This document contains a Quality Assurance Surveillance Plan (QASP) for water treatment support services at the Lincoln Memorial Reflecting Pool and Water Treatment Plant. The QASP defines performance standards for tasks including preventative and corrective maintenance of filters, debris and sludge removal, pressure washing, disinfection, and drainage and inspection of the reflecting pool. Acceptable quality levels range from 97-100% for these tasks, which will be monitored through methods such as file reviews, random inspections, and customer feedback. The plan outlines roles for the contracting officer and contracting officer's technical representative in monitoring performance and addressing any shortfalls. Incentives in the form of payment adjustments may apply if the contractor fails to meet standards or responds inadequately to issues.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Lincoln Memorial Reflecting Pool and Water Treatment Plant Water Treatment Support Issued May 20, 2021

TABLE OF CONTENTS

INTRODUCTION

11.1 Purpose

11.2 Performance Management Approach

11.3 Performance Management Strategy

ROLES AND RESPONSIBILITIES

22.1 The Contracting Officer

22.2 The Contracting Officer’s Technical Representative

IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

METHODOLOGIES TO MONITOR PERFORMANCE

24.1 Surveillance Techniques

34.2 Customer Feedback

34.3 Acceptable Quality Levels

QUALITY ASSURANCE DOCUMENTATION

35.1 The Performance Management Feedback Loop

35.2 Monitoring Forms

ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

46.1 Determining Performance

46.2 Reporting

46.3 Reviews and Resolution

5ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

6ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

1 INTRODUCTION

This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Lincoln Memorial Reflecting Pool and Water Treatment Plant Water Treatment Support services. This plan sets forth the procedures and guidelines the National Park Service, National Mall and Memorial Parks will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.

1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

1.2 Performance Management Approach

1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the National Park Service (NPS), National Mall and Memorial Parks (NAMA) to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

1.3 Performance Management Strategy

1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.

1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

2 ROLES AND RESPONSIBILITIES

2.1 The Contracting Officer

The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by NPS, NAMA: Devin Moore Contracting Officer's Representative (COR), and the contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.

2.2 The Contracting Officer’s Technical Representative

The contracting officer’s technical representative (COTR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COTR limitations are contained in the written appointment letter. The COTR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COTR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COTR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.” [Adjust the following sentences to reflect the instant acquisition.] If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. If the contractor exceeds the service or performance level, it is eligible to receive an incentive or award fee as stated in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount.

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:

· File Reviews – COR review contractor logs and reports typically performed on an monthly basis.

· Random monitoring, which shall be performed by the COR designated inspector.

· Periodic Inspection – COR typically performs the periodic inspection on a monthly basis.

· Customer Complaints - COR will keep track of customer complaints on a monthly basis.

4.2 Customer Feedback

The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the CO and COR, as opposed to the contractor.

Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COTR/COR. The COTR/COR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation, identified in Attachment 3.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

4.3 Acceptable Quality Levels

The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving adherence to all Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 - General Industry and working closely with and alongside NPS personnel for the desired performance level established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at the National Park Service, National Mall and Memorial Parks.

5 QUALITY ASSURANCE DOCUMENTATION

5.1 The Performance Management Feedback Loop

The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.

5.2 Monitoring Forms

The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachments 2 and 3. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required service results of 97% are being achieved.

5.2.1 The COR will retain a copy of all completed QA surveillance forms.

6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

6.1 Determining Performance

6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

6.2 Reporting

6.2.1 At the end of each month, the COR will prepare a written report for the ACO summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.

6.3 Reviews and Resolution

6.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the CO, COR, and other government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:

· Monthly performance assessment data and trend analysis

· Issues and concerns of both parties

· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

· Recommendations for improved efficiency and/or effectiveness

· Issues arising from the performance monitoring processes

6.3.2 The QAR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.

6.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the PCO/ACO.

PERFORMANCE REQUIREMENTS SUMMARY

Required Services (Tasks) Performance

Standards Acceptable Quality

Levels Methods of Surveillance Incentive (Positive and/or Negative)

(Impact on Contractor Payments)

Preventative and Corrective Maintenance -

D.6.1 (b)

Manual cleaning/clearing of all filters, skimmers, etc. of the LMRP WTP and Reflecting Pool – as necessary
97%
File reviews, random monitoring, and periodic inspection.
If contractor fails to perform the requirements, the contractor will have to re-perform the work at the contractor’s own expense before payment will be approved.

Preventative and Corrective Maintenance - D.6.1 (c)

Daily removal and legally discard any large amounts of debris, pollen, and sludge from LMRP
97%
File reviews, random monitoring, and periodic inspection.

If contractor fails to perform the requirements, the contractor will have to re-perform the work at the contractor’s own expense before payment will be approved.

