B08-_Attachment_3-_Contract_Price_Schedule.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- DEVA - HVAC REPLACEMENTS Federal contract opportunity
- Solicitation number
- 140P8525R0006
About this file
This document is a Contract Price Schedule for HVAC replacements at Death Valley National Park, detailing specific equipment installations across multiple locations. The spreadsheet lists 23 line items (CLINs) including various heat pumps, mini-split systems, air exchangers, electric boilers, and related shade structures for facilities such as Skyline Drive, Coyote Loop, Furnace Creek Water Plant, Ranger Station, and Nevares. The equipment ranges from 1-ton to 5-ton central heat pumps and mini-split systems, with quantities between 1-6 units per location.
The price schedule is structured with base bid and option sections, featuring columns for facility, equipment type, quantity, and placeholders for labor and materials unit costs. While no specific pricing is filled in, the instructions indicate that vendors should provide comprehensive unit costs covering labor (including travel, per diem, overhead) and materials (equipment, consumables, installation). The solicitation is issued by the Department of the Interior National Park Service under solicitation number 140P8525R0006, specifically targeting HVAC replacements within Death Valley National Park.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8525R0006_Amd_0001.pdf | ||
| B08_Attachment_7-Q_As_0001.pdf | ||
| Sol_140P8525R0006.pdf | ||
| B08-_Attachment_2-Statement_of_Work_Division_02.pdf | ||
| B08-_Attachment_6-_Construction_Contract_Administration.pdf | ||
| B08-_Attachment_5-Limitation_on_Subcontracting_Report_Template.xlsx | XLSX spreadsheet | |
| B08-_Attachment_1-Statement_of_Work_Division_01.pdf | ||
| B08-_Attachment_4-_DBA_WD_CA20250020_Rev_11.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CLIN | Facility | Equipment | Labor Unit Cost | Materials Unit Cost | Quantity | Total |
| 1 | CCQ120 Skyline Drive | 4-ton Central heat pump | 1 | $ - 0 | ||
| 2 | CC350 International Hall | 5-ton, 4-zone mini split | 1 | $ - 0 | ||
| 3 | CCQ334 Coyote Loop | 4-ton Central heat pump | 1 | $ - 0 | ||
| 4 | CCQ340 Coyote Loop | 4-ton Central heat pump | 1 | $ - 0 | ||
| 5 | CCQ341 Coyote Loop | 4-ton Central heat pump | 1 | $ - 0 | ||
| 6 | CCQ342 Coyote Loop | 4-ton Central heat pump | 1 | $ - 0 | ||
| 7 | CCQ222 A-F Skyline Drive | 3-ton Central heat pump | 6 | $ - 0 | ||
| 8 | SPW NPS Firehouse | 3-ton, 1-zone mini split | 1 | $ - 0 | ||
| SPW NPS Firehouse | MasterCool ASA7112 | 1 | $ - 0 | |||
| 9 | CCQ323 Old Ghost Road | Pioneer mini split head | 1 | $ - 0 | ||
| 10 | Furnace Creek Water Plant Wellhead 1 | Rittal 3302.100 | 1 | $ - 0 | ||
| 11 | Furnace Creek Water Plant Wellhead 2 | Rittal 3302.100 | 1 | $ - 0 | ||
| 12 | Furnace Creek Water Plant Wellhead 3 | 1-ton, 1-zone mini split | 1 | $ - 0 | ||
| 13 | FC271 Furnace Creek Headquarters | Electric Boiler(s) | 1 | $ - 0 | ||
| 14 | CC321 Ranger Station | Air Exchanger | 1 | $ - 0 | ||
| 15 | CCQ10 Old Ghost Road | 3-ton Central heat pump | 1 | $ - 0 | ||
| 16 | CCCQ201 Nevares | 4-ton Central heat pump | 1 | $ - 0 | ||
| 17 | CCQ339 A-B Coyote Loop | 4-ton Central heat pump | 2 | $ - 0 | ||
| 18 | Compressor Shade Structures | Shade structures to match equipment and architecture | 18 | $ - 0 | ||
| Base Bid Subtotal | $ - 0 | |||||
| 19 | CCQ335 A-B Coyote Loop (O) | 4-ton Central heat pump | 2 | $ - 0 | ||
| 20 | CCQ336 B Coyote Loop (O) | 4-ton Central heat pump | 1 | $ - 0 | ||
| 21 | CCQ337 A Coyote Loop (O) | 4-ton Central heat pump | 1 | $ - 0 | ||
| 22 | CCQ338 A-B Coyote Loop (O) | 4-ton Central heat pump | 2 | $ - 0 | ||
| 23 | CCQ220 A-F Skyline Drive (O) | 3-ton Central heat pump | 6 | $ - 0 | ||
| Option Subtotal | $ - 0 |
| TOTAL | $ - 0 |
| Instructions: Provide unit costs that divide labor and materials. In labor, include travel, per diem, overhead costs, and similar. In materials, include all materials, equipment, consumables, and similar required to procure and install the equipment. |