B08_-_NPS_CONG_248643_-_Project_Manual_BDF_REV_2024_0425.pdf
PDF 11 MB Posted
- Attached to
- CONG 248643 Replace Wilderness Boardwalk Sections Federal contract opportunity
- Solicitation number
- 140P2024R0054
About this file
This document is the Project Manual for the CONG 248643 Replace Wilderness Boardwalk Sections solicitation, which is a Request for Proposal (RFP) issued by the Department of the Interior National Park Service National Office.
The project entails the removal and replacement of the elevated and low floodplain boardwalk behind the Visitor Center, within Wilderness boundaries. The existing wooden boardwalk will be replaced with a more substantial material, and the new boardwalks will meet Architectural Barriers Act Accessibility Standards (ABAAS). The work must comply with the Wilderness Act. The solicitation number is 140P2024R0054, and the anticipated contract start date is in fiscal year 2024. No specific pricing terms, set asides, incumbent information, or award dates are provided in the document. This appears to be the complete project manual, which includes technical specifications, drawings, and other contractual requirements, but does not contain the full RFP document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2024_0606_Survey_from_NPS_CONG_248643_-_2-9_of_14_0003.pdf | ||
| B08_Solit_PSP_Vol_II_Solit_Attach_07_GenRefs_doc_0003.pdf | ||
| Sol_140P2024R0054_Amd_0003.pdf | ||
| Pre_bid_site_walk_RFI_-_Responses_-_Updated_6-10-24_0003.xlsx | XLSX spreadsheet | |
| CONG_248643_-_RFI_Response_0002.xlsx | XLSX spreadsheet | |
| Sol_140P2024R0054_Amd_0002.pdf | ||
| Sol_140P2024R0054_Amd_0001.pdf | ||
| Amendment_1_-_RFI_Questions_5-29-24_0001.xlsx | XLSX spreadsheet | |
| CONG_248643_-_Sign-in_Sheet_0001.JPG | JPG image | |
| B08_-_NPS_CONG_248643_-_DRAWINGS_100pct_stamped_SECTION_BDF_2024_0429.pdf | ||
| B08_Attachment_L-4D_Solit_PSP_Vol_I_PastPerf.docx | DOCX document | |
| Construction_Contract_Administration.docx | DOCX document | |
| B08_Attachment_L-4C_Solit_PSP_Vol_I_Exp.docx | DOCX document | |
| B03_-_Wage_Determination_SC20240028.pdf | ||
| Sol_140P2024R0054.pdf | ||
| B08_Attach_4_Subcontracting_Percentage_Worksheet.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONGAREE NATIONAL PARK
HOPKINS, SOUTH CAROLINA
REPLACE WILDERNESS BOARDWALK
SECTIONS B, D, AND F
CONG
PMIS Number: 248643
APRIL 25, 2024
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE (NPS)
DENVER SERVICE CENTER (DSC)
CONG 248643 000107
SEALS PAGE
ARCHITECT:
Elizabeth Corr, AIA
License # AR .9324
Divisions: 01-49 Sections Where indicated as prepared by other design professionals below
STRUCTURAL ENGINEER:
Christopher W. Moore, PE
License # 22003
Divisions: 06 & 31Sections where indicated.
12.05.2023
ELECTRICAL ENGINEER:
Maxwell Sim, PE
License # 39922 Division: 26 Sections where indicated.
