B08 - Exhibit J - BDU-56B CDRLs_FINAL.pdf
PDF 2 MB Posted
- Attached to
- MK80 Series General Purpose Bomb Bodies
- Solicitation number
- W519TC-23-R-0008
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Designed using Perform Pro, WHS/DIOR, Aug 96
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP ___________ TM ___________ OTHER ________________________
F. CONTRACTORD. SYSTEM/ITEM
BDU-56/B BOMB BODY ASSY
E. CONTRACT/PR NO.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
OPERATIONS SECURITY (OPSEC) PLAN
6. REQUIRING OFFICE4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80934,Rev C
5. CONTRACT REFERENCE
SECTION H, H0001 AMJM-OPP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ONE/R ASREQ (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A ASREQ (SEE 16) Reg Repro
CCRI-AMM 0 1 0 16. REMARKS
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED
TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS
ONLY: EXPORT CONTROLLED: 13 DEC 2021. OTHER REQUESTS
SHALL BE REFERRED TO PMA-201, NAS PATUXENT RIVER,
MARYLAND.
BLK 10: GOVERNMENT REQUIRES 10 CALENDAR DAYS FOR
REVIEW AND APPROVAL. IF REVISIONS ARE REQUIRED, RESUBMIT
10 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT
COMMENTS.
BLK 12: CONTRACTOR SHALL SUBMIT OPSEC PLAN 30 CALENDAR
DAYS AFTER THE CONTRACTING OFFICER PROVIDES THE LIST OF
KNOWN CRITICAL INFORMATION (CI)/THREAT INFORMATION.
BLK 13: ANNUAL SELF-ASSESSMENT AND CHECKLIST ARE DUE ON
THE ANNIVERSARY OF THE CONTRACT AWARD DATE.
BLK 14: SUBMIT IN ACCORDANCE WITH SECTION J, ATTACHMENT
0003, VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/), IN ADDITION TO usarmy.ria.jmc.mbx.opsec-fd@army.mil.
SFAE-AA-JB 0 1 0
DCMA/MCWB (QAR) 0 1 0
15. TOTAL 0 3 0
H. DATE I. APPROVED BY J. DATEG. PREPARED BY
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages
MGMT
J015 N/A
N/A julie.a.gregory Highlight julie.a.gregory Highlight
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
QA CDRL Distribution block - IPT members list Distribution with specific contact information will be provided at Post Award
PQM – Product Quality Manager
PCO – Procuring Contracting Officer
CS – Contract Specialist
QAR – Quality Assurance Representative
PO or PM – Project Officer or Project Manager
AQE – Army Quality Engineer
APO - Army Lead Engineer (Project Officer)
DA – Design Agent (NAVSEA)
PL – Project Lead (NAVAIR)
NQA – Navy Quality Assurance
ME – Material Engineer (NAVAIR)
PE – Program Engineer (Air Force)
AEA – Acquisition Engineering Agent (NAVSEA)
GE – Gage Engineer
Production Manager, JMC - Production Manager, Joint Munitions Command
MCEA – Marine Corp Engineering Activity
CDM – Configuration/Data Management (NAVAIR)
WARP - Worldwide Ammunition-Data Repository Program
SAFE - Safe Access File Exchange
FOR GOVERNMENT PERSONNEL FOR THE CONTRACTOR
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM -
Technical Manual; Other - other category of data, such as
"Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Signature of preparer of
CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the
Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items
12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.
The estimated data prices shall not include any amount for rights in data. The
Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423 (BACK)
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the
Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form
1423.
