B08_CHOH_320577_Attachment_1_Project_Specifications_-_FINAL_CDs.pdf
PDF 36 MB Posted
- Attached to
- CHOH 320577 Improve Access at Byron Bridge Federal contract opportunity
- Solicitation number
- 140P2024R0107
About this file
This document is the Project Specifications for the CHOH 320577 Improve Access at Byron Bridge contract opportunity. The contract is for a construction project to improve access at the Byron Bridge along the Chesapeake & Ohio (C&O) Canal in Brunswick, MD. The National Park Service is the federal agency managing the solicitation. The project specifications outline the requirements for the construction work, including site preparation, concrete and masonry work, paving, landscaping, and other related tasks. Key details include a project description, construction drawings, technical specifications, and other contract terms and conditions. Contractors interested in bidding on this opportunity should review the full project specifications to understand the scope of work, required qualifications, pricing terms, and other submittal requirements.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHOH 320577 TOC-1
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work
01 26 01 Contract Modification Procedures
01 27 00 Definition of Contract Line Items
01 31 00 Project Management & Coordination
01 32 16 Construction Schedule
01 32 33 Photo Documentation
01 33 23 Submittal Procedures
Submittal List
01 35 13.22 Archeological Protection
01 35 23 Safety Requirements
01 35 91 Historic Preservation Treatment Procedures
01 40 00 Quality Requirements
Contractor Quality Control (CQC) Daily Report
Accessibility Inspection Report Form
Statement of Structural Tests and Special Inspections
01 42 00 Reference Standards
01 50 00 Temporary Facilities and Controls
01 57 19.12 Noise & Acoustics Management
01 57 23 Under-An-Acre Pollution Prevention
01 67 00 Product Requirements
01 73 40 Execution
01 74 19 Construction Waste Management and Disposal
Project Waste Management Plan Worksheet
Standard Solid Waste Conversions
01 77 00 Closeout Procedures
01 78 23 Operation and Maintenance Data
01 81 13 Sustainable Design Requirements for Non-LEED Projects
DIVISION 02 – EXISTING CONDITIONS
02 41 13 Selective Site Demolition
02 90 00 Monitoring Existing Structures
DIVISION 03 – CONCRETE
03 30 00 Cast-In-Place Concrete
DIVISION 04 – MASONRY
04 47 00 Dry Laid Stone Masonry
DIVISION 05 – METALS
05 12 00 Structural Steel Framing
05 51 00 Metal Stairs
05 52 13 Pipe and Tube Railings
05 53 00 Metal Gratings
CHOH 320577 TOC-2
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 63 Exterior Carpentry
DIVISION 09 – FINISHES
09 96 00 High Performance Coatings
DIVISION 10 – SPECIALTIES
10 14 26 Signage
DIVISION 31 – EARTHWORK
31 10 00 Site Clearing
31 20 00 Earth Moving
31 25 00 Erosion and Sediment Control
31 50 00 Excavation Support and Protection
31 63 33 Drilled Micropiles
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 13 13 Concrete Paving
32 92 00 Seeding and Topsoil
APPENDICES
Appendix A Geotechnical Engineering Report
Appendix B 1986 Stair As-Built Drawings
Appendix C Bridge Shuttle & Detour Information
Appendix D CSX Construction Submission Criteria
CHOH 320577 01 11 00 - 1
051121 SUMMARY OF WORK
SECTION 01 11 00 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes the following:
1. Work Covered by Contract Documents
2. Work Phases
3. Work Under Other Contracts
4. Government-Furnished Materials
5. Contractor Use of Site
6. Public Use of Site
7. Conduct of Operations
8. Work Restrictions
9. Special Construction Requirements
10. Soils Investigation Report
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location: Project is located with Chesapeake & Ohio Canal National Historical Park (CHOH), on Maryland side of the Goodloe Byron Memorial Footbridge across Potomac River from Harper’s Ferry, WV.
B. The Work consists of:
1. The project consists of demolition of steep spiral staircase, approximately 32 feet high and approximately 5 feet wide, connecting the footbridge to the C&O Canal Towpath. The project will also construct a new staircase with concrete and steel columns as well as guardrails. Including new foundations, revetment repairs, stone wall repairs, and other project features. Project is located adjacent to active CSX railroad.
C. Project will be constructed under a single prime contract.
1.3 WORK PHASES
A. The Work shall be conducted in 1 (one) phase.
1.4 WORK UNDER OTHER CONTRACTS
A. General: Cooperate with separate Construction Contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate Work of this Contract with work performed under separate contracts.
