This document is a table of standard trenching dimensions and bedding material quantities for single, double, and triple pipe installations. It provides detailed specifications for pipe diameters ranging from 18 inches to 196 inches, including the required trench width, depth, and volume of bedding material per linear foot.
The related federal contract opportunity is for the "INSTALLATION OF PIPE UNDER CREEK CROSSING" for the Department of the Interior Bureau of Indian Affairs Southern Plains Region, with Solicitation Number 140A0324Q0007. This suggests the table of standard specifications may be relevant to the requirements of this contract opportunity, which likely involves the installation of underground pipes or culverts at a creek crossing location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140A0324Q0007.pdf | ||
| B08_ATTACHMENT__1_BID_SCHEDULE.xlsx | XLSX spreadsheet | |
| 1452_280-4_IBEECert.doc | DOC document | |
| B08_ATTACHMENT__3_Wage_Rates_Kay_County.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRENCHING DIMENSIONS AND
STANDARD BEDDING MATERIAL QUANTITIES
SINGLE PIPE DOUBLE PIPE TRIPLE PIPE SPECIAL TRENCHING
PIPE STANDARD STANDARD STANDARD SINGLE. DOUBLE &
DIAM. TRENCHING TRENCHING TRENCHING TRIPLE PIPE OPTIONS
OR H T W+12"
DESIGN ■ STANDARD STANDARD STANDARD ADD L ST AND ARD
EQUIV. w BEDDING w BEDDING w BEDDING BEDDING
MATERIAL■ MATERIAL■ MATERIAL■ MATERIAL
IN. FT. FT. FT. CY/LF FT. CY/LF FT. CY/LF CY/LF
18 3.25 0.208 3.17 0.274 5.67 0.468 8.17 0.663 0.120 24 3.83 0.25 4.00 0.386 7.00 0.629 10.00 0.873 0.142 30 4.42 0.292 4.58 0.474 8.33 0.811 12.08 1.146 0.163 w 1!1!136 5 0.333 6.17 0.751 10.67 1.193 15.17 1.636 0.185 � 1!1!142 5.58 0.375 6.75 0.870 12.00 1.429 17.25 1.989 0.207 o 1!1!148 6.17 0.417 7.33 0.996 13.33 1.688 19.33 2.379 0.228 � 1!1!154 6.75 0.458 7.92 1.126 14.67 1.960 21.42 2.794 0.250 O 1!1!160V 7.33 0.5 9.50 1.532 17.00 2.521 24.50 3.510 0.271 � 1!1!166V 8.08 0.542 10.08 1.757 18.33 2.965 26.58 4.173 0.299
1!1!172V 8.67 0.583 10.67 1.931 19.67 3.327 28.67 4.724 0.321 1!1!178V 9.25 0.625 11.25 2.107 20.75 3.615 30.25 5.122 0.343 1!1!184V 9.83 0.667 11.83 2.288 21.83 3.908 31.83 5.529 0.364 1!1!190V 10.42 0.708 12.42 2.479 22.92 4.219 33.42 5.959 0.386 1!1!196V 11 0.75 13.00 2.671 24.00 4.527 35.00 6.383 0.407
18 2.88 0.208 3.50 0.271 6.33 0.471 9.17 0.671 0.106 21 3.08 0.229 4.12 0.338 7.29 0.567 10.46 0.796 0.114 24 3.33 0.250 4.38 0.374 7.75 0.624 11.13 0.874 0.123 30 3.79 0.291 6.10 0.603 10.13 0.915 14.16 1.227 0.140 36 4.20 0.333 6.81 0.700 11.67 1.097 16.53 1.493 0.156 w 42 4.69 0.375 7.50 0.813 13.17 1.308 18.83 1.802 0.173 o_
1!1!148 5.17 0:: 0.416 9.21 1.180 15.71 1.842 22.21 2.504 0.191 :r: 1!1!154 5.58 0.458 9.83 1.243 17.05 1.946 24.28 2.649 0.207
