About this file
This is a system schematic drawing for laboratory services and gases at a research facility operated by the U.S. Geological Survey (USGS) and Colorado School of Mines. The document illustrates the design and layout requirements for cryogenic bulk gas storage and distribution systems.
The bulk gas supplier (vendor) is required to provide design, service, installation, and all associated equipment for two 3,000-gallon bulk gas storage tanks—one for nitrogen (LN2/GN2) and one for argon (LAR/GAR). The Dewar fill stations must be metered and controlled with locked-out access to restrict usage and measure quantity. Delivery operations are constrained by the service yard location, which requires smaller delivery trucks, and an on-site inspection must be conducted prior to design and installation. All installation and operation must comply with local, national, and industry-specific codes, including NFPA 55 (Compressed Gases and Cryogenic Fluids Code) and ASME Section VIII. The system includes ambient vaporizers, pipeline pressure control valves, pressure regulators, safety relief valves, source valves, and gas flow meters connected to the building automation system (BAS). Coordination with USGS, Colorado School of Mines, and the General Contractor is required to meet construction permit requirements. The schematic also references related systems including compressed air (P50-01), reverse osmosis (P50-02), and laboratory vacuum systems (P50-04).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140G0226Q0065_Amd_0001.pdf | ||
| B08_Attachment__A_-__BPA_SOW_-_EMRF_Install.pdf | ||
| Sol_140G0226Q0065.pdf | ||
| B08_Attachment_B_Price_List.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE: NONE
LABORATORY SERVICES & GASES - SYSTEM SCHEMATIC
P50-03
BASEMENT
LEVEL 01
CRYOGENIC BULK GAS
STORAGE TANK - BY BULK
GAS SUPPLIER
BULK TANK FILL
CONNECTION
BY BULK GAS SUPPLIER
CONCRETE PAD AND
BOLLARDS BY G.C.
RE: ARCH (TYP.)
LN2 DEWAR
FILL STATION
BY BULK GAS
SUPPLIER
AMBIENT VAPORIZER BY
BULK GAS SUPPLIER
PIPELINE PRESSURE
CONTROL VALVE
BY BULK GAS SUPPLIER
BY GAS
SUPPLIER
BY MECH.
CONTRACTOR
SOURCE VALVE
GN2GN2
LN2
NOTE:
NITROGEN TANKS, PIPING,
PRESSURE REGULATORS,
SAFETY RELIEF VALVES,
ETC. BY BULK GAS
SUPPLIER
CRYOGENIC BULK GAS
STORAGE TANK - BY BULK
GAS SUPPLIER
BULK TANK FILL
CONNECTION
BY BULK GAS SUPPLIER
LAR DEWAR
FILL STATION
BY BULK GAS
SUPPLIER
AMBIENT VAPORIZER BY
BULK GAS SUPPLIER
PIPELINE PRESSURE
CONTROL VALVE
BY BULK GAS SUPPLIER
BY GAS
SUPPLIER
BY MECH.
CONTRACTOR
EXTERIOR BLDG WALL
SOURCE VALVE
GAR GAR
LAR
FM
HOUSE GN2
SYSTEM GAS
FLOW METER
TO BAS FM
HOUSE AR
SYSTEM GAS
FLOW METER
TO BAS
LEVEL 01
INTERIOR
RE: P50-01 FOR CONTINUATION OF
COMPRESSED AIR SYSTEM EQUIPMENT SOURCE
RE: P50-04 FOR CONTINUATION OF
LABORATORY VACUUM SYSTEM EQUIPMENT SOURCE
2" AR
2" GN2
2" AR
2" GN2
2" AR
2" GN2
A R
G N
1-1/2" CA
3" VAC
1-1/2" CA
3" VAC
-1
/2
C A
V A
C
LEVEL 03
LEVEL 05
LEVEL 06
ROOF
TO BASEMENT LABS
1" AR
1" GN2
1-1/2" CA
3" VAC
3/4" CA
TO LEVEL 05 LABS
TO LEVEL 01 LABS
1" AR
1" GN2
1-1/2" CA
3" VAC
TO LEVEL 03 LABS
TO MECHANICAL PENTHOUSE
FLOOR SHUT-OFF VALVE (TYP.)
FLOOR PRESSURE CONTROL VALVE (TYP.) - PRV-RO-0B. RE: SPECS
PRESSURE GAUGE (TYP.)
