This is a Statement of Work (SOW) for a firm fixed commercial services contract with Rocky Mountain National Park for the supply and annual delivery of 1,500 tons of 3/4" CDOT Class 6 Native Road Base material to be used for shoulder stabilization and repairs to gravel roads within the park.

The contractor must deliver the road base material to the Rocky Mountain National Park East Maintenance Yard pit area located at 1000 Highway 36, Estes Park, Colorado 80517, during the performance period of May 25, 2026 through June 30, 2026, with the option to extend delivery to September 1, 2026 at the NPS's discretion. Deliveries are restricted to Tuesday through Friday between 0630-1630 hours during May through October, with no weekend or holiday deliveries permitted. The contractor is responsible for providing trucks, equipment, and drivers; dumping each load as directed by the Contracting Officer Representative (COR); having loads weighed; and leaving weight tickets on-site. The material must be native brown-colored road base free of crushed concrete, recycled asphalt, weeds, and organic materials, and must pass one of the CDOT gradation classifications specified in Table 703-2. The contractor must submit sieve analysis documentation to the COR before delivery begins and may be required to provide a physical sample for pre-award inspection. The COR must approve all deliveries upon receipt, and the government reserves the right to reject any unsuitable material, for which the contractor is responsible for complete removal. Additional requirements include adherence to all park speed limits and regulations, cleaning all vehicles and equipment prior to park entry for invasive weed prevention, and submitting the sourcing location address with the quote package for award eligibility.

View the file

Other files

File Type Posted
Sol_140P1226Q0027_Amd_0001.pdf PDF
B08_Wage_Determination_Driver.pdf PDF
Sol_140P1226Q0027.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Rocky Mountain National Park

Purchase and Delivery of Road Base

1.0 INTRODUCTION

Contract Term and Type:

The government is awarding a firm fixed commercial services contract.

Purpose:

Rocky Mountain National Park is located on the west side of Estes Park, CO. The address is 1000 Hwy 36 Estes Park, CO 80517.

This is a supply and delivery of 1500 Ton 3/4” CDOT Class 6 Native Road Base delivered annually to Rocky Mountain National Park maintenance pit.

Description of Purchase:

This is a purchase of road base material to be used for shoulder stabilization and repairs to gravel roads.

The park reserves the right to reject any material that is not suitable for the use of road base. The vendor will supply and deliver the material to Rocky Mountain National Park as designated by park representative/Contracting Officer Representative (COR). Delivery of the material must be completed from May 25, 2026 to June 30, 2026, with delivery able to be extended to September 1st at the discretion of the NPS depending on the date of approvals and award. The material must be approved by the COR upon delivery.

2.0 KEY ASSUMPTIONS

The contractor shall deliver material during regular business hours as indicated in section 3.0.

Material shall meet the description stated under 3.4 of this specifications document. To be eligible for award, the address location for sourcing of quoted material must be provided with the quote package.

Prior to award, the CO may request a physical sample of the road base aggregate to be delivered to the park for pre-award inspection.

The COR or their designee must be present at time of delivery to approve and accept all deliveries. The NPS will reserve the right to reject any material that is deemed unsuitable for use.

3.0 SELLER RESPONSIBILITIES

THE CONTRACTOR WILL REQUIRE THEIR DRIVERS TO OBEY ALL SPEED

LIMITS, ALL LOCAL LAWS DICTATING LOAD CAPACITIES, AND DRIVE IN A

SAFE DEFENSIVE MANNER AT ALL TIMES.

No deliveries will be allowed on weekends or holidays due to heavy visitation. Location hours of operation are 0630-1630 Tuesday through Friday from May through October.

3.1 Locations:

The contractor shall deliver the material to Rocky Mountain National Park Maintenance yard pit area 1000 Hwy 36, Estes Park, CO 80517. Location inside Rocky Mountain National Park shall be designated by the COR.

3.2 Task to Be Performed:

The contractor will provide the trucks, equipment, and drivers necessary to deliver material addressed in this scope.

The contractor will deliver material to location designated by COR inside Rocky Mountain National Parks East Maintenance Yard pit area.

The contractor will dump each load on site in the area as directed by the government.

The contractor will have each load weighed and will leave each loads weight ticket in on site in the area directed by the COR.

3.3 Task to Perform by Buyer

The government will provide suitable area that includes ample space for turnaround and solid base for dumping.

3.4 Descriptions of Materials

The material shall be 3/4" CDOT Class 6 Road Base material suitable to stabilize shoulders and rebuild roadways.

Material shall be native material. NO crushed concrete, and NO recycled asphalt shall be accepted.

Material shall be brown in color. NO shades of red, pink, or grey color material will be accepted.

Material shall be free of weeds and organic materials. The government reserves the right to inspect the stockpiled material in place prior to delivery to ensure this requirement is met.

Material shall pass one of the following gradations:

Table 703-2

CLASSIFICATION FOR AGGREGATE BASE COURSE

Sieve Size

Mass Percent Passing Square Mesh Sieves

LL not greater than 35 LL not greater than 30

Class 1 Class 2 Class 3 Class 4 Class 5 Class 6 Class 7

150mm (6") 100 100mm (4") 100 75mm (3") 95-100

60mm (2 ½") 100 50mm (2") 95-100 100

37.5mm (1.5") 90-100 100 25mm (1") 95-100 100 100

19mm (3/4") 50-90 95-100 4.75mm (#4) 30-65 30-50 30-70 30-65 2.36mm (#8) 25-55 20-85

75 m (#200) 3-15 3-15 20 max 3-12 3-15 3-12 5-15

NOTE: Class 3 material shall consist of bank or pit run material.

The contractor shall provide COR with documentation of sieve analysis before any material is delivered.

3.5 Quantity: 1500 T

3.6 Period of Performance

May 25, 2026 to June 30, 2026, with delivery able to be extended to September 1st at the discretion of the NPS depending on the date of approvals and award.

4.0 Responsibilities of the Government

Designate location for material location upon delivery.

Stockpile management will be provided by the Government when necessary.

5.0 Project Completion Criteria

The purchase will be complete when all material is delivered and accepted by the Government.

6.0 Additional Terms and Conditions

A physical sample of the road base aggregate, no photographs, may be requested and approved by the COR prior to acceptance and approval of delivery. The COR reserves the right to reject any subsequent delivery of product that does not meet this specification or is otherwise unsuitable for use. The supplier will be responsible for completely removing from the project site any product that is rejected by the

COR.

The contractor shall adhere to all park requirements, rules, and regulations and posted speed limits within all park boundaries.

Clean vehicles and construction equipment prior to entry into the Park to minimize the potential for introduction and/or proliferation of invasive non-native weeds through project actions. All vehicles will be inspected and approved by NPS prior to entering the park. Equipment not deemed clean by the COR will not be allowed to enter the park. The contractor remains liable for additional transportation costs incurred if equipment fails inspection.