1!1!160V 6.08 0.500 10.58 1.392 18.69 2.228 26.81 3.064 0.225 <( 1!1!166V 6.75 0.542 11.00 1.488 19.56 2.365 28.11 3.242 0.250
1!1!172V 7.00 0.583 12.00 1.690 21.78 2.803 31.55 3.917 0.259 1!1!178V 7.83 0.625 12.42 1.854 22.64 3.071 32.86 4.288 0.272 1!1!184V 7.83 0.667 13.33 1.983 24.67 3.385 36.00 4.788 0.290 1!1!190V 8.92 0.708 14.50 2.382 27.08 4.131 39.67 5.881 0.330 1!1!196 V 9.46 0.750 15.17 2.625 28.33 4.549 41.50 6.473 0.350 w 18 2.96 0.229 3.62 0.282 6.54 0.487 9.46 0.691 0.109 Q,, 24 3.46 0.27 4.54 0.387 8.04 0.640 11.54 0.893 0.128 o_ 30 3.96 0.312 6.29 0.629 10.51 0.954 14.74 1.28 0.147 _J
<( 36 4.50 0.375 7.00 0.743 12.00 1.153 17.00 1.564 0.167 g 1!1!142 5.00 0.416 7.75 0.862 13.64 1.379 19.53 1.896 0.185 I-o_ 1!1!148 5.42 0.458 9.42 1.170 16.08 1.788 22.75 2.406 0.200 _J 1!1!154 5.92 0.5 10.17 1.311 17.72 2.050 25.28 2.789 0.219 _J w 1!1!160 V 6.42 0.541 10.92 1.478 19.36 2.368 27.81 3.259 0.238 _J
<( 1!1!166 V 6.91 0.583 11.58 1.626 20.81 2.648 30.03 3.67 0.256 I- 1!1!172 V 7.41 0.625 12.33 1.807 22.44 3.004 32.56 4.201 0.275 z 0 1!1!178 V 7.91 0.667 13.00 1.962 23.89 3.305 34.78 4.649 0.293
1!1!184 V 8.58 0.708 13.75 2.239 25.53 3.850 37.31 5.462 0.318 0 1!1!190 V 9.00 0.75 14.42 2.364 26.83 4.062 39.25 5.759 0.333 :r: 1!1!196-..:; 9.5 0.791 15.17 2.570 28.25 4.408 41.33 6.245 0.352
NOTE: QUANTITIES FOR 66" & 78" EQUIV. DIAM. ARCH PIPE BASED ON METAL PIPE & ESTIMATED WALL THICKNESS.
■ FOR PIPES UNDER PAVEMENT. THE H DIMENSION AND THE STANDARD BEDDING MATERIAL QUANTITY.
SHALL BE INCREASED TO GO TO THE TOP OF THE TRENCH.
V BEDDING MA TERI AL VALUES SHOWN FOR STANDARD TRENCHING CONDITIONS MAY BE USED ONLY FOR VERTICAL WALL TRENCHES. liiil
ORIGINAL GROUND LINE
APPROXIMATE ANGLE OF REPOSE FOR SLOPING
OF SIDES OF EXCAVATIONS IN TRENCHES WITH
DEPTH GREATER THAN 5 FEET AND LESS THAN
20 FEET, AS A METHOD TO PROTECT PERSONNEL
WORKING IN EXCAVATIONS FROM CAVE-INS.♦
0::
_J _J _J a� o o"
U)M U) CJ)�
<!!:S m;, u� W"tj" w LD w� a..- a..::! a_ .
I-"-' I-"-' I-"-'
✓/ NOTE:
'1/ THE PRESENCE OF
GROUND WATER
REQUIRES SPECIAL
TREATMENT.
liiil OPTIONAL TRENCHES WITH DEPTH GREATER THAN 5 O FEET
EXCAVATION AND BEDDING MATERIAL WILL BE MEASURED AND PAID FOR AS IF
TRENCHED WALLS WERE VERTICAL. (SPECIAL TRENCHING= STD. WIDTH TRENCH+12")
T NATURAL SOLID MINERAL MATTER THAN CAN BE EXCAVATED WITH VERTICAL
SIDES AND REMAIN INT ACT WHILE EXPOSED.
♦ SOIL CLASSIFICATION - SOIL AND ROCK DEPOSITS SHALL BE CLASSIFIED IN
ACCORDANCE WITH APPENDIX A UNDER SUBPART P 'EXCAVATIONS' OF 29 CFR 1926.
w
WIDTH OF TRENCH
EXCAVATION
METHOD NO. 1
QEMBANKMENT HEIGHT PRIOR TO EXCAVATION
PIPE SIZES FROM 18" TO 42" =30"
PIPE SIZES FROM 48" TO 84" =2/3 DIAM.
