B08. _Environmental Laboratory Analysis.pdf
PDF 253 KB Posted
- Attached to
- Environmental Laboratory Analysis
- Solicitation number
- W912PB-25-R-A018
About this file
This ELIN (Element Line Item Number) Sheet details a comprehensive environmental laboratory analysis contract for U.S. Army Garrison (USAG) Bavaria, covering a base year from July 2025 to June 2026 and two option years through June 2028. The document outlines an extensive range of environmental sampling and laboratory analysis services, including soil, groundwater, waste water, and surface water testing across multiple locations such as Tower Barracks, Rose Barracks, Grafenwoehr Training Area, Hohenfels, Local Training Area Amberg, and Garmisch.
The contract encompasses over 15 major analysis categories with hundreds of specific testing requirements, including but not limited to: unexploded ordnance clearance, soil and groundwater sampling, core drilling of monitoring wells, heavy metals analysis, petroleum hydrocarbon testing, per- and polyfluoroalkyl substances (PFAS) analysis, and various environmental compliance evaluations. Each schedule (A, B, and C) maintains consistent testing protocols across the base and option years, with estimated quantities for each line item type. The services are designed to support environmental monitoring, contamination assessment, and regulatory compliance for the U.S. Army installation in Bavaria, Germany.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELIN Sheet Environmental Laboratory Analysis, USAG Bavaria
Period: Base Year (1 July 2025 - 30 June 2026) Schedule A
ELIN DESCRIPTION ESTIMATED
QUANTITY U/I
ESTIMATED
UNIT
PRICE €
ESTIMATED
TOTAL
AMOUNT €
A001 HASP-QA/QC, Work Plan, Research and Travel
A001AA Health & Safety-Quality - Assurance/Quality Control Plan
1 EA
A001AB Historical Research 4 EA A001AC Meetings (Kick off, Final) 2 EA A001AD Travel to USAG Bavaria Grafenwoehr/Vilseck 30 EA A001AE Travel to USAG Bavaria Hohenfels 15 EA A001AF Travel to USAG Bavaria Garmisch 3 EA A001AG Travel to Local Training Area Amberg (LTA) 2 EA
A002 Soil Sampling and Study A002AA Unexploded Ordnance (UXO) clearance; assume 1 person is needed (price/day)
6 DAY
A002AB Unexploded Ordnance (UXO) clearance; assume 1 person is needed; 4 half days (each = half day)
4 HALF
DAY
A002AC Mobilization/Demobilization of equipment (Sondier Borings)
8 EA
A002AD Mobilization/Demobilization of equipment (Test Pits) 5 EA A002AE Break through paved surface (e.g. concrete or asphalt) for 50 mm sondier boring
60 EA
A002AF 50 mm sondier borings in soil to a maximum depth of 6 m below ground level (bgl) (average 2 m bgl), unsealed surface, (price/m)
360 m
A002AG Excavation of test pits up to a depth of 4 m bgl (incl.
return surface to original condition). Test pits shall be suitable to make geological profile and take soil samples. Excavated material shall be backfilled
16 EA
A002AH Soil samples 240 EA A002AI Soil-gas samples 30 EA A002AJ On-site flame ionization detector (FID) (soil-gas) measurement; assume 2 persons are needed
1 DAY
A002AK Mobilization/Demobilization of Direct Push and/or small drilling equipment
2 EA
A002AL Direct Push sondier boring with closed probe or protected piping and continuous obtaining of liner samples to a maximum depth of 6 m below ground level (bgl)
50 m
A002AM Expert study report 6 EA
A003 Groundwater Sampling and Evaluation and Monitoring Wells
A003AA Core drilling of one groundwater monitoring well diameter 125 mm, 20 m depth, 10 m in unconsolidated soil, 10 m in bedrock, 20 m screen length (PVC), well head shall be above or flush with the ground
1 EA
A003AB Core drilling of one groundwater monitoring well diameter 125 mm, 40 m depth, 10 m in unconsolidated soil, 30 m in bedrock, 30 m screen length (PVC), well head shall be above or flush with the ground
1 EA
Period: Base Year (1 July 2025 - 30 June 2026) Schedule A
A003AC Dismantling and renovation of a shallow 5" groundwater measuring well (depth <= 15m) without cohesive layers in accordance with the DVGW W 135
(A) Dec 2018
1 EA
A003AD Dismantling and renovation of a shallow 5" groundwater measuring well (depth 15-30m) without cohesive layers in accordance with the DVGW W 135
(A) Dec 2018
1 EA
A003AE Mobilization/Demobilization of equipment (Groundwater monitoring well)
2 EA
A003AF Preparation and Performance of a Water Permit Procedure acc. to Para 8, Water Law (WHG) in association with Article 30, Bavarian Water Law (BayWG) (Water Rights Approval)
2 EA
A003AG Preparation and Performance of a Water Permit Procedure acc. to Para 49, Water Law (WHG) in association with Article 30, Bavarian Water Law (BayWG) (Request for Ground Opening)
2 EA
A003AH Sampling of existing groundwater monitoring wells, equipped with taps and pumps, power generator necessary (HTA)
40 EA
A003AI Sampling of existing groundwater monitoring wells (50 – 150 mm diameter) sampling depth max. 10 m
6 EA
A003AJ Sampling of existing groundwater monitoring wells (50 – 150 mm diameter) sampling depth max. 20 m
2 EA
A003AK Sampling of existing groundwater monitoring wells (50 – 150 mm diameter) sampling depth > 20 m
2 EA
A003AL Performance of a short pump test maximum 6 h incl.
