B08_-_Gravel_SOW_Tennessee_NWR.pdf

PDF 110 KB Posted

Attached to
TN-TN NWR-GRAVEL
Solicitation number
140FS326Q0099
Issued by

About this file

This is a Statement of Work (SOW) for supply and delivery of Grade D base (33c) crusher run limestone gravel to the U.S. Fish and Wildlife Service Tennessee National Wildlife Refuge, Duck River Unit near New Johnsonville, Tennessee.

The contractor is required to supply and deliver approximately 7,650 tons of crushed limestone gravel for levee repair work damaged by recent flood events. All material must be delivered between August 1 and November 30, 2026, during regular business hours of 7:00 a.m. to 4:30 p.m., Monday through Friday, excluding recognized federal holidays. The contractor shall supply all labor necessary to deliver the material and perform tail gate spreading at the direction of refuge staff on site during delivery. Later hours and weekend deliveries may be permitted with prior coordination with refuge staff. The performance period runs from August 1, 2026 through November 30, 2026.

View the file

Other files

File Type Posted
Past_Performance_Survey.docx DOCX document
Sol_140FS326Q0099.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Supply and delivery of Grade D base (33c) crusher run limestone gravel for Tennessee National Wildlife Refuge

1.0 Background

The U.S. Fish and Wildlife Service Tennessee National Wildlife Refuge, Duck River Unit located near New Johnsonville, TN has a levee repair project at the end of Refuge Lane Road near the Tennessee River that will receive repairs in 2026. The Refuge is in the process of repairing severely damaged levees from recent flood events in order to keep these areas accessible for management operations.

2.0 Scope

The Refuge expects to use approximately 7,650 tons of crushed limestone gravel to repair these areas. The Contractor shall deliver these materials to the refuge when work is scheduled to occur between August 1 and November 30, 2026. The Contractor shall supply and deliver this aggregate material and supply all labor to deliver the material which is to be tail gate spread at the direction of the refuge staff on site at the time of delivery.

3.0 Period of Performance

The Performance Period of this contract is August 1, 2026 through November 30, 2026.

Material is expected to be delivered from 7:00 AM through 4:30 PM. Later hours and weekends may be permitted with prior coordination with refuge staff on delivery.

3.1 Hours of Operations

Delivery shall be during regular business hours which are as 7:00 a.m. to 4:30 p.m. Monday thru Friday except recognized Federal holidays. Later hours and weekends may be permitted with prior coordination with refuge staff on delivery.

File details come from the government source that posted it. Updated .