B08_-_Gravel_Statement_of_Work_2026.docx

DOCX document 15 KB Posted

Attached to
NY MONTEZUMA NWR BULK GRAVEL BPA
Solicitation number
140FS326Q0053
Issued by

About this file

This is a Statement of Work (SOW) for the supply and delivery of #2 crusher run gravel to support maintenance operations at Montezuma National Wildlife Refuge in Seneca Falls, New York. The U.S. Fish and Wildlife Service, operating under the Department of the Interior, requires contractor-supplied gravel for routine annual maintenance of the refuge's 3.5-mile Wildlife Drive, which serves as the primary roadway through the facility, as well as for enhancing secondary access roads and parking areas throughout the refuge.

The contractor shall provide all crusher run gravel delivery on an as-needed basis during regular business hours from 7:00 a.m. to 5:30 p.m., Monday through Friday, excluding recognized federal holidays. The contractor is responsible for supplying all labor, including CDL-certified drivers, transport vehicles, and all required vehicle permits. This requirement is structured as a Blanket Purchase Agreement (BPA) with a performance period spanning five years from May 1, 2026, through April 30, 2031, identified under solicitation number 140FS326Q0053.

View the file

Other files

File Type Posted
Sol_140FS326Q0053.pdf PDF
B08_-_Pricing_Sheet_update_2026.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 – Statement of Work (SOW)

Supply and Delivery of #2 crusher run gravel for the Montezuma National Wildlife Refuge.

1.0 Background

The U.S. Fish and Wildlife Service Montezuma National Wildlife Refuge (Refuge) located at 3395 US Route 20 East, Seneca Falls, NY 13148 has a 3.5 mile Wildlife Drive that is the main roadway through the Refuge. The gravel is needed for normal annual maintenance of the Wildlife Drive as well as enhancing other access roads and parking areas on the refuge.

2.0 Scope

The Contractor shall deliver to the Refuge #2 Crusher Run gravel on an as-needed basis. The Contractor shall supply and deliver the crusher run gravel and supply all labor including CDL drivers, transport vehicles, and vehicle permits as may be required.

3.0 Period of Performance

The Performance Period of this BPA is 05/01/2026-04/30/2031.

3.1 Hours of Operations

Delivery shall be during regular business hours which are as 7:00 a.m. to 5:30 p.m. Monday thru Friday except recognized Federal holidays.

File details come from the government source that posted it. Updated .