Mobilization/Demobilization of necessary Equipment (maximum depth 25 m)
1 EA
A003AM Mobilization/Demobilization and Operation of a Water- Activated Carbon System for contaminated Groundwater Cleanup of short pump test (ELIN A003AL); Maximum Flow Rate 1 l/s
1 EA
A003AN Analysis on-site parameters (pH, el. Conductivity, temperature, redox, O2, turbidity, odor, color)
24 EA
A003AO Analysis mineralization (Ca, Mg, Na, K, Mn, Fe, NH4, SO4)
12 EA
A003AP Analysis EC (20 STV acc. to LfU) 24 EA A003AQ Analysis Per- and Polyfluorated Alkylsubstances
(PFAS) (sum/13 and further single parameters as applicable acc. to current LfU-Guideline)
48 EA
A003AR Setup and operation of a groundwater drawdown system incl. short expert report
1 EA
A003AS Short expert report 10 EA
A004 Waste Water Sampling and Evaluation A004AA Sampling from UST/Basin 2 EA A004AB Analysis Herbicides (PSM) 1 EA A004AC Analysis fire fighter water (see attached Exhibit) 2 EA A004AD Analysis Total Petroleum Hydrocarbons (TPH) 3 EA A004AE Declaration report 3 EA
A005 Unknown Substance
Period: Base Year (1 July 2025 - 30 June 2026) Schedule A
A005AA Sampling of unknown substance 3 EA A005AB Analysis of unknown substance 3 EA A005AC Short expert report 3 EA
A006 Railway Gravel A006AA Sample acc. to Bavarian Environmental State Office-guidelines 3.4/2 "Railway track guidance" (LfU- Merkblatt 3.4/2 "Gleisschotterrichtlinie")
3 EA
A006AB Analysis acc. to Bavarian Environmental State Office-guidelines 3.4/2 "Railway track guidance" (LfU- Merkblatt 3.4/2 "Gleisschotterrichtlinie")
3 EA
A006AC Short expert report 3 EA
A007 Contaminated Soil/Solid Sampling and Evaluation/ Declaration for Waste Disposal
A007AA Sampling of contaminated soil according to LAGA
PN98
14 EA
A007AB Analysis of contaminated soil incl. eluate according to LAGA Heft 20
14 EA
A007AC Declaration report 14 EA A007AD Short expert report 4 EA
A008 Construction Debris Sampling and Evaluation A008AA Sampling of Asphalt incl. Core Drilling 30 EA A008AB Analysis of asphalt samples on PAH’s and phenol index according to Guideline 3.4-1 of Bavarian LfU
25 EA
A008AC Analysis of debris on asbestos/mineral fibers 10 EA A008AD Short expert report 6 EA
A009 Additional Sampling and Analyses A009AA Additional water samples from basins, open waters or tanks
15 EA
A009AB Additional sampling of solids 15 EA A009AC Additional sampling of air (room air for fibers) 4 EA A009AD Preparation solid material 10 EA A009AE Analysis n-Alkanes C5 – C9 5 EA A009AF Analysis Explosives (Sprengstofftypische
Verbindungen = STV, 20 single parameters)
2 EA
A009AG Analysis of basic parameters according to the current Bavarian Water Board Guideline 3.8-1, Table 2 without biotest (LfU-Merkblatt 3.8/1, Tabelle 2 ohne Biotest)
2 EA
A009AH Analysis water quality (NH4, NO3, NO4, P total, PO4, N total, TOC, BOD, COD, Chloride, SO4, dissolved oxygen)
5 EA
A009AI Analysis Toxicity (Leuchtbakterientest) 2 EA A009AJ Analysis Per- and Polyfluorated Alkylsubstances
(PFAS) (sum/13 and further single parameters as applicable acc. to current LfU-Guideline)
2 EA
A009AK Analysis tracer (Uranin) 5 EA A009AL Analysis PCB (6 Congener) 2 EA A009AM Analysis PCP & Lindan 2 EA A009AN Analysis Perchlorate 2 EA
Period: Base Year (1 July 2025 - 30 June 2026) Schedule A
A009AO Analysis Fibers (asbestos, mineral fibers) (from gas) 4 EA
A010 Laboratory Analyses (from Water Samples) A010AA Total Heavy Metals 2 EA A010AB Lead (Pb) 20 EA A010AC Arsenic (As) 2 EA A010AD Cadmium (Cd) 2 EA A010AE Total Chromium (Cr) 2 EA A010AF Chromate (Cr VI) 2 EA A010AG Mercury (Hg) 2 EA A010AH Nickel (Ni) 2 EA A010AI Copper (Cu) 2 EA A010AJ Zinc (Zn) 2 EA A010AK Tungsten (W) 2 EA A010AL Cobalt (Co) 2 EA A010AM Thallium (Tl) 2 EA A010AN Iron (Fe) 2 EA A010AO Manganese (Mn) 2 EA A010AP Total Petroleum Hydrocarbons (TPH) C10 – C40 5 EA A010AQ PAH’s (15 single parameters according to EPA without Naphthalene)
5 EA
A010AR Naphthalene & Methylnaphthalenes 5 EA A010AS n-Alkanes C5 – C9 5 EA A010AT Benzene, Toluene, Ethylbenzene, Xylene (BTEX) 2 EA A010AU Volatile Halogenated Hydrocarbones (VHHC) 2 EA A010AV Herbicides (Pflanzenschutzmittel = PSM) 2 EA A010AW Explosives (Sprengstofftypische Verbindungen =
STV, 20 single parameters)
2 EA
A010AX Barium & Strontium 5 EA A010AY analysis of basic parameters according to the
Bavarian Water Board Guideline 3.8-1, Table 2 without biotest (LfU-Merkblatt 3.8/1, Tabelle 2 ohne Biotest)
3 EA
A010AZ Per- and Polyfluorated Alkylsubstances (PFAS) (sum/13 and further single parameters as applicable acc. to current LfU-Guideline)
10 EA
A010BA Adsorbable Organic Halogens (AOX) 5 EA A010BB Phenol Index 5 EA A010BC Cyanide (CN-) 5 EA A010BD Hydrazine 2 EA A010BE Ion Balance (Na, K, Ca, SO4, NO2, NO3, Cl, Fe, NH4, SK4.3, HCO3)
2 EA
A010BF pH value 10 EA A010BG electrical Conductivity 10 EA A010BH Ammonium (NH4+) 100 EA A010BI Ortho-Phosphate (o-PO4_3-) 100 EA A010BJ Nitrate-Nitrogen (NO3-N) 100 EA A010BK Total-Nitrogen (Total-N) 2 EA A010BL Total-Phophate (Total PO4_3-) 2 EA
A010BM BOD-5 2 EA
A010BN COD 2 EA
A010BO Total Solids (TS) 2 EA A010BP MTBE (Methyl-tertiary-butyl-ether) 2 EA A010BQ TBA (Tertiary-butyl-alcohol) 2 EA