Table of Contents (TOC) page 1 of 2
Table of Contents (TOC)
01 11 00 Summary of Work 01 26 01 Contract Modification Procedures 01 27 00 Definition of Contract Line Items – lists options 01 31 00 Project Management and Coordination 01 32 18 Construction Schedule 01 32 33 Photographic Documentation 01 33 23 Submittal Procedures 01 35 23 Safety Requirements 01 40 00 Quality Requirements 01 42 00 Reference Standards 01 50 00 Temporary Facilities and Controls 01 57 19.12 Noise and Acoustics Management 01 57 23 Temporary Storm Water Pollution Prevention (SWPP), Under-an-Acre Pollution Prevention (UPP) 01 67 00 Product Requirements 01 73 29 Cutting and Patching 01 73 40 Execution 01 74 19 Construction Waste Management and Disposal 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance (O&M) Data
02 41 16 Structural Demolition
05 73 30 Metal Mesh for Railings
06 10 63 Exterior Rough Carpentry 06 13 00 Heavy Timber Construction 06 13 01 Timber Boardwalk Framing
26 05 00 Common Work Results for Electrical 26 05 01 Electrical Demolition 26 05 02 Electrical Acceptance Tests 26 05 10 Electrical Submittals 26 05 11 Electrical Work Closeout 26 05 19 Low-Voltage Electrical Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 33 Raceway and Boxes for Electrical Systems 26 05 43 Underground Raceways for Electrical Systems 26 05 48 Vibration and Seismic Controls for Electrical Systems 26 05 53 Identification for Electrical Systems 26 24 00 Panelboards & Loadcenters 26 27 26 Wiring Devices 26 51 00 Lighting
31 66 15 Helical Pile Foundations
Table of Contents (TOC) page 2 of 2
Supporting Documents
Submittal List Template (01 33 23) Special Inspections (01 40 00) Closeout and Operation & Maintenance (O&M) Requirements Template & Sample (01 77 00, 01 78 23) Project Waste Management Plan Worksheet Sample (01 74 19)
Appendix Geotechnical Report HazMat Survey
Congaree - 248643 01 11 00 - 1
051121 SUMMARY OF WORK
SECTION 01 11 00 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes the following:
1. Work Covered by Contract Documents
2. Work Phases
3. Government-Furnished Materials
4. Contractor Use of Site
5. Public Use of Site
6. Occupancy Requirements for Buildings
7. Conduct of Operations
8. Work Restrictions
9. Special Construction Requirements
10. Soils Investigation Report
11. Additional Reports
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location: 100 National Park Road, Hopkins, South Carolina 29061. The boardwalks are located near the Harry Hampton Visitor Center and accessible from the main Park entrance off of Old Bluff Road.
B. The Work consists of:
1. This project will remove and replace the elevated and low floodplain boardwalks behind the Visitor Center. The boardwalk is within Wilderness boundaries and all work will comply with the Wilderness Act. The existing wooden boardwalk will be removed and replaced with more substantial material. New boardwalks will meet Architectural Barriers Act Accessibility Standards (ABAAS). The current boardwalk is located at an elevation that floods six to ten times a year. As a result, the surface is often slippery and uneven and does not meet current ABA and universal design standards.
2. The project will remove and replace Boardwalks B, D, & F as shown on the plans.
Approximate boardwalk lengths are below:
a. Boardwalk Section B: 2435 LF
1) Existing boardwalk transitions from an elevated boardwalk from boardwalk A/G to a low boardwalk at boardwalk C (See existing survey). Existing boardwalk to be removed complete, including wood column supports. New boardwalk to be built in the same or similar footprint.
b. Boardwalk Section D: 1100 LF
1) Boardwalk transitions from a low boardwalk from boardwalk C to an elevated boardwalk at boardwalk E (see existing survey). Existing boardwalk to be
Congaree - 248643 01 11 00 - 2 removed complete, including wood column supports. New boardwalk to be built in the same or similar footprint.
c. Boardwalk Section Weston Lake: 280 LF with 10'X10" gathering area at the end.
1) Boardwalk section is new and does not require demolition.
d. Boardwalk Section E Overlook
1) Boardwalk overlook to be removed complete & replaced. Existing boardwalk is elevated (See survey)
e. Boardwalk Section F: 306 LF
1) Existing low boardwalk (See existing survey). Existing boardwalk to be removed complete, including wood column supports. New boardwalk to be built in the same or similar footprint.
f. Boardwalk Section A
1) Existing boardwalk to remain. Scope includes adding lights to existing boardwalk.
C. Project will be constructed under a single prime contract.
1.3 WORK PHASES
A. As there are multiple sections of boardwalk being demolished and constructed, phasing will be utilized to access to Westin Lake & the Overlook remains open for visitors. The Work shall be conducted in phases. The order and schedule of the phases will be the responsibility of the contractor.
B. NPS anticipates no more than 2 boardwalk sections will be closed at one time. If at any time contractor exceeds this, Contractor shall notify NPS for approval.
C. Contractor shall provide a phasing plan for work on impacted boardwalks and integrate this plan into the schedule.
1.4 WORK UNDER OTHER CONTRACTS
A. General: Cooperate with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate Work of this Contract with work performed under separate contracts.
B. Concurrent Work: Government may award separate contract(s) for construction operations at Project site. Those operations will be conducted simultaneously with work under this Contract but are not anticipated to interfere with the Contract Work.
1.5 GOVERNMENT-FURNISHED MATERIALS
A. Government furnished materials are not anticipated.
Congaree - 248643 01 11 00 - 3
1.6 CONTRACTOR USE OF SITE
A. General: Contractor shall have limited use of site for construction operations. Limit use of premises to areas within the Construction limits indicated on drawings. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Limits: Confine constructions operations to Limit site disturbance to within 2 feet of the footprint of the boardwalks on each side. In no instances should existing trees, vegetation, wild life or other natural elements, not indicated in the contract documents, be disturbed unless prior approval is received by DSC, Congaree Park and the Contracting Officer.