CHOH 320577 01 11 00 - 2
1.5 CONSTRUCTION CONTRACTOR USE OF SITE
A. General: Contractor shall have limited use of site for construction operations. Limit use of premises to limits of construction as indicated on drawings. Do not disturb portions of Project site beyond areas in which the Work is indicated. Contractor shall maintain 8’ clear zone for vehicular traffic on the CHOH Towpath throughout construction.
B. Storage of Materials: Confine storage of materials to staging area shown on plans.
C. Parking: Confine parking to within Limits of Construction or Staging Areas shown on the plans.
D. Stockpiling: Confine stockpiling to within Limits of Construction or Staging Areas shown on the plans.
E. Preservation of Natural Features:
1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
2. Provide temporary barriers to protect existing trees and plants and root zones.
3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with
Contracting Officer (CO) and remove agreed-on roots and branches that interfere with construction.
4. Do not fasten ropes, cables, or guys to existing trees.
5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
F. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government employees, and emergency vehicles at all times. Do not use for parking or storage of materials.
1. Schedule deliveries to minimize use of driveways and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
G. Construction Camp: Establishment of a camp within park will not be permitted.
H. Hauling Restrictions: Comply with legal load restrictions in hauling of materials. The main access from Lock 34 to the construction site will be through the towpath.
1. Comply with all legal load restrictions in the hauling of materials.
2. Load restrictions on park roads are the same as state road restrictions with such additional regulations as may be imposed by the Contracting Officer.
3. The towpath is not considered a road, but rather a trail.
4. The worksite and the access to the worksite is the historic towpath. Ensure that all employees are aware of and fully comply with the rules for operating equipment and vehicles on the towpath.
5. There is a maximum 15 mph speed limit and generally a 15 ton (GVW) single axle vehicle weight restriction on the towpath unless authorized otherwise by the Contracting Officer (CO). Contractor is notified that NPS does not have any load rating available for the multiple wooden structures conveying the towpath traffic between Lock 34 and Byron
CHOH 320577 01 11 00 - 3
Bridge. These bridges shall be inspected for structural integrity prior to mobilizing heavy equipment.
6. Contractor shall evaluate, design, and construct bridging, shoring and protection measures for the existing timber mats, culverts, locks, revetments, and other features to sufficiently carry the intended loads from construction activities over the historic structures along the access route. The design shall be signed and sealed by a professional engineer licensed in the State of Maryland and be submitted for approval to the CO prior to crossing these structures. Pre-inspection and post-inspection of each feature shall be accomplished by the contractor with a minimum of photographic documentation provided to the government.
7. Any damage identified due to construction operations shall be repaired by the contractor at no additional expense to the government, in accordance with an approved repair plan. If structures are avoided or otherwise mitigated for intended loads additional weight limits may be approved for certain areas by the CO.
I. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment, materials and supplies as it relates to entrance point, Lock 34 and movement on towpath.
J. Bridge Restrictions: Identify jurisdictions, load restrictions, permit requirements, time and calendar restrictions as outlined.
1.6 PUBLIC USE OF SITE
A. The towpath adjacent to the construction site will be open to public during construction. Adjacent CSX bridge will remain active.
B. Contractor shall conduct his operations to ensure the least inconvenience to public. Total towpath closures shall not be permitted; however, 15-minute delays will be permitted if proposer signage and approved flag person to assist the public are provided.
1. The towpath shall not be closed to the public during construction. Provide signs and flag personnel as required to alert bicyclists, hikers, and other users on the towpath of the construction areas.
2. Additional delay time may be approved by the CO when conducting specific activities.
3. All traffic on the towpath must yield to pedestrians and cyclists unless they are within a traffic-controlled area utilizing the approved traffic management plan.
4. Contractor shall comply with the most recent version of the NPS C&O Canal NHP Safety
Officer Memo for Towpath driving and provide highway and towpath signage in accordance to MUTCD as specified for each established entrance point along the ingress and egress of the national park. Make reasonable accommodations to maintain access for National Park Service administrative and other official business throughout the construction phase.
5. During transport of equipment and materials outside of the immediate work area along open portions of towpath, construction vehicles will have shared usage with pedestrians.
Any vehicles larger than a pickup truck are required to have flaggers/escorts to ensure pedestrian safety.
CHOH 320577 01 11 00 - 4
1.7 CONDUCT OF OPERATIONS
A. Contractor shall conduct his operations in conformance with rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by Park Superintendent.
B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed unless stated in the Work Restrictions below or without prior consent from the Contracting Officer. Submit requests a minimum of three business days in advance of the work to the Contracting Officer for approval.
C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
1.8 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 6:30 a.m. to 5:00 p.m., Monday through Friday, unless otherwise approved by the Contracting Officer.