Period: Base Year (1 July 2025 - 30 June 2026) Schedule A
A010BR Dioxane 2 EA
A011 Laboratory Analyses (from Soil Samples) A011AA Heavy metals 20 EA A011AB Lead (Pb) 25 EA A011AC Arsenic (As) 4 EA A011AD Cadmium (Cd) 4 EA A011AE Total Chromium (Cr) 4 EA A011AF Chromate (Cr VI) 2 EA A011AG Mercury (Hg) 2 EA A011AH Nickel (Ni) 2 EA A011AI Copper (Cu) 2 EA A011AJ Zinc (Zn) 2 EA A011AK Tungsten (W) 2 EA A011AL Cobalt (Co) 2 EA A011AM Thallium (Tl) 2 EA A011AN Iron (Fe) 2 EA A011AO Manganese (Mn) 2 EA A011AP Total Petroleum Hydrocarbons (TPH) C10 – C40 60 EA A011AQ PAH’s (15 single parameters according to EPA without Naphthalene, see addendum 4)
60 EA
A011AR Naphthalene & Methylnaphthalenes 60 EA A011AS n-Alkanes C5 – C9 60 EA A011AT Benzene, Toluene, Ethylbenzene, Xylene (BTEX) 60 EA A011AU Volatile Halogenated Hydrocarbones (VHHC) 60 EA A011AV Herbicides (Pflanzenschutzmittel = PSM, see
Addendum 3)
5 EA
A011AW Explosives (Sprengstofftypische Verbindungen = STV, 20 single parameters)
2 EA
A011AX Barium & Strontium 5 EA A011AY Phenol Index 5 EA A011AZ Cyanide (CN-) 2 EA A011BA Hydrazine 2 EA
A012 Laboratory Analyses (from Soil Eluate) A012AA Preparation of S4-eluate 45 EA A012AB Preparation of Column-eluate 45 EA A012AC Preparation of bowl-eluate acc. to Schwendner 40 EA A012AD Heavy metals 10 EA A012AE Lead (Pb) 20 EA A012AF Arsenic (As) 2 EA A012AG Cadmium (Cd) 2 EA A012AH Total Chromium (Cr) 2 EA A012AI Chromate (Cr VI) 2 EA A012AJ Mercury (Hg) 2 EA A012AK Nickel (Ni) 2 EA A012AL Copper (Cu) 2 EA A012AM Zinc (Zn) 2 EA A012AN Tungsten (W) 2 EA A012AO Cobalt (Co) 2 EA A012AP Thallium (Tl) 2 EA A012AQ Iron (Fe) 2 EA A012AR Manganese (Mn) 2 EA A012AS Total Petroleum Hydrocarbons (TPH) C10 – C40 40 EA
Period: Base Year (1 July 2025 - 30 June 2026) Schedule A
A012AT PAH’s (15 single parameters according to EPA without Naphthalene)
40 EA
A012AU Naphthalene & Methylnaphthalenes 40 EA A012AV n-Alkanes C5 – C9 5 EA A012AW Benzene, Toluene, Ethylbenzene, Xylene (BTEX) 5 EA A012AX Volatile Halogenated Hydrocarbones (VHHC) 5 EA A012AY Herbicides (Pflanzenschutzmittel = PSM) 2 EA A012AZ Explosives (Sprengstofftypische Verbindungen =
STV, 20 single parameters)
40 EA
A012BA Barium & Strontium 7 EA A012BB Phenol Index 7 EA A012BC Cyanide (CN-) 2 EA A012BD Hydrazine 2 EA A012BE pH value 15 EA A012BF electrical Conductivity 15 EA A012BG Per- and Polyfluorated Alkylsubstances (PFAS)
(sum/13 and further single parameters as applicable acc. to current LfU-Guideline)
30 EA
A012BH Adsorbable Organic Halogenes (AOX) 5 EA
A013 From soil-gas A013AA Benzene, Toluene, Ethylbenzene, Xylene (BTEX) 30 EA A013AB Volatile Halogenated Hydrocarbons (VHHC) 30 EA A013AC Methane 10 EA
A014 Sampling & Analysis acc. to Waste Law A014AA Acc. to Position Paper of Bavaria (Eckpunktepapier
Bayern), Appendices 2+3, Table 2+1 (Original Substance + Eluate), Dec 2005
2 EA
A014AB Acc. to Landfill Decree, Appendix 3, Table 2, Column 4-9, Landfill Category 0-III including glowing loss + Total Organic Carbon (TOC) without Acid Neutralization Capacity (SNK) + LAGA Soil (Original Substance = Eluate) (Deponieverordnung DepV Anhang 2+3, Tab. 2 Spalte 4-9 Deponieklasse DK 0-
III)
2 EA
A014AC Acc. to Landfill Decree, Appendix 3, Table 2, Column 4-9, Landfill Category 0-III including Total Organic Carbon (TOC) without Acid Neutralization Capacity (SNK) + in addition to LAGA 1997 (Deponieverordnung DepV Anhang 2+3, Tab. 2 Spalte 4-9 Deponieklasse DK 0-III)
2 EA
A014AD Acc. to Recycling Guideline Bavaria ZTV-WWG AIIMBI No. 4/95, StB 9/05
2 EA
A015 Sampling A015AA Single Soil Sample from surface 20 EA A015AB Single Soil Sample from 0 - 20 cm below surface with shovel or spade
10 EA
A015AC Single Sediment Sample from surface water 5 EA A015AD Single Scoop Sample 110 EA
Period: Base Year (1 July 2025 - 30 June 2026) Schedule A
Total Sum Base Year 0.00
Period: Option Year 1 (1 July 2026 - 30 June 2027) Schedule B
ELIN DESCRIPTION ESTIMATED
QUANTITY U/I
ESTIMATED
UNIT
PRICE €
ESTIMATED
TOTAL
AMOUNT €
B001 HASP-QA/QC, Work Plan, Research and Travel
B001AA Health & Safety-Quality - Assurance/Quality Control Plan
1 EA
B001AB Historical Research 4 EA B001AC Meetings (Kick off, Final) 2 EA B001AD Travel to USAG Bavaria Grafenwoehr/Vilseck 30 EA B001AE Travel to USAG Bavaria Hohenfels 15 EA B001AF Travel to USAG Bavaria Garmisch 3 EA B001AG Travel to Local Training Area Amberg (LTA) 2 EA
B002 Soil Sampling and Study B002AA Unexploded Ordnance (UXO) clearance; assume 1 person is needed (price/day)
6 DAY
B002AB Unexploded Ordnance (UXO) clearance; assume 1 person is needed; 4 half days (each = half day)
4 HALF
DAY
B002AC Mobilization/Demobilization of equipment (Sondier Borings)
8 EA
B002AD Mobilization/Demobilization of equipment (Test Pits) 5 EA B002AE Break through paved surface (e.g. concrete or asphalt) for 50 mm sondier boring
60 EA
B002AF 50 mm sondier borings in soil to a maximum depth of 6 m below ground level (bgl) (average 2 m bgl), unsealed surface, (price/m)
360 m
B002AG Excavation of test pits up to a depth of 4 m bgl (incl.