B. Storage of Materials: Confine storage of materials to the designated construction areas only.
1. Stage Area 1 – 200’-0” x 18’-0”
2. Staging Area 2 – 160’-0” x 20’-0”
C. Parking: Confine Parking to NPS Parking Lot (limit to 7 parking spaces)
D. Stockpiling: Confine stockpiling to the same areas as storage.
E. Preservation of Natural Features:
1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
2. Provide temporary barriers to protect existing trees and plants and root zones.
3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with
Contracting Officer (CO) and remove agreed-on roots and branches that interfere with construction.
4. Do not fasten ropes, cables, or guys to existing trees.
5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
6. Swamp mats are required for all work at the low boardwalks in the swamp sections.
7. Any cut cypress knees equal to or exceeding 12 inches shall be returned to the park.
F. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government employees, and emergency vehicles at all times. Do not use for parking or storage of materials.
1. Schedule deliveries to minimize use of driveways and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
G. Construction Camp: Establishment of a camp within park will not be permitted.
H. Hauling Restrictions: Comply with legal load restrictions in hauling of materials. Load restrictions on park roads are identical to state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.
I. Bridge Restrictions: Identify jurisdictions, load restrictions, permit requirements, time and calendar restrictions as outlined.
Congaree - 248643 01 11 00 - 4
1.7 PUBLIC USE OF SITE
A. Contractor shall conduct his operations to ensure the least inconvenience to public. Boardwalk closures may be permitted, when required, upon specific approval of Contracting Officer for a maximum of 60 days.
1.8 OCCUPANCY REQUIRMENTS
A. Existing Boardwalks
1. Full Government Occupancy: Government will occupy the Park while the boardwalks are under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities which are not under construction. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Contracting Officer.
1.9 CONDUCT OF OPERATIONS
A. Contractor shall conduct his operations in conformance with rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by Park Superintendent.
B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed unless stated in the Work Restrictions below or without prior consent from the Contracting Officer. Submit requests 3 business/calendar days in advance of the work to the Contracting Officer for approval.
C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
1.10 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7a.m. to 5p.m., Monday through Friday, except when otherwise indicated.
1. Weekend Hours: Permitted with approval from Contracting Officer and the Park.
2. Early Morning Hours: Permitted with approval from Contracting Officer and the Park.
3. Hours for Notify the Contracting Officer at least 5 days in advance of all activities that create excessive noise.
4. Blackout Work Periods: Contractor schedule shall reflect all blackout periods.
a. No Contract work may be performed during Congaree’s Firefly Event period. Dates have yet to be set but anticipate 2 weeks between the beginning of May and beginning of June 2024. A similar blackout period will exist in subsequent years if work is ongoing past the end of 2024.
Congaree - 248643 01 11 00 - 5
b. To comply with the Migratory Bird Treaty Act of 1918, contractor will ensure that the nests of migratory birds are not damaged. Trees over 15' tall and woody branches will be removed outside of migratory bird nesting season (April 1 - September 1) and/or a visual inspection of the vegetation will be completed prior to removal.
c. The tricolored bat is a species proposed for listing under the Endangered Species Act that may be in the area. Trees over 15' tall and woody branches will be removed outside of bat pupping season (May 1 - July 31), and/or a visual inspection of the vegetation will be completed prior to removal.
B. Existing Utilities
1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.
2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify Contracting Officer not less than two business days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Contracting Officer’s written permission.
D. Nonsmoking Building/Tobacco Use/Vaping: Smoking is not permitted within the Park.
1.11 Work restrictions along boardwalk areas designated as Congaree Wilderness:
A. The General Contractor will be required to coordinate with NPS on minimizing the use of power tools and transportation with the Designated Wilderness.
B. The following is an excerpt from the Wilderness Minimum Requirements Analysis for Large Scale Replacement of the boardwalk in the Congaree Wilderness:
1. This alternative allows the use of both traditional and non-traditional tools to preform normal operations and maintenance, repair of damage to the boardwalk, and the management of trees/limbs in the boardwalk corridor (Boardwalk corridor: The boardwalk footprint, extending 3 feet to either side of the finished boardwalk width) that interfere with boardwalk operations and maintenance and repair. In addition, it includes non-motorized cart access to the site, designated staging areas within wilderness, movement of materials and debris on the boardwalk, along Sims Trail, and within the boardwalk corridor.