Preventative and Corrective Maintenance - D.6.1 (d)

Monthly – pressure washing of coping stone around pool – between 11PM and 5AM
97%
File reviews, random monitoring, and periodic inspection.

If contractor fails to perform the requirements, the contractor will have to re-perform the work at the contractor’s own expense before payment will be approved.

Preventative and Corrective Maintenance - D.6.1 (e)

Manually disinfect pool as needed
97%
File reviews, random monitoring, and periodic inspection.

If contractor fails to perform the requirements, the contractor will have to re-perform the work at the contractor’s own expense before payment will be approved.

Preventative and Corrective Maintenance - D.6.1 (f)

2 Times per year – Inspect, maintain and clean existing Dual Vortex Separators
97%
File reviews, random monitoring, and periodic inspection.

If contractor fails to perform the requirements, the contractor will have to re-perform the work at the contractor’s own expense before payment will be approved.

D.6.2 - Full drainage and inspection of reflecting pool (a)
Provide assistance and support at least once per year in the full drainage and inspection of reflecting pool. Which includes starting and stopping system as needed during the draining and filling of pool, the marking and protection of distribution and return lines, grates, covers, and other equipment.
97%
File reviews, random monitoring, and periodic inspection.
If contractor fails to perform the requirements, the contractor will have to re-perform the work at the contractor’s own expense before payment will be approved.
D.6.2 - Full drainage and inspection of reflecting pool (b)
Once reflecting pool is drained, contractor must pressure test all supply and return lines, provide a camera inspection and jetting of all supply and return lines, and repair and/or replace any grates and covers as needed.
97%
File reviews, random monitoring, and periodic inspection.
If contractor fails to perform the requirements, the contractor will have to re-perform the work at the contractor’s own expense before payment will be approved.
D.6.3 (a) – Dead Animals
Contract shall report all dead animals found in or immediately around the pool itself to the COR. Contractor is responsible for all disposal, unless otherwise agree based on quantity and size of animals found
97%
File reviews, random monitoring, and periodic inspection.
If contractor fails to perform the requirements, the contractor will have to re-perform the work at the contractor’s own expense before payment will be approved.
D.6.3 (b) – Special Event Trash and Waste Removal
Contractor is responsible for removing all trash and waste from LMRP after special events.
97%
File reviews, random monitoring, and periodic inspection.
If contractor fails to perform the requirements, the contractor will have to re-perform the work at the contractor’s own expense before payment will be approved.
D.6.3 (c)- Log and track all activities with Activity Log.
Contractor shall submit by the 10th of each month an Activity Log.
97%
File reviews, random monitoring, and periodic inspection.
If contractor fails to perform the requirements, the contractor will have to re-perform the work at the contractor’s own expense before payment will be approved.
D.6.3 (e) – Written Summary Reports
Written Summary Reports may be required by Contractor, in addition to Activity Log.
97%
File reviews, random monitoring, and periodic inspection.
Contractor shall still complete log, and payments may be delayed till Activity Log submitted as required.
D.6.3 (g) – Provide engineering assistance to NPS regarding Reflecting Pool Treatment Systems Operations and Maintenance issues as needed.
Participate in conference calls, perform technical analysis, provide technical recommendations and or communicate or contact equipment manufacturers.
97%
File reviews, random monitoring, and periodic inspection.
Failure to meet this requirement will result in a $500 discount on the monthly invoice.
D.6.4 - Repairs
Contractor is responsible for identifying and providing the NPS with a list of necessary equipment and materials to maintain the facility within ten (10) calendar days after award.
97%
File reviews, random monitoring, and periodic inspection.
Contractor shall still complete list, and payments may be delayed till list is submitted as required.
D.6.5 – Emergency Service Calls
Contractor is responsible for all WTP operations 24/7. The contractor is required to respond either verbally or in writing within 2 hours after service call is placed by the Government.
97%
File reviews, random monitoring, and periodic inspection.
Failure to meet this requirement will result in a $500 discount on the monthly invoice.
D.6.6 – Optional Item – Reflecting Pool Cleaning – This is separate from the requirement stated in D.6.2 (a) and (b)
Clean Reflecting Pool once drained, per Attachment 2 – Reflecting Pool Cleaning Procedures.
97%
File reviews, random monitoring, and periodic inspection.
If contractor fails to perform the requirements, the contractor will have to re-perform the work at the contractor’s own expense.

SAMPLE QUALITY ASSURANCE

MONITORING FORM

SERVICE or STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check):

Random Sampling File Review Periodic Inspection Customer Complaint

LEVEL OF SURVEILLANCE (Check):

Monthly Quarterly As needed

PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD:

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: ______%

Service Provider’s Performance (Check):

Meets Standards

Does Not Meet Standards

Narrative of Performance During Survey Period:

PREPARED BY: ___________________________________

DATE: _________________

PAGE

i