PIPE SIZES LARGER THAN 84" =60"
GRADING TEMPLATE
TOP OF INI
• STD. BACKFILL MATERIAL
m'7RIE�
EMBANK
� EXCAVATION
OR 6" PHASE
BACKFILL
PHASE
24"
METHOD NO. 1 PAY QUANTITIES WILL BE CALCULATED
AND PAID FOR WHEN METHOD NO. 2 IS USED.
METHOD NO. 2
(OPTIONAL INSTALLATION FOR R. C. PIPE)
CONDUIT SHAPE DIST.
ROUND ARCH ELLIPTICAL G
FOR UP TO 24" UP TO 36" UP TO 36" 12"
DIA. 25" TO 72" D/2"
OR 37" TO 108" 37" TO 108" D/3"
SPAN OVER 73" OVER 108" OVER 108" 36"
�0-00-0
ROUND ARCH ELLIPTICAL
DOUBLE PIPE INSTALLATION
(USED WITH CET END TREATMENTS)
TRENCH EXCAVATION IN EMBANKMENT SECTIONS
LIMITS OF STANDARD BEDDING MATERIAL.
QUANTITIES FOR BEDDING MATERIAL. DO NOT
INCLUDE THE SPACE WITHIN AND BOUNDED BY
THE OUTER SURFACE OF THE PIPE CONDUIT.
z LL Q 0- 1- I I <(('J >- <( wu IX WW ('J :r: <( 0 0:: z Ww > 0:: <( I-
= "'I w I
; � WIDTH OF TRENCH
EXCAVATION
� LIMITS OF TRENCH EXCAVATION
w
WIDTH OF TRENCH
EXCAVATION
GENERAL NOTES
1. ALL CONSTRUCTION AND MA TERI AL REQUIREMENTS SHALL BE IN ACCORDANCE WITH THE
2019 ODOT STANDARD SPECIFICATIONS.
2. TRENCH EXCAVATION AND BEDDING MATERIAL WILL NOT BE REQUIRED FOR PIPE
INSTALLATIONS OF SIDE DRAINS UNLESS OTHERWISE NOTED ON THE PLANS.
3. FOR PIPE UNDERDRAIN INSTALLATIONS. SEE ROADWAY STANDARD PUD-4.
liiil 4. SPECIAL TRENCHING CONDITIONS ARE THOSE AS DEFINED BY O.S.H.A. REGULATIONS.
TITLE 29 CFR CHAPTER XVII, PART 1926.650, 1926.651 & 1926.652, SO DEFINED WILL APPLY
UNTIL THEY ARE IN CONFLICT WITH CURRENT SPECIFICATIONS, FOR TRENCH DEPTHS OVER
FIVE FEET. WHERE O.S.H.A. REGULATIONS FOR SPECIAL TRENCHING ARE APPLIED. QUANTITIES
AND DIMENSIONS FOR SPECIAL TRENCHING WILL BE USED FOR COMPUTING QUANTITIES.
SEE TABLE OF TRENCHING DIMENSIONS AND STANDARD BEDDING MA TERI AL QUANTITIES.
5. NORMAL BACKFILLING OPERATIONS SHALL FOLLOW BEDDING AND PIPE INSTALLATION AS
CLOSELY AS PRACTICAL. IN NO CASE SHALL A PIPE INSTALLATION SUBJECT TO SUDDEN
FLOW DEVELOPMENT BE LEFT WITHOUT SUFFICIENT BACKFILL TO RESTRAIN THE CONDUIT
AND PREVENT JOINT SEPARATION AND/OR PIPING SCOUR. PHYSICALLY RESTRAINING THE
CONDUIT MAY BE USED TO AUGMENT OR REPLACE THIS IMMEDIATE BACKFILL REQUIREMENT.
6. ANY EXCESS EXCAVATION NOT USED FOR BACKFILL WILL BECOME THE PROPERTY OF THE
CONTRACTOR AND DISPOSED OF, BY HIM, IN A MANNER APPROVED BY THE ENGINEER.
0 7. STANDARD BEDDING QUANTITIES FOR ROUND PIPE ARE BASED ON AASHTO DESIGNATED
CLASS Ill ( WALL B ) REINFORCED CONCRETE PIPE.