2. Although a high priority will be placed on the use of traditional tools when possible, this alternative allows for the routine use of non-motorized wheeled carts to transport tools and materials on the boardwalk and on Sims Trail, portable gas-powered electric generator (60dB maximum), both battery and electric operated power tools and chainsaws, and gas operated
Congaree - 248643 01 11 00 - 6 power tools and chainsaws in a limited capacity. Any continuous run tool will be turned off when not in use.
3. Risk Management and Timing: Repairs will be performed in a manner that will reduce closure time and minimize hazard exposure, in turn increasing visitor satisfaction while reducing risk and liability. Repair schedule will also consider times that least effect/disrupt visitors, wildlife, and/or other park operations.
4. Noise Pollution: Anytime power tools are to be used, the quietest tool suitable for the task will be used (Example; Jigsaw (98dB) rather than a Circular saw (110 dB). Under no circumstances will a generator operating above 60dB be used (Normal Conversation 60-65 dB).
5. Planning: Each task will make the maximum use of pre-planning to reduce the need for power tools within the Wilderness. For example; To the maximum extent possible, material will be pre-cut prior to entering the Wilderness.
1.12 SPECIAL CONSTRUCTION REQUIREMENTS
A. Project Website: A project website administered by NPS will be used for purposes of managing communication and documents during construction stage.
1. See Section 01 31 00 "Project Management and Coordination" for requirements on using Project Website.
1.13 SOILS INVESTIGATION REPORT
A. The report of Geotechnical Exploration – Congaree National Park – Additional Boardwalk Replacement prepared by S&ME is an appendix with this package.
B. In case of conflict between report and drawings or specifications, the drawings and specifications govern.
1.14 ADDITIONAL REPORTS
A. The existing survey data prepared by Parker Land Surveying, LLC is included in the Drawings.
B. Existing boardwalk hazmat sampling as an appendix to these specifications (Future report to be provided). Sampling & Report done by S&ME, 9/27/2023
C. In case of conflict between report and drawings or specifications, drawings and specifications govern.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 11 00
Congaree - 248643 01 26 01 - 1
012721 CONTRACT MODIFICATION PROCEDURES
SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section consists of administrative and procedural requirements for contract modifications.
1.2 DEFINITIONS AND ALLOWANCES
A. Home Office Overhead: Costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):
1. Rent
2. Utilities
3. Furnishings
4. Office equipment
5. Executive and management staff not exclusively assigned to the project
6. Support, accounting, and administrative staff
7. Preparation of cost proposals, estimating, and schedule analyses connected with
Modifications
8. Estimating and preconstruction services
9. Mortgage costs
10. Real estate and corporate taxes
11. Automobile maintenance and travel costs for home office personnel
12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.
13. Depreciation of equipment and other assets
14. Home office supplies (paper, staples, etc.)
15. Legal services
16. Accounting and data processing
17. Professional fees/registration
B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with preparation of modifications will not be allowed. Costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:
1. Project Manager (PM), Assistant Project Manager
2. Superintendent, Assistant Superintendent
3. Quality Control, Safety Officer, Environmental Manager, etc.
4. Engineers
5. Travel, lodging, and per diem (as established by Federal Travel Regulations)
6. Scheduling
Congaree - 248643 01 26 01 - 2
7. Field Office Trailers (Contractor & CMR) and associated temporary utilities
8. Field office supplies
a. Mailing and couriers
b. Reproduction costs
c. Storage
d. Phones
e. Computers
f. Copiers
9. Personal vehicles i.e. Superintendent Pickup trucks
C. General Requirements: Costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate.
The following items, if applicable, are considered allowable costs for calculating General Requirements:
1. Hoisting
2. Material handling
3. Temporary fencing
4. Port-a-lets
5. Trash removal, dumpsters
6. Barricades
7. Small tools
8. Safety supplies
9. Scaffolding
10. Daily cleaning
11. Traffic control
12. Temporary signage
13. Temporary power
D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on project site. Modification costs for salaried workers are only allowed within the structure of a 40-hour week and no overtime or holiday pay will be allowed.
1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:
a. Base Rate: The hourly rate paid directly to the worker
b. Labor Burden: Employer payments of all applicable burdens; includes insurance and taxes the business must pay on behalf of the worker to government entities and educational forums, such as:
1) Social Security
2) Medicare
3) Workers Compensation – Policy and company calculation to be made available.
4) Federal Unemployment Tax Act (FUTA) - Cap Rate and percentage to be proportionally allocated over one year.
5) State Unemployment Tax Act (SUTA) - Cap Rate and percentage to be proportionally allocated over one year.