INSTRUCTIONS FOR COMPLETING DD FORM 1423
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form
1423.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the
Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD
Form 1423 at no cost.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the
Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
of
| Distro List |
| Instructions |
| number: |
| TDP: |
| TM: |
| E CONTRACTPR NO: |
| F CONTRACTOR: |
| 17: |
| 18: |
| H DATE: |
| Draft15 TOTAL: 0 |
| Repro15 TOTAL: 0 |
| J DATE: |
| A0(CDRL#) SPC: |
| SPC OTHER: MGMT |
| SPC CDRL #: J002 |
| SPC DID: DI-MGMT-80004, Rev A |
| SPC DATA Item: MANAGEMENT PLAN |
| SPC Subtitle: PROCESS CONTROL PLAN (PCP) |
| SPC Submission: 90DAC |
| SPC N/A: N/A |
| SPC Sub: ASREQ |
| SPC Remarks: BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY: EXPORT CONTROLLED: 13 DEC 2021. OTHER REQUESTS SHALL BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND. |
BLK 12: THE CONTRACTOR SHALL SUBMIT INITIAL PCP NO LATER THAN 90 CALENDAR DAYS AFTER CONTRACT AWARD. THE GOVERNMENT WILL RESPOND WITHIN 30 CALENDAR DAYS OF INITIAL SUBMISSION. IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO GENERATE THEM AND THE GOVERNMENT SHALL HAVE 15 CALENDAR DAYS TO REVIEW AND RESPOND TO THEM. THE PCP SHALL BE APPROVED PRIOR TO THE FIRST ARTICLE OR START OF PRODUCTION IF A FIRST ARTICLE IS NOT REQUIRED. DISPOSITION OF THE PCCI SUBMISSION WILL BE PROVIDED THROUGH THE PROCURING CONTRACTING OFFICER.
BLK 13: IF CONTRACTOR REVISES A PREVIOUSLY GOVERNMENT ACCEPTED PCP, THE REVISED PCP MUST BE SUBMITTED TO THE GOVERNMENT FOR ACCEPTANCE BEFORE IT IS RELEASED FOR USE. THE GOVERNMENT WILL RESPOND WITHIN 15 WORKING DAYS.
BLK 14: SUBMIT IN ACCORDANCE WITH SECTION J, ATTACHMENT 0003, VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
WHEN SENDING BY EMAIL, THE EMAIL SUBJECT LINE SHALL INCLUDE THE DATA ITEM NO., TITLE OF DATA ITEM AND SUBTITLE. THIS INFORMATION IS FOUND IN BLOCKS 1, 2 AND 3
OF THE CDRL.
**A PCCI Review Guide is available to assist Contractors on the DEVCOM Armaments Center website (https://ac.ccdc.army.mil/organizations/QESA/) in the application of the PCCI Clause. The PCCI Review Guide's content, in its entirety, is provided solely for REFERENCE and GUIDANCE PURPOSES ONLY- it is not, nor is it intended to be, contractually binding. Accordingly, the information contained within the PCCI Review Guide is expressly not, nor shall it be construed to be, incorporated either directly or by reference into the terms of the PCCI clause itself nor into the terms and conditions of any underlying contract which contains the PCCI clause.
| MSE OTHER: QCIC |
| MSE CDRL #: J003 |
| MSE TITLE OF DATA ITEM: Measurement System Evaluation (MSE) – Measurement and Inspection Equipment System Design Documentation for Acceptance Inspection Equipment |
| MSE SUBTITLE: Measurement System Evaluation/Acceptance Inspection Equipment (MSE/AIE) |
| MSE Authority: DI-QCIC-81960, Notice 1 |
| MSE CONTRACT REFERENCE: Section E, E0005 |
| MSE DD 250: LT |
| MSE FREQUENCY: ONE/R |
| MSE DATE OF FIRST SUBMISSION: 150DAC |
| MSE DATE OF SUBSEQUENT SUBMISSION: ASREQ |
| CCCP OTHER: SESS |
| CCCP CDRL #: J011 |
| CCCP TITLE OF DATA ITEM: ENGINEERING CHANGE PROPOSAL (ECP) |
| CCCP SUBTITLE: N/A |
| CCCP CONTRACT REFERENCE: Section C, C0003 |
| CCCP DD 250: LT |
| CCCP FREQUENCY: ASREQ |
| CCCP DATE OF FIRST SUBMISSION: ASREQ |
| CCCP DATE OF SUBSEQUENT SUBMISSION: ASREQ |
| CCCP Remarks: DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). |
*DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY THE DOD CONFIGURATION CONTROL AUTHORITY. DISTRIBUTION STATEMENT SHOULD BE THE HIGHEST LEVEL OF THE DRAWINGS. DISTRIBUTION STATEMENT A IS THE LOWEST. FOR EXAMPLE, IF THE DOCUMENT HAS A DISTRIBUTION STATEMENT A AND D DRAWING, THEN THE WHOLE SUBMITTAL WILL BE LABELED "D".