1iii18. WHEN REQUIRED. THE SIDES OF THE TRENCHES SHALL BE SHEETED AND SHORED OR
OTHERWISE SUPPORTED WHEN THE TRENCH IS MORE THAN 5.0 FEET IN DEPTH. IN LIEU
OF SHEETING. THE SIDES OF THE TRENCH ABOVE THE 5 FOOT LEVEL MAY BE SLOPED
TO PRECLUDE COLLAPSE, SEE OPTIONAL TRENCHES DETAIL THIS SHEET.
!!!!I 9. PROPER COMPACTION OF BACKFILL REQUIRES A VERTICAL WALLED TRENCH TO 24 INCHES
ABOVE TOP OF PIPE. REGARDLESS OF EXCAVATION ABOVE THAT ELEVATION.
TRENCH EXCAVATION IN CUT SECTIONS
e 10. EQUIVALENT PIPE SIZES 66 INCHES AND LARGER REQUIRE 6 INCHES OF BEDDING MA TERI AL
BELOW PIPE CONDUIT.
TABLE OF EQUIVALENT PIPES
EQUIV. REINF. CONG. STEEL ALUMINUM REINF. CONC.
DIA. ARCH PIPE ARCH PIPE ARCH PIPE ELLIPTICAL PIPE
(t
18" 22" X 13" 21" X 15" 21" X 15" 14" X 23" 21" 24" X 18" 24" X 18" 24" 28" X 18" 28" X 20" 28" X 20" 19" X 30" 27" 22" X 34" 30" 36" X 22" 35" X 24" 35" X 24" 24" X 38" 36" 43" X 26" 42" X 29" 42" X 29" 29" X 45" 42" 51" X 31" 49" X 33" 49" X 33" 34" X 53" 48" 58" X 36" 57" X 38" 57'' X 38" 38" X 60" 54" 65" X 40" 64" X 43" 64" X 43" 43" X 68" 60" 73" X 45" 71" X 47" 71" X 47" 48" X 76" 66" 77" X 52" 77" X 52" 53" X 83" 72" 88" X 54" 83" X 57" 83" X 57'' 58" X 91" 78" 87'' X 63" 92" X 65" ... 63" X 98" 84" 102" X 62" 95" X 67" 95" X 67" ... 68" X 106" 90" 115" X 72" 103" X 71" 103" X 71" .._ 72" X 113" 96" 122" X 77" 112" X 75" 112" X 75" _., 77" X 121"
.& STRUCTURAL PLATE ARCH.
0 11. ELLIPTICAL PIPE DIMENSIONS CONFORM TO AASHTO M 207, AS DESIGNATED RISE BY SPAN.
12. FOR COMPUTING TRENCH EXCAVATION & STANDARD BEDDING QUANTITIES. THE LENGTH
OF THE CULVERT SHALL INCLUDE END SECTION AND END TREATMENT LENGTHS.
13. MULTIPLE PIPE INSTALLATIONS WILL REQUIRE A MINIMUM OF 12" BETWEEN PIPES FOR
PROPER COMPACTION .
BASIS OF PAYMENT
ITEM NO. ITEM UNIT
613 ( Rl STANDARD BEDDING MA TERI AL. CLASS A CY 613 ( Sl STANDARD BEDDING MATERIAL. CLASS B CY
613 ( T ) STANDARD BEDDING MATERIAL. CLASS C CY
613(Vl TRENCH EXCAVATION CY
APPROVED BY
ROADWAYENGINEE,y __ �-'----"�-L£-""----DATE: __ _
STANDARD PIPE INSTALLATION
� ._ Ol(LAHOMA
Transportation 2019 SPECIFICATIONS
SPl-5 2
-5
7/1/22
NATURAL GROUND
NATIVE
SOIL*
NA TUR AL GROUND NATURAL GROUND
ll/'=/1/=fl! 11!'=11!'=!1/'=11! '=il/=!l/=11!
NATIVE
SOIL*
= !//=fl!
NATURAL GROUND
NATIVE
SOIL
C.L.S.M.
(SEC. 501.02)
OR CLASS C
CONCRETE
COARSE COVER AGGR.
(SEC. 703.06) OR
COARSE AGGREGATE
NO. 8 (SEC. 701.06)
• 0 • • 0 ' ' 0 • • 0 • . .
FILTER SAND
(SEC. 703.06) OR
CLASS C BEDDING
MA T'L (SEC. 703.08)
:r: COARSE AGGREGATE
NO. 8 (SEC. 701.06) OR
C.L.S.M. (SEC. 501.02)
:r: OR AGGREGATE BASE Ll TYPE A (SEC. 703.01)
:r:
I WIDTH 0'1 TRENCH I
EXCAVATION
CLASS A BEDDING
THICKNESS VARIES
ACCORDING TO
TYPE OF PIPE.