Congaree - 248643 01 26 01 - 3
6) Union agreement costs - Other costs required under an enforceable collective bargaining agreement.
c. Fringe Benefits: Various non-wage compensations provided to employees such as:
1) Health Care Insurance Premiums
2) Cell Phone
3) Clothing
4) 401K and Pensions
5) Vehicle allowances
6) Gas allowance
7) Life insurance premiums
8) Disability insurance
9) Other Fringe Benefits required under an enforceable collective bargaining agreement
E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.
F. General Liability Insurance: An insurance policy that protects Contractor from claims resulting from bodily injury or property damage to a third party. Include as a separate line item within all modification proposals and provide a current insurance quote upon request.
G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees the Contractor will pay the labor and material costs incurred. Banks and Insurance companies charge a premium for individual project based on a sliding scale related to the size of the project.
Include as a separate line item in modification proposals and provide current company bonding rates upon request.
H. Builder’s Risk Insurance: Covers the contractor’s loss due to fire, high winds, or other natural forces. Not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.
1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS
A. General:
1. Proposal be received in the format and within the time frame specified in the Request for Proposal (RFP) letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.
2. Proposal shall be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed they are included in the hourly rate shown, or contractor is not requesting reimbursement. Contractor may utilize the government provided Contractor Estimate Form, or their own form, provided that it contains the same information and level of detail as the Government’s form.
http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank http://www.nps.gov/dscw/publicforms.htm#CP___PAGEID=396735|
Congaree - 248643 01 26 01 - 4
3. Requests for extensions of contract time as a result of change must be justified with a Time Impact Analysis (TIA). Refer to Section 01 32 16 "Construction Schedule", for time impact analysis requirements. TIA and associated costs shall be received with the proposal by the date shown within the Request for Proposal letter. Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving right for additional time and no time extension will be allowed.
4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer (CO) upon request.
5. Contractor shall review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.
6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.
B. Labor:
1. Contractor shall estimate cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing hours required for each craft directly engaged in modification work. Any work proposed requiring overtime work or premium pay shall be itemized separately. Rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, Federal Insurance Contributions Act (FICA), FUTA, and other direct costs resulting from Federal, State or local laws.
2. Itemize labor costs for equipment operators separate from equipment costs.
3. Labor cost for foremen shall only be costs for related work required for the modification.
C. Materials:
1. Estimated cost for materials shall include quotes from multiple sources. Material prices shall include applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.
2. No markup shall be applied to any material provided by NPS.
D. Equipment:
1. Equipment used for the project must be appropriately sized for work being performed.
2. Do not include costs for "miscellaneous tools and equipment", in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 shall be broken out separately.
3. Regardless of ownership, rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:
a. United States (U.S.) Army Corps of Engineers, Ownership and Operating Expense Schedule (use latest edition and applicable region)
b. Construction Blue Book
c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.
Congaree - 248643 01 26 01 - 5
4. Estimated equipment rates shall include operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires and tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per Federal Acquisition Regulation (FAR) 31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.
5. Estimate full rate for equipment only for duration that equipment will be utilized to accomplish work of the modification.
6. Standby unit rates used in accordance with paragraph 1.3, D, 2, above. If the U.S. Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then 1/2 of equipment costs minus any operating costs, major repair and overhaul will be accepted.
7. If equipment is in standby mode due solely to a documented NPS delay, established standby rate shall apply from the first day of the delay.
8. Equipment not used and on job site for up to five consecutive days may be classified at standby rates, provided the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work.
Equipment still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.
9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.
10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.
E. Establishment and Application of Overhead and Profit Percentages:
1. For contract modifications where Prime Contractor does not self-perform the work the maximum percentage shall be 3%.
2. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.
Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:
Overhead………….10% Profit………………7%
3. Total aggregate limit of markup (OH&P) for Contractor and Subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.
4. If Contractors form a partnership, partnership may only receive home office overhead and profit in same amount as an individual Contractor (refer to paragraph 1.3,E,1 above). It is the responsibility of the partners to decide on division of revenue.
5. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, overhead and profit mark-ups are required on net increases and deducted on net decreases.
6. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.
Congaree - 248643 01 26 01 - 6
PART 2 - PRODUCTS
PART 3 - EXECUTION
END OF SECTION 012601
Congaree - 248643
012721
01 27 00 - 1
DEFINITION OF CONTRACT LINE ITEMS
SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS
PART 1 - GENERAL
1.1 SUMMARY
A. Section explains in general, what is and is not included in a contract line item, and limits or cut-off points where one item ends and another begins.