1. Requests for other working hours will be considered for approval by the Contracting Officer upon written request stating days, times, proposed activities, and who will be onsite for the contractor in the key personnel roles (i.e. Superintendent, Safety, Quality Control, etc.). No on site work shall be performed on weekends or Federal Holidays unless approved in writing by the Contracting Officer.
2. Requests shall be made at least 72 hours in advance for consideration by park management.
B. Existing Utilities
1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.
2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
4. Notify Miss Utility a minimum of 5 working days prior to the start of the excavation.
5. There may be utilities not included in the Miss Utility databases, and that other (third party) utility location services will be necessary to be provided at no additional cost to the government.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify Contracting Officer not less than two business days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Contracting Officer’s written permission.
CHOH 320577 01 11 00 - 5
D. Nonsmoking Building/Tobacco Use/Vaping: Smoking is only permitted in designated location, to be coordinated with COR after award. Smoking is not permitted within 25’ of the construction limits to include but not limited to material handling equipment.
1.9 SPECIAL CONSTRUCTION REQUIREMENTS
A. Project Management and Communication Software: Software administered by NPS shall be used to manage communication and document sharing during construction.
1. See Section 01 31 00 "Project Management and Coordination" for requirements on using NPS project management and communication software.
1.10 SOILS INVESTIGATION REPORT
A. The report titled “CHOH-320577 Improve Access at Byron Bridge, dated April 17, 2024, prepared by Terracon is included as Appendix A with this package.
B. In case of conflict between report and drawings or specifications, the drawings and specifications govern.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 11 00
CHOH 320577 01 26 01 - 1
012721 CONTRACT MODIFICATION PROCEDURES
SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section consists of administrative and procedural requirements for contract modifications.
1.2 DEFINITIONS AND ALLOWANCES
A. Home Office Overhead: Costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):
1. Rent
2. Utilities
3. Furnishings
4. Office equipment
5. Executive and management staff not exclusively assigned to the project
6. Support, accounting, and administrative staff
7. Preparation of cost proposals, estimating, and schedule analyses connected with
Modifications
8. Estimating and preconstruction services
9. Mortgage costs
10. Real estate and corporate taxes
11. Automobile maintenance and travel costs for home office personnel
12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.
13. Depreciation of equipment and other assets
14. Home office supplies (paper, staples, etc.)
15. Legal services
16. Accounting and data processing
17. Professional fees/registration
B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with preparation of modifications will not be allowed. Costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:
1. Project Manager (PM), Assistant Project Manager
2. Superintendent, Assistant Superintendent
3. Quality Control, Safety Officer, Environmental Manager, etc.
4. Engineers
5. Travel, lodging, and per diem (as established by Federal Travel Regulations)
6. Scheduling
CHOH 320577 01 26 01 - 2
7. Field Office Trailers and associated temporary utilities
8. Field office supplies
a. Mailing and couriers
b. Reproduction costs
c. Storage
d. Phones
e. Computers
f. Copiers
9. Personal vehicles i.e. Superintendent Pickup trucks
C. General Requirements: Costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate.
The following items, if applicable, are considered allowable costs for calculating General Requirements:
1. Hoisting
2. Material handling
3. Temporary fencing
4. Port-a-lets
5. Trash removal, dumpsters
6. Barricades
7. Small tools
8. Safety supplies
9. Scaffolding
10. Daily cleaning
11. Traffic control
12. Temporary signage
13. Temporary heating and power
D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on project site. Modification costs for salaried workers are only allowed within the structure of a 40-hour week and no overtime or holiday pay will be allowed.
1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:
a. Base Rate: The hourly rate paid directly to the worker
b. Labor Burden: Employer payments of all applicable burdens; includes insurance and taxes the business must pay on behalf of the worker to government entities and educational forums, such as:
1) Social Security
2) Medicare
3) Workers Compensation – Policy and company calculation to be made available.
4) Federal Unemployment Tax Act (FUTA) - Cap Rate and percentage to be proportionally allocated over one year.
5) State Unemployment Tax Act (SUTA) - Cap Rate and percentage to be proportionally allocated over one year.
CHOH 320577 01 26 01 - 3
6) Union agreement costs - Other costs required under an enforceable collective bargaining agreement.
c. Fringe Benefits: Various non-wage compensations provided to employees such as:
1) Health Care Insurance Premiums
2) Cell Phone
3) Clothing
4) 401K and Pensions
5) Vehicle allowances
6) Gas allowance
7) Life insurance premiums
8) Disability insurance
9) Other Fringe Benefits required under an enforceable collective bargaining agreement
E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.
F. General Liability Insurance: An insurance policy that protects Contractor from claims resulting from bodily injury or property damage to a third party. Include as a separate line item within all modification proposals and provide a current insurance quote upon request.
