B08_Attachment_3_Drawings_Annex_Roof_FIIS.pdf
PDF 10 MB Posted
- Attached to
- FIIS REHABILITATE LH ANNEX ROOF
- Solicitation number
- 140P4524R0017
About this file
This document appears to be Attachment 3 - Drawings for the FIIS REHABILITATE LH ANNEX ROOF solicitation. The solicitation is for the rehabilitation of the annex roof at Fort Independence Island State Park, issued by the Department of the Interior National Park Service Northeast Region.
The attachment includes detailed engineering drawings and specifications for the roof rehabilitation project, such as roof plans, elevations, details, and material requirements. This information would be used by offerors to develop their technical and pricing proposals in response to the overall solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET
DRAWING NO.
PKG. NO.
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
HACE OF
NAME OF PARK
LOCATION WITHIN PARK
REGION COUNTY STATE
TITLE OF DRAWINGREVISIONMARK SHEET DATE INITA/E FIRM
FIRE ISLAND NATIONAL SEASHORE
FIRE ISLAND LIGHT STATION ANNEX
CONSTRUCTION DOCUMENTS REPLACE CRITICAL EXTERIOR BUILDING SYSTEMS AT WEST WING
ONE SUFFOLK NEW YORK
192771
FIIS
210056
FIRE ISLAND NATIONAL SEASHORE
FIIS 210056
-- COVER SHEET
A-01 ANNEX ROOF PLAN; BIRD'S-EYE & PHOTO VIEWS
A-02 ELEVATIONS & PHOTO DETAILS -- WEST WING
A-03 ENLARGED ROOF PLAN; COPING TILES
A-04 ROOFING, STUCCO CLADDING & ROOF DRAINAGE DETAILS
LIST OF DRAWINGS
NATIONAL PARK SERVICE, HACE/PFCA
INTERIOR REGION 1,
NORTH ATLANTIC - APPALACHIAN
FIRE ISLAND LIGHT STATION ANNEX:
REPLACE CRITICAL EXTERIOR BUILDING SYSTEMS at WEST WING
THIS PROJECT
LIGHT STATION ANNEX, FROM SOUTH
WEST WING OF ANNEX, FROM NORTHWEST
JG
JG A-01
ANNEX ROOF PLAN;
BIRD'S-EYE & PHOTO VIEWS
x
FIIS
210056 2
03/11/24
REPLACE CRITICAL EXTERIOR BUILDING SYSTEMS
AT LIGHT STATION ANNEX BUILDING WEST WING
FIRE ISLAND NATIONAL SEASHORE
192771
EXISTING COPING, NORTHEAST CORNER
NOT TO SCALE
A-01
EXISTING CONDITIONS, LOOKING SOUTH
NOT TO SCALE
A-01
EXISTING PLUMBING VENT
NOT TO SCALE
A-01
EXISTING CONDITIONS -- BUR ROOFING, FLASHING, ETC.
NOT TO SCALE
A-01
EXISTING CONDITIONS -- COPING / CORNER
NOT TO SCALE
A-01
DRAWING NO.
PKG
NO. SHEET
OF ____
SUB SHEET NO.DESIGNED:
CADD
DESIGNED:
TECH. REVIEW:
DATE:
TITLE OF SHEET
GENERAL NOTES:
1. POTENTIAL ASBESTOS HAZARD: ASSUME THAT EXISTING TAR &
GRAVEL BUILT-UP ROOF (BUR) CONTAINS ASBESTOS. PROVIDE
CONTAINMENT, ABATEMENT AND DISPOSAL PROTOCOLS IN
ACCORDANCE WITH ALL APPLICABLE ENVIRONMENTAL LAWS
AND REGULATIONS.
2. ASSUME PARTIAL REPAIR AND/OR IN-KIND REPLACEMENT
OF DAMAGED ROOF SHEATHING; ALLOW 40 SQ. FT.
SCALE OF FEET
8 4 0 8 16
SCALE A
ROOF PLAN1
A-01 SCALE A
BIRD'S-EYE VIEW FROM SOUTHEAST, ILLUSTRATING EXISTING SINGLE-SLOPE ROOF CONFIGURATION2
A-01 NO SCALE
A-02
BIRD'S-EYE VIEW FROM WEST -- PROPOSED NEW ROOFING SYSTEM & VITRIFIED CLAY TILE COPING3
A-01 NO SCALE
REMOVE EXISTING TAR &
GRAVEL BUR ROOFING,
FLASHING & COPING TILES,
COMPLETE, DOWN TO
EXISTING ROOF DECK.
NOTE: TELECOMUNICATIONS
EQUIPMENT AND ASSOCIATED
DUNNAGE & ACCESSORIES WILL BE
REMOVED BY OTHERS..