B. If no contract line item exists for a portion of work, include costs in a related item.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEMS
A. Contract Line Item Number 0001: Demolition of Existing Boardwalk B.
1. This item consists of the removal of all elements of Boardwalk B.
2. Measurement for payment will per monthly progress and substantial completion.
3. Payment will be made at the contract sum price.
B. Contract Line Item Number 0002: Construction of raised Boardwalk B.
1. This item consists of all costs associated with the construction of Boardwalk B.
2. Measurement for payment will be per monthly progress and substantial completion.
3. Payment will be made at the contract lump sum price.
C. Contract Line Item Number 0003: Demolition of Existing Boardwalk D.
1. This item consists of the removal of all elements of Boardwalk D.
D. Contract Line Item Number 0004: Construction of low Boardwalk D.
1. This item consists of all costs associated with the construction of Boardwalk D.
E. Contract Line Item Number 0005: Option 1 – Demolition of Existing Boardwalk E Overlook.
1. This item consists of the removal of all elements of Boardwalk E Overlook.
Congaree - 248643
012721
01 27 00 - 2
DEFINITION OF CONTRACT LINE ITEMS
F. Contract Line Item Number 0006: Option 2 – Construction of Boardwalk E Overlook.
1. This item consists of all costs associated with the construction of Boardwalk E Overlook.
G. Contract Line Item Number 0007: Option 3 – Construction of Overlook off of Boardwalk
Section D.
1. This item consists of all costs associated with the construction of Boardwalk D Overlook.
H. Contract Line Item Number 0008: Option 4 – Lighting at Boardwalk Section A.
1. This item consists of all costs associated with installation of lighting at Boardwalk A.
I. Contract Line Item Number 0009: Option 5: Demolition of Existing Boardwalk F.
1. This item consists of the removal of all elements of Boardwalk F.
J. Contract Line Item Number 0010: Option 6: Construction of low Boardwalk F.
1. This item consists of all costs associated with the construction of Boardwalk F.
END OF SECTION 01 27 00
Congaree - 248643 01 31 00 - 1
012721 PROJECT MANAGEMENT AND COORDINATION
SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. Definitions
2. Construction Coordination
3. Submittals
4. Coordination Drawings
5. Requests for Information (RFIs)
6. NPS/DSC Project Website
7. Project Meetings
8. Environmental Coordination
B. Related Requirements:
1. Section 01 32 16 "Construction Schedule" for preparing and submitting Contractor’s construction schedule.
2. Section 01 73 40 "Execution" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
3. Section 01 77 00 "Closeout Procedures" for coordinating closeout of the Contract.
1.2 DEFINITIONS
A. Agency with Jurisdiction
1.3 CONSTRUCTION COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.
3. Make provisions to accommodate items scheduled for later installation.
4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of components, including mechanical and electrical.
http://www.nps.gov/dscw/definitionsdc_a.htm#awj
Congaree - 248643 01 31 00 - 2
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to:
1. Preparation of Contractor's Construction Schedule
2. Preparation of the Schedule of Values
3. Installation and removal of temporary facilities and controls
4. Delivery and processing of submittals
5. Progress meetings
6. Pre-installation conferences
7. Project closeout activities
D. Key Personnel: Qualifications paragraphs in this Article establish minimum qualification levels required:
1. Project Manager – Note: This shall be performed by the Prime Contractor.
a. Provide Project Manager with a minimum 10 years’ experience in construction of projects of similar size and complexity.
2. On-Site Superintendent – Note: This position cannot perform any of the Quality Control responsibilities and must be on-site when work is being performed.
a. Provide project superintendent with a minimum of 10 years’ experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of OSHA and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. Identify in the plan an alternate to serve in the event of the On-Site Superintendent’s absence. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.
1.4 SUBMITTALS
A. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.
1. Content: Project-specific information, drawn accurately to scale. Do not base Coordination Drawings on reproductions of Contract Documents or standard printed data. Include following information, as applicable:
a. Indicate functional and spatial relationships of components of architectural, structural, civil, and electrical systems.
b. Indicate dimensions shown on Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to Contracting Officer (CO) for resolution of such conflicts.
Congaree - 248643 01 31 00 - 3
c. Indicate space requirements for routine maintenance and anticipated replacement of components during the life of the installation.
d. Indicate required installation sequences.
2. Sheet Size: At least 8-1/2 by 11 inches (215 by 280 millimeters) but no larger than 30 by 40 inches (750 by 1000 millimeters).
3. Number of Copies: Submit two opaque copies of each submittal. Contracting Officer will return one copy.
4. Refer to individual Sections for Coordination Drawing requirements for Work in those Section
B. Coordination Drawing Organization: Organize coordination drawings as follows:
1. Floor Plans: Show architectural, structural, and electrical elements. Supplement plan drawings with section drawings where required to adequately represent the Work.