G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees the Contractor will pay the labor and material costs incurred. Banks and Insurance companies charge a premium for individual project based on a sliding scale related to the size of the project.
Include as a separate line item in modification proposals and provide current company bonding rates upon request.
H. Builder’s Risk Insurance: Covers the contractor’s loss due to fire, high winds, or other natural forces. Not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.
1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS
A. General:
1. Proposal be received in the format and within the time frame specified in the Request for Proposal (RFP) letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.
2. Proposal shall be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed they are included in the hourly rate shown, or contractor is not requesting reimbursement. Contractor may utilize the government provided Contractor Estimate Form, or their own form, provided that it contains the same information and level of detail as the Government’s form.
http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank http://www.nps.gov/dscw/publicforms.htm
CHOH 320577 01 26 01 - 4
3. Requests for extensions of contract time as a result of change must be justified with a Time Impact Analysis (TIA). Refer to Section 01 32 16 "Construction Schedule", for time impact analysis requirements. TIA and associated costs shall be received with the proposal by the date shown within the Request for Proposal letter. Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving right for additional time and no time extension will be allowed.
4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer (CO) upon request.
5. Contractor shall review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.
6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.
B. Labor:
1. Contractor shall estimate cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing hours required for each craft directly engaged in modification work. Any work proposed requiring overtime work or premium pay shall be itemized separately. Rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, Federal Insurance Contributions Act (FICA), FUTA, and other direct costs resulting from Federal, State or local laws.
2. Itemize labor costs for equipment operators separate from equipment costs.
3. Labor cost for foremen shall only be costs for related work required for the modification.
C. Materials:
1. Estimated cost for materials shall include quotes from multiple sources. Material prices shall include applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.
2. No markup shall be applied to any material provided by NPS.
D. Equipment:
1. Equipment used for the project must be appropriately sized for work being performed.
2. Do not include costs for "miscellaneous tools and equipment", in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 shall be broken out separately.
3. Regardless of ownership, rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:
a. United States (U.S.) Army Corps of Engineers, Ownership and Operating Expense Schedule (use latest edition and applicable region)
b. Construction Blue Book
c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.
CHOH 320577 01 26 01 - 5
4. Estimated equipment rates shall include operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires and tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per Federal Acquisition Regulation (FAR) 31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.
5. Estimate full rate for equipment only for duration that equipment will be utilized to accomplish work of the modification.
6. Standby unit rates used in accordance with paragraph 1.3, D, 2, above. If the U.S. Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then 1/2 of equipment costs minus any operating costs, major repair and overhaul will be accepted.
7. If equipment is in standby mode due solely to a documented NPS delay, established standby rate shall apply from the first day of the delay.
8. Equipment not used and on job site for up to five consecutive days may be classified at standby rates, provided the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work.
Equipment still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.
9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.
10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.
E. Establishment and Application of Overhead and Profit Percentages:
1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.
Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:
Overhead………………10% Profit…………………….9%
2. Total aggregate limit of markup (OH&P) for Contractor and Subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.
3. If Contractors form a partnership, partnership may only receive home office overhead and profit in same amount as an individual Contractor (refer to paragraph 1.3,E,1 above). It is the responsibility of the partners to decide on division of revenue.
4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, overhead and profit mark-ups are required on net increases and deducted on net decreases.
5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.
CHOH 320577 01 26 01 - 6
PART 2 - PRODUCTS
PART 3 - EXECUTION
END OF SECTION 012601
REV 0 0 SF
LINE Unit$ Prod/Hr Total Unit$ Total Unit$ Total Subtotal %MU Markup Total
1 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 2 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 3 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 4 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 5 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 6 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf
7 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 8 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 9 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 10 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 11 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 12 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 13 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 14 0.00 sf 0.00 hr $1.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 15 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 16 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 17 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 18 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 19 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 20 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf
No 21 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 22 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 23 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 24 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 25 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf 26 0.00 sf 0.00 hr $0.00 0.00 $0 0.00 sf $0.00 $0 0.00 hr $0.00 $0 0.00 0.00% 0.00 $0 sf
$0 $0 $0 0.00 $0 Total Sub Costs $0 $0 $0 Total Sales Tax % 0.00% $0 Total Sales Taxes
Is Critical Path Impacted as a direct result of this Modification?
