B08_CHOH_320577_Attachment_2_Drawing_FINAL_CDs.pdf
PDF 31 MB Posted
- Attached to
- CHOH 320577 Improve Access at Byron Bridge Federal contract opportunity
- Solicitation number
- 140P2024R0107
About this file
This document appears to be a set of drawings, labeled as Attachment 2, related to the federal contract opportunity for the CHOH 320577 Improve Access at Byron Bridge project. The contract opportunity is a solicitation issued by the Department of the Interior National Park Service National Office with the solicitation number 140P2024R0107. The project is for a construction contract to improve access at the Byron Bridge along the Chesapeake & Ohio (C&O) Canal, located in Brunswick, MD.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
SITE
ST
ATE OF MARYLAND
T IM
OTHY J. HOGAN
PROF ES S I ONA L ENG I NEERREG I ST ERED
NO . 4 0 9 4 1
06/14/2024
ST
ATE OF MARYLAND
T IM
OTHY J. HOGAN
PROF ESS I ONA L ENG I NEERREG I ST ERED
NO . 4 0 9 4 1
06/14/2024
GENERAL NOTES
1. PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ENSURING THAT ALL REQUIRED PERMITS AND APPROVALS
HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL
THE CONTRACTOR HAS RECEIVED AND THOROUGHLY REVIEWED ALL PLANS AND
OTHER DOCUMENTS APPROVED BY ALL PERMITTING AUTHORITIES.
2. NO GRADING, STRIPPING, EXCAVATION, FILLING OR OTHER DISTURBANCE OF THE
NATURAL GROUND COVER SHALL TAKE PLACE UNTIL PROPOSED SOIL EROSION
CONTROL PLAN HAS BEEN APPROVED AND IN PLACE.
3. IN THE CASE OF CONFLICT BETWEEN THIS DRAWING AND ANY OTHER DRAWING
AND/OR SPECIFICATIONS, THE CONTRACTING OFFICER (CO) SHALL BE
IMMEDIATELY NOTIFIED FOR CLARIFICATION.
4. THE CONTRACTOR SHALL BID AND PERFORM THE WORK IN ACCORDANCE WITH
ALL LOCAL, STATE AND NATIONAL CODES AND THE REQUIREMENTS OF LOCAL
UTILITY COMPANIES.
5. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE
CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR
CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND
PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL
APPLY CONTINUOUSLY AND WILL NOT BE LIMITED TO NORMAL WORKING HOURS.
THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING ALL
BARRICADES, WARNING SIGNS, FLASHING LIGHTS AND THE TRAFFIC CONTROL
DEVICES DURING CONSTRUCTION. CONTRACTOR SHALL COMPLY WITH OSHA
REGULATIONS AND SAFETY REQUIREMENTS. CONTRACTOR SHALL PROVIDE A
SAFETY PLAN TO CONTRACTING OFFICE FOR REVIEW AND APPROVAL.
6. THE CONTRACTOR IS RESPONSIBLE FOR THE SAFETY OF ALL VEHICLE TRAFFIC IN
AND AROUND THE CONSTRUCTION AREA.
CONSTRUCTION NOTES
1. CONTRACTOR SHALL FLAG ALL TREES TO BE REMOVED FOR CO APPROVAL PRIOR
TO BEGINNING CONSTRUCTION.
2. SEE DEMOLITION AND EROSION & SEDIMENT CONTROL PLAN FOR TREES TO BE
CUT FLUSH WITH GROUND SURFACE AND TREATED WITH APPROVED HERBICIDE
PER SPECIFICATIONS. DO NOT DISTURB ROOTS EXCEPT AS NEEDED TO
CONSTRUCT THE PROPOSED STRUCTURE.
3. ANY MODIFICATION TO THE STAGING AREA SHOWN IN THE CONTRACT
DOCUMENTS IS TO BE APPROVED BY THE MARYLAND DEPARTMENT OF THE
ENVIRONMENT AND THE CONTRACT OFFICER PRIOR TO CONSTRUCTION.
4. CONSTRUCTION STAKEOUT OF LOD, LOW, AND STAIR TOWER FOUNDATIONS
SHALL BE PERFORMED BY THE CONTRACTOR PRIOR TO THE SITE BEING
DISTURBED.
GRADING AND DRAINAGE NOTES
1. CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES HAVING UNDERGROUND
UTILITIES ON SITE OR IN RIGHT-OF-WAY PRIOR TO EXCAVATION. CONTRACTOR
SHALL NOTIFY MD-811 AND PRIVATE UTILITY LOCATOR 48 HOURS PRIOR TO
EXCAVATION.
2. SITE GRADING SHALL NOT PROCEED UNTIL EROSION CONTROL MEASURES HAVE
BEEN INSTALLED AND APPROVED BY CONTRACT OFFICER.
3. DURING ALL GRADING AND DRAINAGE OPERATIONS, CONTRACTOR SHALL ABIDE
BY ALL OSHA REGULATIONS FOR SLOPING AND BENCHING.
4. SITE GRADES AROUND PAVEMENT SHALL BE GRADED DURING CONSTRUCTION
TO PREVENT PONDING. ANY SURFACE WATER ACCUMULATION IN THE PROJECT
AREAS SHALL BE DRAINED IMMEDIATELY TO AVOID SATURATION OF THE
SUBGRADE SOILS.
5. ALL EXCAVATIONS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE LATEST
OSHA GUIDELINES AS MANDATED IN CURRENT FEDERAL, STATE AND LOCAL
REGULATIONS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE IN PROVIDING
SAFE WORKING CONDITIONS IN CONNECTION WITH ANY EXCAVATION WORK.
6. SUITABLE FILL MATERIAL SHALL BE PLACED AND COMPACTED TO A DENSITY AS
SPECIFIED.
7. STONE BASES SHOULD BE COMPACTED TO A DENSITY AS SPECIFIED.
8. GRADE LINES SHOWN ARE FINISHED GRADE. CONTRACTOR SHOULD SEE DETAIL
SHEETS FOR APPROPRIATE MATERIAL TYPE TO DETERMINE SUB-GRADE
ELEVATIONS FOR VARIOUS PAVEMENT TYPES.
9. ALL CONSTRUCTED PEDESTRIAN SURFACES SHALL MEET THE ARCHITECTURAL
BARRIERS ACT (ACCESSIBILITY) STANDARDS FOR SLOPE AND CROSS-SLOPE
REQUIREMENTS OR REWORK WILL BE PROVIDED BY THE CONTRACTOR TO
CORRECT NON-COMPLIANCE AT THE CONTRACTOR'S EXPENSE.
CULTURAL RESOURCE NOTES
1. CONTRACTOR SHALL PROTECT STONE WALLS, EXISTING CANAL LOCK WALLS,
CSX BRIDGE & ABUTMENTS AND ALL ASSOCIATED FEATURES FROM DAMAGE
DURING ALL PORTIONS OF CONSTRUCTION.
2. AT ALL ARCHEOLOGICALLY SENSITIVE AREAS, AN NPS PROVIDED
ARCHEOLOGICAL MONITOR MAY OBSERVE ALL GROUND-DISTURBING SITE WORK,
INCLUDING CONSTRUCTION OF TEMPORARY FACILITIES, FROM A SAFE LOCATION
MUTUALLY AGREED ON BY CONTRACTOR AND MONITOR. AS NEW GROUND IS
BROKEN, MONITOR MAY EXAMINE EXCAVATED MATERIALS USING CONSTRUCTION
LAYOUT CENTERLINE AND PERIMETER STAKING AS A REFERENCE POINT TO
RECORD LOCATIONS OF FINDING. CONTRACTOR SHALL PROVIDE A MINIMUM OF
ONE WEEK NOTICE IN ADVANCE OF EXCAVATION ACTIVITIES.
3. IF THE CONTRACTOR OR THE ARCHEOLOGICAL MONITOR DISCOVERS
UNDOCUMENTED RESOURCES, ALL WORK WITHIN 100 FEET SHALL STOP
IMMEDIATELY AND BE RELOCATED TO A NON-SENSITIVE AREAS. CONTRACTOR
MAY BE REQUIRED TO ALLOW MONITOR TO TAKE SOIL SAMPLES AND RECORD
RESOURCES. WHILE ARCHEOLOGICAL MONITOR IS DOCUMENTING RESOURCES IN
SENSITIVE AREAS, CONTRACTOR SHALL RELOCATE WORK TO NON-SENSITIVE
AREAS WHERE MONITORING IS NOT NORMALLY REQUIRED.
4. IF RESOURCES ARE DISCOVERED WHILE ARCHEOLOGICAL MONITOR IS ABSENT,
STOP WORK IMMEDIATELY AND REPORT THE DISCOVERY TO THE CONTRACTING
OFFICER.
5. THE CONTRACTOR SHALL PLAN, SCHEDULE AND EXECUTE THE WORK TO
PREVENT STOPPAGES AT ONE AREA FROM STOPPING ALL WORK AT THE
CONSTRUCTION SITE.
HISTORIC PRESERVATION REQUIREMENTS
1. WORK SHALL BE COMPLETED IN A MANNER CONSISTENT WITH THE SECRETARY
OF INTERIOR'S STANDARD FOR TREATMENT OF HISTORIC PROPERTIES.
CONSTRUCTION SEQUENCE
THE CONTRACTOR IS REQUIRED TO CONSTRUCT THE PROJECT IN NUMERICAL ORDER
NOTED WITHIN THE FOLLOWING SEQUENCE OF CONSTRUCTION.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR STABILIZING THE SITE AT THE END
OF EACH DAY IN ACCORDANCE WITH MDE STANDARDS AND SPECIFICATIONS OF SOIL
EROSION AND SEDIMENT CONTROL.
1. CONTACT MDE AND NPS CONTRACTING OFFICER 48 HOURS PRIOR TO THE START
OF CONSTRUCTION, A PRE-CONSTRUCTION MEETING WILL BE REQUIRED PRIOR
TO THE START OF ANY CONSTRUCTION.
2. THE CONTRACTOR SHALL INSTALL SPECIFIED PERIMETER CONTROLS PRIOR TO
COMMENCING CONSTRUCTION ACTIVITIES CAUSING EARTH DISTURBANCE.
3. CONSTRUCT STAGING AREA AS SHOWN ON PLANS, INCLUDING TEMPORARY
FACILITIES.