REPLACE
EXISTING "ROLL-
DOWN" LEAD
VENT FLASHING
WITH SOLDERED
COPPER SLEEVE.
NOTE EXISTING HIGH POINT
NOTE EXISTING LOW SIDE
(WEST)
A-01 4 A-01
A-01
A-01
A-01
MAIN BLOCK ROOF
(N.I.C)
NEW DOUBLE-SLOPE SBS
MODIFIED-BITUMEN ROOF
SYSTEM AT WEST WING,
COMPLETE.
THIS PROJECT
NEW ROOF DRAIN ASSEMBLY AT NW
CORNER, TO MATCH RECONSTRUCTED
ASSEMBLY AT SW CORNER, COMPLETE.
RE-CLAD EXISTING PLUMBING VENT
STACK IN CONJUNCTION WITH NEW
INTEGRATED SBS ROOFING AND
FLASHING. REFER TO DETAIL 7/A-04.
LINK
(N.I.C)
MAIN BLOCK ROOF
(N.I.C)
REPAIR, PATCH &
REFINISH (100%)
STUCCO CLADDING
OF WEST WING,
COMPLETE.
EXISTING WINDOWS
N.I.C.
ABATE, STRIP & REMOVE ALL
EXISTING TAR & GRAVEL BUR
ROOFING, UNDERLAYMENT,
MASTICS AND ASSOCIATED
FLASHING.
JG A-02
ELEVATIONS & PHOTO
DETAILS -- WEST WING
x
FIIS
210056 3
03/11/24
REPLACE CRITICAL EXTERIOR BUILDING SYSTEMS
AT LIGHT STATION ANNEX BUILDING WEST WING
FIRE ISLAND NATIONAL SEASHORE
192771
EXISTING CONDITIONS -- SOUTHEAST CORNER
NOT TO SCALE
A-02
EXISTING CONDITIONS -- WEST FACE
NOT TO SCALE
A-02
EXISTING CONDITIONS -- NORTHEAST CORNER
NOT TO SCALE
A-02
TYPICAL CONDITION AT STUCCO / COPING JUNCTION
NOT TO SCALE
A-02
PKG
NO. SHEET
OF ____
SUB SHEET NO.DESIGNED:
CADD
DESIGNED:
TECH. REVIEW:
DATE:
TITLE OF SHEET
SCALE OF FEET
2 1 0 2 4
SCALE C
SCALE OF FEET
4 2 0 4 8
SCALE B
DRAWING NO.
GENERAL STUCCO REPAIR/REFINISHING NOTES:
1. STUCCO CRACKS ILLUSTRATED ABOVE IN RED REPRESENT
TYPICAL DEFICIENCIES ONLY AND SHOULD NOT BE USED
FOR DETAILED QUANTITY TAKEOFFS.
2. OFFSET CRACKS: RESET OFFSET CLADDING SEGMENTS IF
POSSIBLE. IF UNDERLYING CLAY BLOCKS ARE OFFSET BUT
STRUCTURALLY SOUND, PATCH AND REFINISH STUCCO AT
AND AROUND IRREGULARITIES TO REMAIN.
NORTH ELEVATION3
A-02 SCALE B
WEST ELEVATION2
A-02 SCALE B
SOUTH ELEVATION1
A-02 SCALE B
EAST ELEVATION OF WEST WING4
A-02 SCALE B
REPAIR, PATCH & REFINISH ALL
STUCCO CLADDING AT WEST
WING, INCLUDING WALLS AND
PILASTERS, COMPLETE.
MAIN BLOCK
(N.I.C)
LINK
(N.I.C)
REPAIR, PATCH & REFINISH ALL
STUCCO CLADDING AT WEST
WING, INCLUDING WALLS AND
PILASTERS, COMPLETE.MAIN BLOCK
(N.I.C)
MAIN BLOCK
(N.I.C)
LINK
(N.I.C)
TIMBER BRIDGE
(N.I.C)
MAIN BLOCK ROOF
(N.I.C)MAIN BLOCK ROOF
(N.I.C)
MAIN BLOCK ROOF
(N.I.C)
REPAIR, PATCH &
REFINISH ALL STUCCO
CLADDING AT WEST
WING, INCL. WALLS AND
PILASTERS, COMPLETE.
METERS
(N.I.C)
EXISTING WINDOW
SASH, FRAMES &
TRIM N.I.C.
REPAIR, PATCH & REFINISH
ALL STUCCO CLADDING AT
WEST WING, INCLUDING
WALLS AND PILASTERS,
COMPLETE.
RETAIN & PROTECT EXISTING
WALL FLASHING, TERMINATION
BARS, ETC. AT LINK.