2. Electrical Work:
a. Runs of vertical and horizontal conduit 1-1/4 inches (32 millimeters) in diameter and larger.
b. Light fixture, exit light, and emergency battery pack.
c. Panel board, switch board, switchgear, transformer, busway, generator, and motor control center locations.
d. Location of pull boxes and junction boxes, dimensioned from column center lines.
3. Review: Contracting Officer will review coordination drawings to confirm Work is being coordinated; details of coordination are Contractor's responsibility. If Contracting Officer determines coordination drawings are not prepared in scope or detail, or are otherwise deficient, Contracting Officer will inform Contractor, who shall make changes and resubmit.
4. Coordination Drawing Prints: Prepare coordination drawing prints according to requirements in Section 01 33 23 "Submittal Procedures."
C. Coordination Digital Data Files: Prepare coordination digital data files according to:
1. File Preparation Format: Same digital data software program, version, and operating system as original Drawings.
2. File Submittal Format: Submit or post coordination drawing files using Portable Document Format (PDF) file format.
3. Contracting Officer will furnish Contractor one set of digital data files (AutoCad.dwg) of Drawings for use in preparing coordination digital data files.
a. Contracting Officer makes no representations as to accuracy or completeness of digital data files as they relate to Drawings.
b. Digital Data Software Program: Drawings are available in AutoCad.dwg.
D. Division 1 documents: The following items shall be submitted a minimum of one week prior to Preconstruction Conference. Contracting Officer will notify Contractor of tentative date for Pre- Construction Conference.
1. Letter designating Project Superintendent
Congaree - 248643 01 31 00 - 4
2. Construction Schedule
3. A Comprehensive Schedule of Values
4. Accident Prevention Plan
5. A List of Subcontractors for this project
6. Written statements from Subcontractors certifying compliance with applicable labor standard clauses.
7. Certificates of Insurance or SF1413 for Contactor and all Subcontractors
8. Waste Management Plan
9. Quality Control Plan
10. Temporary Storm Water Pollution Prevention Plan (SWPP or UPPP)
11. List of Required Construction Permits. Include the following information for each permit:
a. Name of Permit
b. Agency(ies) with Jurisdiction issuing the permit
c. Information required from Government to complete permit application
E. Provide items listed to Contracting Officer before Pre-Construction Conference. If all documents have not been received one week prior to scheduled Pre-Construction Conference date, conference may be cancelled, Notice to Proceed may not be issued, and Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.
1.5 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of Contract Documents, Contractor shall prepare and submit an RFI utilizing form created on NPS/DSC management software website.
1. Contracting Officer will not respond to RFIs submitted by other entities controlled by Contractor.
2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.
B. Content of RFI: Include detailed, legible description of item needing information or interpretation and the following:
1. RFI number, numbered sequentially
2. Date
3. RFI subject
4. Specification Section number and title and related paragraphs, as appropriate.
5. Drawing number and detail references, as appropriate.
6. Field dimensions and conditions, as appropriate.
7. Contractor's suggested resolution: If Contractor's suggested resolution impacts Contract
Time or Contract Sum, Contractor shall state impact in RFI.
8. Contractor's signature
9. Requested date for response
10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop
Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
Congaree - 248643 01 31 00 - 5
a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.
C. RFI Form: Complete RFI Form on NPS/DSC Project Website as follows:
1. Enter general information at the top of the form.
2. Under the "Action" section at the bottom of the form, select "Question" then select "CMR" in drop-down of "Send to" box.
3. Enter details of question and attach related documents.
4. Select "Submit Form" at bottom of page.
D. Contracting Officer’s Action: Contracting Officer will review each RFI, determine action required, and respond. Contracting Officer will determine critical nature of each RFI and issue response accordingly.
1. The following are not considered to be RFIs and will receive no action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for approval of Contractor's means and methods.
d. Requests for coordination information already indicated in Contract Documents.
e. Requests for adjustments in Contract Time or Contract Sum.
f. Requests for interpretation of Architect's actions on submittals.
g. Incomplete RFIs or inaccurately prepared RFIs.
2. Contracting Officer's action may include a request for additional information; time for response will date from time of receipt of additional information.
3. Contracting Officer's action on RFIs may result in need for a change to Contract Time or Contract Sum. All contract changes will be processed following terms and conditions of contract.
1.6 PROJECT WEB SITE
A. Use NPS/DSC management software website for communication throughout contract period on:
1. Project directory
2. Project correspondence
3. Meeting agendas and minutes
4. Contract modifications forms and logs
5. RFI form and processing
6. Task and issue management
7. Photo documentation
8. Baseline schedule, schedule updates and calendar management
9. Submittal form and processing
10. Payment coordination documentation
11. Drawing and specification document hosting, viewing, and updating
12. Online document collaboration
13. Reminder and tracking functions
14. Archiving functions
15. Notification of submittal and RFI statuses and current responsible party
Congaree - 248643 01 31 00 - 6
16. Permits and addendums
B. Some documents are not suitable to be shared using the NPS/DSC management software website.
Documents containing Personal Identifying Information (PII) (i.e. certified payrolls) shall not be shared using NPS/DSC management software website and shall be coordinated with Project team as appropriate.