4. CLEAR AND GRUB SITE, REMOVING TREES AS INDICATED ON PLANS.
5. COMPLETE ALL STAIR TOWER CONSTRUCTION AND STABILIZATION.
6. COMPLETE ALL BACKFILL AND EARTHWORK ASSOCIATED WITH STAIR TOWER.
7. INSTALL TOWPATH GRAVEL BASE & TOP COURSE WITH GEOTEXTILE BENEATH.
8. THE CONTRACTOR SHALL REMOVE ALL EROSION CONTROLS AT THE END OF THE
PROJECT AFTER THE REMOVAL OF ALL TEMPORARY FACILITIES & RESEEDING.
ALL DISTURBED AREAS MUST BE PERMANENTLY STABILIZED AT THIS TIME.
9. FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE COMPLETED BASED ON BELOW
REQUIREMENT:
· NO DISTURBED AREA SHALL BE LEFT UNSTABILIZED OVERNIGHT UNLESS THE RUNOFF WILL
BE DIRECTED TO AN MDE APPROVED SEDIMENT CONTROL DEVICE.
· THE CONTRACTOR SHALL REQUEST THAT THE INSPECTION AGENCY APPROVE THE WORK
COMPLETED AT THE STAGES OF CONSTRUCTION SPECIFIED BELOW IN ACCORDANCE WITH
THE APPROVED EROSION AND SEDIMENT CONTROL PLAN, GRADING OR BUILDING PERMIT,
AND THIS SECTION OF THE GUIDELINES.
10. A REVISED SEQUENCE OF CONSTRUCTION MAY BE SUBMITTED BY THE
CONTRACTOR. THE REVISED SEQUENCE MUST BE APPROVED BY MDE AND CO.
CSXT CONSTRUCTION REQUIREMENTS
1. THE CONTRACTOR MUST PLAN AND PERFORM THE WORK IN A MANNER SUCH
THAT THE CSXT TRACKS AT THE PROJECT LOCATION REMAIN FULLY CAPABLE OF
CARRYING RAIL TRAFFIC THROUGHOUT THE WORK PERIOD AND RAIL TRAFFIC IS
NOT DELAYED OR OTHERWISE IMPACTED DUE TO THE WORK BEING PERFORMED.
2. THE CONTRACTOR SHALL NOT BE PERMITTED TO USE THE CSXT RIGHT-OF-WAY
FOR STORAGE OF MATERIALS OR EQUIPMENT DURING CONSTRUCTION. THE
CSXT RIGHT-OF-WAY MUST REMAIN CLEAR AT ALL TIMES.
3. NO EQUIPMENT WILL BE PERMITTED TO BE STAGED WITHIN 15 FEET OF TRACK
CENTERLINE AT ANY TIME DURING THE PERFORMANCE OF THE PROJECT WORK.
4. THE CONTRACTOR SHALL BE REQUIRED TO FULLY COMPLY WITH ALL FEDERAL,
STATE, AND LOCAL ENVIRONMENTAL LAWS, REGULATIONS, STATUTES AND
ORDINANCES AT ALL TIMES.
5. CSXT FACILITIES ARE NOT SUBJECT TO "MISS UTILITY" PROGRAMS SUCH AS
MARYLAND 811. CONTRACTOR SHALL COORDINATE WITH CSXT TO HAVE ITS
FACILITIES MARKED IN THE FIELD PRIOR TO PERFORMING WORK WITH THE
POTENTIAL TO IMPACT BELOW-GRADE FACILITIES. CSXT WILL MARK OUT
EXISTING CSXT FACILITIES AT PROJECT EXPENSE.
6. A CSXT FLAGMAN MAY BE REQUIRED FOR ANY WORK WHICH REQUIRES ENTRY
ONTO THE CSXT RIGHT-OF-WAY, ANY WORK THAT HAS POTENTIAL TO FOUL CSXT
TRACK, AND ANY WORK TO BE PERFORMED WITHIN 50 FEET OF THE CENTERLINE
OF TRACK. CSXT SHALL HAVE SOLE AUTHORITY TO DETERMINE THE NEED FOR
FLAGGING REQUIRED TO PROTECT ITS OPERATIONS AND PROPERTY.
7. THE CONTRACTOR MUST ADHERE TO THE PROVISIONS OF THE CSXT INSURANCE
REQUIREMENTS, CSXT SPECIAL PROVISIONS, CSXT CONSTRUCTION SUBMISSION
CRITERIA, CSXT SOIL AND WATER MANAGEMENT POLICY, AND PROJECT-SPECIFIC
CONSTRUCTION REQUIREMENTS. IN THE EVENT THERE IS ANY DISCREPANCY OR
PERCEIVED VARIANCE BETWEEN THE PROVISIONS WITHIN THE CSXT DOCUMENTS
AND THOSE OF THE NATIONAL PARK SERVICE AS RELATED TO THIS PROJECT,
THEN THE PROVISIONS OF THE CSXT DOCUMENTS SHALL GOVERN.
8. CSXT DOES NOT PERMIT ANY REDUCTION TO THE EXISTING HORIZONTAL OR
VERTICAL CLEARANCES AT ANY TIME DURING CONSTRUCTION, OR IN THE FINAL
CONDITION. ANY PROPOSED TEMPORARY REDUCTION OF THE EXISTING
HORIZONTAL OR VERTICAL CLEARANCE MUST BE REVIEWED BY CSXT WITH NO
GUARANTEE OF APPROVAL.
9. THE USE OF ACETYLENE GAS IS PROHIBITED. TORCH CUTTING SHALL BE
PERFORMED UTILIZING OTHER MATERIALS SUCH AS PROPANE.
10. CSXT INSURANCE REQUIREMENTS, CSXT SPECIAL PROVISIONS, CSXT
CONSTRUCTION SUBMISSION CRITERIA, AND CSXT SOIL AND WATER
MANAGEMENT POLICY SHALL BE INCORPORATED INTO THE PROJECT
DOCUMENTS. THE CONTRACTOR MUST ADHERE TO THE PROVISIONS OF THESE
DOCUMENTS. IN THE EVENT THERE IS ANY DISCREPANCY OR PERCEIVED
VARIANCE BETWEEN THE PROVISIONS WITHIN THESE DOCUMENTS AND THOSE
OF NATIONAL PARK SERVICES AS RELATED TO THIS PROJECT, THE PROVISIONS
OF THE ATTACHED DOCUMENTS SHALL GOVERN.
11. MORTAR REPOINTING MATERIAL
· MORTAR FOR TUCKPOINTING SHALL BE COMPOSED OF 4 PARTS PORTLAND CEMENT, FROM 1
TO 2 PARTS HYDRATED LIME AND CLEAN WELL-GRADED SAND IN THE PROPORTION OF 3
TIMES THE SUM OF THE CEMENTITIOUS MATERIAL (CEMENT PLUS LIME). MIX IN A BATCH
MIXER FOR NOT LESS THAN FIVE MINUTES AND LONG ENOUGH FOR THOROUGH MIXING OF
ALL INGREDIENTS. AFTER WHICH CLEAN POTABLE WATER SHALL BE ADDED IN SUCH
QUANTITY AS TO FORM A STIFF PLASTIC MASS. MORTAR SHALL BE USED WITHIN 45 MINUTES
AFTER MIXING. RETEMPERING OF MORTAR SHALL NOT BE PERMITTED.
12. MORTAR REPOINTING EXECUTION
· LOOSE MATERIAL IN THE JOINTS SHALL BE COMPLETELY REMOVED TO SOUND MATERIAL TO A
MINIMUM DEPTH AS SPECIFIED ON THE PROJECT PLANS AND BY THOROUGHLY WETTING
WITH CLEAN WATER.
· TUCKPOINTING SHALL NOT BE DONE WHEN THE SURFACE TEMPERATURE OF THE MASONRY IS
BELOW 40° F OR AMBIENT TEMPERATURES BELOW 32° ARE PREDICTED WITHIN 24 HOURS OF
COMPLETION OF WORK.
· AFTER RAKING AND WETTING, THE JOINTS SHALL BE FILLED WITH MORTAR. THE MORTAR
SHALL BE WELL DRIVEN AND COMPACTED INTO THE JOINTS AND FINISHED WITH A POINTING
TOOL. MORTAR SHOULD BE ADDED IN LIFTS NO GREATER THAN ¼ INCH OR 3/8 INCH, WHICH
ALLOWS FOR THE MORTAR TO BOND TO THE SURROUNDING MASONRY AND MINIMIZES
SHRINKAGE. ONCE THE MORTAR HAS REACHED THUMBPRINT HARDNESS, A SECOND LIFT
CAN BE ADDED. THE PORTION OF THE ABUTMENT OR PIER SHALL BE KEPT WET FOR A
PERIOD OF AT LEAST 3 DAYS AFTER COMPACTION.
· ONCE THE POINTING IS COMPLETED AND THE MORTAR SET, THE MASONRY ELEMENTS SHALL
BE THOROUGHLY CLEANED AND LEFT IN A NEAT AND WORKMANLIKE CONDITION.
· MATERIAL, TEXTURE AND COLOR SHALL MATCH EXISTING ADJACENT ABUTMENT
ABBREVIATIONS:
A AREA
ABAAS ARCHITECTURAL BARRIERS ACT ACCESSIBILITY
STANDARDS
ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS
B/C BOTTOM OF CURB
BIT BITUMINOUS PAVEMENT
BM BENCH MARK
BS BOTTOM OF STEP
C/C CENTER TO CENTER
CB CATCH BASIN
CO CONTRACTING OFFICER
CONC CONCRETE
CWD CLEAR WATER DIVERSION
DGA DENSE GRADED AGGREGATE
DIA DIAMETER
(E) EAST
EL. ELEV ELEVATION
EQ EQUIVALENT
FH FIRE HYDRANT
GND, GRD GROUND
HD HEAVY DUTY
HT HEIGHT
LBS POUNDS
LD LIGHT DUTY
LF LINEAR FEET
LOD LIMITS OF DISTURBANCE
MANUF MANUFACTURE
MAT'L MATERIAL
MAX MAXIMUM
MDE MARYLAND DEPARTMENT OF ENVIRONMENT
MIN MINIMUM
MG MATCH EXISTING GRADE
MH MANHOLE
(N) NORTH
NPS NATIONAL PARK SERVICE
OSHA OCCUPATIONAL SAFETY & HEALTH ADMINISTRATON
PE POLYETHYLENE
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
R RADIUS
REQ'D REQUIRED
ROW RIGHT-OF-WAY
RW RETAINING WALL
(N) SOUTH
SB SOIL BORING
SF, SQFT SQUARE FEET
SPCL SPECIAL
SR LAID-BACK STONE REVETMENT
STRUC STRUCTURE
SW STONE WALL
TC TOP OF CURB
TEL TELEPHONE
TP TOP OF PAVEMENT
TS TOP OF SLAB
TW TOP OF WALL
TYP TYPICAL
UC UTILITY CROSSING
W WIRE
(W) WEST
W/ WITH
WTR WATER
WLL WORK LIMIT LINE
WOUS WATERS OF THE US
T IM
OTHY J. HOGAN
PROF ESS I ONA L ENG I NEERREG I ST ERED
NO . 4 0 9 4 1
06/14/2024
STANDARD EROSION AND SEDIMENT CONTROL NOTES
MDE REQUIRES THAT THESE NOTES, IN THEIR ENTIRETY, BE INCLUDED ON THE EROSION AND SEDIMENT CONTROL PLAN. IT IS RECOGNIZED THAT NOT EVERY NOTE MAY APPLY TO ALL PROJECTS. THE REQUIREMENT OF ANY INDIVIDUAL NOTE NOT APPLICABLE TO THE SUBJECT PROJECT IS NOT BINDING
UPON THE APPLICANT OR THE APPLICANT'S CONTRACTOR.