A-02
A02
A-02
RAKE OUT ALL LOOSE & FRIABLE STUCCO AND
MISC. DEBRIS AT MAJOR CRACKS. PREPARE
SUBSTRATES. PATCH HOLES & CRACKS VIA
INJECTION AND/OR HAND-TOOLING, TYPICAL
AT ALL WEST-WING ELEVATIONS.
EXISTING WINDOWS N.I.C.
SCRAPE OFF ALL LOOSE AND/OR PEELING PAINT;
'FEATHER' EDGES OF SOUND, WELL-ADHERED PAINT TO
REMAIN. PREP, PRIME AND PAINT ALL ELEVATIONS, 100%.
RAKE OUT ALL LOOSE & FRIABLE STUCCO AND
MISC. DEBRIS AT MAJOR CRACKS. PREPARE
SUBSTRATES. PATCH HOLES & CRACKS VIA
INJECTION AND/OR HAND-TOOLING, TYPICAL
AT ALL WEST-WING ELEVATIONS.
RESET OFFSET SOFFITS
IF POSSIBLE, TYPICAL.
REMOVE EXISTING CLAY WALL TILE
COPING & ASSOCIATED MORTAR,
COMPLETE. PREP SUBSTRATE FOR
NEW FLASHING & COPING ASSEMBLY.
A-02
A-02
PROVIDE RECONSTRCTED
DRAINAGE ASSEMBLY AT
SOUTHWEST CORNER, TO MATCH
EXISTING ASSEMBLY, COMPLETE.
TREAT EXISTING STUCCO TO
REMAIN WITH BIOCIDE, IN
CONJUNCTION WITH OTHER
SURFACE PREPARATION WORK.
TREAT EXISTING
STUCCO TO REMAIN
WITH BIOCIDE, IN
CONJUNCTION WITH
OTHER SURFACE
PREPARATION WORK,
ALL SIDES.
PREP AND PAINT METAL DOOR
AND FRAME.
JG A-03
ENLARGED ROOF PLAN;
COPING TILES
x
FIIS
210056 4REPLACE CRITICAL EXTERIOR BUILDING SYSTEMS
AT LIGHT STATION ANNEX BUILDING WEST WING
FIRE ISLAND NATIONAL SEASHORE02/20/24
192771
EXISTING "DOUBLE-SLANT" CLAY COPING TILES
NOT TO SCALE
A-03
PKG
NO. SHEET
OF ____
SUB SHEET NO.DESIGNED:
CADD
DESIGNED:
TECH. REVIEW:
DATE:
TITLE OF SHEET
SCALE OF FEET
2 1 0 2 4
SCALE C
SCALE OF FEET
4 2 0 4 8
SCALE B
THREE WALL COPING TILE "CONDITIONS": FULL-SIZE; FIELD-CUT; CORNER UNITS
EST. 6 EA.; V.I.F. 2 LH+2 RH
DRAWING NO.
ENLARGED ROOF PLAN1
A-03 SCALE C
COLOR-CODED WALL COPING TILE CONFIGURATION2
A-03 NO SCALE
KEY: COLOR-CODED WALL COPING TILES3
A-03 NO SCALE
A-04
SLOPE
S
LO
PE
SLOPE
S
LO
PE
RECONSTRUCTED ROOF
DRAINAGE SCUPPER
ASSEMBLY, CONDUCTOR,
LEADER AND ELBOW.
NEW ROOF DRAINAGE
SCUPPER ASSEMBLY,
CONDUCTOR, LEADER AND
ELBOW.
NEW VITRIFIED CLAY WALL
COPING TILE ASSEMBLY,
INCLUDING FULL-,
CORNER- AND FIELD-CUT
INTERLOCKING TILES,
PROPERLY SET IN
MORTAR BED.
RIDGE
TIMBER BRIDGE
(N.I.C)
ROOF BELOW
(N.I.C)
ROOF BELOW
(N.I.C)
A-03
NEW DOUBLE-SLOPE SBS
MODIFIED-BITUMEN ROOF
SYSTEM AT WEST WING,
COMPLETE.
FULLY-FLASHED RIGID CANT
STRIPS, TYPICAL ALL SIDES.
TERMINATE AT TWO
SCUPPERS AS INDICATED;
REFER TO DETAIL 6/A-04.