SEE NOTE 2
I WIDTH 0'1 TRENC� I
EXCAVATION
CLASS B BEDDING
PIPE BEDDING CLASS/DESIGN TABLE
■ UNDER PAVING OUTSIDE PAVING
� � n:: n:: n:: 0 n::
0 w w (fJ :r:
(fJ :r: :r: I- �� I- z� 0
0 �o �
TYPE OF PIPE zo... z n::o... n:: z n::
-> W> w w <(o <! so s <! z s n::o n:: WO w n::
w oo 0 (f)O (fJ 0 (fJ
(fJ co
(fJ � co � (fJ n:: � (fJ /I (fJ n:: /I n:: (fJ 0 n::
01- 0 QI- 0 0 w 0 n::o n:: 1-0 I- n:: g I- U<( u (fJ <( (fJ u (fJ (fJ
REINFORCED CONCRETE PIPE B C B C C D C
CORRUGATED GALV. STEEL PIPE (CGSP) NA B NA B C D C
MILL (POLYMER) PRECOATED CGSP NA B NA B C D C
CORRUGATED GALV. STRUCT. PLATE NA B NA B C D C
ALUMINIZED (ALUMINUM COATED) TYPE II CSP NA B NA B C D C
CORRUGATED HIGH DENSITY POLYETHYLENE / PVC NA A NA A B B B
POLYVINYL CHLORIDE (SC 40/80 PVC) NA NA NA NA NA NA NA
CORRUGATED POLYPROPYLENE PIPE (PP) & B B B B C D C
■ WHEN THERE IS ANY POSSIBILITY OF THE PAVEMENT BEING WIDENED DURING THE LIFE OF
THE DRAINAGE STRUCTURE. THE BEDDING SHALL MEET THE 'UNDER PAVING SECTION'
CRITERIA FOR THE FULL EXTENT OF ANY ANTICIPATED EXPANSION TO THE FACILITY.
& BACKFILL WITH A MINIMUM OF TWO (2) FEET OF APPROVED BACKFILL MATERIAL.
THICKNESS VARIES
I
I ACCORDING TO W
TYPE OF PIPE. WIDTH OF TRENCH
SEE NOTE 2 EXCAVATION
CLASS C BEDDING
NATURAL GROUND
n::
2" MIN. FILTER I W I
SAND (SEC. 703.06) WIDTH OF TRENCH
FINAL
GRADE
EXCAVATION
CLASS D BEDDING
ALTERNATE1
,111'=11l'=III
// NATIVE SOIL
OR BORROW
NATIVE SOIL OR FILTER SAND (SEC. 703.06) MAY
BE USED TO ADJUST FLOWLINE OF NATURAL
DITCH TO PROVIDE SMOOTH BEDDING SURFACE
FOR PIPE CONDUIT AND ATTAIN PROPER DESIGN
GRADE. SEE SECTION 613.04.G
CLASS D BEDDING
ALTERNATE 2
1.
2.
3.
GENERAL NOTES
ALL CONSTRUCTION AND MATERIAL REQUIREMENTS SHALL BE IN
ACCORDANCE WITH THE 2019 ODOT STANDARD SPECIFICATIONS.
THE THICKNESS OF BEDDING MATERIAL BELOW PIPE CONDUIT VARIES
ACCORDING TO THE TYPE OF PIPE BEING INSTALLED. SEE ROADWAY
STANDARDS CCl-1, TCl-1, AND MCl-1.
NATIVE SOIL FOR BACKFILL, TO BE COMPACTED IN ACCORDANCE
WITH SECTION 202.04 OF THE 2019 ODOT STANDARD SPECIFICATIONS.
4. A BETTER CLASS OF BEDDING MA TERI AL MAY BE SUBSTITUTED FOR
THE NEXT ALPHABETICALLY- LOWER CLASS. FOR EXAMPLE, CLASS A
STANDARD BEDDING MATERIAL CAN BE USED IN LIEU OF CLASS B
STANDARD BEDDING MA TERI AL.
5. FOR TRENCH WIDTH (W), BEDDING HEIGHT (H), PIPE DAT A, MULTIPLE
PIPE SPACING AND BEDDING DATA, SEE ROADWAY STANDARDS CCl-1, TCl-1, AND MCl-1.