1. THE CONTRACTOR SHALL NOTIFY THE MARYLAND DEPARTMENT OF THE ENVIRONMENT (MDE) AT (410) 537-3510 SEVEN (7) DAYS BEFORE COMMENCING ANY LAND DISTURBING ACTIVITY AND, UNLESS WAIVED BY MDE, SHALL BE REQUIRED TO HOLD A PRE-CONSTRUCTION MEETING BETWEEN PROJECT
REPRESENTATIVES AND A REPRESENTATIVE OF MDE.
2. THE CONTRACTOR SHALL NOTIFY MDE IN WRITING AND BY TELEPHONE AT THE FOLLOWING POINTS:
A. THE REQUIRED PRE-CONSTRUCTION MEETING.
B. FOLLOWING INSTALLATION OF SEDIMENT CONTROL MEASURES.
C. PRIOR TO REMOVAL OR MODIFICATION OF ANY SEDIMENT CONTROL STRUCTURE(S).
D. PRIOR TO REMOVAL OF ALL SEDIMENT CONTROL DEVICES.
E. PRIOR TO FINAL ACCEPTANCE.
3. THE PLAN APPROVAL LETTER, APPROVED EROSION AND SEDIMENT CONTROL PLANS, DAILY LOG BOOKS, AND TEST REPORTS SHALL BE AVAILABLE FOR INSPECTION BY DULY AUTHORIZED OFFICIALS
OF MDE AND THE AGENCY RESPONSIBLE FOR THE PROJECT.
4. THE CONTRACTOR SHALL CONSTRUCT ALL EROSION AND SEDIMENT CONTROL MEASURES PER THE APPROVED PLAN AND CONSTRUCTION SEQUENCE AND SHALL HAVE THEM INSPECTED AND APPROVED BY THE MDE INSPECTOR PRIOR TO BEGINNING ANY OTHER LAND DISTURBANCES. MINOR SEDIMENT CONTROL DEVICE LOCATION ADJUSTMENTS MAY BE MADE IN THE FIELD WITH THE APPROVAL OF THE MDE INSPECTOR. THE CONTRACTOR SHALL ENSURE THAT ALL RUNOFF FROM DISTURBED AREAS IS
DIRECTED TO THE SEDIMENT CONTROL DEVICES AND SHALL NOT REMOVE ANY EROSION OR
SEDIMENT CONTROL MEASURE WITHOUT PRIOR PERMISSION FROM MDE INSPECTOR. THE
CONTRACTOR MUST OBTAIN PRIOR AGENCY AND MDE APPROVAL FOR MODIFICATIONS TO THE
SEDIMENT CONTROL PLAN AND/OR SEQUENCE OF CONSTRUCTION.
5. THE MDE INSPECTOR HAS THE OPTION OF REQUIRING ADDITIONAL SAFETY OR SEDIMENT CONTROL
MEASURES, IF DEEMED NECESSARY.
6. THE CONTRACTOR SHALL PROTECT ALL POINTS OF CONSTRUCTION INGRESS AND EGRESS TO
PREVENT THE DEPOSITION OF MATERIALS ONTO PUBLIC ROADS. ALL MATERIALS DEPOSITED ONTO
PUBLIC ROADS SHALL BE REMOVED IMMEDIATELY.
7. THE CONTRACTOR SHALL INSPECT DAILY AND MAINTAIN CONTINUOUSLY IN AN EFFECTIVE OPERATING
CONDITION ALL EROSION AND SEDIMENT CONTROL MEASURES UNTIL SUCH TIME AS THEY ARE
REMOVED WITH PRIOR PERMISSION FROM THE MDE INSPECTOR.
8. EROSION AND SEDIMENT CONTROL FOR UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY CONSTRUCTION SHALL ONLY BE FOR AREAS WITHIN THE DELINEATED LIMIT OF DISTURBANCE. CALL "MISS UTILITY" AT 1-800-257-7777 48 HOURS PRIOR TO
THE START OF WORK.
WHEN SAME DAY STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL BE BACKFILLED, COMPACTED, AND STABILIZED AT
THE END OF EACH WORKING DAY. No MORE TRENCH SHALL BE OPENED THAN CAN BE
COMPLETED THE SAME DAY.
9. ALL WATER REMOVED FROM EXCAVATED AREAS SHALL BE PASSED THROUGH AN MDE APPROVED DEWATERING PRACTICE OR PUMPED TO A SEDIMENT TRAP OR BASIN PRIOR TO DISCHARGE TO A
FUNCTIONAL STORM DRAIN SYSTEM OR TO STABLE GROUND SURFACE.
10. CONCRETE WASHOUT STRUCTURES SHALL BE USED WHEN CONCRETE TRUCKS, DRUMS, PUMPS, CHUTES, OR OTHER EQUIPMENT IS RINSED OR CLEANED ON-SITE.
11. CONSTRUCTION ACTIVITIES PRODUCING DUST SHALL IMPLEMENT CONTROL MEASURES TO AVOID THE SUSPENSION OF DUST PARTICLES AND/OR PREVENT DUST FROM BLOWING OFF-SITE OR TO AREAS
WITHOUT TREATMENT.
12. FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT OR TEMPORARY
STABILIZATION SHALL BE COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER CONTROLS, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL
(3:1); AND
B. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED AREAS ON THE PROJECT
SITE NOT UNDER ACTIVE GRADING.
13. VEGETATIVE STABILIZATION SHALL BE PERFORMED IN ACCORDANCE WITH THE 2011 MARYLAND
STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL. REFER TO
APPROPRIATE SPECIFICATIONS FOR TEMPORARY SEEDING, PERMANENT SEEDING, MULCHING,
SODDING, AND GROUND COVERS.
14. WHEN SEEDING, ALL DISTURBED AREAS WITH SLOPES FLATTER THAN 2:1 SHALL BE STABILIZED WITH 4 INCHES OF TOPSOIL, SEED, AND MULCH. ALL DISTURBED AREAS WITH SLOPES 2:1 OR STEEPER SHALL
BE STABILIZED WITH MATTING OVER 2 INCHES OF TOPSOIL AND SEED.
15. ALL SEDIMENT BASINS, TRAP EMBANKMENTS AND SLOPES, PERIMETER DIKES, SWALES AND ALL DISTURBED SLOPES STEEPER OR EQUAL TO 3:1 SHALL BE STABILIZED WITH SEED AND ANCHORED STRAW MULCH, SOD, OR OTHER APPROVED STABILIZATION MEASURES, AS SOON AS POSSIBLE BUT NO LATER THAN THREE (3) CALENDAR DAYS AFTER ESTABLISHMENT. ALL AREAS DISTURBED OUTSIDE
OF THE PERIMETER SEDIMENT CONTROL SYSTEM MUST BE MINIMIZED. MAINTENANCE SHALL BE
PERFORMED AS NECESSARY TO ENSURE CONTINUED STABILIZATION.
16. PERMANENT SWALES OR OTHER POINTS OF CONCENTRATED WATER FLOW SHALL BE STABILIZED WITH SEED AND AN APPROVED EROSION CONTROL MATTING, SOD, RIP-RAP, OR OTHER APPROVED
STABILIZATION MEASURES.
17. FOR STOCKPILE SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1), THE CONTRACTOR SHALL APPLY SEED AND ANCHORED STRAW MULCH, SOD, OR OTHER APPROVED STABILIZATION MEASURES TO THE FACE OF THE STOCKPILE WITHIN THREE (3) CALENDAR DAYS OF ACTIVITY HAVING CEASED ON THE RESPECTIVE FACE. FOR SLOPES 3:1 OR FLATTER, THE CONTRACTOR SHALL APPLY STABILIZATION MEASURES TO THE FACE OF THE STOCKPILE WITHIN SEVEN (7) CALENDAR DAYS OF ACTIVITY HAVING
CEASED ON THE RESPECTIVE FACE. MAINTENANCE SHALL BE PERFORMED AS NECESSARY TO
ENSURE CONTINUED STABILIZATION.
18. FOR FINISHED GRADING, THE CONTRACTOR SHALL PROVIDE ADEQUATE GRADIENTS TO PREVENT WATER FROM PONDING FOR MORE THAN TWENTY-FOUR (24) HOURS AFTER THE END OF A RAINFALL EVENT. DRAINAGE COURSES AND SWALE FLOW AREAS MAY TAKE AS LONG AS FORTY-EIGHT (48) HOURS AFTER THE END OF A RAINFALL EVENT TO DRAIN. AREAS DESIGNATED TO HAVE STANDING
WATER SHALL NOT BE REQUIRED TO MEET THIS REQUIREMENT.
19. WHERE DEEMED APPROPRIATE BY THE ENGINEER OR INSPECTOR, SEDIMENT BASINS AND TRAPS MAY
NEED TO BE SURROUNDED WITH AN APPROVED SAFETY FENCE. THE FENCE MUST CONFORM TO
LOCAL ORDINANCES AND REGULATIONS. THE DEVELOPER OR OWNER SHALL CHECK WITH LOCAL
BUILDING OFFICIALS ON APPLICABLE SAFETY REQUIREMENTS. WHERE SAFETY FENCE IS DEEMED
APPROPRIATE AND LOCAL ORDINANCES DO NOT SPECIFY FENCING SIZES AND TYPES, THE
FOLLOWING SHALL BE USED AS A MINIMUM STANDARD: THE SAFETY FENCE SHALL BE MADE OF
WELDED WIRE AND AT LEAST 42 INCHES HIGH, HAVE POSTS SPACED NO FARTHER APART THAN 8 FEET, HAVE MESH OPENINGS NO GREATER THAN 2 INCHES IN WIDTH AND 4 INCHES IN HEIGHT WITH A MINIMUM OF 14 GAUGE WIRE. SAFETY FENCE SHALL BE MAINTAINED AND IN GOOD CONDITION AT ALL
TIMES.