return surface to original condition). Test pits shall be suitable to make geological profile and take soil samples. Excavated material shall be backfilled
16 EA
B002AH Soil samples 240 EA B002AI Soil-gas samples 30 EA B002AJ On-site flame ionization detector (FID) (soil-gas) measurement; assume 2 persons are needed
1 DAY
B002AK Mobilization/Demobilization of Direct Push and/or small drilling equipment
2 EA
B002AL Direct Push sondier boring with closed probe or protected piping and continuous obtaining of liner samples to a maximum depth of 6 m below ground level (bgl)
50 m
B002AM Expert study report 6 EA
B003 Groundwater Sampling and Evaluation and Monitoring Wells
B003AA Core drilling of one groundwater monitoring well diameter 125 mm, 20 m depth, 10 m in unconsolidated soil, 10 m in bedrock, 20 m screen length (PVC), well head shall be above or flush with the ground
1 EA
B003AB Core drilling of one groundwater monitoring well diameter 125 mm, 40 m depth, 10 m in unconsolidated soil, 30 m in bedrock, 30 m screen length (PVC), well head shall be above or flush with
Period: Option Year 1 (1 July 2026 - 30 June 2027) Schedule B
B003AC Dismantling and renovation of a shallow 5" groundwater measuring well (depth <= 15m) without cohesive layers in accordance with the DVGW W 135
(A) Dec 2018
1 EA
B003AD Dismantling and renovation of a shallow 5" groundwater measuring well (depth 15-30m) without cohesive layers in accordance with the DVGW W 135
(A) Dec 2018
1 EA
B003AE Mobilization/Demobilization of equipment (Groundwater monitoring well)
2 EA
B003AF Preparation and Performance of a Water Permit Procedure acc. to Para 8, Water Law (WHG) in association with Article 30, Bavarian Water Law (BayWG) (Water Rights Approval)
2 EA
B003AG Preparation and Performance of a Water Permit Procedure acc. to Para 49, Water Law (WHG) in association with Article 30, Bavarian Water Law (BayWG) (Request for Ground Opening)
2 EA
B003AH Sampling of existing groundwater monitoring wells, equipped with taps and pumps, power generator necessary (HTA)
40 EA
B003AI Sampling of existing groundwater monitoring wells (50 – 150 mm diameter) sampling depth max. 10 m
6 EA
B003AJ Sampling of existing groundwater monitoring wells (50 – 150 mm diameter) sampling depth max. 20 m
2 EA
B003AK Sampling of existing groundwater monitoring wells (50 – 150 mm diameter) sampling depth > 20 m
2 EA
B003AL Performance of a short pump test maximum 6 h incl.
Mobilization/Demobilization of necessary Equipment (maximum depth 25 m)
1 EA
B003AM Mobilization/Demobilization and Operation of a Water- Activated Carbon System for contaminated Groundwater Cleanup of short pump test (ELIN B003AL); Maximum Flow Rate 1 l/s
1 EA
B003AN Analysis on-site parameters (pH, el. Conductivity, temperature, redox, O2, turbidity, odor, color)
24 EA
B003AO Analysis mineralization (Ca, Mg, Na, K, Mn, Fe, NH4, SO4)
12 EA
B003AP Analysis EC (20 STV acc. to LfU) 24 EA B003AQ Analysis Per- and Polyfluorated Alkylsubstances
(PFAS) (sum/13 and further single parameters as applicable acc. to current LfU-Guideline)
48 EA
B003AR Setup and operation of a groundwater drawdown system incl. short expert report
1 EA
B003AS Short expert report 10 EA
B004 Waste Water Sampling and Evaluation B004AA Sampling from UST/Basin 2 EA B004AB Analysis Herbicides (PSM) 1 EA B004AC Analysis fire fighter water (see attached Exhibit) 2 EA B004AD Analysis Total Petroleum Hydrocarbons (TPH) 3 EA B004AE Declaration report 3 EA
B005 Unknown Substance
Period: Option Year 1 (1 July 2026 - 30 June 2027) Schedule B
B005AA Sampling of unknown substance 3 EA B005AB Analysis of unknown substance 3 EA B005AC Short expert report 3 EA
B006 Railway Gravel B006AA Sample acc. to Bavarian Environmental State Office-guidelines 3.4/2 "Railway track guidance" (LfU- Merkblatt 3.4/2 "Gleisschotterrichtlinie")
3 EA
B006AB Analysis acc. to Bavarian Environmental State Office-guidelines 3.4/2 "Railway track guidance" (LfU- Merkblatt 3.4/2 "Gleisschotterrichtlinie")
3 EA
B006AC Short expert report 3 EA
B007 Contaminated Soil/Solid Sampling and Evaluation/ Declaration for Waste Disposal
B007AA Sampling of contaminated soil according to LAGA
PN98
14 EA
B007AB Analysis of contaminated soil incl. eluate according to LAGA Heft 20
14 EA
B007AC Declaration report 14 EA B007AD Short expert report 4 EA
B008 Construction Debris Sampling and Evaluation B008AA Sampling of Asphalt incl. Core Drilling 30 EA B008AB Analysis of asphalt samples on PAH’s and phenol index according to Guideline 3.4-1 of Bavarian LfU
25 EA
B008AC Analysis of debris on asbestos/mineral fibers 10 EA B008AD Short expert report 6 EA
B009 Additional Sampling and Analyses B009AA Additional water samples from basins, open waters or tanks
15 EA
B009AB Additional sampling of solids 15 EA B009AC Additional sampling of air (room air for fibers) 4 EA B009AD Preparation solid material 10 EA B009AE Analysis n-Alkanes C5 – C9 5 EA B009AF Analysis Explosives (Sprengstofftypische
Verbindungen = STV, 20 single parameters)
2 EA