THE PREFERRED METHOD FOR SUBMITTAL IS DD FORM 1692 LOCATED AT https://www.esd.whs.mil/dd/.
BLK 14: SUBMIT IN ACCORDANCE WITH SECTION J, ATTACHMENT 0003, VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
| CPOA OTHER: SESS |
| CPOA CDRL #: J012 |
| CPOA TITLE OF DATA ITEM: REQUEST FOR VARIANCE (RFV) |
| CPOA 3 SUBTITLE: N/A |
| CPOA Authority: DI-SESS-80640, Rev E |
| CPOA 5 CONTRACT REFERENCE: SECTION C, C0003 |
| CPOA DD 250: LT |
| CPOA 10 FREQUENCY: ASREQ |
| CPOA 12 DATE OF FIRST SUBMISSION: ASREQ |
| CPOA 13 DATE OF SUBSEQUENT SUBMISSION: ASREQ |
| CPOA Remarks: BLK 4: DELETE PARAGRAPH 2B AND 2C AND INCLUDE ADEQUATE DATA/ANALYSIS/TESTING TO SUPPORT THE REQUEST IN THE CONTENT OF THE RFV. THE CONTRACTOR SHALL PREPARE AND SUBMIT A RFV FOR EACH VARIANCE ON DD FORM 1694, LOCATED AT: https://www.esd.whs.mil/dd/. |
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY: EXPORT CONTROLLED: 13 DEC 2021. OTHER REQUESTS SHALL BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND.
BLK 14: SUBMIT IN ACCORDANCE WITH SECTION J, ATTACHMENT 0003, VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
| CICL 1 OTHER: SESS |
| CICL 1 CDRL #: J013 |
| CICL 1 Authority: DI-SESS-80642, Rev E |
| CICL 1 2 TITLE OF DATA ITEM: NOTICE OF REVISION (NOR) |
| CICL 1 3 SUBTITLE: N/A |
| CICL 1 5 CONTRACT REFERENCE: SECTION C, C0003 |
| CICL 1 6 REQUIRING OFFICE: NAWCWD (D434200) |
| CICL 1 DD 250: LT |
| CICL 1 10 FREQUENCY: ASREQ |
| CICL 1 12 DATE OF FIRST SUBMISSION: ASREQ |
| CICL 1 13 DATE OF SUBSEQUENT SUBMISSION: ASREQ |
| CICL 1 Remarks: DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). |
*DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY THE DOD CONFIGURATION CONTROL AUTHORITY. DISTRIBUTION STATEMENT SHOULD BE THE HIGHEST LEVEL OF THE DRAWINGS. DISTRIBUTION STATEMENT A IS THE LOWEST. FOR EXAMPLE, IF THE DOCUMENT HAS A DISTRIBUTION STATEMENT A AND D DRAWING, THEN THE WHOLE SUBMITTAL WILL BE LABELED "D".
THE PREFERRED METHOD FOR SUBMITTAL IS DD FORM 1695 LOCATED AT https://www.esd.whs.mil/dd/.
BLK 14: SUBMIT IN ACCORDANCE WITH SECTION J, ATTACHMENT 0003, VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
| CICL 2 OTHER: MGMT |
| CICL 2 CDRL #: J014 |
| CICL 2 Authority: DI-MGMT-81255 - NOTICE 1 |
| CICL 2 TITLE OF DATA ITEM: PRODUCTION PROGRESS REPORTS |
| CICL 2 SUBTITLE: N/A |
| CICL 2 5 CONTRACT REFERENCE: Section H, H0004; Section I, 52.242-2 |
| CICL 2REQUIRING OFFICE: AMJM-SP |
| CICL 2 DD 250: NO |
| CICL 2 STATEMENT REQUIRED: N/A |
| CICL 2 10 FREQUENCY: MTHLY |
| CICL 2 12 DATE OF FIRST SUBMISSION: SEE BLK 16 |
| CICL 2 DATE OF SUBSEQUENT SUBMISSION: SEE BLK 16 |
| CICL 2 RegRow1: 1 |
| CICL 2 RegRow2: 1 |
| CICL 2 Remarks: BLK 12,13: FIRST SUBMITTAL IS DUE 2 WORKING DAYS AFTER END OF THE MONTH IN WHICH PRODUCTION BEGINS. SUBSEQUENT SUBMISSIONS ARE DUE MONTHLY, 2 WORKING DAYS AFTER REPORTING PERIOD WITH THE LAST SUBMITTAL DUE 2 WORKING DAYS AFTER THE END OF THE MONTH PRODUCTION HAS COMPLETED. |
BLK 14: SUBMIT IN ACCORDANCE WITH SECTION J, ATTACHMENT 0003, VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
ALSO SUBMIT IN ACCORDANCE WITH SECTION H, H0004 - INSTRUCTIONS FOR PREPARATION AND SUBMISSION OF PRODUCTION PROGRESS REPORTS.
