B08_Attachment_B_MANA_Hazard_Tree_Price_Schedule_RFQ_DRAFT.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- PMIS 340733A REMOVE OR PRUNE HAZARD TREE Federal contract opportunity
- Solicitation number
- 140P3026Q0037
About this file
This is a price schedule template for a Request for Quotation (RFQ) for hazard tree services at Manassas National Battlefield Park under the Department of the Interior National Park Service (Solicitation No. 140P3026Q0037). Quoters must provide firm-fixed lump-sum prices for all 36 mandatory work items, with pricing to include labor, supervision, equipment, mobilization, traffic and visitor control, material disposition, permits, insurance, taxes, and incidentals. The work items consist primarily of individual tree removals, crown reductions, and pruning operations across various park locations, with three items covering multiple trees: HT-03 (approximately 18 trees in a tree-of-heaven grove), HT-30 (two pine trees), and HT-35 (approximately 25 red cedar trees). Material disposition requirements vary by item, ranging from leaving material onsite and clearing trails to chipping onsite or removing material from the park for offsite disposal.
The price schedule requires quoters to enter their legal business name, UEI, and quotation date, and specifies that all 36 line items are mandatory components of one complete firm-fixed-price service requirement with no items being optional or separately exercisable. Blank price cells render the schedule incomplete, and quoters must enter $0.00 for any item whose cost is included in another line item. Each work item includes specific details such as tree species, diameter at breast height (DBH), GPS coordinates, and required work scope as controlled by SOW Attachment A, Table A-1.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P3026Q0037_Amd_0002.pdf | ||
| B09_QA_0002.docx | DOCX document | |
| B09_Amended_Attachment_A_MANA_Hazard_Tree_SOW_0002.docx | DOCX document | |
| Sol_140P3026Q0037_Amd_0001.pdf | ||
| Sol_140P3026Q0037.pdf | ||
| B08_Attachment_C_WD_2015-4281.txt | TXT text file | |
| B08_Attachment_A_MANA_Hazard_Tree_SOW_RFQ_DRAFT.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| ATTACHMENT B - PRICE SCHEDULE | |||||||||
| FY-26 Hazard Tree Services | Manassas National Battlefield Park | |||||||||
| Solicitation No. | [INSERT CALL NUMBER] | Quoter Legal Business Name | |||||||
| UEI | Quotation Date | ||||||||
| PRICING INSTRUCTIONS | |||||||||
| 1. Enter a price for each of the 36 mandatory work items. All items are included in the complete requirement. | |||||||||
| 2. Enter one firm-fixed lump-sum price for each row. HT-03 covers about 18 trees, HT-30 covers two trees, and HT-35 covers about 25 trees; each other row covers one tree. | |||||||||
| 3. Include all costs required by the SOW in the 36 line prices, including labor, supervision, equipment, mobilization, traffic and visitor control, material disposition, permits, insurance, taxes, and incidentals. | |||||||||
| 4. Enter a dollar amount for every line. Use $0.00 when an item's cost is included in another line. Blank price cells make the schedule incomplete. | |||||||||
| 5. SOW Attachment A, Table A-1, controls. The abbreviated descriptions below identify the priced work but do not change the required scope. | |||||||||
| SOW Item | Source ID | Location / GPS | Tree or Group | Required Work | Material Disposition | Qty | Unit | Quoted Line-Item Price | Extended Amount |
| HT-01 | 74 | Chinn Ridge Lat 38.803823 Long -77.540498 | Elm? DBH: 10 in. | Crown-reduce / remove hazardous top | Leave onsite; clear of trail | 1 | LS | ||
| HT-02 | 79 | Chinn Ridge Lat 38.804471 Long -77.537094 | Pine DBH: 24 in. | Prune dead or unproductive branches | Leave onsite; clear of trail | 1 | LS | ||
| HT-03 | 39 | Lewis House Lat 38.799722 Long -77.551902 | Tree-of-heaven grove Aggregate DBH: 146 in. (source value) Count: about 18 trees | Remove grove (about 18 trees) | Chip onsite; place chips as approved | 1 | LS | ||
| HT-04 | 103 | Stuarts Hill Lat 38.802635 Long -77.560287 | Pine DBH: 10 in. | Remove tree | Leave onsite; clear of trail | 1 | LS | ||
| HT-05 | 23 | Unfinished Railroad Lat 38.831894 Long -77.541661 | Oak DBH: 6 in. | Remove tree | Leave onsite; clear of trail | 1 | LS | ||
| HT-06 | 84 | Unfinished Railroad Lat 38.828768 Long -77.546831 | Oak? DBH: 30 in. | Remove tree | Chip onsite; place chips as approved | 1 | LS | ||
| HT-07 | 46 | Matthews Hill Lat 38.828517 Long -77.523786 | Dead tree; poison ivy present DBH: 18 in. | Prune dead or unproductive branches | Leave onsite; clear of trail | 1 | LS | ||
| HT-08 | 51 | Matthews Hill Lat 38.828652 Long -77.530264 | Pine DBH: 10 in. | Remove tree | Leave onsite; clear of trail | 1 | LS | ||
