B08_HoH ES_Materials Supply_SOW.pdf
PDF 622 KB Posted
- Attached to
- OLYM-HOH ENTRANCE STATION MATERIALS SUPP
- Solicitation number
- 140P8321Q0029
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_Combined Synopsis Solicitation 140P8321Q0029.pdf | ||
| B08_HoH ES_Materials Supply_Drawing Attachment.pdf | ||
| Sol_140P8321Q0029.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Supply & Service
Supply & Deliver Building Materials Heart of the Hills Entrance Station
PMIS 245378
FY2021
Developed By
Olympic National Park Facility Management 600 East Park Ave Port Angeles, WA
PMIS 245378 1 SCOPE OF SUPPLY & DELIVERY
PART 1 GENERAL
1.1 DESCRIPTION
In accordance with the terms and conditions of the Contract, the contractor shall supply the items and provide the services for Olympic National Park (OLYM) as described herein.
A. Project Title: SUPPLY AND DELIVER BUILDING MATERIALS TO HEART O’
THE HILLS ENTRANCE STATION.
B. Project Location: Hurricane Ridge Road, approximately 5 miles south of Port
Angeles, WA 98362.
1.2 BACKGROUND
A. Olympic National Park (ONP) is constructing three (3) new buildings to serve as entrance booths (kiosks) and an office to serve visitors entering ONP.
B. The Purpose of this contract is to supply and deliver building materials as needed in standard construction phases (framing, insulating/exterior envelope, roofing, etc.) for the three (3) buildings to the jobsite.
1.3 GOVERNMENT FURNISHED EQUIPMENT
A. No Equipment will be available for offloading materials from delivery truck(s).
Supplier shall furnish all equipment and appropriate operator to offload heavy and bulky items from delivery truck to approved location. OLYM may provide additional labor to assist with offloading, if available.
PART 2 SCOPE OF SUPPLIES
2.1 MATERIALS AND QUANTITIES
All materials listed below are brand name or approved equal. Refer to drawing attachment for building dimensions reference.
Fee Booths (Kiosks) Qty Multiplier Total Unit Description
FRAMING
1 2 2 EA 2x6 16' GC TREATED Hem/Fir 4 2 8 EA 2x6 20' GC TREATED Hem/Fir
PMIS 245378 2 SCOPE OF SUPPLY & DELIVERY
5 2 10 EA 2x6 16' Doug Fir PREM Kiln Dried 10 2 20 EA 2x6 18' Doug Fir PREM Kiln Dried 56 2 112 EA 2x6 104-5/8" Doug Fir STUD
1 2 2 EA 2x6 8' Doug Fir PREM Kiln Dried 3 2 6 EA 2x6 12' Doug Fir PREM Kiln Dried
18 2 36 EA 4x10 Zip R-9 Panel 2 2 4 EA 2.5" x 4'x8' XPS Foam 4 2 8 EA Zip Tape (6" x 75') 1 2 2 EA Zip Tape (12" x 50') 2 2 4 EA Zip Stretch Tape (6" x 75')
0.25 2 0.5 CASE Zip Liquid Flash 1 2 2 EA Zip Tape Roller with "Z"- Impression Marking 2 2 4 EA 5-1/2" x 50' Foam Sill Seal
ROOF
6 2 12 EA 2x6 8' Doug Fir PREM Kiln Dried 4 2 8 EA 2x6 12' Doug Fir PREM Kiln Dried 2 2 4 EA 2x4 14' Doug Fir PREM Kiln Dried
20 2 40 EA 4x8 Zip 5/8" Panel 2 2 4 EA 323 Sq.Ft. Roll Delta Trella with supplied gasketed fasteners 1 2 2 EA 225 Sq.Ft. Roll Grace Ice & Water Shield SAM