6. DAT A TABLE DISPLAYS 'NA' TO SHOW THAT PIPE MATERIALS ARE NOT
ALLOWED.
7. STANDARD BEDDING MATERIAL CLASS D AL TERNA TE 1 WILL BE
CONSIDERED INCIDENTAL. AND NOT BE PAID SEPARATELY. COST FOR
BORROW ORE FILL MA TERI AL, NEEDED FOR AL TERNA TE 2, WILL BE
INCLUDED IN THE PRICE OF THE PIPE.
8. PIPE MA TERI AUS) / PRODUCT(S) NOT SHOWN IN THE DAT A TABLE WILL
BE EVALUATED AND APPROVED ON A CASE-BY-CASE BASIS.
9. ALL TEMPORARY PIPES SHALL HAVE BEDDING MATERIAL CLASS D
UNLESS OTHERWISE SHOWN IN THE PLANS.
10. BEDDING MATERIAL CLASS B. C, AND D, SHALL BE PLACED IN 6" LAYERS
AND COMPACTED TO THE SPECIFICIED DENSITY USING HAND
OPERA TED EQUIPMENT ONLY.
11. WHEN PIPE INSTALLATION IS UNDER PAVING, IN LIEU OF BACKFILLING
WITH NATIVE SOIL, PLACE BEDDING MATERIAL ALL THE WAY TO THE
TOP OF THE TRENCH.
12. THE USE OF AN AL TERNA TE PIPE AND ITS CORRESPONDING BEDDING
MATERIAL WILL BE ACCEPT ABLE PROVIDIED THE CRITERIA IN THE
DATA TABLE IS MET.
13. CORRUGATED POLYPROPYLENE PIPE SHALL BE INSTALLED IN
ACCORDANCE WITH ASTM D2321.
BASIS OF PAYMENT
ITEM NO. ITEM UNIT
613 ( R) STANDARD BEDDING MATERIAL, CLASS A CY
613 ( S) STANDARD BEDDING MATERIAL, CLASS B CY
613 ( T ) STANDARD BEDDING MATERIAL, CLASS C CY
ROADWAY DESIGN DIVISION STANDARD
;,j�
PIPE BEDDING AND BACKFILL
.. :. OKLAHOMA
�_., Transportation ,., 2019 SPECIFICATIONS
PBB-1 2
R-61
I FULL CIRCLE STEEL PIPE CULVERT I
PIPE DIAMETER MAXIMUM FILL HEIGHT
FOR MIN. COVER ABOVE TOP OF PIPE
CORRUGATION PATTERN
TOP OF PIPE EQUIV. STANDARD GAGE
TO TOP OF
2 2/3" 3" 5" 6" SUBGRADE
X X X X
1/2" 1" 1" 2" 16 14 12 10 8 7 5
18" 12" 61' 67' 86' 90' 94'
21" 12" 53' 57' 74' 77' 81'
24" 12" 46' 50' 65' 68' 71'
27" 12" 41' 44' 57' 60' 63'
30" 12" 37' 40' 52' 54' 56'
36" 12" 30' 33' 43' 45' 47'
36" 12" 53' 66' 77' 89' 100'
42" 12" 34' 44' 46' 47' 49'
42" 12" 45' 56' 64' 71' 78'
48" 12" 41' 44' 45' 46'
48" 12" 39' 49' 56' 61' 66'
48" 12" 49' 52' 56' 61' 66'
54" 12" 36' 43' 44' 45'
54" 12" 35' 44' 51' 55' 58'
54" 12" 47' 48' 52' 55' 58'
60" 12" 42' 43' 43'
60" 12" 31' 39' 49' 51' 53'
60" 12" 43' 46' 49' 51' 53'
60" 12" 46' 68' 90' 96' 106'
66" 12" 42' 43'
66" 12" 29' 36' 47' 48' 50'
66" 12" 39' 45' 47' 48' 50'
66" 12" 42' 62' 78' 82' 90'
72" 12" 42' 42'
72" 12" 26' 33' 45' 47' 48'
72" 12" 36' 44' 45' 47' 48' 73' 78'
72" 12" 38' 57' 69'
78" 12" 42'
78" 12" 24' 30' 44' 45' 46'
78" 12" 33' 42' 44' 45' 46'
78" 12" 35' 53' 63' 66' 70'
84" 12" 42'
84" 12" 22' 28' 42' 44' 45'