| HT-09 | 89 | Rock Road Lat 38.811104 Long -77.510338 | Pine DBH: 15 in. | Remove tree | Leave onsite; clear of trail | 1 | LS | ||
| HT-10 | 48 | Rosefield Lat 38.817783 Long -77.534525 | Paper mulberry DBH: 44 in. | Remove tree | Chip onsite; place chips as approved | 1 | LS | ||
| HT-11 | 47 | Stone Bridge Lat 38.824045 Long -77.504704 | Oak? DBH: 20 in. | Remove tree | Leave onsite; clear of trail | 1 | LS | ||
| HT-12 | 70 | Stone Bridge Lat 38.827770 Long -77.509213 | Pine DBH: 9 in. | Remove tree | Leave onsite; clear of trail | 1 | LS | ||
| HT-13 | 24 | Unfinished Railroad Lat 38.832759 Long -77.540908 | Pine DBH: 5 in. | Remove tree | Leave onsite; clear of trail | 1 | LS | ||
| HT-14 | 57 | Unfinished Railroad Lat 38.828258 Long -77.545937 | White oak DBH: 13 in. | Crown-reduce / remove hazardous top | Leave onsite; clear of trail | 1 | LS | ||
| HT-15 | 60 | Unfinished Railroad Lat 38.829685 Long -77.544064 | Sourwood DBH: 6 in. | Prune overhanging branches | Leave onsite; clear of trail | 1 | LS | ||
| HT-16 | 86 | Visitor Center Lat 38.811667 Long -77.515555 | Pine DBH: 15 in. | Remove tree | Leave onsite; clear of trail | 1 | LS | ||
| HT-17 | 87 | Visitor Center Lat 38.812166 Long -77.512765 | Pine DBH: 11 in. | Remove tree | Leave onsite; clear of trail | 1 | LS | ||
| HT-18 | 88 | Visitor Center Lat 38.813130 Long -77.512185 | Pine DBH: 10 in. | Remove tree | Leave onsite; clear of trail | 1 | LS | ||
| HT-19 | 34 | Blacksmith Shop Lat 38.810832 Long -77.549414 | Elm DBH: 14 in. | Prune dead or unproductive branches | Chip onsite; place chips as approved | 1 | LS | ||
| HT-20 | 40 | Chinn Ridge Lat 38.806155 Long -77.535274 | Red cedar DBH: 10 in. | Prune overhanging branches | Remove from park; chip/dispose offsite | 1 | LS | ||
| HT-21 | 76 | Chinn Ridge Lat 38.808689 Long -77.543696 | Red cedar DBH: 9 in. | Prune overhanging branches | Leave onsite; clear of trail | 1 | LS | ||
| HT-22 | 49 | Confederate Cemetery Lat 38.814119 Long -77.546123 | White oak DBH: 16 in. | Prune overhanging branches | Remove from park; chip/dispose offsite | 1 | LS | ||
| HT-23 | 52 | Deep Cut Lat 38.823538 Long -77.550792 | Oak DBH: 28 in. | Prune hazardous branches as identified | Leave onsite; clear of trail | 1 | LS | ||
| HT-24 | 54 | Deep Cut Lat 38.823988 Long -77.550396 | Pine DBH: 13 in. | Remove tree | Leave onsite; clear of trail | 1 | LS | ||
| HT-25 | 43 | Law Enforcement Lat 38.826751 Long -77.515103 | Oak? DBH: 10 in. | Prune dead or unproductive branches | Remove from park; chip/dispose offsite | 1 | LS | ||
| HT-26 | 44 | Law Enforcement Lat 38.828547 Long -77.521900 | White oak DBH: 15 in. | Prune dead or unproductive branches | Chip onsite; place chips as approved | 1 | LS | ||
| HT-27 | 19 | Portici Lat 38.803876 Long -77.507461 | Red oak DBH: 20 in. | Prune dead or unproductive branches | Remove from park; chip/dispose offsite | 1 | LS | ||
| HT-28 | 91 | Rock Road Lat 38.813964 Long -77.508838 | Pine DBH: 14 in. | Crown-reduce / remove hazardous top | Leave onsite; clear of trail | 1 | LS | ||
| HT-29 | 92 | Rock Road Lat 38.819075 Long -77.508114 | Tulip poplar DBH: 15 in. | Prune overhanging branches | Leave onsite; clear of trail | 1 | LS | ||
| HT-30 | 71 | Stone Bridge Lat 38.826701 Long -77.508784 | Pine DBH: 17 in. Count: two trees | Prune overhanging branches on both trees | Leave onsite; clear of trail | 1 | LS | ||
| HT-31 | 93 | Visitor Center Lat 38.818326 Long -77.511948 | Red cedar DBH: 12 in. | Crown-reduce / remove hazardous top | Leave onsite; clear of trail | 1 | LS | ||
| HT-32 | 14+61:61E172:6622:68 | Blacksmith Shop Lat 38.810954 Long -77.549559 | Maple? DBH: 30 in. | Prune hazardous branches as identified | Leave onsite; place out of public view as approved | 1 | LS | ||
| HT-33 | 33 | Brawner Lat 38.813626 Long -77.568362 | Red cedar DBH: 20 in. | Prune dead or unproductive branches | Remove from park; chip/dispose offsite | 1 | LS | ||
| HT-34 | 30 | Portici Lat 38.804184 Long -77.506474 | Cedar DBH: 13 in. | Prune overhanging branches | Remove from park; chip/dispose offsite | 1 | LS | ||
| HT-35 | 41 | Portici Lat 38.808576 Long -77.504181 | Red cedar grove DBH: many Count: about 25 trees | Prune hazardous branches on all 25 trees in the grove as identified | Remove from park; chip/dispose offsite | 1 | LS | ||
| HT-36 | 42 | Portici Lat 38.806414 Long -77.508573 | Red cedar DBH: 23 in. | Remove tree | Leave onsite; place out of public view as approved | 1 | LS |
| Pricing completeness check | INCOMPLETE - enter all 36 prices |
| TOTAL QUOTED PRICE - COMPLETE INCLUDED SCOPE (HT-01 THROUGH HT-36) |
All 36 work items are mandatory components of one complete firm-fixed-price service requirement. Line-item pricing does not make any item optional or separately exercisable.
| Authorized Representative | Title |
| Signature | Date |