50 2 100 EA 12" Snaploc Panels 26ga - 103" long - "Weathered Copper" 3 2 6 EA 7-1/4" Ridge Cap 26ga - 10ft long -hemmed edges - Weathered Copper 3 2 6 EA Drip Edge - 26ga - 10 ft long - bottom edge hemmed - Weathered Copper 4 2 8 EA Rake Trim - 26ga - 10ft long - bottom edge hemmed - Weathered Copper
WINDOWS & TRIM
2 2 4 EA
ALUM Clad Wood - 60" x 48" Slider (1-XO, 1-OX) Low-E + Insul. Safety Glass Dark Bronze Standard Jamb See Attachment for Specifications
1 2 2 EA
ALUM Clad Wood - 64" x 48" 2-LITE FIXED Low-E + Insul. Safety Glass Dark Bronze Standard Jamb See Attachment for Specifications
8 2 16 EA 18ga 8" x 1/2" Drip Cap - Head flashing DARK BRONZE 150 2 300 LF 1x4 S4S CVG Doug Fir 20 2 40 LF 1x8 S4S CVG Doug Fir 30 2 60 LF 1x6 S4S CVG Doug Fir
1 2 2 Box 1/2" Foam Backer Rod
0.25 2 0.5 CASE Prosoco Air Dam
DOORS & HARDWARE
PMIS 245378 3 SCOPE OF SUPPLY & DELIVERY
1 2 2 EA
3'-0" x 6'-8" EXT IHM RH Outswing
FLUSH
8-5/8" HM Jamb
1 2 2 EA 18ga 8" x 1/2" Drip Cap - Head flashing DARK BRONZE 1 2 2 EA ORCA HARDWARE BHDC1958RA/PA DURO SNB Dark Bronze 1 2 2 EA PEMKO 276A - 36" Mill Finish Aluminum Threshold 3 2 6 EA Stainless Steel 4 hole NRP/Security Hinge
1 2 2 EA BEST - LOCKSET 9K3-7AB15D L/C S3 626
2 2 4 EA 18ga Stainless Steel 34" x 34" Armor Kick Plate
INSULATION
5 2 10 Bags Rockwool ComfortBatt R23 for 16" OC Wood Studs 5 2 10 Bags Rockwool ComfortBatt R30 for 24" OC Wood Studs 3 2 6 Bags Rockwool ComfortBatt R15 for 24" OC Wood Studs
0.5 2 1 EA Roll 10mil Visqueen/Vapor Barrier
EXTERIOR SIDING & TRIM
6 2 12 EA 4x4 8' TREATED Hem/Fir
1 2 2 BOX 2" x 0.093" 304 Ring Shank Siding Nails Collated 3 2 6 EA 3/8" x 4' x 8' Treated Plywood (for 2" x 84" furring strips)
0.5 2 1 CASE MasterSeal NP-1 Special Bronze 50 2 100 LF 18ga 2"x2"x2" Dark Bronze Z-Flashing 50 2 100 LF Galvanized weep screed 25 2 50 EA 80" Bag Type S Mortar 10 2 20 LF 2"x2"x0.125" Galvanized Steel Angle Iron
0.5 2 1 EA #10 x 4" Exterior Coated Screws BOX 11 2 22 EA Galvanized Metal Lathe 30" x 8' ASTM C847-18 60 2 120 LF 18ga 1-1/2" x 1-1/2" Reverse Drip Edge Dark Bronze
0.5 2 1 BOX 1-1/4" Plastic Stucco Washers
1 2 2 EA Acrylic Bonding Admixture - 5 GAL
0.5 2 1 EA 250 PC FastenMaster Headlok 5-1/2" Structural Screws
1.5 2 3 EA 3.3' x 50' Roll Delta Stucco and Stone
Office Building Qty Unit Description
EXT FRAMING
7 EA 2x6 16' GC TREATED Hem/Fir
30 EA 2x6 16' Doug Fir PREM Kiln Dried 108 EA 2x6 104-5/8" Doug Fir STUD
1 EA 2x6 8' Doug Fir PREM Kiln Dried 5 EA 2x6 10' Doug Fir PREM Kiln Dried 1 EA 2x6 14' Doug Fir PREM Kiln Dried
26 EA 4x10 Zip R-9 Panel
PMIS 245378 4 SCOPE OF SUPPLY & DELIVERY
2 EA 2.5" x 4'x8' XPS Foam 5 EA Zip Tape (6" x 75') 4 EA Zip Tape (12" x 50') 4 EA Zip Stretch Tape (6" x 75')
0.5 EA Zip Liquid Flash CASE
2 EA Zip Tape Roller with "Z"- Impression Marking 2 EA 5-1/2" x 50' Foam Sill Seal
INT FRAMING
1 EA 2x6 8' GC TREATED Hem/Fir 1 EA 2x6 14' Doug Fir PREM Kiln Dried 4 EA 2x6 104-5/8" Doug Fir STUD 4 EA 2x6 8' Doug Fir PREM Kiln Dried
65 EA 2x4 20' GC TREATED Hem/Fir 18 EA 2x4 16' Doug Fir PREM Kiln Dried 65 EA 2x4 104-5/8" Doug Fir STUD
ENTRY FRAMING