| CICL 2 RegRow3: 1 |
| CICL 2 RegRow4: |
| CICL 2 RegRow5: |
| CCCPRegRow2: 1 |
| CCCPRegRow3: 1 |
| CCCPRegRow4: 1 |
| CCCPRegRow5: 1 |
| CCCPRegRow1: 1 |
| QPP Remarks: BLK 5: THE QUALITY PROGRAM PLAN (QPP) SHALL DOCUMENT THE CONTRACTOR'S IMPLEMENTATION OF A QUALITY SYSTEM IN ACCORDANCE WITH THE QUALITY ASSURANCE PROVISION (QAP). |
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY: EXPORT CONTROLLED: 13 DEC 2021. OTHER REQUESTS SHALL BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND.
BLK 10, 12: THE QPP SHALL BE SUBMITTED NLT 150 CALENDAR DAYS AFTER CONTRACT AWARD. THE GOVERNMENT REQUIRES 30 DAYS FOR REVIEW. DISPOSITION OF THE QPP WILL BE PROVIDED THROUGH THE PROCURING CONTRACTING OFFICER (PCO). IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL HAVE 15 DAYS TO PROVIDE REVISIONS AND THE GOVERNMENT SHALL REVIEW AND PROVIDE DISPOSITION WITHIN 15 DAYS OF RECEIPT. THE QPP SHALL BE APPROVED PRIOR TO FAT, IF FAT IS REQUIRED, OR PRIOR TO INITIATION OF PRODUCTION.
BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND APPROVAL PRIOR TO IMPLEMENTATION.
BLK 14: SUBMIT IN ACCORDANCE WITH SECTION J, ATTACHMENT 0003, VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
| QPP OTHER: QCIC |
| QPP SUBTITLE: N/A |
| QPP TITLE OF DATA ITEM: Quality Program Plan (QPP) |
| QPP Authority: DI-QCIC-81722, Rev - |
| QPP CONTRACT REFERENCE: Section J, Attachment 0008 - QAP |
| QPP REQUIRING OFFICE: AMJM-QA |
| QPP DD 250: LT |
| QPP App Code: A |
| QPP 9 DIST STATEMENT REQUIRED: D |
| QPP FREQUENCY: ONE/R |
| QPP DATE OF FIRST SUBMISSION: 150DAC |
| QPP DATE OF SUBSEQUENT SUBMISSION: ASREQ |
| QPP RegRow1: 1 |
| QPP RegRow2: 1 |
| QPP RegRow3: 1 |
| QPP RegRow4: 1 |
| QPP RegRow5: 1 |
| SPC FREQUENCY: ONE/R |
| SPC DD 250: LT |
| SPC App Code: A |
| SPC 9 DIST STATEMENT REQUIRED: D |
| SPC RegRow1: 1 |
| SPC RegRow2: 1 |
| SPC RegRow3: 1 |
| SPC RegRow4: 1 |
| SPC RegRow5: 1 |
| SPC Reg15 TOTAL: 6 |
| MSE Remarks: BLK 9: DISTRIBUTION STATEMEND D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY: EXPORT CONTROLLED: 13 DEC 2021. OTHER REQUESTS SHALL BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND. |
BLK 10, 12: THE CONTRACTOR SHALL SUBMIT A COMPLETED ACCEPTANCE INSPECTION EQUIPMENT (AIE) PACKAGE NLT 150 CALENDAR DAYS AFTER CONTRACT AWARD. THE GOVERMENT WILL PROVIDE DISPOSITION WITHIN 45 DAYS AFTER FINAL PACKAGE RECEIPT.