B009AG Analysis of basic parameters according to the current Bavarian Water Board Guideline 3.8-1, Table 2 without biotest (LfU-Merkblatt 3.8/1, Tabelle 2 ohne Biotest)
2 EA
B009AH Analysis water quality (NH4, NO3, NO4, P total, PO4, N total, TOC, BOD, COD, Chloride, SO4, dissolved oxygen)
5 EA
B009AI Analysis Toxicity (Leuchtbakterientest) 2 EA B009AJ Analysis Per- and Polyfluorated Alkylsubstances
(PFAS) (sum/13 and further single parameters as applicable acc. to current LfU-Guideline)
2 EA
B009AK Analysis tracer (Uranin) 5 EA B009AL Analysis PCB (6 Congener) 2 EA B009AM Analysis PCP & Lindan 2 EA B009AN Analysis Perchlorate 2 EA
Period: Option Year 1 (1 July 2026 - 30 June 2027) Schedule B
B009AO Analysis Fibers (asbestos, mineral fibers) (from gas) 4 EA
B010 Laboratory Analyses (from Water Samples) B010AA Total Heavy Metals 2 EA B010AB Lead (Pb) 20 EA B010AC Arsenic (As) 2 EA B010AD Cadmium (Cd) 2 EA B010AE Total Chromium (Cr) 2 EA B010AF Chromate (Cr VI) 2 EA B010AG Mercury (Hg) 2 EA B010AH Nickel (Ni) 2 EA B010AI Copper (Cu) 2 EA B010AJ Zinc (Zn) 2 EA B010AK Tungsten (W) 2 EA B010AL Cobalt (Co) 2 EA B010AM Thallium (Tl) 2 EA B010AN Iron (Fe) 2 EA B010AO Manganese (Mn) 2 EA B010AP Total Petroleum Hydrocarbons (TPH) C10 – C40 5 EA B010AQ PAH’s (15 single parameters according to EPA without Naphthalene)
5 EA
B010AR Naphthalene & Methylnaphthalenes 5 EA B010AS n-Alkanes C5 – C9 5 EA B010AT Benzene, Toluene, Ethylbenzene, Xylene (BTEX) 2 EA B010AU Volatile Halogenated Hydrocarbones (VHHC) 2 EA B010AV Herbicides (Pflanzenschutzmittel = PSM) 2 EA B010AW Explosives (Sprengstofftypische Verbindungen =
STV, 20 single parameters)
2 EA
B010AX Barium & Strontium 5 EA B010AY analysis of basic parameters according to the
Bavarian Water Board Guideline 3.8-1, Table 2 without biotest (LfU-Merkblatt 3.8/1, Tabelle 2 ohne Biotest)
3 EA
B010AZ Per- and Polyfluorated Alkylsubstances (PFAS) (sum/13 and further single parameters as applicable acc. to current LfU-Guideline)
10 EA
B010BA Adsorbable Organic Halogens (AOX) 5 EA B010BB Phenol Index 5 EA B010BC Cyanide (CN-) 5 EA B010BD Hydrazine 2 EA B010BE Ion Balance (Na, K, Ca, SO4, NO2, NO3, Cl, Fe, NH4, SK4.3, HCO3)
2 EA
B010BF pH value 10 EA B010BG electrical Conductivity 10 EA B010BH Ammonium (NH4+) 100 EA B010BI Ortho-Phosphate (o-PO4_3-) 100 EA B010BJ Nitrate-Nitrogen (NO3-N) 100 EA B010BK Total-Nitrogen (Total-N) 2 EA B010BL Total-Phophate (Total PO4_3-) 2 EA
B010BM BOD-5 2 EA
B010BN COD 2 EA
B010BO Total Solids (TS) 2 EA B010BP MTBE (Methyl-tertiary-butyl-ether) 2 EA B010BQ TBA (Tertiary-butyl-alcohol) 2 EA
Period: Option Year 1 (1 July 2026 - 30 June 2027) Schedule B
B010BR Dioxane 2 EA
B011 Laboratory Analyses (from Soil Samples) B011AA Heavy metals 20 EA B011AB Lead (Pb) 25 EA B011AC Arsenic (As) 4 EA B011AD Cadmium (Cd) 4 EA B011AE Total Chromium (Cr) 4 EA B011AF Chromate (Cr VI) 2 EA B011AG Mercury (Hg) 2 EA B011AH Nickel (Ni) 2 EA B011AI Copper (Cu) 2 EA B011AJ Zinc (Zn) 2 EA B011AK Tungsten (W) 2 EA B011AL Cobalt (Co) 2 EA B011AM Thallium (Tl) 2 EA B011AN Iron (Fe) 2 EA B011AO Manganese (Mn) 2 EA B011AP Total Petroleum Hydrocarbons (TPH) C10 – C40 60 EA B011AQ PAH’s (15 single parameters according to EPA without Naphthalene, see addendum 4)
60 EA
B011AR Naphthalene & Methylnaphthalenes 60 EA B011AS n-Alkanes C5 – C9 60 EA B011AT Benzene, Toluene, Ethylbenzene, Xylene (BTEX) 60 EA B011AU Volatile Halogenated Hydrocarbones (VHHC) 60 EA B011AV Herbicides (Pflanzenschutzmittel = PSM, see
Addendum 3)
5 EA
B011AW Explosives (Sprengstofftypische Verbindungen = STV, 20 single parameters)
2 EA
B011AX Barium & Strontium 5 EA B011AY Phenol Index 5 EA B011AZ Cyanide (CN-) 2 EA B011BA Hydrazine 2 EA
B012 Laboratory Analyses (from Soil Eluate) B012AA Preparation of S4-eluate 45 EA B012AB Preparation of Column-eluate 45 EA B012AC Preparation of bowl-eluate acc. to Schwendner 40 EA B012AD Heavy metals 10 EA B012AE Lead (Pb) 20 EA B012AF Arsenic (As) 2 EA B012AG Cadmium (Cd) 2 EA B012AH Total Chromium (Cr) 2 EA B012AI Chromate (Cr VI) 2 EA B012AJ Mercury (Hg) 2 EA B012AK Nickel (Ni) 2 EA B012AL Copper (Cu) 2 EA B012AM Zinc (Zn) 2 EA B012AN Tungsten (W) 2 EA B012AO Cobalt (Co) 2 EA B012AP Thallium (Tl) 2 EA B012AQ Iron (Fe) 2 EA B012AR Manganese (Mn) 2 EA B012AS Total Petroleum Hydrocarbons (TPH) C10 – C40 40 EA
Period: Option Year 1 (1 July 2026 - 30 June 2027) Schedule B
B012AT PAH’s (15 single parameters according to EPA without Naphthalene)
40 EA
B012AU Naphthalene & Methylnaphthalenes 40 EA B012AV n-Alkanes C5 – C9 5 EA B012AW Benzene, Toluene, Ethylbenzene, Xylene (BTEX) 5 EA B012AX Volatile Halogenated Hydrocarbones (VHHC) 5 EA B012AY Herbicides (Pflanzenschutzmittel = PSM) 2 EA B012AZ Explosives (Sprengstofftypische Verbindungen =
STV, 20 single parameters)
40 EA
B012BA Barium & Strontium 7 EA B012BB Phenol Index 7 EA B012BC Cyanide (CN-) 2 EA B012BD Hydrazine 2 EA B012BE pH value 15 EA B012BF electrical Conductivity 15 EA B012BG Per- and Polyfluorated Alkylsubstances (PFAS)