20. ALL SEDIMENT TRAP DEPTH DIMENSIONS ARE RELATIVE TO THE OUTLET ELEVATION. ALL TRAPS SHALL HAVE A STABLE OUTFALL. ALL TRAPS AND BASINS SHALL HAVE STABLE INFLOW POINTS.
21. SEDIMENT SHALL BE REMOVED AND THE TRAP OR BASIN RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE QUARTER OF THE TOTAL DEPTH OF THE TRAP OR BASIN. TOTAL DEPTH SHALL BE MEASURED FROM THE TRAP OR BASIN BOTTOM TO THE CREST OF THE
OUTLET.
22. SEDIMENT REMOVED FROM TRAPS (AND BASINS) SHALL BE PLACED AND STABILIZED IN APPROVED AREAS, BUT NOT WITHIN A FLOODPLAIN, WETLAND OR TREE-SAVE AREA. WHEN PUMPING SEDIMENT LADEN WATER, THE DISCHARGE SHALL BE DIRECTED TO AN MDE APPROVED SEDIMENT TRAPPING
DEVICE PRIOR TO RELEASE FROM THE SITE. A SUMP PIT MAY BE USED IF SEDIMENT TRAPS
THEMSELVES ARE BEING PUMPED OUT.
23. PRIOR TO REMOVAL OF SEDIMENT CONTROL MEASURES, THE CONTRACTOR SHALL STABILIZE AND HAVE ESTABLISHED PERMANENT STABILIZATION FOR ALL CONTRIBUTORY DISTURBED AREAS USING
SOD OR AN APPROVED PERMANENT SEED MIXTURE WITH REQUIRED SOIL AMENDMENTS AND AN
APPROVED ANCHORED MULCH. WOOD FIBER MULCH MAY ONLY BE USED IN SEEDING SEASON WHERE
THE SLOPE DOES NOT EXCEED 10% AND GRADING HAS BEEN DONE TO PROMOTE SHEET FLOW
DRAINAGE. AREAS BROUGHT TO FINISHED GRADE DURING THE SEEDING SEASON SHALL BE
PERMANENTLY STABILIZED AS SOON AS POSSIBLE, BUT NOT LATER THAN THREE (3) CALENDAR DAYS AFTER ESTABLISHMENT FOR SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) AND SEVEN
(7) CALENDAR DAYS FOR FLATTER SLOPES. WHEN PROPERTY IS BROUGHT TO FINISHED GRADE
DURING THE MONTHS OF NOVEMBER THROUGH FEBRUARY, AND PERMANENT STABILIZATION IS
FOUND TO BE IMPRACTICAL, TEMPORARY SEED AND ANCHORED STRAW MULCH SHALL BE APPLIED TO DISTURBED AREAS. THE FINAL PERMANENT STABILIZATION OF SUCH PROPERTY SHALL BE APPLIED BY
MARCH 15 OR EARLIER IF GROUND AND WEATHER CONDITIONS ALLOW.
24. TEMPORARY SEDIMENT CONTROL DEVICES SHALL BE REMOVED WITH PERMISSION OF THE MDE
INSPECTOR WITHIN THIRTY (30) CALENDAR DAYS FOLLOWING ESTABLISHMENT OF PERMANENT
STABILIZATION IN ALL CONTRIBUTORY DRAINAGE AREAS. UPON REMOVAL OF SEDIMENT CONTROL DEVICES, THE AREA DISTURBED BY REMOVAL SHALL BE STABILIZED WITH TOPSOIL, SEED, AND MULCH, OR AS SPECIFIED, WITHIN 24 HOURS OF SAID REMOVAL. STORMWATER MANAGEMENT STRUCTURES
USED TEMPORARILY FOR SEDIMENT CONTROL SHALL BE CONVERTED TO THE PERMANENT
CONFIGURATION WITHIN THIS TIME PERIOD AS WELL.
25. OFF-SITE SPOIL OR BORROW AREAS ON STATE OR FEDERAL PROPERTY SHALL HAVE PRIOR
APPROVAL BY MDE AND OTHER APPLICABLE STATE, FEDERAL, AND LOCAL AGENCIES; OTHERWISE
APPROVAL SHALL BE GRANTED BY THE LOCAL AUTHORITIES. ALL WASTE AND BORROW AREAS
OFF-SITE SHALL BE PROTECTED BY SEDIMENT CONTROL MEASURES AND STABILIZED.
26. SITE INFORMATION
A. AREA DISTURBED ACRES
B. TOTAL CUT CUBIC YARDS
C. TOTAL FILL CUBIC YARDS
D. OFF-SITE WASTE / BORROW AREA LOCATION
BEST MANAGEMENT PRACTICES FOR WORKING IN NONTIDAL WETLANDS, WETLAND
BUFFERS, WATERWAYS, AND 100-YEAR FLOODPLAINS
1. NO EXCESS FILL, CONSTRUCTION MATERIAL, OR DEBRIS SHALL BE STOCKPILED OR STORED IN NONTIDAL WETLANDS, NONTIDAL WETLAND BUFFERS, WATERWAYS, OR THE 100-YEAR FLOODPLAIN.
2. PLACE MATERIALS IN A LOCATION AND MANNER WHICH DOES NOT ADVERSELY IMPACT SURFACE OR SUBSURFACE WATER FLOW INTO OR OUT OF NONTIDAL WETLANDS, NONTIDAL WETLAND BUFFERS, WATERWAYS, OR THE 100-YEAR FLOODPLAIN.
3. DO NOT USE THE EXCAVATED MATERIAL AS BACKFILL IF IT CONTAINS WASTE METAL PRODUCTS, UNSIGHTLY DEBRIS, TOXIC MATERIAL, OR ANY OTHER DELETERIOUS SUBSTANCE. IF ADDITIONAL
BACKFILL IS REQUIRED, USE CLEAN MATERIAL FREE OF WASTE METAL PRODUCTS, UNSIGHTLY
DEBRIS, TOXIC MATERIAL, OR ANY OTHER DELETERIOUS SUBSTANCE.
4. PLACE HEAVY EQUIPMENT ON MATS OR SUITABLY OPERATE THE EQUIPMENT TO PREVENT DAMAGE
TO NONTIDAL WETLANDS, NONTIDAL WETLAND BUFFERS, WATERWAYS, OR THE 100-YEAR
FLOODPLAIN.
5. REPAIR AND MAINTAIN ANY SERVICEABLE STRUCTURE OF FILL SO THERE IS NO PERMANENT LOSS OF NONTIDAL WETLANDS, NONTIDAL WETLAND BUFFERS, OR WATERWAYS, OR 100-YEAR FLOODPLAIN IN
EXCESS OF THAT LOST UNDER THE ORIGINALLY AUTHORIZED STRUCTURE OF FILL.
6. RECTIFY ANY NONTIDAL WETLANDS, WETLAND BUFFERS, WATERWAYS, OR 100-YEAR FLOODPLAIN
TEMPORARILY IMPACTED BY ANY CONSTRUCTION.
7. ALL STABILIZATION IN THE NONTIDAL WETLAND AND NONTIDAL WETLAND BUFFER SHALL CONSIST OF THE FOLLOWING SPECIES: ANNUAL RYEGRASS (Lolium multiflorum), MILLET (Setaria italica), BARLEY (Hordeum sp.), OATS (Uniola sp.), AND/OR RYE (Secale cereale). THESE SPECIES WILL ALLOW FOR THE
STABILIZATION OF THE SITE WHILE ALSO ALLOWING FOR THE VOLUNTARY REVEGETATION OF
NATURAL WETLAND SPECIES. OTHER NON-PERSISTENT VEGETATION MAY BE ACCEPTABLE, BUT MUST BE APPROVED BY THE NONTIDAL WETLANDS AND WATERWAYS DIVISION. KENTUCKY 31 FESCUE SHALL NOT BE UTILIZED IN WETLAND OR BUFFER AREAS. THE AREA SHOULD BE SEEDED AN MULCHED TO
REDUCE EROSION AFTER CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED.
8. AFTER INSTALLATION HAS BEEN COMPLETED, MAKE POST-CONSTRUCTION GRADES AND ELEVATIONS
THE SAME AS THE ORIGINAL GRADES AND ELEVATIONS IN TEMPORARILY IMPACTED AREAS.
9. TO PROTECT AQUATIC SPECIES, IN-STREAM WORK IS PROHIBITED AS DETERMINED BY THE
CLASSIFICATION OF THE STREAM:
USE I WATERS: IN-STREAM WORK SHALL NOT BE CONDUCTED DURING THE PERIOD MARCH 1
THROUGH JUNE 15, INCLUSIVE, DURING ANY YEAR.
USE III WATERS: IN-STREAM WORK SHALL NOT BE CONDUCTED DURING THE PERIOD
OCTOBER 1 THROUGH APRIL 30, INCLUSIVE, DURING ANY YEAR.
USE IV WATERS: IN-STREAM WORK SHALL NOT BE CONDUCTED DURING THE PERIOD MARCH 1
THROUGH MAY 31, INCLUSIVE, DURING ANY YEAR.
10. STORMWATER RUNOFF FROM IMPERVIOUS SURFACES SHALL BE CONTROLLED TO PREVENT THE
WASHING OF DEBRIS INTO THE WATERWAY.
11. CULVERTS SHALL BE CONSTRUCTED AN ANY RIPRAP PLACED SO AS NOT TO OBSTRUCT THE
MOVEMENT OF AQUATIC SPECIES, UNLESS THE PURPOSE OF THE ACTIVITY IS TO IMPOUND WATER.
ADDITIONAL EROSION AND SEDIMENT CONTROL NOTES
1. ALL EQUIPMENT & VEHICLES MUST BE EQUIPPED TO CONTROL ANY SPILLS OF OILS, FLUIDS, RUNOFF, AND LEAKAGE FROM ANY MATERIAL BEING HAULED TO OR FROM THE WORK SITE.