BLK 13: IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL HAVE 30 DAYS TO GENERATE REVISIONS AND THE GOVERNMENT SHALL HAVE 30 DAYS TO REVIEW AND RESPOND. THE APPROVED AIE SHALL BE AVAILABLE FOR FAT, IF FAT IS REQUIRED, PRODUCTION AND/OR ALL ACCEPTANCE OF PRODUCT UNDER THE CONTRACT. IF CONTRACTOR REVISES A PREVIOUSLY GOVERNMENT-ACCEPTED AIE FOR THIS CONTRACT, THE REVISED AIE MUST BE SUBMITTED TO THE GOVERNMENT FOR REVIEW AND APPROVAL. GOVERNMENT APPROVAL MUST BE GRANTED BEFORE AIE IS USED FOR ACCEPTANCE OF PRODUCT. THE GOVERNMENT WILL RESPOND WITHIN 30 DAYS AFTER RECEIPT OF AIE. THE CONTRACTOR SHALL NOTIFY THE RESPONSIBLE GOVERNMENT TECHNICAL AGENCY WITHIN A MINIMUM OF 30 DAYS PRIOR TO ACCEPTANCE (PROVE OUT) TESTING.
BLK 14: SUBMIT IN ACCORDANCE WITH SECTION J, ATTACHMENT 0003, VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
| MSE RegRow1: 1 |
| MSE RegRow2: 1 |
| MSE RegRow3: 1 |
| MSE RegRow4: 1 |
| MSE RegRow5: 1 |
| MSE Reg15 TOTAL: 6 |
| FATR OTHER: NDTI |
| FATR CDRL #: J004 |
| FATR TITLE OF DATA ITEM: Test/Inspection Reports |
| FATR SUBTITLE: First Article Test Report (FATR) |
| FATR Authority: DI-NDTI-80809, Rev B |
| FATR DD 250: LT |
| FATR DIST STATEMENT REQUIRED: D |
| FATR FREQUENCY: ONE/R |
| FATR DATE OF FIRST SUBMISSION: 270DAC |
| FATR App Code: A |
| FATR AS OF DATE: N/A |
| FATR DATE OF SUBSEQUENT SUBMISSION: ASREQ |
| FATR RegRow1: 1 |
| FATR RegRow2: 1 |
| FATR Remarks: BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY: EXPORT CONTROLLED: 13 DEC 2021. OTHER REQUESTS SHALL BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND. |
BLK 10,12: THE FIRST ARTICLE TEST (FAT) REPORT SHALL BE SUBMITTED WITH QAR FINDINGS ON DD FORM 1222. FAT REPORT SHALL BE SUBMITTED 240 DAYS AFTER CONTRACT AWARD. THE GOVERNMENT REQUIRES 30 DAYS FOR REVIEW. DISPOSITION OF THE FAT REPORT WILL BE PROVIDED THROUGH THE PCO. FAT MUST BE APPROVED PRIOR TO PRODUCTION.
BLK 13: IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL HAVE 15 DAYS TO GENERATE REVISIONS AND THE GOVERNMENT SHALL HAVE 15 DAYS TO REVIEW AND RESPOND.
BLK 14: SUBMIT IN ACCORDANCE WITH SECTION J, ATTACHMENT 0003, VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
| FATR RegRow3: 1 |
| FATR RegRow4: 1 |
| FATR RegRow5: 1 |
| FATR Reg15 TOTAL: 5 |
| LATR OTHER: NDTI |
| LATR CDRL #: J007 |
| LATR SUBTITLE: Lot Acceptance Test Report |
| LATR Authority: DI-NDTI-80809, Rev B |
| LATR REQUIRING OFFICE: DCMA-MCWB (QAR) |
| LATR DD 250: LT |
| LATR DIST STATEMENT REQUIRED: D |
| LATR FREQUENCY: ASREQ |
| LATR DATE OF FIRST SUBMISSION: ASREQ |
| LATR App Code: A |
| LATR AS OF DATE: N/A |
| LATR RegRow1: 1 |
| LATR RegRow2: 1 |
| LATR Remarks: BLK 4: LOT ACCEPTANCE TEST (LAT) REPORTS SHALL CONTAIN ALL INSPECTION RECORDS OF CLASSIFIED CHARACTERISTICS SAMPLES AND ANY OTHER TESTS REQUIRED FOR EACH LOT PER THE CONTRACT. |
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY: EXPORT CONTROLLED: 13 DEC 2021. OTHER REQUESTS SHALL BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND.