(sum/13 and further single parameters as applicable acc. to current LfU-Guideline)
30 EA
B012BH Adsorbable Organic Halogenes (AOX) 5 EA
B013 From soil-gas B013AA Benzene, Toluene, Ethylbenzene, Xylene (BTEX) 30 EA B013AB Volatile Halogenated Hydrocarbons (VHHC) 30 EA B013AC Methane 10 EA
B014 Sampling & Analysis acc. to Waste Law B014AA Acc. to Position Paper of Bavaria (Eckpunktepapier
Bayern), Appendices 2+3, Table 2+1 (Original Substance + Eluate), Dec 2005
2 EA
B014AB Acc. to Landfill Decree, Appendix 3, Table 2, Column 4-9, Landfill Category 0-III including glowing loss + Total Organic Carbon (TOC) without Acid Neutralization Capacity (SNK) + LAGA Soil (Original Substance = Eluate) (Deponieverordnung DepV Anhang 2+3, Tab. 2 Spalte 4-9 Deponieklasse DK 0-
III)
2 EA
B014AC Acc. to Landfill Decree, Appendix 3, Table 2, Column 4-9, Landfill Category 0-III including Total Organic Carbon (TOC) without Acid Neutralization Capacity (SNK) + in addition to LAGA 1997 (Deponieverordnung DepV Anhang 2+3, Tab. 2 Spalte 4-9 Deponieklasse DK 0-III)
2 EA
B014AD Acc. to Recycling Guideline Bavaria ZTV-WWG AIIMBI No. 4/95, StB 9/05
2 EA
B015 Sampling B015AA Single Soil Sample from surface 20 EA B015AB Single Soil Sample from 0 - 20 cm below surface with shovel or spade
10 EA
B015AC Single Sediment Sample from surface water 5 EA B015AD Single Scoop Sample 110 EA
Period: Option Year 1 (1 July 2026 - 30 June 2027) Schedule B
Period: Option Year 2 (1 July 2027 - 30 June 2028) Schedule C
ELIN DESCRIPTION ESTIMATED
QUANTITY U/I
ESTIMATED
UNIT
PRICE €
ESTIMATED
TOTAL
AMOUNT €
C001 HASP-QA/QC, Work Plan, Research and Travel
C001AA Health & Safety-Quality - Assurance/Quality Control Plan
1 EA
C001AB Historical Research 4 EA C001AC Meetings (Kick off, Final) 2 EA C001AD Travel to USAG Bavaria Grafenwoehr/Vilseck 30 EA C001AE Travel to USAG Bavaria Hohenfels 15 EA C001AF Travel to USAG Bavaria Garmisch 3 EA C001AG Travel to Local Training Area Amberg (LTA) 2 EA
C002 Soil Sampling and Study C002AA Unexploded Ordnance (UXO) clearance; assume 1 person is needed (price/day)
6 DAY
C002AB Unexploded Ordnance (UXO) clearance; assume 1 person is needed; 4 half days (each = half day)
4 HALF
DAY
C002AC Mobilization/Demobilization of equipment (Sondier Borings)
8 EA
C002AD Mobilization/Demobilization of equipment (Test Pits) 5 EA C002AE Break through paved surface (e.g. concrete or asphalt) for 50 mm sondier boring
60 EA
C002AF 50 mm sondier borings in soil to a maximum depth of 6 m below ground level (bgl) (average 2 m bgl), unsealed surface, (price/m)
360 m
C002AG Excavation of test pits up to a depth of 4 m bgl (incl.
return surface to original condition). Test pits shall be suitable to make geological profile and take soil samples. Excavated material shall be backfilled
16 EA
C002AH Soil samples 240 EA C002AI Soil-gas samples 30 EA C002AJ On-site flame ionization detector (FID) (soil-gas) measurement; assume 2 persons are needed
1 DAY
C002AK Mobilization/Demobilization of Direct Push and/or small drilling equipment
2 EA
C002AL Direct Push sondier boring with closed probe or protected piping and continuous obtaining of liner samples to a maximum depth of 6 m below ground level (bgl)
50 m
C002AM Expert study report 6 EA
C003 Groundwater Sampling and Evaluation and Monitoring Wells
C003AA Core drilling of one groundwater monitoring well diameter 125 mm, 20 m depth, 10 m in unconsolidated soil, 10 m in bedrock, 20 m screen length (PVC), well head shall be above or flush with the ground
1 EA
C003AB Core drilling of one groundwater monitoring well diameter 125 mm, 40 m depth, 10 m in unconsolidated soil, 30 m in bedrock, 30 m screen length (PVC), well head shall be above or flush with
Period: Option Year 2 (1 July 2027 - 30 June 2028) Schedule C
C003AC Dismantling and renovation of a shallow 5" groundwater measuring well (depth <= 15m) without cohesive layers in accordance with the DVGW W 135
(A) Dec 2018
1 EA
C003AD Dismantling and renovation of a shallow 5" groundwater measuring well (depth 15-30m) without cohesive layers in accordance with the DVGW W 135
(A) Dec 2018
1 EA
C003AE Mobilization/Demobilization of equipment (Groundwater monitoring well)
2 EA
C003AF Preparation and Performance of a Water Permit Procedure acc. to Para 8, Water Law (WHG) in association with Article 30, Bavarian Water Law (BayWG) (Water Rights Approval)
2 EA
C003AG Preparation and Performance of a Water Permit Procedure acc. to Para 49, Water Law (WHG) in association with Article 30, Bavarian Water Law (BayWG) (Request for Ground Opening)
2 EA
C003AH Sampling of existing groundwater monitoring wells, equipped with taps and pumps, power generator necessary (HTA)
40 EA
C003AI Sampling of existing groundwater monitoring wells (50 – 150 mm diameter) sampling depth max. 10 m
6 EA
C003AJ Sampling of existing groundwater monitoring wells (50 – 150 mm diameter) sampling depth max. 20 m
2 EA
C003AK Sampling of existing groundwater monitoring wells (50 – 150 mm diameter) sampling depth > 20 m
2 EA
C003AL Performance of a short pump test maximum 6 h incl.