2. VEGETATION STABILIZATION NOTES AND SEEDING SUMMARY TABLES ARE SHOWN ON SHEETS 4, 5, AND 6.
13.75
- CONTRACTOR TO SUBMIT.
7.47
0.60
T IM
OTHY J. HOGAN
PROF ESS I ONA L ENG I NEERREG I ST ERED
NO . 4 0 9 4 1
06/14/2024
B-4 STANDARDS AND SPECIFICATIONS FOR VEGETATIVE STABILIZATION
DEFINITION
USING VEGETATION AS COVER TO PROTECT EXPOSED SOIL FROM EROSION.
PURPOSE
TO PROMOTE THE ESTABLISHMENT OF VEGETATION ON EXPOSED SOIL.
CONDITIONS WHERE PRACTICE APPLIES
ON ALL DISTURBED AREAS NOT STABILIZED BY OTHER METHODS. THIS SPECIFICATION IS DIVIDED INTO SECTIONS ON INCREMENTAL STABILIZATION; SOIL PREPARATION, SOIL AMENDMENTS AND TOPSOILING;
SEEDING AND MULCHING; TEMPORARY STABILIZATION;
AND PERMANENT STABILIZATION.
EFFECTS ON WATER QUALITY AND QUANTITY
STABILIZATION PRACTICES ARE USED TO PROMOTE THE ESTABLISHMENT OF VEGETATION ON EXPOSED SOIL. WHEN SOIL IS STABILIZED WITH VEGETATION, THE SOIL IS LESS LIKELY TO ERODE AND MORE LIKELY
TO ALLOW INFILTRATION OF RAINFALL, THEREBY REDUCING SEDIMENT LOADS AND RUNOFF TO
DOWNSTREAM AREAS.
PLANTING VEGETATION IN DISTURBED AREAS WILL HAVE AN EFFECT ON THE WATER BUDGET, ESPECIALLY ON VOLUMES AND RATES OF RUNOFF, INFILTRATION, EVAPORATION, TRANSPIRATION, PERCOLATION, AND
GROUNDWATER RECHARGE. OVER TIME, VEGETATION WILL
INCREASE ORGANIC MATTER CONTENT AND IMPROVE THE WATER HOLDING CAPACITY OF THE SOIL AND
SUBSEQUENT PLANT GROWTH.
VEGETATION WILL HELP REDUCE THE MOVEMENT OF SEDIMENT, NUTRIENTS, AND OTHER CHEMICALS
CARRIED BY RUNOFF TO RECEIVING WATERS. PLANTS WILL ALSO HELP PROTECT GROUNDWATER
SUPPLIES BY ASSIMILATING THOSE SUBSTANCES PRESENT WITHIN THE ROOT ZONE.
SEDIMENT CONTROL PRACTICES MUST REMAIN IN PLACE DURING GRADING, SEEDBED PREPARATION, SEEDING, MULCHING, AND VEGETATIVE ESTABLISHMENT.
ADEQUATE VEGETATIVE ESTABLISHMENT
INSPECT SEEDED AREAS FOR VEGETATIVE ESTABLISHMENT AND MAKE NECESSARY REPAIRS,
REPLACEMENTS, AND RESEEDINGS WITHIN THE PLANTING SEASON.
1. ADEQUATE VEGETATIVE STABILIZATION REQUIRES 95 PERCENT GROUNDCOVER.
2. IF AN AREA HAS LESS THAN 40 PERCENT GROUNDCOVER, RESTABILIZE FOLLOWING THE ORIGINAL
RECOMMENDATIONS FOR LIME, FERTILIZER, SEEDBED PREPARATION, AND SEEDING.
3. IF AN AREA HAS BETWEEN 40 AND 94 PERCENT GROUNDCOVER, OVER-SEED AND FERTILIZE USING
HALF OF THE RATES ORIGINALLY SPECIFIED.
4. MAINTENANCE FERTILIZER RATES FOR PERMANENT SEEDING ARE SHOWN IN TABLE B.6.
B-4-1 STANDARDS AND SPECIFICATIONS FOR INCREMENTAL STABILIZATION
DEFINITION
ESTABLISHMENT OF VEGETATIVE COVER ON CUT AND FILL SLOPES.
PURPOSE
TO PROVIDE TIMELY VEGETATIVE COVER ON CUT AND FILL SLOPES AS WORK PROGRESSES.
CONDITIONS WHERE PRACTICE APPLIES
ANY CUT OR FILL SLOPE GREATER THAN 15 FEET IN HEIGHT. THIS PRACTICE ALSO APPLIES TO
STOCKPILES.
CRITERIA
A. INCREMENTAL STABILIZATION - CUT SLOPES
1. EXCAVATE AND STABILIZE CUT SLOPES IN INCREMENTS NOT TO EXCEED 15 FEET IN HEIGHT.
PREPARE SEEDBED AND APPLY SEED AND MULCH ON ALL CUT SLOPES AS THE WORK
PROGRESSES.
2. CONSTRUCTION SEQUENCE EXAMPLE (REFER TO FIGURE B.1):
a. CONSTRUCT AND STABILIZE ALL TEMPORARY SWALES OR DIKES THAT WILL BE USED TO
CONVEY RUNOFF AROUND THE EXCAVATION.
b. PERFORM PHASE 1 EXCAVATION, PREPARE SEEDBED, AND STABILIZE.
c. PERFORM PHASE 2 EXCAVATION, PREPARE SEEDBED, AND STABILIZE. OVERSEED PHASE 1
AREAS AS NECESSARY.
d. PERFORM FINAL PHASE EXCAVATION, PREPARE SEEDBED, AND STABILIZE. OVERSEED
PREVIOUSLY SEEDED AREAS AS NECESSARY.
NOTE: ONCE EXCAVATION HAS BEGUN THE OPERATION SHOULD BE CONTINUOUS FROM GRUBBING
THROUGH THE COMPLETION OF GRADING AND PLACEMENT OF TOPSOIL (IF REQUIRED) AND
PERMANENT SEED AND MULCH. ANY INTERRUPTIONS IN THE OPERATION OR COMPLETING THE
OPERATION OUT OF THE SEEDING SEASON WILL NECESSITATE THE APPLICATION OF TEMPORARY
STABILIZATION.
FIGURE B.1: INCREMENTAL STABILIZATION – CUT
B. INCREMENTAL STABILIZATION - FILL SLOPES
1. CONSTRUCT AND STABILIZE FILL SLOPES IN INCREMENTS NOT TO EXCEED 15 FEET IN HEIGHT.
PREPARE SEEDBED AND APPLY SEED AND MULCH ON ALL SLOPES AS THE WORK PROGRESSES.
2. STABILIZE SLOPES IMMEDIATELY WHEN THE VERTICAL HEIGHT OF A LIFT REACHES 15 FEET, OR
WHEN THE GRADING OPERATION CEASES AS PRESCRIBED IN THE PLANS.
3. AT THE END OF EACH DAY, INSTALL TEMPORARY WATER CONVEYANCE PRACTICE(S), AS
NECESSARY, TO INTERCEPT SURFACE RUNOFF AND CONVEY IT DOWN THE SLOPE IN A
NON-EROSIVE MANNER.
4. CONSTRUCTION SEQUENCE EXAMPLE (REFER TO FIGURE B.2):
a. CONSTRUCT AND STABILIZE ALL TEMPORARY SWALES OR DIKES THAT WILL BE USED TO DIVERT
RUNOFF AROUND THE FILL. CONSTRUCT SILT FENCE ON LOW SIDE OF FILL UNLESS OTHER
METHODS SHOWN ON THE PLANS ADDRESS THIS AREA.
b. AT THE END OF EACH DAY, INSTALL TEMPORARY WATER CONVEYANCE PRACTICE(S), AS
NECESSARY, TO INTERCEPT SURFACE RUNOFF AND CONVEY IT DOWN THE SLOPE IN A
NON-EROSIVE MANNER.
c. PLACE PHASE 1 FILL, PREPARE SEEDBED, AND STABILIZE.
d. PLACE PHASE 2 FILL, PREPARE SEEDBED, AND STABILIZE.
e. PLACE FINAL PHASE FILL, PREPARE SEEDBED, AND STABILIZE. OVERSEED PREVIOUSLY SEEDED
AREAS AS NECESSARY.
NOTE: ONCE THE PLACEMENT OF FILL HAS BEGUN THE OPERATION SHOULD BE CONTINUOUS FROM GRUBBING THROUGH THE COMPLETION OF GRADING AND PLACEMENT OF TOPSOIL (IF REQUIRED) AND
PERMANENT SEED AND MULCH. ANY INTERRUPTIONS IN THE OPERATION OR COMPLETING THE
OPERATION OUT OF THE SEEDING SEASON WILL NECESSITATE THE APPLICATION OF TEMPORARY
STABILIZATION.
FIGURE B.2: INCREMENTAL STABILIZATION – FILL
B-4-2 STANDARDS AND SPECIFICATIONS FOR SOIL PREPARATION, TOPSOILING, AND SOIL AMENDMENTS
DEFINITION
THE PROCESS OF PREPARING THE SOILS TO SUSTAIN ADEQUATE VEGETATIVE STABILIZATION.
PURPOSE
TO PROVIDE A SUITABLE SOIL MEDIUM FOR VEGETATIVE GROWTH.
CONDITIONS WHERE PRACTICE APPLIES
WHERE VEGETATIVE STABILIZATION IS TO BE ESTABLISHED.
CRITERIA
A. SOIL PREPARATION
1. TEMPORARY STABILIZATION
a. SEEDBED PREPARATION CONSISTS OF LOOSENING SOIL TO A DEPTH OF 3 TO 5 INCHES BY
MEANS OF SUITABLE AGRICULTURAL OR CONSTRUCTION EQUIPMENT, SUCH AS DISC HARROWS
OR CHISEL PLOWS OR RIPPERS MOUNTED ON CONSTRUCTION EQUIPMENT. AFTER THE SOIL IS
LOOSENED, IT MUST NOT BE ROLLED OR DRAGGED SMOOTH BUT LEFT IN THE ROUGHENED
CONDITION. SLOPES 3:1 OR FLATTER ARE TO BE TRACKED WITH RIDGES RUNNING PARALLEL TO
THE CONTOUR OF THE SLOPE.
b. APPLY FERTILIZER AND LIME AS PRESCRIBED ON THE PLANS.
c. INCORPORATE LIME AND FERTILIZER INTO THE TOP 3 TO 5 INCHES OF SOIL BY DISKING OR
OTHER SUITABLE MEANS.