GENERAL INFORMATION SECTION
Park Acronym Mod Number
Hyperlink to Solication
Other Taxes 0.00%
Mtrl Tax Yes
0.00% NPS Project Manager PMIS # Weather Protection
Contractor's Contact
Labor TaxFile Location
Contract No. Design/Build
MODIFICATION DESCRIPTION
Overall Unit
State Sales Tax 0.00%
Local Sales Tax
Approximate Start
Overall Time Frame
Material Sales TaxLabor Sales Tax Total Equipment Cost
Equipment Sales Tax Total Sub Markup
$0.00
$0.00
SUBTOTALS Total Material Costs $0.00
$0.00 $0.00 $0.00
$0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
Equipment Tax
$0.00
DIVISIONAL WORK
OVERALL
QUANTITY
LABOR (inc fringe benefits) MATERIAL
No
\\vhb.com\gbl\proj\Williamsburg\34684.5
CHOH_Byron_Bridge_Access\Specificati RemotenessOpen Architects's Phone Number
EQUIPMENT
No Estimated By Open
Zip Code
State Open RFP # Architect's Contact
Subcontractor BondCounty
NPS Project Specialist
Total Labor Costs
TOTAL COST
Davis/Bacon Decision
January 1, 2013
0.00% Subcontractor Profit
Estimate Date
Quantity Quantity
CLINPark Name
Quantity
GENERAL CONDITIONS
$0 Unit Cost $0.00
DEDUCTIONS
ADDITIONS
Contractor's Company Subcontractor Overhead
Special Protection
TOTAL
Contractor Phone Number
Architect's Company Night/Day Work 0.00%
$/Unit
$0.00
$0.00
0.00%
REQUIRED SPREADSHEET DATA SECTION
No
$0.00
1/18/20242:37 PM Page 1 of 2
Access Davis Bacon Website Here
Qty/Hr Base Fringe Burden Tot/Hr Total Hr Model # Source Rate FOM Qty Laborer 0 $0.00 $0.00 $0.00 $0.00 $0.00
Individual Equipment Operator 0 $0.00 $0.00 $0.00 $0.00 $0.00 None $0.00 hr
Carpenter 0 $0.00 $0.00 $0.00 $0.00 $0.00 None $0.00 hr 0.00% 0.00%
Concrete Finisher 0 $0.00 $0.00 $0.00 $0.00 $0.00 None $0.00 hr
Painter 0 $0.00 $0.00 $0.00 $0.00 $0.00 None $0.00 hr Bond 0.00% 0.00%
Sprinkler Fitter 0 $0.00 $0.00 $0.00 $0.00 $0.00 None $0.00 hr 0.00% 0.00%
Plumber 0 $0.00 $0.00 $0.00 $0.00 $0.00 None $0.00 hr
Sheetmetal 0 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment Crew 0.00% None $0.00 hr 0.00%
Electrician 0 $0.00 $0.00 $0.00 $0.00 $0.00 None $0.00 hr 0.00% None $0.00 hr SUBTOTA 0.00%
Crew None $0.00 hr Worker 0 $0.00 $0.00 $0.00 $0.00 $0.00 None $0.00 hr Worker 0 $0.00 $0.00 $0.00 $0.00 $0.00 Total $0.00 hr 0.00% Worker 0 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment Crew Profit 0.00%
$0.00 None $0.00 hr 0.00% None $0.00 hr
SS FUTA TOTAL None $0.00 hr 6.20% 0.80% State% 0.00% Ave LABOR None $0.00 hr 0.0%
Medicare WC State Cap $0 Rate BURDEN None $0.00 hr 1.45% 0.00% Ave Salary $50,000 0.00% 8.45% Total $0.00 hr
GENERAL CLARIFICATIONS AND EXCLUSIONS
$0
SUBTOTAL
HOME OFFICE & PROFIT
Home Office Overhead
$0
Check Number Variance $0
Other $0
TOTAL COST $0
$0
SUBTOTAL $0
MISCELLANEOUS
$0
$0
$0
Other $0
INSURANCE
$0
General Liability
Total Variance $0
GENERAL CONTRACTOR MARKUPS
Design Liability
TESTING & INSPECTIONS
Testing & Inspections
SUBTOTAL
$0
$0
$0
0.00%
Labor Burden Calculation Total
0.00% $0
Hourly Rates $0
Corps Of Engineers Equipment Website Labor, Materals, Equip, & Taxes $0
Equipment http://140.194.76.129/publications/eng-pamphlets/EP_1110-1-8/toc.html
Crew & Check Number
Reference Tradesperson http://www.wdol.gov/dba.aspx#14
LABOR RATES WORKSHEET EQUIPMENT RATES WORKSHEET TOTAL DIRECT COST
Other
SUTA Training
Architectural Design Fees
1/18/20242:37 PM Page 2 of 2
CHOH 320577 01 27 00 - 1
012721 DEFINITION OF CONTRACT LINE ITEMS
SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS
PART 1 - GENERAL
1.1 SUMMARY
A. Section explains in general, what is and is not included in a contract line item, and limits or cut-off points where one item ends and another begins.