40 LF 8x8 Doug Fir KD
2 EA SIMPSON H6 Tie 4 EA SIMPSON OT Tie
12 EA 1/2-13x8" Zinc Hex Bolts 12 EA 1/2"-13 Zinc Nuts 14 EA 1x8 8' Nickel Gap T&G KD
ROOF
10 EA 2x4 8' Doug Fir PREM Kiln Dried
2 EA 2x6 16' Doug Fir PREM Kiln Dried 4 EA 2x4 14' Doug Fir PREM Kiln Dried
34 EA 4x8 Zip 5/8" Panel 4 EA 323 Sq. Ft Roll Delta Trela with supplied gasketed nails 3 EA 225 Sq. Ft. Roll Grace Ice & Water Shield SAM
40 EA SIMPSON H8
2 EA SIMPSON A34
12 EA SIMPSON H2.5A
83 EA 12" Snaploc Panels - 145" long - Weathered Copper (Main Roof) 15 EA 12" Snaploc Panels - 93" Long - Weathered Copper (Gable Entry)
6 EA 7-1/4" Ridge Cap 26ga - 10ft long -hemmed edges - Weathered Copper 8 EA Drip Edge - 26ga - 10 ft long - bottom edge hemmed - Weathered Copper
12 EA Rake Trim - 26ga - 10ft long - bottom edge hemmed - Weathered Copper 4 EA Valley Pan - 26ga - 10ft long - Weathered Copper
WINDOWS & TRIM
PMIS 245378 5 SCOPE OF SUPPLY & DELIVERY
4 EA
ALUM Clad Wood - 48" x 48" 2-LITE FIXED Low-E + Insul. Safety Glass Dark Bronze Standard Jamb See Attachment for Specifications
2 EA
ALUM Clad Wood - 72" x 48" 2-LITE FIXED Low-E + Insul. Safety Glass Dark Bronze Standard Jamb See Attachment for Specifications
1 EA
ALUM Clad Wood - 48" x 36" 2-LITE FIXED Low-E EXTERIOR + Insul. Safety Glass OBSCURE/PRIVACY Dark Bronze Standard Jamb See Attachment for Specifications
400 LF 18ga 8" x 1/2" Drip Cap - Head flashing DARK BRONZE 276 LF 1x4 S4S CVG Doug Fir 50 LF 1x6 S4S CVG Doug Fir
3 BOX 1/2" Foam Backer Rod
0.5 CASE Prosoco Air Dam
DOORS & HARDWARE
1 EA
3'-0" x 6'-8" EXT IHM RH Outswing
FLUSH
8-5/8" HM Jamb
1 EA ORCA HARDWARE BHDC1958RA/PA DURO SNB Dark Bronze
1 EA PEMKO 276A - 36" Mill Finish Aluminum Threshold
1 EA 18ga 8" x 1/2" Drip Cap - Head flashing DARK BRONZE
3 EA 4"x 4" Stainless Hinge NRP/Security
1 EA BEST - LOCKSET 9K3-7AB15D L/C S3 626
2 EA 18ga Stainless Steel 34" x 34" Armor Kick Plate
1 EA Concave Wall Stop
1 EA Smoke Seal Weatherstrip 24'
1 EA
3'-0" x 6'-8" HM LH
NARROW LITE - ISG
4-3/4" HM Jamb
3 EA 4"x 4" Stainless Hinge
1 EA BEST - LOCKSET 9K3-7AB15D L/C S3 626
1 EA Concave Wall Stop
1 EA
3'-0" x 6'-8" HM LH
FLUSH
4-3/4" HM Jamb
3 EA 4"x 4" Stainless Hinge
1 EA BEST - LOCKSET 9K3-7AB15D L/C S3 626
1 EA Concave Wall Stop
PMIS 245378 6 SCOPE OF SUPPLY & DELIVERY
1 EA
3'-0" x 6'-8" HM RH
FLUSH
6-3/4" HM Jamb
3 EA 4"x 4" Stainless Hinge
1 EA BEST - LOCKSET 9K3-7AB15D L/C S3 626
1 EA Concave Wall Stop
2 EA
2'-0" x 6'-8" HM DH RH ACTIVE
FLUSH
4-3/4" HM Jamb
6 EA 4"x 4" Stainless Hinge
1 EA BEST - LOCKSET 9K3-7AB15D L/C S3 626
2 EA Stainless Flush Hand Bolts 2 EA Concave Wall Stop 1 EA Ives SR64 Silencer BAG QTY 100
INSULATION
15 EA Rockwool ComfortBatt R23 for 16" OC Wood Studs
6 EA Rockwool Safe'N'Sound 3" for 16" OC Wood Studs 17 EA Rockwool ComfortBatt R30 for 24" OC Wood Studs
9 EA Rockwool ComfortBatt R15 for 24" OC Wood Studs 1 EA Roll 10mil Visqueen/Vapor Barrier
EXTERIOR SIDING & TRIM
164 EA LP SmartSide 38 Series 8" Cedar lap siding PRIMED 12 EA LP SmartSide 5/4" x 4" Outside Corner Cedar Texture Trim PRIMED
