B08_Attachment_2_-_140P1526Q0095_Price_Schedule.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- SAGU Vault Toilets & Septic Tank Pumping
- Solicitation number
- 140P1526Q0095
About this file
This is a Price Schedule template for vault toilet and septic tank pumping services at Saguaro National Park (SAGU), Solicitation Number 140P1526Q0095. Contractors must complete the orange-highlighted blocks to provide pricing for pumping services across multiple facilities in both the Rincon Mountain (RM) and Tucson Mountain (TM) Districts. The schedule itemizes nine vault toilet facilities ranging from 1,000 to 1,500 gallons with one annual pumping each, and seven septic tank locations ranging from 1,200 to 6,000 gallons with frequencies between 0.3 and 1 annual pumping. Pricing submission requires contractor information including UEI, date, and point of contact email, with separate price lines for Base Year (period 6/15/2026–6/14/2027) and four optional years.
The solicitation is a 100% total small business set-aside issued by the Department of the Interior National Park Service Intermountain Region. The government notes that pumping services may require multiple trips to SAGU due to scheduling constraints, and contractors should structure service fees to account for all associated costs including travel and mobilization, though historical billing practice is based primarily on actual volume pumped. Site visits are scheduled for May 19–20, 2026, in Tucson, Arizona, with questions due by 12:00 p.m. Mountain Time on May 25, 2026, and compiled responses to be posted as an amendment to the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1526Q0095_Amd_0001.pdf | ||
| Sol_140P1526Q0095.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Attachment 2- 140P1526Q0095 Price List Saguaro National Park Vault Toilet and Septic Tank Pumping
| Contractor: | Fill in orange blocks only |
| UEI: | |
| Date: | |
| Point of Contact: | |
| Email: |
| Vault Toilet Facilities | Gallons* | Annual Pumping * | ||
| Mica View | 1500 | 1 | ||
| Javelina | 1000(2) | 1 | PRICE** | |
| Sus | 1000 | 1 | BASE YEAR | $ - 0 |
| Ez-Kim-In-Zin | 1000 | 1 | OPTION YEAR 1 | $ - 0 |
| Sendero Esperanza | 1000 | 1 | OPTION YEAR 2 | $ - 0 |
| Signal Hill | 1000 | 1 | OPTION YEAR 3 | $ - 0 |
| TM Cam-Boh | 1000 | 1 | OPTION YEAR 4 | $ - 0 |
| Septic Tanks | Gallons | |||
| RM Visitor Center | 4500 | 1 | ||
| RM Headquarters | 6000 | 1 | ||
| RM Fire Module | 1200 | 1 | ||
| RM Helibase | 1400 | 1 | ||
| RM Green Property | 1200 | Est .3 | ||
| TM Red Hills Visitor Center | 6000 | 1 | ||
| TM Hills Property | 1200(2) | Est .3 |
| NOTE*: These numbers are estimated. |
| NOTE**: Pumping services may not always align to allow for simultaneous servicing of all vault toilets and septic tanks, which may require multiple trips to SAGU. If a separate service fee is included, it should be structured to account for all associated costs, including travel, mobilization, and multiple site visits; however, consistent with historical practice, billing will be based primarily on the actual volume pumped. |
File details come from the government source that posted it. Updated .