2. PERMANENT STABILIZATION
a. A SOIL TEST IS REQUIRED FOR ANY EARTH DISTURBANCE OF 5 ACRES OR MORE. THE MINIMUM
SOIL CONDITIONS REQUIRED FOR PERMANENT VEGETATIVE ESTABLISHMENT ARE:
i. SOIL PH BETWEEN 6.0 AND 7.0.
ii. SOLUBLE SALTS LESS THAN 500 PARTS PER MILLION (PPM).
iii. SOIL CONTAINS LESS THAN 40 PERCENT CLAY BUT ENOUGH FINE GRAINED MATERIAL (GREATER
THAN 30 PERCENT SILT PLUS CLAY) TO PROVIDE THE CAPACITY TO HOLD A MODERATE AMOUNT
OF MOISTURE. AN EXCEPTION: IF LOVEGRASS WILL BE PLANTED, THEN A SANDY SOIL (LESS
THAN 30 PERCENT SILT PLUS CLAY) WOULD BE ACCEPTABLE.
iv. SOIL CONTAINS 1.5 PERCENT MINIMUM ORGANIC MATTER BY WEIGHT.
v. SOIL CONTAINS SUFFICIENT PORE SPACE TO PERMIT ADEQUATE ROOT PENETRATION.
b. APPLICATION OF AMENDMENTS OR TOPSOIL IS REQUIRED IF ON-SITE SOILS DO NOT MEET THE
ABOVE CONDITIONS.
c. GRADED AREAS MUST BE MAINTAINED IN A TRUE AND EVEN GRADE AS SPECIFIED ON THE
APPROVED PLAN, THEN SCARIFIED OR OTHERWISE LOOSENED TO A DEPTH OF 3 TO 5 INCHES.
d. APPLY SOIL AMENDMENTS AS SPECIFIED ON THE APPROVED PLAN OR AS INDICATED BY THE
RESULTS OF A SOIL TEST.
e. MIX SOIL AMENDMENTS INTO THE TOP 3 TO 5 INCHES OF SOIL BY DISKING OR OTHER SUITABLE
MEANS. RAKE LAWN AREAS TO SMOOTH THE SURFACE, REMOVE LARGE OBJECTS LIKE STONES
AND BRANCHES, AND READY THE AREA FOR SEED APPLICATION. LOOSEN SURFACE SOIL BY
DRAGGING WITH A HEAVY CHAIN OR OTHER EQUIPMENT TO ROUGHEN THE SURFACE WHERE
SITE CONDITIONS WILL NOT PERMIT NORMAL SEEDBED PREPARATION. TRACK SLOPES 3:1 OR
FLATTER WITH TRACKED EQUIPMENT LEAVING THE SOIL IN AN IRREGULAR CONDITION WITH
RIDGES RUNNING PARALLEL TO THE CONTOUR OF THE SLOPE. LEAVE THE TOP 1 TO 3 INCHES OF
SOIL LOOSE AND FRIABLE. SEEDBED LOOSENING MAY BE UNNECESSARY ON NEWLY DISTURBED
AREAS.
B. TOPSOILING
1. TOPSOIL IS PLACED OVER PREPARED SUBSOIL PRIOR TO ESTABLISHMENT OF PERMANENT
VEGETATION. THE PURPOSE IS TO PROVIDE A SUITABLE SOIL MEDIUM FOR VEGETATIVE GROWTH.
SOILS OF CONCERN HAVE LOW MOISTURE CONTENT, LOW NUTRIENT LEVELS, LOW PH, MATERIALS
TOXIC TO PLANTS, AND/OR UNACCEPTABLE SOIL GRADATION.
2. TOPSOIL SALVAGED FROM AN EXISTING SITE MAY BE USED PROVIDED IT MEETS THE STANDARDS AS SET FORTH IN THESE SPECIFICATIONS. TYPICALLY, THE DEPTH OF TOPSOIL TO BE SALVAGED FOR A GIVEN SOIL TYPE CAN BE FOUND IN THE REPRESENTATIVE SOIL PROFILE SECTION IN THE
SOIL SURVEY PUBLISHED BY USDA-NRCS.
3. TOPSOILING IS LIMITED TO AREAS HAVING 2:1 OR FLATTER SLOPES WHERE:
a. THE TEXTURE OF THE EXPOSED SUBSOIL/PARENT MATERIAL IS NOT ADEQUATE TO PRODUCE
VEGETATIVE GROWTH.
b. THE SOIL MATERIAL IS SO SHALLOW THAT THE ROOTING ZONE IS NOT DEEP ENOUGH TO
SUPPORT PLANTS OR FURNISH CONTINUING SUPPLIES OF MOISTURE AND PLANT NUTRIENTS.
c. THE ORIGINAL SOIL TO BE VEGETATED CONTAINS MATERIAL TOXIC TO PLANT GROWTH.
d. THE SOIL IS SO ACIDIC THAT TREATMENT WITH LIMESTONE IS NOT FEASIBLE.
4. AREAS HAVING SLOPES STEEPER THAN 2:1 REQUIRE SPECIAL CONSIDERATION AND DESIGN.
5. TOPSOIL SPECIFICATIONS: SOIL TO BE USED AS TOPSOIL MUST MEET THE FOLLOWING CRITERIA:
a. TOPSOIL MUST BE A LOAM, SANDY LOAM, CLAY LOAM, SILT LOAM, SANDY CLAY LOAM, OR LOAMY
SAND. OTHER SOILS MAY BE USED IF RECOMMENDED BY AN AGRONOMIST OR SOIL SCIENTIST
AND APPROVED BY THE APPROPRIATE APPROVAL AUTHORITY. TOPSOIL MUST NOT BE A
MIXTURE OF CONTRASTING TEXTURED SUBSOILS AND MUST CONTAIN LESS THAN 5 PERCENT BY
VOLUME OF CINDERS, STONES, SLAG, COARSE FRAGMENTS, GRAVEL, STICKS, ROOTS, TRASH,
OR OTHER MATERIALS LARGER THAN 1½ INCHES IN DIAMETER.
b. TOPSOIL MUST BE FREE OF NOXIOUS PLANTS OR PLANT PARTS SUCH AS BERMUDA GRASS, QUACK GRASS, JOHNSON GRASS, NUT SEDGE, POISON IVY, THISTLE, OR OTHERS AS SPECIFIED.
c. TOPSOIL SUBSTITUTES OR AMENDMENTS, AS RECOMMENDED BY A QUALIFIED AGRONOMIST OR SOIL SCIENTIST AND APPROVED BY THE APPROPRIATE APPROVAL AUTHORITY, MAY BE USED IN
LIEU OF NATURAL TOPSOIL.
6. TOPSOIL APPLICATION
a. EROSION AND SEDIMENT CONTROL PRACTICES MUST BE MAINTAINED WHEN APPLYING TOPSOIL.
b. UNIFORMLY DISTRIBUTE TOPSOIL IN A 5 TO 8 INCH LAYER AND LIGHTLY COMPACT TO A MINIMUM
THICKNESS OF 4 INCHES. SPREADING IS TO BE PERFORMED IN SUCH A MANNER THAT SODDING OR SEEDING CAN PROCEED WITH A MINIMUM OF ADDITIONAL SOIL PREPARATION AND TILLAGE.
ANY IRREGULARITIES IN THE SURFACE RESULTING FROM TOPSOILING OR OTHER OPERATIONS
MUST BE CORRECTED IN ORDER TO PREVENT THE FORMATION OF DEPRESSIONS OR WATER
POCKETS.
c. TOPSOIL MUST NOT BE PLACED IF THE TOPSOIL OR SUBSOIL IS IN A FROZEN OR MUDDY
CONDITION, WHEN THE SUBSOIL IS EXCESSIVELY WET OR IN A CONDITION THAT MAY
OTHERWISE BE DETRIMENTAL TO PROPER GRADING AND SEEDBED PREPARATION.
C. SOIL AMENDMENTS (FERTILIZER AND LIME SPECIFICATIONS)
1. SOIL TESTS MUST BE PERFORMED TO DETERMINE THE EXACT RATIOS AND APPLICATION RATES FOR BOTH LIME AND FERTILIZER ON SITES HAVING DISTURBED AREAS OF 5 ACRES OR MORE. SOIL
ANALYSIS MAY BE PERFORMED BY A RECOGNIZED PRIVATE OR COMMERCIAL LABORATORY. SOIL
SAMPLES TAKEN FOR ENGINEERING PURPOSES MAY ALSO BE USED FOR CHEMICAL ANALYSES.
2. FERTILIZERS MUST BE UNIFORM IN COMPOSITION, FREE FLOWING AND SUITABLE FOR ACCURATE APPLICATION BY APPROPRIATE EQUIPMENT. MANURE MAY BE SUBSTITUTED FOR FERTILIZER WITH
PRIOR APPROVAL FROM THE APPROPRIATE APPROVAL AUTHORITY. FERTILIZERS MUST ALL BE
DELIVERED TO THE SITE FULLY LABELED ACCORDING TO THE APPLICABLE LAWS AND MUST BEAR
THE NAME, TRADE NAME OR TRADEMARK AND WARRANTY OF THE PRODUCER.
3. LIME MATERIALS MUST BE GROUND LIMESTONE (HYDRATED OR BURNT LIME MAY BE SUBSTITUTED EXCEPT WHEN HYDROSEEDING) WHICH CONTAINS AT LEAST 50 PERCENT TOTAL OXIDES (CALCIUM OXIDE PLUS MAGNESIUMOXIDE). LIMESTONE MUST BE GROUND TO SUCH FINENESS THAT AT LEAST
50 PERCENT WILL PASS THROUGH A #100 MESH SIEVE AND 98 TO 100 PERCENT WILL PASS
THROUGH A #20 MESH SIEVE.
4. LIME AND FERTILIZER ARE TO BE EVENLY DISTRIBUTED AND INCORPORATED INTO THE TOP 3 TO 5
INCHES OF SOIL BY DISKING OR OTHER SUITABLE MEANS.
5. WHERE THE SUBSOIL IS EITHER HIGHLY ACIDIC OR COMPOSED OF HEAVY CLAYS, SPREAD GROUND LIMESTONE AT THE RATE OF 4 TO 8 TONS/ACRE (200-400 POUNDS PER 1,000 SQUARE FEET) PRIOR
TO THE PLACEMENT OF TOPSOIL.