BLK 10,12, 13: SUBMISSION OF LAT REPORTS AND PRODUCTION ACCEPTANCE TEST REPORTS SHALL BE NO LATER THAN 30 DAYS AFTER LAT. THE QAR WILL PROVIDE DISPOSITION OF LOT/PRODUCTION ACCEPTANCE TEST REPORTS.
BLK 14: LAT REPORTS SHALL BE SUBMITTED BY ACCESSING THE WORLDWIDE AMMUNITION DATA CARD REPOSITORY PROGRAM (WARP) WHICH IS LOCATED ON THE MUNITIONS HISTORY PROGRAM (MHP) WEBSITE AT: https://mhp.redstone.army.mil/.
SUBMIT ELECTRONICALLY UNLESS OTHERWISE SPECIFIED.
| LATR RegRow3: |
| LATR RegRow4: |
| LATR RegRow5: |
| LATR Reg15 TOTAL: 2 |
| FACAR OTHER: SESS |
| FACAR DID: J008 |
| FACAR TITLE OF DATA ITEM: Failure Analysis and Corrective Action Report (FACAR) |
| FACAR SUBTITLE: N/A |
| FACAR Authority: DI-SESS-80255, Rev B |
| FACAR CONTRACT REFERENCE: Section J, Attachment 0008 - QAP |
| FACAR REQUIRING OFFICE: AMJM-QA |
| FACAR DD 250: LT |
| FACAR DIST STATEMENT REQUIRED: D |
| FACAR FREQUENCY: ASREQ |
| FACAR DATE OF FIRST SUBMISSION: ASREQ |
| FACAR App Code: A |
| FACAR AS OF DATE: N/A |
| FACAR DATE OF SUBSEQUENT SUBMISSION: ASREQ |
| FACAR RegRow1: 1 |
| FACAR RegRow2: 1 |
| FACAR Remarks: BLK 5: THE FAILURE ANALYSIS AND CORRECTIVE ACTION REPORT (FACAR) SHALL BE IN ACCORDANCE WITH THE QUALITY ASSURANCE PROVISION (QAP). |
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY: EXPORT CONTROLLED: 13 DEC 2021. OTHER REQUESTS SHALL BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND.
BLK 10, 12, 13: CONTRACTOR SHALL NOTIFY THE USG, IN ACCORDANCE WITH BLK 14, VIA EMAIL WITHIN 24 HOURS AFTER THE OCCURRENCE OF A FAILURE DURING ACCEPTANCE TESTING; INCLUDING, BUT NOT LIMITED TO, ANY FAILURES DURING FAT/LAT AND ANY DESTRUCTIVE OR NON-DESTRUCTIVE TEST FAILURES. FORMAL SUBMITTAL SHALL BE NO LATER THAN 10 DAYS AFTER REPORTED FAILURE. FINAL REPORT SHALL BE SUBMITTED NO LATER THAN 30 DAYS DETERMINING/CONDUCTING ROOT CAUSE FAILURE ANALYSIS.
BLK 14: SUBMIT IN ACCORDANCE WITH SECTION J, ATTACHMENT 0003, VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
| FACAR RegRow3: 1 |
| FACAR RegRow4: 1 |
| FACAR RegRow5: 1 |
| FACAR Reg15 TOTAL: 6 |
| ITP OTHER: QCIC |
| ITP DID: J009 |
| ITP TITLE OF DATA ITEM: Inspection and Test Plan (ITP) |
| ITP SUBTITLE: N/A |
| ITP Authority: DI-QCIC-81110, Notice 2 |
| ITP CONTRACT REFERENCE: Section J, Attachment 0008 - QAP |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .