant weaknesses identified.

(G) Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts

b) Ability to meet quality standards specified for technical performance O G S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance O G S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

O G S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

O G S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract O G S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? O G S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

O G S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? O G S M U N

d) Overall customer satisfaction O G S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? O G S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort O G S M U N

c) Government Property Control O G S M U N

d) Knowledge/expertise demonstrated by contractor personnel O G S M U N

e) Utilization of Small Business concerns O G S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines O G S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes O G S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) O G S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)? O G S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client O G S M U N

O G S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

O G S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

O G S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements. O G S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

O G S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) O G S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor. O G S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

RATING DEFINITION NOTE
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluati...
CONTRACT INFORMATION Contractor to complete Blocks 14:
Prime Contractor: Off
Sub Contractor: Off
Joint Venture: Off
Other Explain: Off
3 Contract Information Contract Number DeliveryTask Order Number if applicable Contract Type Firm Fixed Price Cost Reimbursement Other Please specify Competitive Contract Yes No Contract Title Contract Location Award Date mmddyy Period of Performance Original Contract Price Award Amount Final Contract Price to include all modifications if applicable Explain Differences:
Firm Fixed Price: Off
Cost Reimbursement: Off
Other Please specify: Off
4 Project Description Complexity of Work High Med Routine How is this project relevant to project of submission Please provide details such as similar equipment requirements conditions etc:
High: Off
Med: Off
Routine: Off
CLIENT INFORMATION Client to complete Blocks 58:
5 Client Information Name Title Phone Number Email Address:
6 Describe the clients role in the project:
7 Date Questionnaire was completed mmddyy:
8 Clients Signature:
O Outstanding:
G Good:
S Satisfactory:
Performance meets minimum contractual requirements The contractual performance of the element or subelement contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory:
M Marginal:
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the GovernmentOwner:
U Unsatisfactory:
1 QUALITY:
a Quality of technical datareport preparation efforts:
O G S M U N2 SCHEDULETIMELINESS OF PERFORMANCE:
O G S M U N3 CUSTOMER SATISFACTION:
d Overall customer satisfaction:
O G S M U N4 MANAGEMENT PERSONNELLABOR:
c Government Property Control:
e Utilization of Small Business concerns:
O G S M U N5 COSTFINANCIAL MANAGEMENT:
Yes No6 SAFETYSECURITY:
O G S M U N7 GENERAL:
Solicitation Number: 140FC225Q0047