National Park Service, Olympic National Park

Heart O’ the Hills Maintenance Shed Asbestos Abatement

Scope of Work

Background

A minor fire occurred in the Heart O’ the Hills Maintenance shed which coated the interior of the building and its contents with a black residue from a burned set of rubber raingear. A hazardous materials test of the building was performed which identified that the drywall mud contained asbestos.

General Description

This project consists of removal of all building contents, including:

• 1 workbench 4’ x 8’ x 3’

• 1 cabinet 9’ x 3’ x 3’

• Shelves 2’ x 4’ x 8’

• Shelves 4’ x 4’ x 6’

• Approximately 13 cubic yards of miscellaneous tools and supplies

Once empty, all drywall, including the asbestos containing drywall mud, shall be removed from the walls and ceiling, as well as any insulation behind or above the drywall. The attached asbestos inspection/ survey report (attachment 5) contains photos and additional details. Attachment 4 identifies the location of the structure.

All building contents shall be disposed of at a legal location outside the park.

The contractor is responsible for determining specific work methods and practices to be utilized for all work. All work methods and practices will be in compliance with all applicable Federal, State, and Local laws and regulations. The contractor will field verify all dimensions affecting the work of this contract.

PLEASE NOTE: The Government does not warrant any measurements of items included in this contract.

The quantities identified are taken directly from the asbestos survey report, and should be considered estimates. A site visit may be arranged prior to preparation of quote and will be scheduled by the Park.

All identified asbestos containing material will be removed and disposed of in accordance with Washington State Regulations. Washington State Department of Labor and Industries and ORCCA require that the abatement be performed using Certified Asbestos Workers under the direct on site supervision of a Certified Asbestos Supervisor.

All work, including work practices, is subject to inspection and approval by the Contracting Officer or Representative. Work and work practices are also subject to inspection by regulatory personnel.

Work hours will be between 7:00AM and 5:30PM, Monday through Friday. The Contracting Officer or Contracting Officer’s Representative must authorize any exceptions.

The contractor is responsible for acquiring all required permits for the project. Copies of all permits, disposal documentation and clearance sample documentation will be submitted to the park in a completion report supplied by the contractor.