C. Submit to Contracting Officer a list of employees who will need access to the website. Users will receive an invitation to register from Department of Interior (DOI). Once registered on DOI website, user will be given access to NPS/DSC management software website. For login procedures and other SharePoint information, refer to the Workflows website at http://www.nps.gov/dscw/precon_spproj.htm.
D. All users will be required to have the following software packages:
1. Internet Explorer version 7 or later.
2. Adobe Acrobat Professional (Pro) version 9 or later.
3. Project Management software: Project Team.
1.7 PROJECT MEETINGS
A. Preconstruction Conference: Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor. Meeting agenda will include the following as a minimum:
1. Roles & Responsibilities / Lines of Authority
2. Park rules and regulations
3. Jobsite Safety
4. Resolution of comments on required Division 1 documents
5. Coordination of Subcontractors
6. Labor law application
7. Modifications
8. Payments to Contractor
9. Payroll reports
10. Contract time
11. Liquidated damages
12. Contractor Performance Evaluation
13. Display of Hotline posters
14. Notice to proceed
15. Correspondence procedures
16. NPS/DSC Project website
17. Acceptance/rejection of work
18. Progress meetings
19. Submittal procedures
20. NPS Final Accessibility Inspection
21. Environmental requirements
22. As-constructed drawings/operation and maintenance (O&M) manuals.
23. Saturday, Sunday, holiday and night work.
24. Reference materials
25. Value engineering
26. Schedule of Values http://www.nps.gov/dscw/precon_spproj.htm
Congaree - 248643 01 31 00 - 7
B. Progress Meetings: Contracting Officer will schedule weekly meetings with Contractor. Design Team will attend progress meetings bi-weekly.
1. Attendees: In addition to Government Representatives, each Contractor, Subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented. Participants at meeting shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Meeting agenda will include:
a. Approval of minutes of previous meetings
b. Submittal status
c. Review of off-site fabrication and delivery schedules.
d. Requests for information (RFI) and other issues.
e. Modifications
f. Work in progress and projected.
1) Status of required inspections (Special Inspections, Accessibility, etc.)
g. Inspections of work in progress and projected (Special inspections, Accessibility, etc.)
h. Construction Schedule update (provide updated Critical Path Method (CPM)).
i. Status of Project Record Drawings and O&M manuals.
j. Other business relating to work.
k. Permit requirements
C. Preinstallation Conferences: Conduct at Project site before each construction activity that requires coordination with other construction.
1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend meeting. Advise Contracting Officer of scheduled meeting dates.
2. Agenda: Review progress of other construction activities and preparations for particular activity under consideration, including requirements for:
a. Contract Documents
b. Options
c. Related RFIs
d. Related Change Orders
e. Purchases
f. Deliveries
g. Submittals
h. Review of mockups
i. Possible conflicts
j. Compatibility requirements
k. Time schedules
l. Weather limitations
m. Manufacturer's written instructions
n. Warranty requirements
o. Compatibility of materials
p. Acceptability of substrates
Congaree - 248643 01 31 00 - 8
q. Temporary facilities and controls
r. Space and access limitations
s. Regulations of agency(ies) with jurisdiction
t. Testing and inspecting requirements
u. Installation procedures
v. Coordination with other work
w. Required performance results
x. Protection of adjacent work
y. Protection of construction and personnel
3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.
4. Reporting: Distribute minutes of meeting to each party present and to other parties requiring information.
5. Do not proceed with installation if conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of Work and reconvene conference at earliest feasible date.
1.8 ENVIRONMENTAL COORDINATION
A. Contractor’s Environmental Manager: Designate on-site party responsible for overseeing Contractor’s conformance to environmental goals for project and implementing procedures for environmental protection.
1. Qualifications: Minimum 3 years Construction experience on projects of similar size and scope; with environmental procedures similar to this project; familiarity with Environmental Management Systems (EMSs) such as International Organization for Standardization (ISO) 14001; familiar with environmental regulations applicable to construction operations.
2. Responsibilities: Responsibilities shall include:
a. Compliance with applicable Federal, State, and local environmental regulations, including maintaining required documentation.
b. Implementation of Waste Management Plan (WMP).
c. Implementation of…
This is the start of the file's text. The full file is on GovTribe.