B08_BidSchedule.docx

DOCX document 15 KB Posted

Attached to
DALE HOLLOW NFH, Celina, TN -Repair of a sinkhole/
Solicitation number
140FC123R0054
Issued by

About this file

This bid schedule outlines pricing requirements for repair work at the Dale Hollow National Fish Hatchery. The federal contract opportunity seeks bids to address a sinkhole and drainage issues causing sinkhole formation. Bidders must provide lump sum pricing for mobilization, bonds/insurance, excavation, pavement repair, technical discovery of the sinkhole source, and sinkhole source mitigation. Estimated quantities are provided for informational purposes only and will not be used for bidding or claims. The solicitation was issued by the U.S. Department of the Interior Fish and Wildlife Service as solicitation number 140FC123R0054 to address issues at the Dale Hollow NFH location in Celina, Tennessee.

View the file

Other files

File Type Posted
Sol_140FC123R0054_Amd_0002.pdf PDF
Sol_140FC123R0054_Amd_0001.pdf PDF
A04_SOW_DH_sinkhole.docx DOCX document
B03_Wage_Determinations_TN2023147.pdf PDF
A06_Picture_1.jpg JPG image
Sol_140FC123R0054.pdf PDF
A06_Picture_4.jpg JPG image
A06_Picture_5.jpg JPG image
A06_Picture_3.jpg JPG image
A06_Picture_2.jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RT901 Emergency repair of sinkhole/pothole and address drainage that caused the problem Dale Hollow National Fish Hatchery

Bid Options

Bid Schedule

All bidders shall provide lump sum prices for the line-items below. Line-item breakdowns of each division must be submitted with proposal.

Estimated Quantities Estimated quantities for Bid Option 1 are provided below. These quantities are provided for general information only and shall not be used for bidding purposes. Bidders shall be solely responsible for the determination of accurate quantities for their bids and the quantities presented below shall not be used as a basis of a claim for additional work or bid modifications.

Bid Option 1 Estimated Quantities Quantity Unit Cost Mobilization and preparatory work 1 LS Performance Bond and Insurance 1 LS

Description of Work
Quantity
Unit
Cost

Excavation Pavement Section Repair L.C.Y M2

Technical Discovery of Sinkhole Source
3
Hours
Sinkhole Source Mitigation
1
EA

TOTAL