B08_Attachment_2_OLYM_Hurricane_Ridge_Primary_Electric_Testing_SOS.pdf

PDF 591 KB Posted

Attached to
OLYM - HURRICANE RIDGE PRIMARY ELECTRICAL TESTING Federal contract opportunity
Solicitation number
140P8323Q0054
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This document outlines requirements for primary electrical testing services at Hurricane Ridge in Olympic National Park. The National Park Service requires a certified lineworker to inspect and perform tests on the primary electrical system serving the site of the former Hurricane Ridge Day Lodge, which was destroyed in a fire in May 2023. Services include checking the fusing and oil levels in the 100kVA transformer serving the area, isolating and removing secondary feeders, visually inspecting the primary cables feeding the transformer and those located in Junction 323781, performing hipot tests of the same cables, and re-energizing the primary electrical system. Optional services include providing and replacing fuses as needed. These services support Solicitation 140P8323Q0054 issued by the Department of the Interior National Park Service Pacific West Region for primary electrical testing at Hurricane Ridge.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Information

Location: This project is located at Hurricane Ridge, within Olympic National Park. Hurricane Ridge is approximately 17 miles south of Port Angeles, WA 98362. The elevation at the site is 5,242 feet.

Background: The Hurricane Ridge Day Lodge was lost to a fire on May 7, 2023. The primary electric is owned by the National Park Service and has been de-energized. Due to the proximity of the adjacent transformer and junction vault, request certified lineworker(s) to inspect and perform tests prior to re-energizing the system.

Scope of Services

All tests shall be per industry standard to ensure primary can be re-energized

• Check fusing in 100kVA transformer

• Check oil level in transformer, add if needed

• Lift/remove and isolate secondary feeders from transformer

• Visually inspect primary cable feeding transformer and primary cables in junction immediately east of burn site (Junction 323781)

• Perform hipot tests of primary cable feeding transformer and cables located in Junction 323781

• Re-energize primary electrical system, to include transformer and check continuity

Option Item: Provide and replace fuse(s) as required