B08_Contract_Price_Schedule.pdf

PDF 95 KB Posted

Attached to
Replace Fishing Pier, Lake Mead, Nevada
Solicitation number
140P8122R0004
Issued by

About this file

This document contains a price schedule and details for a federal contract opportunity to replace a fishing pier at Lake Mead National Recreation Area. The price schedule lists seven items needed to complete the project, including recycling the existing pier, installing a transition plate and ramp, adding an access walkway and fishing platform, and providing anchors and attachment accessories. Bidders should submit a firm fixed price as the total for items 1 through 7, with an additional line item price for an optional shade structure. Award will be made as a lump sum to the overall lowest priced conforming offer. The related federal contract opportunity is solicitation number 140P8122R0004 to replace the Hemenway Harbor Fishing Pier for the Department of the Interior National Park Service Pacific West Region.

View the file

Other files

File Type Posted
B03_General_Decision_NV20220024.pdf PDF
B08_Transmittal.pdf PDF
Sol_140P8122R0004.pdf PDF
A04_Project_Specifications.pdf PDF
B08_Invoice_Payment_Request.docx DOCX document
B08_Release_of_Claims.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Price Items – From Page 13 of the Project Specifications

Item No. 01- Replace HH Fishing Pier is the sum of items 1-6 in the table below.

Item No. 02 – Install Sunshade is item 7 in the table below.

Item No.

Schedule of Values

Quantities

Unit

Total ($)

Replace HH Fishing Pier 1 Recycle Fishing Pier, Tire Anchor, & Conc Block Anchors 1 LS 2 Transition Plate 1 LS 3 Transition Ramp 1 LS 4 Access Walkway 1 LS 5 Fishing Platform 1 LS 6 Anchors & Anchor Attachment Accessories 1 LS 7 Bid Option Contract Price Item No. 02 - Shade Structure 1 LS

TOTAL

Note that this is FOB Destination. This is a firm fixed price requirement. All costs associated to perform the work in accordance to the Project Specifications shall be include. It is anticipated that award will be made as a lump sum.

For price evaluation purposes, price reasonableness will be based on the total sum of item prices 1-7 and requirements in FAR 15.420(a)(2).