Mobilization/Demobilization of necessary Equipment (maximum depth 25 m)
1 EA
C003AM Mobilization/Demobilization and Operation of a Water- Activated Carbon System for contaminated Groundwater Cleanup of short pump test (ELIN C003AL); Maximum Flow Rate 1 l/s
1 EA
C003AN Analysis on-site parameters (pH, el. Conductivity, temperature, redox, O2, turbidity, odor, color)
24 EA
C003AO Analysis mineralization (Ca, Mg, Na, K, Mn, Fe, NH4, SO4)
12 EA
C003AP Analysis EC (20 STV acc. to LfU) 24 EA C003AQ Analysis Per- and Polyfluorated Alkylsubstances
(PFAS) (sum/13 and further single parameters as applicable acc. to current LfU-Guideline)
48 EA
C003AR Setup and operation of a groundwater drawdown system incl. short expert report
1 EA
C003AS Short expert report 10 EA
C004 Waste Water Sampling and Evaluation C004AA Sampling from UST/Basin 2 EA C004AB Analysis Herbicides (PSM) 1 EA C004AC Analysis fire fighter water (see attached Exhibit) 2 EA C004AD Analysis Total Petroleum Hydrocarbons (TPH) 3 EA C004AE Declaration report 3 EA
C005 Unknown Substance
Period: Option Year 2 (1 July 2027 - 30 June 2028) Schedule C
C005AA Sampling of unknown substance 3 EA C005AB Analysis of unknown substance 3 EA C005AC Short expert report 3 EA
C006 Railway Gravel C006AA Sample acc. to Bavarian Environmental State Office-guidelines 3.4/2 "Railway track guidance" (LfU- Merkblatt 3.4/2 "Gleisschotterrichtlinie")
3 EA
C006AB Analysis acc. to Bavarian Environmental State Office-guidelines 3.4/2 "Railway track guidance" (LfU- Merkblatt 3.4/2 "Gleisschotterrichtlinie")
3 EA
C006AC Short expert report 3 EA
C007 Contaminated Soil/Solid Sampling and Evaluation/ Declaration for Waste Disposal
C007AA Sampling of contaminated soil according to LAGA
PN98
14 EA
C007AB Analysis of contaminated soil incl. eluate according to LAGA Heft 20
14 EA
C007AC Declaration report 14 EA C007AD Short expert report 4 EA
C008 Construction Debris Sampling and Evaluation C008AA Sampling of Asphalt incl. Core Drilling 30 EA C008AB Analysis of asphalt samples on PAH’s and phenol index according to Guideline 3.4-1 of Bavarian LfU
25 EA
C008AC Analysis of debris on asbestos/mineral fibers 10 EA C008AD Short expert report 6 EA
C009 Additional Sampling and Analyses C009AA Additional water samples from basins, open waters or tanks
15 EA
C009AB Additional sampling of solids 15 EA C009AC Additional sampling of air (room air for fibers) 4 EA C009AD Preparation solid material 10 EA C009AE Analysis n-Alkanes C5 – C9 5 EA C009AF Analysis Explosives (Sprengstofftypische
Verbindungen = STV, 20 single parameters)
2 EA
C009AG Analysis of basic parameters according to the current Bavarian Water Board Guideline 3.8-1, Table 2 without biotest (LfU-Merkblatt 3.8/1, Tabelle 2 ohne Biotest)
2 EA
C009AH Analysis water quality (NH4, NO3, NO4, P total, PO4, N total, TOC, BOD, COD, Chloride, SO4, dissolved oxygen)
5 EA
C009AI Analysis Toxicity (Leuchtbakterientest) 2 EA C009AJ Analysis Per- and Polyfluorated Alkylsubstances
(PFAS) (sum/13 and further single parameters as applicable acc. to current LfU-Guideline)
2 EA
C009AK Analysis tracer (Uranin) 5 EA C009AL Analysis PCB (6 Congener) 2 EA C009AM Analysis PCP & Lindan 2 EA C009AN Analysis Perchlorate 2 EA
Period: Option Year 2 (1 July 2027 - 30 June 2028) Schedule C
C009AO Analysis Fibers (asbestos, mineral fibers) (from gas) 4 EA
C010 Laboratory Analyses (from Water Samples) C010AA Total Heavy Metals 2 EA C010AB Lead (Pb) 20 EA C010AC Arsenic (As) 2 EA C010AD Cadmium (Cd) 2 EA C010AE Total Chromium (Cr) 2 EA C010AF Chromate (Cr VI) 2 EA C010AG Mercury (Hg) 2 EA C010AH Nickel (Ni) 2 EA C010AI Copper (Cu) 2 EA C010AJ Zinc (Zn) 2 EA C010AK Tungsten (W) 2 EA C010AL Cobalt (Co) 2 EA C010AM Thallium (Tl) 2 EA C010AN Iron (Fe) 2 EA C010AO Manganese (Mn) 2 EA C010AP Total Petroleum Hydrocarbons (TPH) C10 – C40 5 EA C010AQ PAH’s (15 single parameters according to EPA without Naphthalene)
5 EA
C010AR Naphthalene & Methylnaphthalenes 5 EA C010AS n-Alkanes C5 – C9 5 EA C010AT Benzene, Toluene, Ethylbenzene, Xylene (BTEX) 2 EA C010AU Volatile Halogenated Hydrocarbones (VHHC) 2 EA C010AV Herbicides (Pflanzenschutzmittel = PSM) 2 EA C010AW Explosives (Sprengstofftypische Verbindungen =
STV, 20 single parameters)
2 EA
C010AX Barium & Strontium 5 EA C010AY analysis of basic parameters according to the
Bavarian Water Board Guideline 3.8-1, Table 2 without biotest (LfU-Merkblatt 3.8/1, Tabelle 2 ohne Biotest)
3 EA
C010AZ Per- and Polyfluorated Alkylsubstances (PFAS) (sum/13 and further single parameters as applicable acc. to current LfU-Guideline)
10 EA