B. If no contract line item exists for a portion of work, include costs in a related item.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEMS
A. Contract Line Item Number (CLIN) 01 – Mobilization & Demobilization
1. This item consists of mobilization and demobilization to and from site. All labor and materials required for preparing the staging areas shall be included in CLIN 02.
2. Measurement for payment will be lump sum or percentage complete of line item per scheduled value.
3. Payment will be made at the contract lump sum price.
B. Contract Line Item Number 02 – Contractor Staging & Access / General Conditions
1. This item consists of preparation of laydown and materials storage areas, dewatering measures within canal prism, trailers, and all access equipment and cranes.
2. Measurement for payment will be lump sum.
3. Payment will be made at the contract lump sum price.
C. Contract Line Item Number 03 – Detour Route
1. This item consists of all labor and materials required for signage plan to re-route pedestrian traffic. This line item shall include all cost associated with signage, mobilization, and demobilization of the detour route signage and equipment necessary to complete the project. Refer to Appendix C for minimum requirements.
2. Measurement for payment will be lump sum.
3. Payment will be made at the contract lump sum price.
CHOH 320577 01 27 00 - 2
D. Contract Line Item Number 04 – Erosion Control/Oil Seepage Control & Water Testing
1. This item consists of activities required to protect water quality.
2. Measurement for payment will be lump sum or percentage complete of line item per scheduled value.
3. Payment will be made at the contract lump sum price.
E. Contract Line Item Number 05 – Tree Removal
1. This item consists of all site clearing and removal of trees over 4” DBH (to be cut flush with the existing grade) as indicated in drawings, notes and specifications.
2. Measurement for payment will be lump sum or percentage complete of line item per scheduled value.
3. Payment will be made at the contract lump sum price.
F. Contract Line Item Number 06 – Stair Tower Foundations/Grade Beams
1. This item consists of all labor and materials required, excavation, removal and disposal or re-use of suitable fill, placement, grading, and compaction, as well installation of new below ground concrete grade beams and column pile caps per the drawings and specifications. Demolition and removal of existing spiral staircase shall be included in CLIN 09. Stone wall & stone revetment work is listed under CLIN Item No. 10.
2. Measurement for payment will be lump sum or percentage complete of line item per scheduled value.
3. Payment will be made at the contract lump sum price.
G. Contract Line Item Number 07 – Foundation Micro Piles
1. This item consists of all labor and materials required for installation of the foundation micro piles in accordance with the drawings and specifications.
2. Measurement for payment will be linear foot of micro pile installed.
3. Payment will be made at the contract linear foot price.
H. Contract Line Item Number 08 – Stair Tower Structure
1. This item consists of all labor and materials required for installation of new above ground stair structure per the drawings and specifications. Work associated with micro piles shall be included in CLIN 07.
2. Measurement for payment will be lump sum or percentage complete of line item per scheduled value. Stair Tower Foundations are listed under CLIN Item No. 06, and Foundation Micro Piles are listed under CLIN Item No. 07.
3. Payment will be made at the contract lump sum price.
I. Contract Line Item Number 09 – Site Work
1. This item consists of all labor and materials required for all demolition and removal of existing spiral staircase, construction of the towpath surface and base course including all geotextile placement, stair tower concrete landings and apron transitions, imbricated stone armoring, and topsoil & seeding.
2. Measurement for payment will be lump sum or percentage complete of line item per scheduled value.
CHOH 320577 01 27 00 - 3
3. Payment will be made at the contract lump sum price.
J. Contract Line Item Number 10 – Stone Wall & Stone Revetment Work
1. This item consists of all labor and materials required for Includes suitable fill placement, grading and compaction, reconstruction of existing dry-laid stone walls, revetments and resetting coping stones. Excavation for grade beams and pile cap installation shall be included in CLIN 06.
2. Measurement for payment will be lump sum or percentage complete of line item per scheduled value.
3. Payment will be made at the contract lump sum price.
3.2 BID OPTIONS
A. Contract Line Item Number 11 Bid Option A – CSXT Coordination
1. This item consists of all labor and materials required for CSX Transportation Construction Submissions
2. Measurement for payment will be lump sum or percentage complete of line item per scheduled value.
3. Payment will be made at the contract lump sum price.
END OF SECTION 01 27 00
CHOH 320577 01 31 00 - 1
112723 PROJECT MANAGEMENT AND COORDINATION
SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. Definitions
2. Construction Coordination
3. Submittals
4. Coordination Drawings
5. Requests for Information (RFIs)
6. NPS Project Management and Communication Software
7. Project Meetings
8. Environmental Coordination
9. Permits
B. Related Requirements:
1. Section 01 32 16 "Construction Schedule" for preparing and submitting Construction Contractor’s construction schedule.
