B08_BidSchedule.docx
DOCX document 15 KB Posted
- Solicitation number
- 140FC123R0054
About this file
This bid schedule outlines pricing requirements for repair work at the Dale Hollow National Fish Hatchery. The federal contract opportunity seeks bids to address a sinkhole and drainage issues causing sinkhole formation. Bidders must provide lump sum pricing for mobilization, bonds/insurance, excavation, pavement repair, technical discovery of the sinkhole source, and sinkhole source mitigation. Estimated quantities are provided for informational purposes only and will not be used for bidding or claims. The solicitation was issued by the U.S. Department of the Interior Fish and Wildlife Service as solicitation number 140FC123R0054 to address issues at the Dale Hollow NFH location in Celina, Tennessee.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FC123R0054_Amd_0002.pdf | ||
| Sol_140FC123R0054_Amd_0001.pdf | ||
| A04_SOW_DH_sinkhole.docx | DOCX document | |
| B03_Wage_Determinations_TN2023147.pdf | ||
| A06_Picture_1.jpg | JPG image | |
| Sol_140FC123R0054.pdf | ||
| A06_Picture_4.jpg | JPG image | |
| A06_Picture_5.jpg | JPG image | |
| A06_Picture_3.jpg | JPG image | |
| A06_Picture_2.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RT901 Emergency repair of sinkhole/pothole and address drainage that caused the problem Dale Hollow National Fish Hatchery
Bid Options
Bid Schedule
All bidders shall provide lump sum prices for the line-items below. Line-item breakdowns of each division must be submitted with proposal.
Estimated Quantities Estimated quantities for Bid Option 1 are provided below. These quantities are provided for general information only and shall not be used for bidding purposes. Bidders shall be solely responsible for the determination of accurate quantities for their bids and the quantities presented below shall not be used as a basis of a claim for additional work or bid modifications.
Bid Option 1 Estimated Quantities Quantity Unit Cost Mobilization and preparatory work 1 LS Performance Bond and Insurance 1 LS
| Description of Work |
| Quantity |
| Unit |
| Cost |
Excavation Pavement Section Repair L.C.Y M2
| Technical Discovery of Sinkhole Source |
| 3 |
| Hours |
| Sinkhole Source Mitigation |
| 1 |
| EA |
TOTAL