VA
LL
EY
VALLEY
JG A-04
ROOFING, STUCCO CLADDING &
ROOF DRAINAGE DETAILS
x
192771
FIIS
210056 5
03/11/24
REPLACE CRITICAL EXTERIOR BUILDING SYSTEMS
AT LIGHT STATION ANNEX BUILDING WEST WING
FIRE ISLAND NATIONAL SEASHORE
SBS ROOFING SYSTEM -- CUTAWAY VIEW
NOT TO SCALE
A-04
SCUPPER & CONDUCTOR BOX
NOT TO SCALE
A-04
VIEW OF NEW & RECONSTRUCTED ROOF DRAINAGE ASSEMBLIES
NOT TO SCALE
A-04
TERMINATION BAR WITH COVER & SEALANT BEAD
NOT TO SCALE
A-04
EXISTING SCUPPER & CONDUCTOR BOX; V.I.F.
NOT TO SCALE
A-04
SCUPPER DETAIL
NOT TO SCALE
A-04
FLASHING AT EXISTING PLUMBING VENT
NOT TO SCALE
A-04
DRAWING NO.
PKG
NO. SHEET
OF ____
SUB SHEET NO.DESIGNED:
CADD
DESIGNED:
TECH. REVIEW:
DATE:
TITLE OF SHEETSUB SHEET NO.DESIGNED:DESIGNED:
REPAIR EXISTING 3/4"
PLYWD. DECK AS REQ'D.
SUPPLY & INSTALL EXTRUDED, STAINLESS
STEEL OR ALUMINUM TERMINATION BAR WITH
COVER AND ACCOMMODATION FOR
CONTINUOUS SEALANT BEAD, ALL ROOF-SIDE
FACES OF PARAPET.
CONTINUOUS FILLET-TYPE FLEXIBLE SEALANT
BEAD.
PROVIDE SELF-ADHERED EPDM MEMBRANE FOR
USE AS FLASHING, AS INDICATED.
MORTAR SETTING BED FOR VITRIFIED CLAY
WALL COPING TILES.
PROVIDE NEW DRAINAGE
ASSEMBLY AT NW CORNER,
TO MATCH RECONSTRUCTED
ASSEMBLY AT SW CORNER,
COMPLETE.
PROVIDE CONTINUOUS
SEALANT AT SCUPPER
PENETRATION PERIMETER.
FABRICATE TWO (2)
REPLICAS OF SCUPPER,
CONDUCTOR BOX &
RAIN LEADER.
PROVIDE NEW DRAINAGE ASSEMBLY AT
NORTHWEST CORNER, TO MATCH
RECONSTRUCTED ASSEMBLY AT
SOUTHWEST CORNER, COMPLETE.
PROVIDE RECONSTRCTED
DRAINAGE ASSEMBLY AT
SOUTHWEST CORNER, TO
MATCH EXISTING ASSEMBLY,
COMPLETE.
TREAT BIOLOGICAL STAINS WITH
BIOCIDE. REPAIR, PATCH & REFINISH
(100%) STUCCO CLADDING OF WEST
WING, COMPLETE.
PROVIDE SELF-ADHERED
BASE FLASHING MEMBRANE
& LIQUID-APPLIED SEALANT
AT SCUPPER PENETRATION
PERIMETER.
PROVIDE WALL
PENETRATION, FLASHING
& SCUPPER ASSEMBLY AT
NW CORNER TO MATCH
SW-CORNER ASSEMBLY.
TAPER CANT ASSEMBLY FOR
PROPER RAINWATER DRAINAGE
TO AND THROUGH SCUPPER,
TYPICAL FOR 2.
NEW VITRIFIED CLAY TILE COPING ASSEMBLY
EXISTING STUCCO-CLAD
HOLLOW CLAY TILE WALL
& PILASTER ASSEMBLY
ELASTOMERIC ADHESIVE
2-1/2" THICK RIGID
POLYISOCYANURATE (CLOSED
CELL) BOARD INSULATION
RIGID COVER BOARD
TYPICAL CANT STRIP
SBS INTERPLY
SBS BASE FLASHING
SBS CAP PLY WITH
GRANULAR SURFACE
SBS CAP FLASHING
SBS BASE PLY
ADHESIVE BLEED, IN ACCORDANCE WITH SBS
SYSTEM MANUFACTURER'S INSTALLATION
INSTRUCTIONS
EXIST'G. ROOF
FRAMING (VIF)
PREP PIPE STACK EXPOSED
SURFACE AND INSTALL
LIQUID-APPLIED FLASHING,
COMPATIBLE WITH SBS
MEMBRANE SYSTEM,
COMPLETE, INCLUDING
PRIMER, REINFORCED-
FABRIC BASE PLIES.
PROVIDE NEW ROLL-DOWN
SOLDERED COPPER SLEEVE
AT EXISTING VENT PIPE
STACK TO REMAIN.
SBS BASE PLY AND
INTERPLY MEMBRANES
SBS CAP PLY WITH
GRANULAR SURFACE