2. Section 01 73 40 "Execution" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
3. Section 01 77 00 "Closeout Procedures" for coordinating closeout of the Contract.
1.2 DEFINITIONS
A. Agency with Jurisdiction
1. An Agency that has been granted legal authority over a location, action, or resource. This authority includes the ability to issue a permit or other legal permission document.
B. Construction Permits – Contractor Provided
1. Permits obtained by the Contractor based on the means and methods to conduct the work.
Construction Permits are typically issued by the Agency to the Contractor and not to the National Park Service. Examples of typical Contractor Provided Permits are: National Pollutant Discharge Elimination System (NPDES) Construction Permit (ground disturbance), dewatering permit, permit for work in a roadway (with traffic management plan), temporary utility tap permit, etc.
C. Government Furnished Permits
1. Obtained by National Park Service (NPS), usually through the Architect/Engineer (A/E) or a consultant, during the design process (Predesign (PD) through Construction Documents (CD)) and are usually concerned with impacts to resources protected by federal law.
http://www.nps.gov/dscw/definitionsdc_a.htm https://www.nps.gov/dscw/definitionsdc_p.htm http://www.nps.gov/dscw/definitionsdc_c.htm https://www.nps.gov/dscw/definitionsdc_c.htm https://www.nps.gov/dscw/definitionsdc_a.htm http://www.nps.gov/dscw/definitionsdc_g.htm https://www.nps.gov/dscw/definitionsdc_n.htm https://www.nps.gov/dscw/definitionsdc_a.htm https://www.nps.gov/dscw/design.htm
CHOH 320577 01 31 00 - 2
Howevepermits that are obtained for the convenience of the Government during design.
GF permits are "furnished" to the Contractor in the Request for Proposal (RFP) and as part of the final contract documents. The Contractor must comply with GF permit provisions.
Examples of typical GF permits: Clean Water Act (CWA) 404 dredge and fill permit, CWA Water Quality Certification (often state administered), Highway Right-of-Way Permit, etc.
1.3 CONSTRUCTION COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components with other Construction Contractors to ensure maximum accessibility for required maintenance, service, and repair.
3. Make provisions to accommodate items scheduled for later installation.
4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of components, including mechanical and electrical.
5. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other Construction Contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to:
1. Preparation of Construction Contractor Construction Schedule
2. Preparation of the Schedule of Values
3. Installation and removal of temporary facilities and controls
4. Delivery and processing of submittals
5. Progress meetings
6. Permit requirements
7. Pre-installation conferences
8. Project closeout activities
9. Commissioning activities https://www.nps.gov/dscw/definitionsdc_p.htm https://www.nps.gov/dscw/definitionsdc_c.htm
CHOH 320577 01 31 00 - 3
1.4 SUBMITTALS
A. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.
1. Content: Project-specific information, drawn accurately to scale. Do not base Coordination Drawings on reproductions of Contract Documents or standard printed data. Include following information, as applicable:
a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.
b. Indicate dimensions shown on Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to Contracting Officer (CO) for resolution of such conflicts.
c. Indicate space requirements for routine maintenance and anticipated replacement of components during the life of the installation.
d. Show location and size of access doors required for access to concealed dampers, valves, and controls.
e. Indicate required installation sequences.
2. Refer to individual Sections for Coordination Drawing requirements for Work in those Sections.
3. Follow NPS DSC Electronic Drawing Standards. See CAD/BIM (Computer Aided Design/Building Information Modeling) & Drafting Standards page > DSC Requirements section.
B. Coordination Drawing Organization: Organize coordination drawings as follows:
1. Floor Plans and Reflected Ceiling Plans: Show architectural, structural, mechanical, plumbing, fire-protection, fire-alarm, and electrical elements. Show locations of visible ceiling-mounted devices relative to acoustical ceiling grid. Supplement plan drawings with section drawings where required to adequately represent the Work.
2. Plenum Space: Indicate sub-framing for support of ceiling and wall systems, mechanical and electrical equipment, and related Work. Locate components within ceiling plenum to accommodate layout of light fixtures indicated on Drawings. Indicate areas of conflict between light fixtures and other components.
3. Mechanical Rooms: Provide coordination drawings for mechanical rooms showing plans and elevations of mechanical, plumbing, fire-protection, fire-alarm, and electrical equipment.
4. Structural Penetrations: Indicate penetrations and openings required for all disciplines.
5. Slab Edge and Embedded Items: Indicate slab edge locations and sizes and locations of embedded items for metal fabrications, sleeves, anchor bolts, bearing plates, angles, door floor closers, slab depressions for floor finishes, curbs and housekeeping pads, and similar items.