(SPECIFICATIONS CONTINUE ON SHEET G4)
T IM
OTHY J. HOGAN
PROF ESS I ONA L ENG I NEERREG I ST ERED
NO . 4 0 9 4 1
06/14/2024
B-4-3 STANDARDS AND SPECIFICATIONS FOR SEEDING AND MULCHING
DEFINITION
THE APPLICATION OF SEED AND MULCH TO ESTABLISH VEGETATIVE COVER.
PURPOSE
TO PROTECT DISTURBED SOILS FROM EROSION DURING AND AT THE END OF CONSTRUCTION.
CONDITIONS WHERE PRACTICE APPLIES
TO THE SURFACE OF ALL PERIMETER CONTROLS, SLOPES, AND ANY DISTURBED AREA NOT UNDER ACTIVE
GRADING.
CRITERIA
A. SEEDING
1. SPECIFICATIONS
a. ALL SEED MUST MEET THE REQUIREMENTS OF THE MARYLAND STATE SEED LAW. ALL SEED MUST BE SUBJECT TO RE-TESTING BY A RECOGNIZED SEED LABORATORY. ALL SEED USED MUST
HAVE BEEN TESTED WITHIN THE 6 MONTHS IMMEDIATELY PRECEDING THE DATE OF SOWING
SUCH MATERIAL ON ANY PROJECT. REFER TO TABLE B.4 REGARDING THE QUALITY OF SEED.
SEED TAGS MUST BE AVAILABLE UPON REQUEST TO THE INSPECTOR TO VERIFY TYPE OF SEED
AND SEEDING RATE.
b. MULCH ALONE MAY BE APPLIED BETWEEN THE FALL AND SPRING SEEDING DATES ONLY IF THE
GROUND IS FROZEN. THE APPROPRIATE SEEDING MIXTURE MUST BE APPLIED WHEN THE
GROUND THAWS.
c. INOCULANTS: THE INOCULANT FOR TREATING LEGUME SEED IN THE SEED MIXTURES MUST BE A
PURE CULTURE OF NITROGEN FIXING BACTERIA PREPARED SPECIFICALLY FOR THE SPECIES.
INOCULANTS MUST NOT BE USED LATER THAN THE DATE INDICATED ON THE CONTAINER. ADD
FRESH INOCULANTS AS DIRECTED ON THE PACKAGE. USE FOUR TIMES THE RECOMMENDED
RATE WHEN HYDROSEEDING. NOTE: IT IS VERY IMPORTANT TO KEEP INOCULANT AS COOL AS
POSSIBLE UNTIL USED. TEMPERATURES ABOVE 75 TO 80 DEGREES FAHRENHEIT CAN WEAKEN
BACTERIA AND MAKE THE INOCULANT LESS EFFECTIVE.
d. SOD OR SEED MUST NOT BE PLACED ON SOIL WHICH HAS BEEN TREATED WITH SOIL
STERILANTS OR CHEMICALS USED FOR WEED CONTROL UNTIL SUFFICIENT TIME HAS ELAPSED
(14 DAYS MIN.) TO PERMIT DISSIPATION OF PHYTO-TOXIC MATERIALS.
2. APPLICATION
a. DRY SEEDING: THIS INCLUDES USE OF CONVENTIONAL DROP OR BROADCAST SPREADERS.
i. INCORPORATE SEED INTO THE SUBSOIL AT THE RATES PRESCRIBED ON TEMPORARY SEEDING
TABLE B.1, PERMANENT SEEDING TABLE B.3, OR SITE-SPECIFIC SEEDING SUMMARIES.
ii. APPLY SEED IN TWO DIRECTIONS, PERPENDICULAR TO EACH OTHER. APPLY HALF THE SEEDING
RATE IN EACH DIRECTION. ROLL THE SEEDED AREA WITH A WEIGHTED ROLLER TO PROVIDE
GOOD SEED TO SOIL CONTACT.
b. DRILL OR CULTIPACKER SEEDING: MECHANIZED SEEDERS THAT APPLY AND COVER SEED WITH
SOIL.
i. CULTIPACKING SEEDERS ARE REQUIRED TO BURY THE SEED IN SUCH A FASHION AS TO PROVIDE
AT LEAST 1/4 INCH OF SOIL COVERING. SEEDBED MUST BE FIRM AFTER PLANTING.
ii. APPLY SEED IN TWO DIRECTIONS, PERPENDICULAR TO EACH OTHER. APPLY HALF THE SEEDING
RATE IN EACH DIRECTION.
c. HYDROSEEDING: APPLY SEED UNIFORMLY WITH HYDROSEEDER (SLURRY INCLUDES SEED AND
FERTILIZER).
i. IF FERTILIZER IS BEING APPLIED AT THE TIME OF SEEDING, THE APPLICATION RATES SHOULD
NOT EXCEED THE FOLLOWING: NITROGEN, 100 POUNDS PER ACRE TOTAL OF SOLUBLE
NITROGEN; P2O5 (PHOSPHOROUS), 200 POUNDS PER ACRE; K2O (POTASSIUM), 200 POUNDS PER
ACRE.
ii. LIME: USE ONLY GROUND AGRICULTURAL LIMESTONE (UP TO 3 TONS PER ACRE MAY BE APPLIED
BY HYDROSEEDING). NORMALLY, NOT MORE THAN 2 TONS ARE APPLIED BY HYDROSEEDING AT
ANY ONE DO NOT USE BURNT OR HYDRATED LIME WHEN HYDROSEEDING.
iii. MIX SEED AND FERTILIZER ON SITE AND SEED IMMEDIATELY AND WITHOUT INTERRUPTION.
iv. WHEN HYDROSEEDING DO NOT INCORPORATE SEED INTO THE SOIL.
B. MULCHING
1. MULCH MATERIALS (IN ORDER OF PREFERENCE)
a. STRAW CONSISTING OF THOROUGHLY THRESHED WHEAT, RYE, OAT, OR BARLEY AND REASONABLY BRIGHT IN COLOR. STRAW IS TO BE FREE OF NOXIOUS WEED SEEDS AS SPECIFIED
IN THE MARYLAND SEED LAW AND NOT MUSTY, MOLDY, CAKED, DECAYED, OR EXCESSIVELY
DUSTY. NOTE: USE ONLY STERILE STRAW MULCH IN AREAS WHERE ONE SPECIES OF GRASS IS
DESIRED.
b. WOOD CELLULOSE FIBER MULCH (WCFM) CONSISTING OF SPECIALLY PREPARED WOOD
CELLULOSE PROCESSED INTO A UNIFORM FIBROUS PHYSICAL STATE.
i. WCFM IS TO BE DYED GREEN OR CONTAIN A GREEN DYE IN THE PACKAGE THAT WILL PROVIDE
AN APPROPRIATE COLOR TO FACILITATE VISUAL INSPECTION OF THE UNIFORMLY SPREAD
SLURRY.
ii. WCFM, INCLUDING DYE, MUST CONTAIN NO GERMINATION OR GROWTH INHIBITING FACTORS.
iii. WCFM MATERIALS ARE TO BE MANUFACTURED AND PROCESSED IN SUCH A MANNER THAT THE
WOOD CELLULOSE FIBER MULCH WILL REMAIN IN UNIFORM SUSPENSION IN WATER UNDER
AGITATION AND WILL BLEND WITH SEED, FERTILIZER AND OTHER ADDITIVES TO FORM A
HOMOGENEOUS SLURRY. THE MULCH MATERIAL MUST FORM A BLOTTER-LIKE GROUND COVER,
ON APPLICATION, HAVING MOISTURE ABSORPTION AND PERCOLATION PROPERTIES AND MUST
COVER AND HOLD GRASS SEED IN CONTACT WITH THE SOIL WITHOUT INHIBITING THE GROWTH
OF THE GRASS SEEDLINGS.
iv. WCFM MATERIAL MUST NOT CONTAIN ELEMENTS OR COMPOUNDS AT CONCENTRATION LEVELS
THAT WILL BE PHYTO-TOXIC.
v. WCFM MUST CONFORM TO THE FOLLOWING PHYSICAL REQUIREMENTS: FIBER LENGTH OF APPROXIMATELY 10 MILLIMETERS, DIAMETER APPROXIMATELY 1 MILLIMETER, PH RANGE OF 4.0
TO 8.5, ASH CONTENT OF 1.6 PERCENT MAXIMUM AND WATER HOLDING CAPACITY OF 90
PERCENT MINIMUM.
2. APPLICATION
a. APPLY MULCH TO ALL SEEDED AREAS IMMEDIATELY AFTER SEEDING.
b. WHEN STRAW MULCH IS USED, SPREAD IT OVER ALL SEEDED AREAS AT THE RATE OF 2 TONS
PER ACRE TO A UNIFORM LOOSE DEPTH OF 1 TO 2 INCHES. APPLY MULCH TO ACHIEVE A
UNIFORM DISTRIBUTION AND DEPTH SO THAT THE SOIL SURFACE IS NOT EXPOSED. WHEN USING
A MULCH ANCHORING TOOL, INCREASE THE APPLICATION RATE TO 2.5 TONS PER ACRE.
c. WOOD CELLULOSE FIBER USED AS MULCH MUST BE APPLIED AT A NET DRY WEIGHT OF 1500
POUNDS PER MIX THE WOOD CELLULOSE FIBER WITH WATER TO ATTAIN A MIXTURE WITH A
MAXIMUM OF 50 POUNDS OF WOOD CELLULOSE FIBER PER 100 GALLONS OF WATER.
3. ANCHORING
a. PERFORM MULCH ANCHORING IMMEDIATELY FOLLOWING APPLICATION OF MULCH TO MINIMIZE LOSS BY WIND OR WATER. THIS MAY BE DONE BY ONE OF THE FOLLOWING METHODS (LISTED BY
PREFERENCE), DEPENDING UPON THE SIZE OF THE AREA AND EROSION HAZARD:
i. A MULCH ANCHORING TOOL IS A TRACTOR DRAWN IMPLEMENT DESIGNED TO PUNCH AND
ANCHOR MULCH INTO THE SOIL SURFACE A MINIMUM OF 2 INCHES. THIS PRACTICE IS MOST
EFFECTIVE ON LARGE AREAS, BUT IS LIMITED TO FLATTER SLOPES WHERE EQUIPMENT CAN
OPERATE SAFELY. IF USED ON SLOPING LAND, THIS PRACTICE SHOULD FOLLOW THE CONTOUR.
ii. WOOD CELLULOSE FIBER MAY BE USED FOR ANCHORING STRAW. APPLY THE FIBER BINDER AT A NET DRY WEIGHT OF 750 POUNDS PER ACRE. MIX THE WOOD CELLULOSE FIBER WITH WATER AT
A MAXIMUM OF 50 POUNDS OF WOOD CELLULOSE FIBER PER 100 GALLONS OF WATER.
iii. SYNTHETIC BINDERS SUCH AS ACRYLIC DLR (AGRO-TACK), DCA-70, PETROSET, TERRA TAX II, TERRA TACK AR OR OTHER APPROVED EQUAL MAY BE USED. FOLLOW APPLICATION RATES AS
SPECIFIED BY THE MANUFACTURER. APPLICATION OF LIQUID BINDERS NEEDS TO BE HEAVIER AT
THE EDGES WHERE WIND CATCHES MULCH, SUCH AS IN VALLEYS AND ON CRESTS OF BANKS.
