This is a pricing schedule template for rapid response boat operations services supporting the National Park Service at Grand Canyon National Park (GRCA) and Glen Canyon National Park (GLCA). The document outlines 25 scheduled trips spanning May through December, with pricing to be completed by the contractor. The trips include electrofishing operations, both day trips and multi-day river missions, requiring night operations technical boat operators, standard boat operators, operations managers, logistical boat operators, and boat operator assistants depending on trip scope.
The pricing schedule requires contractors to fill in unit prices for labor (personnel listed by day), travel costs (mileage at 252 miles per trip to transport NPS-supplied boats, meals and incidental expenses, lodging at day/participant rates, and food for downstream trips), equipment (37-foot S-Rig boats for multi-day missions), and materials (gasoline for contractor and sport boats). Most standard trips require two night operations technical boat operators and one operations manager, while larger river missions (Trips 26-19 and 26-22) require expanded crews including logistical personnel and contractor-supplied boat equipment with associated transportation and fuel costs. All unit prices currently display $0.00, indicating this is a blank template awaiting contractor pricing submission.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_Attachment_2_140P1526Q0047_REVISED_Price_Schedule_0001.xlsx | XLSX spreadsheet | |
| Sol_140P1526Q0047_Amd_0001.pdf | ||
| Sol_140P1526Q0047.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Trips
| Attachment 2, 140P1526Q0047 Price List | |
| GRCA & GLCA Rapid Response Boat Operators | |
| National Park Service (NPS) | |
| Contractor: | (fill in orange blocks only) |
| UEI: | |
| Date: | |
| Point of Contact: | |
| Email: |
| Trip 26-1: May 4 – May 8 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-2: May 11 – May 15 | |||||
| GRCA PBR Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-3: May 18 – May 22 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-4: June 1 – June 5 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-5: June 1 – June 5 | |||||
| GRCA PBR Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-6: June 15 – June 19 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-7: June 29 – July 3 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-8: July 13 – July 24 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-9: July 20 – July 24 | |||||
| GRCA PBR Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-10: July 27 – July 31 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-11: August 3 – August 7 | |||||
| GRCA PBR Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-12: August 10 – August 14 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-13: August 24 – August 28 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-14: August 31 – September 4 | |||||
| GRCA PBR Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-15: September 8 – September 11 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 4 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 4 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 4 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 4 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 6 | $0.00 | |
| $0.00 | |||||
| Trip 26-16: September 21 – September 25 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-17: October 5 – October 9 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-18: October 19 – October 23 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-19: October 20 - October 30 | |||||
| GRCA Electrofishing River Mission #1 | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 7 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 7 | $0.00 | |
| Personnel | TECHNICAL BOAT OPERATOR 1 | Day | 4 | $0.00 | |
| Personnel | TECHNICAL BOAT OPERATOR 2 | Day | 4 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Personnel | LOGISTICAL BOAT OPERATOR 1 | Day | 1 | $0.00 | |
| Personnel | LOGISTICAL BOAT OPERATOR 2 | Day | 11 | $0.00 | |
| Personnel | BOAT OPERATOR ASSISTANT 1 | Day | 11 | $0.00 | |
| Equipment | Boat 1 - 37'S-Rig, complete package | Day | 11 | $0.00 | |
| Equipment | Boat 2 - 37'S-Rig, complete package | Day | 11 | $0.00 | |
| Travel | Food, downstream trips | Day/Participant | 87 | $0.00 | |
| Transportation | Transportation of Contractor boats – Lees Ferry | Trip/Boat | 2 | $0.00 | |
| Transportation | Transportation of Contractor boats – Diamond Creek | Trip/Boat | 2 | $0.00 | |
| Materials | Gasoline – Contractor S-Rig. 70 gal/trip | Trip/Boat | 2 | $0.00 | |
| Materials | Gasoline – Sport boat. 80 gal/trip | Trip/Boat | 2 | $0.00 | |
| $0.00 | |||||
| Trip 26-20: November 2 – November 6 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-21: November 16 – November 20 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-22: November 18 - November 27 | |||||
| GRCA Electrofishing River Mission #2 | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 6 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 6 | $0.00 | |
| Personnel | TECHNICAL BOAT OPERATOR 1 | Day | 4 | $0.00 | |
| Personnel | TECHNICAL BOAT OPERATOR 2 | Day | 4 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Personnel | LOGISTICAL BOAT OPERATOR 1 | Day | 10 | $0.00 | |
| Personnel | LOGISTICAL BOAT OPERATOR 2 | Day | 10 | $0.00 | |
| Personnel | BOAT OPERATOR ASSISTANT 1 | Day | 10 | $0.00 | |
| Equipment | Boat 1 - 37'S-Rig, complete package | Day | 10 | $0.00 | |
| Equipment | Boat 2 - 37'S-Rig, complete package | Day | 10 | $0.00 | |
| Travel | Food, downstream trips | Day/Participant | 78 | $0.00 | |
| Transportation | Transportation of Contractor boats – Lees Ferry | Trip/Boat | 2 | $0.00 | |
| Transportation | Transportation of Contractor boats – Diamond Creek | Trip/Boat | 2 | $0.00 | |
| Materials | Gasoline – Contractor S-Rig. 70 gal/trip | Trip/Boat | 2 | $0.00 | |
| Materials | Gasoline – Sport boat. 80 gal/trip | Trip/Boat | 2 | $0.00 | |
| $0.00 | |||||
| Trip 26-23: November 30 – December 4 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-24: December 7 – December 11 | |||||
| GRCA PBR Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| Trip 26-25: December 14 – December 18 | |||||
| GLCA Electrofishing | |||||
| Category | Requirement | Unit of Measure | Unit(s) | Unit Price | Total |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 1 | Day | 5 | $0.00 | |
| Personnel | NIGHT OPERATIONS TECHNICAL BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Travel | M&IE BOAT OPERATOR 2 | Day | 5 | $0.00 | |
| Personnel | OPERATIONS MANAGER | Trip | 1 | $0.00 | |
| Travel | Mileage to Transport NPS supplied Boats | Mile | 252 | $0.00 | |
| Travel | Lodging | Day/Participant | 8 | $0.00 | |
| $0.00 | |||||
| GRAND TOTAL | $0.00 |