6. Mechanical and Plumbing Work:
a. Sizes and bottom elevations of ductwork, piping, and conduit runs, including insulation, bracing, flanges, and support systems.
https://www.nps.gov/dscw/ds-cad-bim-drafting.htm https://www.nps.gov/dscw/ds-cad-bim-drafting.htm
CHOH 320577 01 31 00 - 4
b. Dimensions of major components, such as dampers, valves, diffusers, access doors, cleanouts and electrical distribution equipment.
c. Fire-rated enclosures around ductwork.
7. Electrical Work:
a. Runs of vertical and horizontal conduit 1-1/4 inches in diameter and larger.
b. Light fixture, exit light, emergency battery pack, smoke detector, and other fire-alarm locations.
c. Panel board, switch board, switchgear, transformer, busway, generator, and motor control center locations.
d. Location of pull boxes and junction boxes, dimensioned from column center lines.
8. Fire-Protection System:
a. Locations of standpipes, mains piping, branch lines, pipe drops, and sprinkler heads.
9. Review: Contracting Officer will review coordination drawings to confirm Work is being coordinated; details of coordination are Construction Contractor's responsibility. If Contracting Officer determines coordination drawings are not prepared in scope or detail, or are otherwise deficient, Contracting Officer will inform Construction Contractor, who shall make changes and resubmit.
10. Coordination Drawing Prints: Prepare coordination drawing prints according to requirements in Section 01 33 23 "Submittal Procedures."
C. Coordination Digital Data Files: Prepare coordination digital data files according to:
1. File Preparation Format: Same digital data software program, version, and operating system as original Drawings.
2. File Submittal Format: Submit or post coordination drawing files using Portable Document Format (PDF) file format.
3. Contracting Officer will furnish Construction Contractor one set of digital data files (AutoCad.dwg) of Drawings for use in preparing coordination digital data files.
a. Contracting Officer makes no representations as to accuracy or completeness of digital data files as they relate to Drawings.
b. Digital Data Software Program: Drawings are available in AutoCad.dwg.
D. Division 1 Documents:
1. Letter designating Project Superintendent
2. Construction Schedule
3. A Comprehensive Schedule of Values
4. Accident Prevention Plan
5. A List of Subcontractors for this project
6. Written statements from Subcontractors certifying compliance with applicable labor standard clauses.
7. Certificates of Insurance and Standard Form SF1413 for Contractor and all Subcontractors
8. Waste Management Plan
9. Quality Control Plan
10. Temporary Storm Water Pollution Prevention Plan (SWPP or UPPP)
CHOH 320577 01 31 00 - 5
11. Indoor Air Quality (IAQ) Management Plan
12. Construction Contractor Commissioning Plan
13. Historic Preservation Treatment Plan (HPTP)
14. List of Required Construction Permits. Include the following information for each permit:
a. Name of Permit
b. Agency(ies) with Jurisdiction issuing the permit
c. Information required from Government to complete permit application
15. Flood Mitigation Plan shall be submitted to NPS for review and approval prior to construction.
a. Include plans developed to address preparation, actions to be taken, and recovery from a flood.
b. Include methods and sources of information that well be used for monitoring onsite, localized, and regional flooding events, along with frequency.
1) Include monitoring plans, equipment, temporary gauges to be used, temporary gauge installation information, and temporary gauge locations. Perform daily monitoring of the Potomac River water levels.
c. Include who will be responsible for monitoring and determining actions on behalf of the contractor.
d. Establish an emergency contact plan for key individuals that will be available during normal business hours and off duty hours.
e. Establish thresholds and actions to mitigate damages in the event of forecasted floods. Define alternate locations outside of primary construction areas that equipment and materials can be located in the event of a flood. Identify critical tasks that will have elevated concerns for flood impacts and any risk reduction measures that will be implemented to mitigate those impacts.
1) Include specific measures to be taken to protect walls adjacent to open excavations in the event of an overtopping event.
2) Include triggers for removing temporary stockpiles from the floodplain.
3) Identify key tasks/activities that are most vulnerable to flooding and potential mitigative techniques that will be implemented during construction.
f. Define actions and tasks to recover from floods. Protection of the work area and recovery from floods is the responsibility of the contractor.
16. Traffic Management Plan shall be submitted to NPS for review and approval prior to construction.
a. Plan shall comply with the most recent version of the NPS C&O Canal NHP Safety Officer Memo for Towpath driving and provide highway and towpath signage in accordance to MUTCD as specified for each established entrance point along the ingress and egress of the national park.
b. Contractor shall coordinate with NPS on a signage plan to re-reroute pedestrian traffic.
c. See appendix C “Bridge Shuttle & Detour Information” identifying minimum requirements for the signage plan for the pedestrian re-route. Contract shall submit the signage plan for approval by the CO.