84" 12" 31' 39' 43' 44' 45'
84" 12" 33' 49' 59' 61' 64' 90" 12" 26' 39' 44' 44'
90" 12" 29' 36' 43' 44' 44' 90" 12" 31' 45' 55' 57' 60'
96" 12" 24' 36' 43' 44' 96" 12" 34' 43' 43' 44'
96" 12" 29' 43' 53' 54' 57'
102" 24" 34' 41' 43'
102" 24" 32' 42' 43' 43'
108" 24" 32' 39' 43'
108" 24" 42' 42' 43'
108" 24" 25' 38' 49' 50' 52'
114" 24" 31' 37' 41'
114" 24" 40' 42' 42'
120" 24" 29' 35' 39'
120" 24" 38' 42' 42'
120" 24" 23' 34' 45' 48' 49'
I FULL CIRCLE ALUMINUM PIPE CUL VERT I I MET AL PIPE ARCH - FILLS TO 10 FT. MAX. I
PIPE DIAMETER
FOR MIN. COVER
CORRUGATION PATTERN
TOP OF PIPE
2 2/3" 3" 6" TO TOP OF
SUBGRADE
X X X 16 1/2" 1" 1"
18" 12" 36'
24" 12" 27'
27" 12" 24'
30" 12" 22'
30" 12" 40'
36" 12" 36" 12" 33'
36" 12" 20'
42" 12" 42" 12" 27'
48" 12" 48" 12" 24'
54" 12" 54" 12" 21'
54" 12" 60" 12"
60" 12" 19'
60" 12" 66" 12"
66" 12" 14'
66" 12" 72" 12"
72" 15" 78" 15"
78" 15" 84" 18"
84" 18" 90" 18"
90" 18" 96" 18"
96" 18" 102" 21"
102" 21" 108" 21"
108" 21" 114" 24"
114" 24" 120" 24"
120" 24"
MAXIMUM FILL HEIGHT
POLY- OVER CULVERT (FT.) 0 PROPYLENE
PIPE UNDER PAVEMENT OUTSIDE PAVEMENT
DIAMETER
95% 90% Class C -85% Class D-85%
COMPACT COMPACT COMPACT COMPACT
18 25 18 16 13 24 22 16 14 12 30 23 17 13 12 36 22 16 11 11 42 22 15 11 11 48 21 15 11 10 60 23 16 11 10
C) REFER TO ROADWAY DESIGN STANDARD SPB-2 FOR
MINIMUM FILL HEIGHT AND OTHER POLYPROPYLENE
INSTALLATION DETAILS.
MAXIMUM FILL HEIGHT 2 2/3" x 1/2" CORRUGATION PATTERN
APPROX.
ABOVE TOP OF PIPE EQUIV. SIZE STEEL ALUMINUM
ROUND SPAN x RISE
MIN. MIN. MIN. MIN. PIPE EQUIV. STANDARD GAGE GAGE COVER GAGE COVER
36'
27'
24'
21'
50'
18'
41'
35'
30'
27'
29'
24'
25'
18'
23'
28'
19'
18'
17'
17'
12 10 8 15" 17" X 13" 16 12" 16 12" 18" 21" X 15" 16 12" 16 12"
63' 21" 24" X 18" 16 12" 16 12"
47' 50' 24" 28" X 20" 16 12" 14 12"
42' 44' 30" 35" X 24" 14Q 12" 14 12"
37' 39' 36" 42" X 29" 14 12" 12 15"
68' 42" 49" X 33" 14 12" 12 15"
32' 33' 48" 57" X 38" 12 12" 10 15"
57' 85' 54" 64" X 43" 12 12" 10 18" 60" 71" X 47" 10 12" 8 18"
54' 57' 66" 77" X 52" 8 12" 8 18"
48' 73' 72" 83" X 57" 8 12" 8 18"
47' 49' 51' 3" x 1" & 5" x 1" CORRUGATION PATTERN 42' 63' 82'
36" 40" X 31" 14 12" 41' 44' 45'
42" 46" X 36" 14 12" 37' 56' 73'
48" 53" X 41" 14 12" 42' 67' 66'
54" 60" X 46" 14 12" 14 15" 39' 41'
60" 66" X 51" 14 12" 14 18" 33' 24' 66'
66" 73" X 55" 14 12" 14 18" 37' 59' 58'
72" 81" X 59" 14 12" 12 21" 36' 37'
78" 87'' X 63" 14 12" 12 21"