A R
G N
V A
C
A R
G N
V A
C
/4
C
A
HOUSE VALVE,
RE: P11-01A FOR LOCATION
HOUSE VALVE,
RE: P11-01A FOR LOCATION
NOTE:
ARGON TANKS, PIPING,
PRESSURE REGULATORS,
SAFETY RELIEF VALVES,
ETC. BY BULK GAS
SUPPLIER
3" VAC EX
VACUUM
EXHAUST TO
EXTERIOR
L E
V E
L
I N
T E
R
IO
R
L E
V E
L
I N
T E
R
IO
R
RE: P50-02 FOR CONTINUATION OF REVERSE
OSMOSIS (RO) SYSTEM SOURCE
1-1/2" RO
1" RO
1" RO
-1
/4
R O
R O
1-1/4" RO
1-1/4" RO
PRV-RO-01. RE: SPECS
1" AR
1" GN2
1-1/2" CA
3" VAC
1" RO
1" AR
1" GN2
1-1/2" CA
3" VAC
1" RO
P
TO ROCP-001
RE: P50-02
-1
/2
C A
-1
/4
R O
-1
/2
C A
-1
/4
R O
SBEC PROJECT #:
DRAWN BY:
DESIGNED BY:
CHECK BY:
APPROVED BY:
SHEET NUMBER
TITLE
Approved
Checked
Drawn
Job Number
ISSUE CHART
KEYPLAN
PROJECT
220022
DP/TMH/TW
DH
CEJ
GS
CONSULTANTS
STRUCTURAL
CIVIL
MEP
CONTRACTOR
FACILITY LOCATION
LANDSCAPING
OWNER
/1
/2
:2
:2
P M
A u to d e s k D o c s
/M in e s -S
S F
/M P
F -E
M R
F
- A
L L
.r v t
P50-03
PLUMBING -
LABORATORY
SERVICES & GASES -
SYSTEM SCHEMATIC
CJ
DP / TMH / TW
221904
GS
ENERGY & MINERALS
RESEARCH FACILITY
Copyright © 2023 Perkins+Will
Sunrise Valley Drive Reston, Virginia 20192
1000 18TH STREET
GOLDEN, CO 80401
U.S. GEOLOGICAL
SURVEY
A S
I 0
B U
IL
D
IN
G
P A
C K
S
E P
T E
M B
E R
9, Martin/Martin
JVA
1319 Spruce Street
Boulder, Colorado 80302
12499 West Colfax Avenue Lakewood, Colorado 80215
Shaffer Baucom Engineering & Consulting 3900 S. Wadsworth Boulevard, Suite 600
Lakewood, Colorado 80235
DATACOM DESIGN GROUP
7600 Burnet Road, Suite 350
Austin, Texas
Colorado School of Mines 1801 19th Street
Golden, Colorado 80401
Adolfson & Peterson Construction 797 Ventura Street
Aurora, Colorado 80011
Energy & Mineral Research Facility 1000 18th Street
Golden, Colorado 80401
Confluence 3457 Ringsby Ct., Suite 223
Denver, Colorado 80216
U.S. Geological Survey Sunrise Valley Drive
Reston, Virginia 20192
Facility Operator
TECHNOLOGY
475 Lincoln Street, Suite100 Denver, CO 80203 t 303.308.0200 f 303.308.0222 www.perkinswill.com
MARK ISSUE DATE
1 DP-3: INTERIOR PACKAGE 2023.11.09
2 PR-05 - CONFORMED BUILDING PACK 2024.01.16
3 PR-08 - CONFORMED BUILDING PACK 2024.06.06
4 ASI-03 - BUIDING PACK. 2024.09.19
9/19/2024
Vendor (Bulk Gas Supplier) shall provide the design, service, installation, and all associated equipment for two 3000 gallon bulk gas storage tanks (Nitrogen and Argon) as shown per the below drawings. Coordination will be required to meet construction permit requirements with USGS, CO School of Mines, and the General Contractor.
The Dewar fill stations shall be metered and controlled (locked out) to control access and measure usage/quantity. Delivery of gases will be restricted to smaller trucks due to the location of the tanks in the service yard (see diagrams below) and an on-site inspection must be conducted prior to design and installation.
Installation and operation of tanks must adhere to all local, national, and industry specific codes to include but not limited to NFPA 55 (Compressed Gases and Cryogenic Fluids Code) and ASME Section VIII.
Vehicle Access Area/Restrictions
Service Yard Plan