B08_Contract_Price_Schedule.pdf

PDF 121 KB Posted

Attached to
Boulder Beach Lodge Demolition for Lake Mead Natio
Solicitation number
140P8121R0010
Issued by

About this file

This document contains a price schedule for a demolition project solicitation issued by the National Park Service Pacific West Region. The solicitation seeks fixed-price bids to demolish and remove four buildings at Lake Mead Lodge Motel in Lake Mead National Recreation Area in Clark County, Nevada. The work includes asbestos abatement, building demolition and disposal, utility termination and removal, water and dust control, permitting, decompaction and site grading. Bidders must provide unit pricing for each line item as well as a total proposed price for lines 1 through 12. The document notes that lines 1 through 8 will be initially awarded, with the government reserving the option to award specific line items for asbestos abatement work up to five days before the end of the contract period.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LAKE ‐252139

5/19/2021

SOLICITATION NUMBER:

PARK ‐ PMIS: LAKE ‐ 252139

DEVELOPED AREA: Lake Mead Lodge Motel PROJECT TITLE: Lake Mead Lodge Motel Demo Project

Contract Line Item Number

Contract Line Item (CLI) Title QUANTITY

UNIT OF

MEASURE

UNIT

PRICE

TOTAL PRICE

LAKE ‐ 252139 ‐ Lake Mead Lodge Motel Demo Project 1 Mobilization and Demobilization 2 Each 2 Asbestos Mitigation 1 LS 3 Building Demolition and Disposal 1 LS 4 Utility Termination, Removal and Disposal 1 LS 5 Coordination of Transformer Removal with NV Energy 1 LS 6 Water and Dust Control 1 LS 7 Permits 1 LS 8 Decompaction, Fill and Grading 1 LS

* Option A‐ Asbestos Abatement of Transite under slabs

Bldg A ‐ Annex Building 140 LF Bldg B ‐ Lodge Rooms 1‐ 19 220 LF Bldg C ‐Main Office and Suites 240 LF Bldg D ‐Lodge Rooms 20‐37 220 LF

Note 1 Note 2 Note 3

NOTES:

This is a firm fixed price requirement. All costs associated to perform the work in accordance to the Statement of Work. For price evaluation purposes, the overall total price of line Items1‐ 12 are going to be evaluated to determine price reasonableness. It is anticipated that lines 1-8 are going to be awarded at the time of contract award. The Government may select one or more option lines to award five days before the expiration of the performance period. Listing option lines in the price schedule is not a guarantee by the Government that optional lines are to be awarded during contract administration.

I

CONTRACT PRICE SCHEDULE

TOTAL PROPOSED PRICE (CONTRACT LINE ITEM 1‐8)

Total Proposed Price Lines 1-12