7 EA LP Smartside 540 Series 5/4" x 4" x 16' Cedar Texture Trim PRIMED 4 EA LP Smartside 540 Series 5/4" x 6" x 16' Cedar Texture Trim PRIMED 9 EA LP Smartside 38 Series 24"x 16' Cedar Texture Vented Soffit PRIMED 8 EA LP Smartside 38 Series 24" x 16' Cedar Texture Non Vented Soffit PRIMED
10 EA 4x4 8' TREATED Hem/Fir 2 BOX 2" x 0.093" 304 Ring Shank Siding Nails Collated 5 EA 3/8" x 4' x 8' Treated Plywood 1 CASE MasterSeal NP-1 Special Bronze
100 LF 18ga 2"x2"x2" Dark Bronze Z-Flashing 100 LF Galvanized weep screed
2 EA #10 x 4" Exterior Coated Screws BOX 40 LF 2"x2"x0.125" Galvanized Steel Angle Iron 50 EA 80" Bag Type S Mortar 26 EA Galvanized Metal Lathe 30" x 8' ASTM C847-18
100 LF 1-1/2" x 1-1/2" Reverse Drip Edge Dark Bronze 1 BOX 1-1/4" Plastic Stucco Washers 3 EA Acrylic Bonding Admixture - 5 GAL 2 EA 250 PC FastenMaster Headlok 5-1/2" Structural Screws 2 EA 3.3' x 50' Roll Delta Stucco and Stone
PMIS 245378 7 SCOPE OF SUPPLY & DELIVERY
2.2 Scope of Services
A. Supply all materials and their respective quantities to the location listed in Part 1, including transportation and necessary equipment, operator(s) and labor to offload.
2.3 SUBMITTALS
A. Provide complete material list prior to any deliveries and individual lists prior to each delivery.
2.4 REGULATIONS
A. Contractor shall comply with all DOT, state and local regulations and guidelines.
2.5 WARRANTY
A. The contractor shall provide all materials, above, free of defects or damage.
Materials will be inspected as they are offloaded, by OLYM. Any unacceptable defect or damaged item shall be replaced by the contractor at no additional cost to the government.
2.6 PERIOD OF PERFORMANCE
A. The period of performance is expected between June 1, 2021 and October 29, 2021.
B. Point of Contact for Delivery Scheduling: Dave Weaver, Trades Crew Supervisor
(360) 461-2695
| 2.1 MATERIALS AND QUANTITIES |
| All materials listed below are brand name or approved equal. Refer to drawing attachment for building dimensions reference. |
| 2.2 Scope of Services |
| A. Supply all materials and their respective quantities to the location listed in Part 1, including transportation and necessary equipment, operator(s) and labor to offload. |
| 2.3 SUBMITTALS |
| A. Provide complete material list prior to any deliveries and individual lists prior to each delivery. |
| 2.4 REGULATIONS |
| A. Contractor shall comply with all DOT, state and local regulations and guidelines. |
| 2.5 WARRANTY |
| A. The contractor shall provide all materials, above, free of defects or damage. Materials will be inspected as they are offloaded, by OLYM. Any unacceptable defect or damaged item shall be replaced by the contractor at no additional cost to the gove... |
| 2.6 PERIOD OF PERFORMANCE |
| A. The period of performance is expected between June 1, 2021 and October 29, 2021. |
| B. Point of Contact for Delivery Scheduling: Dave Weaver, Trades Crew Supervisor (360) 461-2695 |