USE OF ASPHALT BINDERS IS STRICTLY PROHIBITED.
iv. LIGHTWEIGHT PLASTIC NETTING MAY BE STAPLED OVER THE MULCH ACCORDING TO
MANUFACTURER RECOMMENDATIONS. NETTING IS USUALLY AVAILABLE IN ROLLS 4 TO 15 FEET
WIDE AND 300 TO 3,000 FEET LONG.
B-4-4 STANDARDS AND SPECIFICATIONS FOR TEMPORARY STABILIZATION
DEFINITION
TO STABILIZE DISTURBED SOILS WITH VEGETATION FOR UP TO 6 MONTHS.
PURPOSE
TO USE FAST GROWING VEGETATION THAT PROVIDES COVER ON DISTURBED SOILS.
CONDITIONS WHERE PRACTICE APPLIES
EXPOSED SOILS WHERE GROUND COVER IS NEEDED FOR A PERIOD OF 6 MONTHS OR LESS. FOR LONGER
DURATION OF TIME, PERMANENT STABILIZATION PRACTICES ARE REQUIRED.
CRITERIA
1. SELECT ONE OR MORE OF THE SPECIES OR SEED MIXTURES LISTED IN TABLE B.1 FOR THE
APPROPRIATE PLANT HARDINESS ZONE (FROM FIGURE B.3), AND ENTER THEM IN THE TEMPORARY
SEEDING SUMMARY BELOW ALONG WITH APPLICATION RATES, SEEDING DATES AND SEEDING
DEPTHS. IF THIS SUMMARY IS NOT PUT ON THE PLAN AND COMPLETED, THEN TABLE B.1 PLUS
FERTILIZER AND LIME RATES MUST BE PUT ON THE PLAN.
2. FOR SITES HAVING SOIL TESTS PERFORMED, USE AND SHOW THE RECOMMENDED RATES BY THE
TESTING AGENCY. SOIL TESTS ARE NOT REQUIRED FOR TEMPORARY SEEDING.
3. WHEN STABILIZATION IS REQUIRED OUTSIDE OF A SEEDING SEASON, APPLY SEED AND MULCH OR STRAW MULCH ALONE AS PRESCRIBED IN SECTION B-4-3.A.1.B AND MAINTAIN UNTIL THE NEXT
SEEDING SEASON
B-4-5 STANDARDS AND SPECIFICATIONS FOR PERMANENT STABILIZATION
DEFINITION
TO STABILIZE DISTURBED SOILS WITH PERMANENT VEGETATION.
PURPOSE
TO USE LONG-LIVED PERENNIAL GRASSES AND LEGUMES TO ESTABLISH PERMANENT GROUND COVER ON
DISTURBED SOILS.
CONDITIONS WHERE PRACTICE APPLIES
EXPOSED SOILS WHERE GROUND COVER IS NEEDED FOR 6 MONTHS OR MORE.
CRITERIA
A. SEED MIXTURES
1. GENERAL USE
a. SELECT ONE OR MORE OF THE SPECIES OR MIXTURES LISTED IN TABLE B.3 FOR THE APPROPRIATE PLANT HARDINESS ZONE (FROM FIGURE B.3) AND BASED ON THE SITE CONDITION
OR PURPOSE FOUND ON TABLE B.2. ENTER SELECTED MIXTURE(S), APPLICATION RATES, AND
SEEDING DATES IN THE PERMANENT SEEDING SUMMARY. THE SUMMARY IS TO BE PLACED ON
THE PLAN.
b. ADDITIONAL PLANTING SPECIFICATIONS FOR EXCEPTIONAL SITES SUCH AS SHORELINES, STREAM BANKS, OR DUNES OR FOR SPECIAL PURPOSES SUCH AS WILDLIFE OR AESTHETIC
TREATMENT MAY BE FOUND IN USDA-NRCS TECHNICAL FIELD OFFICE GUIDE, SECTION 342 -
CRITICAL AREA PLANTING.
c. FOR SITES HAVING DISTURBED AREA OVER 5 ACRES, USE AND SHOW THE RATES
RECOMMENDED BY THE SOIL TESTING AGENCY.
d. FOR AREAS RECEIVING LOW MAINTENANCE, APPLY UREA FORM FERTILIZER (46-0-0) AT 3 ½ POUNDS PER 1000 SQUARE FEET (150 POUNDS PER ACRE) AT THE TIME OF SEEDING IN ADDITION
TO THE SOIL AMENDMENTS SHOWN IN THE PERMANENT SEEDING SUMMARY .
(SPECIFICATIONS CONTINUE ON SHEET G5)
T IM
OTHY J. HOGAN
PROF ESS I ONA L ENG I NEERREG I ST ERED
NO . 4 0 9 4 1
06/14/2024
B-4-5 STANDARDS AND SPECIFICATIONS FOR PERMANENT STABILIZATION (CONT.)
2. TURFGRASS MIXTURES
a. AREAS WHERE TURFGRASS MAY BE DESIRED INCLUDE LAWNS, PARKS, PLAYGROUNDS, AND
COMMERCIAL SITES WHICH WILL RECEIVE A MEDIUM TO HIGH LEVEL OF MAINTENANCE.
b. SELECT ONE OR MORE OF THE SPECIES OR MIXTURES LISTED BELOW BASED ON THE SITE
CONDITIONS OR PURPOSE. ENTER SELECTED MIXTURE(S), APPLICATION RATES, AND SEEDING
DATES IN THE PERMANENT SEEDING SUMMARY. THE SUMMARY IS TO BE PLACED ON THE PLAN.
i. KENTUCKY BLUEGRASS: FULL SUN MIXTURE: FOR USE IN AREAS THAT RECEIVE INTENSIVE
MANAGEMENT. IRRIGATION REQUIRED IN THE AREAS OF CENTRAL MARYLAND AND EASTERN
SHORE. RECOMMENDED CERTIFIED KENTUCKY BLUEGRASS CULTIVARS SEEDING RATE: 1.5 TO
2.0 POUNDS PER 1000 SQUARE FEET. CHOOSE A MINIMUM OF THREE KENTUCKY BLUEGRASS
CULTIVARS WITH EACH RANGING FROM 10 TO 35 PERCENT OF THE TOTAL MIXTURE BY WEIGHT.
ii. KENTUCKY BLUEGRASS/PERENNIAL RYE: FULL SUN MIXTURE: FOR USE IN FULL SUN AREAS
WHERE RAPID ESTABLISHMENT IS NECESSARY AND WHEN TURF WILL RECEIVE MEDIUM TO
INTENSIVE MANAGEMENT. CERTIFIED PERENNIAL RYEGRASS CULTIVARS/CERTIFIED KENTUCKY
BLUEGRASS SEEDING RATE: 2 POUNDS MIXTURE PER 1000 SQUARE FEET. CHOOSE A MINIMUM
OF THREE KENTUCKY BLUEGRASS CULTIVARS WITH EACH RANGING FROM 10 TO 35 PERCENT OF
THE TOTAL MIXTURE BY WEIGHT.
iii. TALL FESCUE/KENTUCKY BLUEGRASS: FULL SUN MIXTURE: FOR USE IN DROUGHT PRONE AREAS
AND/OR FOR AREAS RECEIVING LOW TO MEDIUM MANAGEMENT IN FULL SUN TO MEDIUM SHADE.
RECOMMENDED MIXTURE INCLUDES; CERTIFIED TALL FESCUE CULTIVARS 95 TO 100 PERCENT,
CERTIFIED KENTUCKY BLUEGRASS CULTIVARS 0 TO 5 PERCENT. SEEDING RATE: 5 TO 8 POUNDS
PER 1000 SQUARE FEET. ONE OR MORE CULTIVARS MAY BE BLENDED.
iv. KENTUCKY BLUEGRASS/FINE FESCUE: SHADE MIXTURE: FOR USE IN AREAS WITH SHADE IN BLUEGRASS LAWNS. FOR ESTABLISHMENT IN HIGH QUALITY, INTENSIVELY MANAGED TURF AREA.
MIXTURE INCLUDES; CERTIFIED KENTUCKY BLUEGRASS CULTIVARS 30 TO 40 PERCENT AND
CERTIFIED FINE FESCUE AND 60 TO 70 PERCENT. SEEDING RATE: 1½ TO 3 POUNDS PER 1000
SQUARE FEET.
NOTES:
SELECT TURFGRASS VARIETIES FROM THOSE LISTED IN THE MOST CURRENT UNIVERSITY OF
MARYLAND PUBLICATION, AGRONOMY MEMO #77, "TURFGRASS CULTIVAR
RECOMMENDATIONS FOR MARYLAND"
CHOOSE CERTIFIED MATERIAL. CERTIFIED MATERIAL IS THE BEST GUARANTEE OF CULTIVAR
PURITY. THE CERTIFICATION PROGRAM OF THE MARYLAND DEPARTMENT OF AGRICULTURE,
TURF AND SEED SECTION, PROVIDES A RELIABLE MEANS OF CONSUMER PROTECTION AND
ASSURES A PURE GENETIC LINE
c. IDEAL TIMES OF SEEDING FOR TURF GRASS MIXTURES
WESTERN MD: MARCH 15 TO JUNE 1, AUGUST 1 TO OCTOBER 1 (HARDINESS ZONES: 5B, 6A)
CENTRAL MD: MARCH 1 TO MAY 15, AUGUST 15 TO OCTOBER 15 (HARDINESS ZONE: 6B)
SOUTHERN MD, EASTERN SHORE: MARCH 1 TO MAY 15, AUGUST 15 TO OCTOBER 15
(HARDINESS ZONES: 7A, 7B)
d. TILL AREAS TO RECEIVE SEED BY DISKING OR OTHER APPROVED METHODS TO A DEPTH OF 2 TO
4 INCHES, LEVEL AND RAKE THE…