C010BA Adsorbable Organic Halogens (AOX) 5 EA C010BB Phenol Index 5 EA C010BC Cyanide (CN-) 5 EA C010BD Hydrazine 2 EA C010BE Ion Balance (Na, K, Ca, SO4, NO2, NO3, Cl, Fe, NH4, SK4.3, HCO3)
2 EA
C010BF pH value 10 EA C010BG electrical Conductivity 10 EA C010BH Ammonium (NH4+) 100 EA C010BI Ortho-Phosphate (o-PO4_3-) 100 EA C010BJ Nitrate-Nitrogen (NO3-N) 100 EA C010BK Total-Nitrogen (Total-N) 2 EA C010BL Total-Phophate (Total PO4_3-) 2 EA
C010BM BOD-5 2 EA
C010BN COD 2 EA
C010BO Total Solids (TS) 2 EA C010BP MTBE (Methyl-tertiary-butyl-ether) 2 EA C010BQ TBA (Tertiary-butyl-alcohol) 2 EA
Period: Option Year 2 (1 July 2027 - 30 June 2028) Schedule C
C010BR Dioxane 2 EA
C011 Laboratory Analyses (from Soil Samples) C011AA Heavy metals 20 EA C011AB Lead (Pb) 25 EA C011AC Arsenic (As) 4 EA C011AD Cadmium (Cd) 4 EA C011AE Total Chromium (Cr) 4 EA C011AF Chromate (Cr VI) 2 EA C011AG Mercury (Hg) 2 EA C011AH Nickel (Ni) 2 EA C011AI Copper (Cu) 2 EA C011AJ Zinc (Zn) 2 EA C011AK Tungsten (W) 2 EA C011AL Cobalt (Co) 2 EA C011AM Thallium (Tl) 2 EA C011AN Iron (Fe) 2 EA C011AO Manganese (Mn) 2 EA C011AP Total Petroleum Hydrocarbons (TPH) C10 – C40 60 EA C011AQ PAH’s (15 single parameters according to EPA without Naphthalene, see addendum 4)
60 EA
C011AR Naphthalene & Methylnaphthalenes 60 EA C011AS n-Alkanes C5 – C9 60 EA C011AT Benzene, Toluene, Ethylbenzene, Xylene (BTEX) 60 EA C011AU Volatile Halogenated Hydrocarbones (VHHC) 60 EA C011AV Herbicides (Pflanzenschutzmittel = PSM, see
Addendum 3)
5 EA
C011AW Explosives (Sprengstofftypische Verbindungen = STV, 20 single parameters)
2 EA
C011AX Barium & Strontium 5 EA C011AY Phenol Index 5 EA C011AZ Cyanide (CN-) 2 EA C011BA Hydrazine 2 EA
C012 Laboratory Analyses (from Soil Eluate) C012AA Preparation of S4-eluate 45 EA C012AB Preparation of Column-eluate 45 EA C012AC Preparation of bowl-eluate acc. to Schwendner 40 EA C012AD Heavy metals 10 EA C012AE Lead (Pb) 20 EA C012AF Arsenic (As) 2 EA C012AG Cadmium (Cd) 2 EA C012AH Total Chromium (Cr) 2 EA C012AI Chromate (Cr VI) 2 EA C012AJ Mercury (Hg) 2 EA C012AK Nickel (Ni) 2 EA C012AL Copper (Cu) 2 EA C012AM Zinc (Zn) 2 EA C012AN Tungsten (W) 2 EA C012AO Cobalt (Co) 2 EA C012AP Thallium (Tl) 2 EA C012AQ Iron (Fe) 2 EA C012AR Manganese (Mn) 2 EA C012AS Total Petroleum Hydrocarbons (TPH) C10 – C40 40 EA
Period: Option Year 2 (1 July 2027 - 30 June 2028) Schedule C
C012AT PAH’s (15 single parameters according to EPA without Naphthalene)
40 EA
C012AU Naphthalene & Methylnaphthalenes 40 EA C012AV n-Alkanes C5 – C9 5 EA C012AW Benzene, Toluene, Ethylbenzene, Xylene (BTEX) 5 EA C012AX Volatile Halogenated Hydrocarbones (VHHC) 5 EA C012AY Herbicides (Pflanzenschutzmittel = PSM) 2 EA C012AZ Explosives (Sprengstofftypische Verbindungen =
STV, 20 single parameters)
40 EA
C012BA Barium & Strontium 7 EA C012BB Phenol Index 7 EA C012BC Cyanide (CN-) 2 EA C012BD Hydrazine 2 EA C012BE pH value 15 EA C012BF electrical Conductivity 15 EA C012BG Per- and Polyfluorated Alkylsubstances (PFAS)
(sum/13 and further single parameters as applicable acc. to current LfU-Guideline)
30 EA
C012BH Adsorbable Organic Halogenes (AOX) 5 EA
C013 From soil-gas C013AA Benzene, Toluene, Ethylbenzene, Xylene (BTEX) 30 EA C013AB Volatile Halogenated Hydrocarbons (VHHC) 30 EA C013AC Methane 10 EA
C014 Sampling & Analysis acc. to Waste Law C014AA Acc. to Position Paper of Bavaria (Eckpunktepapier
Bayern), Appendices 2+3, Table 2+1 (Original Substance + Eluate), Dec 2005
2 EA
C014AB Acc. to Landfill Decree, Appendix 3, Table 2, Column 4-9, Landfill Category 0-III including glowing loss + Total Organic Carbon (TOC) without Acid Neutralization Capacity (SNK) + LAGA Soil (Original Substance = Eluate) (Deponieverordnung DepV Anhang 2+3, Tab. 2 Spalte 4-9 Deponieklasse DK 0-
III)
2 EA
C014AC Acc. to Landfill Decree, Appendix 3, Table 2, Column 4-9, Landfill Category 0-III including Total Organic Carbon (TOC) without Acid Neutralization Capacity (SNK) + in addition to LAGA 1997 (Deponieverordnung DepV Anhang 2+3, Tab. 2 Spalte 4-9 Deponieklasse DK 0-III)
2 EA
C014AD Acc. to Recycling Guideline Bavaria ZTV-WWG AIIMBI No. 4/95, StB 9/05
2 EA
C015 Sampling C015AA Single Soil Sample from surface 20 EA C015AB Single Soil Sample from 0 - 20 cm below surface with shovel or spade
10 EA
C015AC Single Sediment Sample from surface water 5 EA C015AD Single Scoop Sample 110 EA
Period: Option Year 2 (1 July 2027 - 30 June 2028) Schedule C
| Base Year (FY25-26) |
| Option Year 1 (FY26-27) |
| Option Year 2 (FY27-28) |
File details come from the government source that posted it. Updated .