26' 40' 51' 84" 95" X 67" 12 12" 12 24"
33' 53' 52' 90" 103" X 71" 12 18" 10 24"
27' 41' 54' 96" 112" X 75" 12 18" 10 27"
27' 36' 43' 102" 117" X 79" 12 18"
25' 38' 50' 108" 128" X 83" 10 24"
25' 32' 40' 114" 137" X 87'' 10 24"
23' 35' 47' 120" 142" X 91" 10 24"
23' 30' 37'
Q WHEN INSTALLED UNDER PAVEMENT INCLUDING ALL P.C. OR A.C. SURFACING
21' 33' 43' UNDER MAINLINE TRAFFIC AND MAJOR STREET RETURNS. A MINIMUM PIPE
21' 28' 34' GAGE OF 16 MAY BE USED FOR INSTALLATION REQUIRING 30 INCH EQUIVALENT
ROUND CONDUITS (MAX.) AND LIMITED TO LOW VOLUME COUNTY OR OFF-
20' 31' 40' SYSTEM ROADS, MINOR STREET RETURNS, DRIVEWAYS OR TEMPORARY
19' 26' 32' DETOURS, AS APPROVED BY THE ENGINEER.
18' 28' 37' GENERAL NOTES
18' 25' 29'
1. METAL PIPE FILL HEIGHT DESIGNS ARE BASED ON A CLASS B BEDDING,
27' 35' NEGATIVE PROJECTION, HS-20 LIVE LOADING AND 120 LBS/C.F. SOIL
17' 23' 28' WEIGHT. POLYPROPYLENE PIPE FILL HEIGHTS ARE BASED ON AASHTO
M330 FOR POLYPROPYLENE, TYPE S, PIPE WITH OUTER CORRUGATED
25' 34' WALL AND SMOOTH INNER WALL.
16' 21' 26' 2. IN THE EVENT LOADS IN EXCESS OF HS-20 ARE TO BE OPERA TED OVER
24' 32' OR ADJACENT TO THE PIPE INSTALLATION DURING THE CONSTRUCTION
20' 25' PHASE, THE CONTRACTOR SHALL PROVIDE AND MAINTAIN A MINIMUM
OF FOUR FEET OF COVER OVER THE PIPE AT WHEEL OR TRACK PATHS.
3. PROPER INSTALLATION PRACTICES MUST BE ADHERED TO AS SHOWN ON
ROADWAY STANDARDS SPl-5, FPl-4 AND SPB-2. POLYPROPYLENE PIPE
SHALL BE INSTALLED IN ACCORDANCE WITH ASTM 02321.
EQUIVALENT METAL THICKNESS
AND GAGE 4. ANY PIPE DEFORMED PRIOR TO FINAL ACCEPTANCE SHALL BE REPLACED
BY THE CONTRACTOR AT HIS EXPENSE. SURFACE DISTRESS MUST BE
METAL THICKNESS (INCHES) REPAIRED TO THE SATISFACTION OF THE ENGINEER OR REPLACED AT
GAGE THE CONTRACTOR'S EXPENSE.
NUMBER
■ STEEL ♦ ALUMINUM 5. MAXIMUM FILL HEIGHTS ARE MEASURED TO TOP OF SUBGRADE (OR
BOTTOM OF ASPHALT OR PC PAVEMENT) FOR MET AL AND
16 0.064 0.060 POLYPROPYLENE PIPES.
14 0.079 0.075 12 0.109 0.105 �) � -
10 0.138 0.135 / .,a:'J,){))f£-APPROVED BY
8 0.168 0.164 ROADWAY ENGINEER: DATE:
ROADwlv DESIGN 0IvIsION STANDARD 7 0.188 ----
5 0.218 ----
■ THE THICKNESS OF THE SHEET INCLUDES BOTH THE FILL HEIGHT TABLES
JI._ Ol(L.AHO�:( AL & POLYPROPYLENE PIPES)BASE STEEL AND THE COATING.
♦ THE THICKNESS SHOWN REFERS TO THE CLAD SHEET.
��, Transportation 2019 SPECIFICATIONS
◄ .., I FHTMPP-2 I 1
I R-62
6/30/22
File details come from the government source that posted it. Updated .