B08_Bid_Schedule.pdf

PDF 135 KB Posted

Attached to
Roof Repair OH
Solicitation number
140FC226R0012
Issued by

About this file

This is a Bid Schedule for a roof replacement project at Ottawa National Wildlife Refuge in Oak Harbor, Ohio. The project scope requires complete replacement of the headquarters roof, including weather barrier and underlayment, covering 3,800 square feet. Quoters must furnish all labor, materials, and equipment to complete the work in accordance with attached documents.

The bid schedule contains three line items: (1) Mobilization/Demobilization, Bonding, Overhead, and Profit (1 JB); (2) Replace Roof, weather barrier, and underlayment (3,800 SF); and (3) All other work described in the SOW including inspection of existing conditions, flashing, boots, ventilation, and drip edge (1 JB). Quoters must provide unit costs for each line item and calculate total costs. The form requires quoter identification including company name, authorized representative signature and title, address, SAM UEI number, telephone number, and submission date.

View the file

Other files

File Type Posted
Sol_140FC226R0012_Amd_0002.pdf PDF
B09_Q_A_0002.docx DOCX document
Sol_140FC226R0012_Amd_0001.pdf PDF
Sol_140FC226R0012.pdf PDF
B08_Wages.pdf PDF
B08_Past_Performance_Survey.pdf PDF
B08_SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

OTTAWA NATIONAL WILDLIFE REFUGE

OAK HARBER, OH

Unit Total

QTY Unit Cost Cost

1 1 JB

2 Replace Roof, weather barrier, and underlayment 3800 SF

3 1 JB

Total

By:

(signature)

Address:

SAM UEI#:

Telephone No.:

Title:

Date:

Project Description: HQ replacement of roof.

Furnish all labor, materials, and equipment to complete the following work in accordance with the attached documents.

Mobilization/Demobilization, Bonding, Overhead, & Profit

All other work described in the SOW (inspection of existing conditions, flashing, boots, ventilation, and drip edge

Name of Quoter: