B08_Attachment_1_-_Specifications.pdf

PDF 1 MB Posted

Attached to
Cape Cod National Seashore - Demolish Bartlett Hou Federal contract opportunity
Solicitation number
140P4325R0033
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This document is a comprehensive set of demolition specifications for the Bartlett House located at 40 Ocean View Drive in Eastham, Massachusetts, part of Cape Cod National Seashore. The project involves complete demolition of an existing residential property, with significant emphasis on environmental protection, bluff stability, and careful management of potential hazardous materials. Key requirements include conducting a thorough geotechnical assessment of the adjacent bluff, implementing comprehensive erosion control measures, performing hazardous material testing and abatement (including asbestos, PCBs, and lead-based paint), and ensuring minimal environmental disturbance during demolition.

The project scope includes removing all structures, foundations, utilities, and site improvements, with specific attention to ecological preservation and safety. Contractors must adhere to strict environmental protocols, including protecting native wildlife habitats (such as eastern box turtle and migratory bird nesting areas), managing potential archaeological resources, and implementing extensive stormwater and sediment control measures. The demolition must be performed using equipment and methods approved to prevent bluff destabilization, with continuous monitoring by a geotechnical engineer. The project will require detailed documentation, environmental testing, and proper disposal of all materials, with a strong focus on recycling and minimizing environmental impact.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL PARK SERVICE

NORTHEAST REGION

CAPE COD NATIONAL SEASHORE

DEMOLISH BARTLETT HOUSE

CACO 339390

Demolition Documents

MARCH 24, 2025

SPECIFICATIONS

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 26 01 Contract Modification Procedures 01 27 00 Definition of Contract Line Items 01 31 00 Project Management and Coordination 01 32 16 Construction Schedule 01 32 33 Photo Documentation 01 33 23 Submittal Procedures 01 35 13.22 Archeological Protection (PLACEHOLDER) 01 35 23 Safety Requirements 01 40 00 Quality Requirements 01 42 00 References 01 50 00 Temporary Facilities and Controls 01 56 39 Temporary Tree and Plant Protection 01 57 19.12 Noise and Acoustics Management 01 57 23 Temporary Stormwater Pollution Prevention 01 73 40 Execution 01 74 19 Construction Waste Management and Disposal 01 74 19B Appendix B 01 77 00 Closeout Procedures

DIVISION 02 – EXISTING CONDITIONS

02 41 13.43 Utility Line Capping 02 41 16 Structure Demolition 02 41 16C Pre-Demolition Checklist Attachment 02 81 01 Off-Site Transportation and Disposal 02 82 13 Sampling and Testing of Hazardous Materials……………………………………………..

02 82 14 Asbestos Abatement 02 84 33 Removal and Disposal of PCB Containing Equipment

DIVISION 31 – EARTHWORK

31 10 00 Site Clearing 31 20 00 Earth Moving

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 91 19.13 Salvaged Topsoil 32 92 00 Grass and Seeding

DIVISION 33 – UTILITIES

33 29 00 Well Abandonment

SECTION 01 11 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Contractor use of Site.

3. Public use of Site.

4. Occupancy requirements for buildings.

5. Conduct of Operation

6. Work Restrictions.

7. Special Demolition Requirements.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Location:

1. Park Headquarters: Cape Cod National Seashore, 99 Marconi Station Site Road, Wellfleet, MA 02667.

2. Property to be demolished: Bartlett Property – 40 Ocean View Drive, Eastham, MA. (GPS:

41.847716 N 69.948297 )W.

B. The Base Bid Work-- The contractor shall provide turnkey demolition and site restoration services, assuming full responsibility for all required work, including but not limited to the following:

1. Land Survey

a. Conduct pre-demolition and post-demolition surveys for permit applications and as-built documentation.

2. Coastal Mitigation Measures:

a. The Contractor shall conduct a thorough evaluation of the bluff located approximately 10 feet from the demolition site, which overlooks the Atlantic Ocean. The purpose of this evaluation is to assess the erosion risk and the stability of the bluff. The assessment must be conducted by a qualified geotechnical engineer, coastal engineer, or other relevant professional with expertise in bluff stability and erosion dynamics.

Provide the assessment before demolition begins.

b. Heavy equipment will be positioned at a safe distance from the bluff edge, with weight limits imposed as needed.

c. Erosion control measures, including biodegradable silt fencing and temporary stabilization matting, will be installed to prevent sediment runoff.

d. Post-demolition, the bluff area will be reinforced with native vegetation and erosion control blankets to minimize erosion, stabilize the soil, and restore the slope naturally.

3. Environmental Protection Plan

a. All debris will be contained and removed in compliance with environmental regulations, ensuring no contamination of nearby coastal waters.

b. A containment plan for hazardous materials, including proper disposal procedures, will be implemented.

c. Daily inspections will monitor stormwater runoff and ensure compliance with best management practices (BMPs). All debris will be contained and removed in compliance with environmental regulations, ensuring no contamination of nearby coastal waters.

4. Public Safety & Traffic Management Site Security:

a. Develop and implement a traffic control plan, including potential temporary road closures or detours of Ocean View Road.

b. Provide flaggers, barricades, lights, etc to ensure safety at the roadway and construction site.

c. Emergency vehicle access will be maintained at all times.

d. Develop public notification plan to inform local residents and businesses of the demolition timeline and potential disruptions.

5. Site Security:

a. Contractor shall fence and secure the site to prevent unauthorized access.

b. The contractor shall protect its employees from hazards posed by the existing bluff.

6. Hazardous Material Identification & Testing:

a. Perform a comprehensive survey to identify the presence of asbestos, lead-based paint, and polychlorinated biphenyls (PCBs). Testing shall include soils within 5 feet of the foundation.

b. Perform all required testing and provide certified results prior to demolition.

7. Site Preparation & Environmental Protection:

a. Install ground protection as needed.

b. Implement sediment and erosion controls in accordance with regulatory requirements.

8. Demolition and Removal:

a. Demolish and remove all structures, including the residence, garage, associated foundations, slabs, decks, appurtenances, and surrounding debris.

b. Remove all utilities, including cutting, capping, and proper abandonment of the following: Water line from well; sewer lines; drywell.

c. Contractor shall conduct TCLP sampling of debris prior to disposal. If debris is classified as hazardous per TCLP testing, it shall be disposed of at a permitted hazardous waste facility in accordance with all applicable regulations. If classified as non-hazardous, it shall be disposed of at a licensed C&D landfill.

9. Potable Water Well Closure:

a. Permanently abandon the existing well by removing all below grade infrastructure, and cap per state and local regulations. This item includes all permit fees, certification and testing required by the state and local agencies.

10. Permit Closeout and Contractor Responsibility:

a. Obtain all necessary permits and approvals.

b. Notify and coordinate with all relevant agencies and utility providers

c. Ensure full compliance with all hazardous material handling, testing, disposal, and site restoration regulations.

11. Bid Options for Hazardous Material Abatement: The following bid options account for potential hazardous material removal beyond the base bid. The contractor shall provide unit pricing for the following materials, with removal performed only as directed by the government:

a. Sheet and/or asbestos floor tile and mastic-

Quantity not to exceed 1,300 square feet

b. Building roof felt, shingles, flashing, and mastic-

Quantity not to exceed 1,500 square feet

c. Building exterior wall felt and mastic

Quantity not to exceed 2,000 square feet

d. PCB caulking at roof, windows and chimneys

Quantity not to exceed 15 linear feet

e. Garage roof felt, shingles, flashing, and mastic

Quantity not to exceed 600 square feet

f. Garage exterior wall felt and mastic

Quantity not to exceed 2000 square feet

g. Sewer line – asbestos-containing pipe

Quantity not to exceed 40 linear feet

h. Block foundation water proofing

Quantity not to exceed 2000 square feet

12. Emergency Slope Stabilization – Provide turnkey rapid response stabilization should the bluff exhibit signs of unexpected instability. The Contractor shall provide a detailed emergency response protocol, including clear communication steps with the geotechnical or coastal engineer and the Contracting Officer. This protocol will ensure swift and coordinated action in response to any signs of instability. The contractor shall then furnish all necessary supervision, equipment, labor, and materials (e.g., geotextile fabric, sandbags, erosion control blankets, fast-growing vegetation, temporary retaining structures) to mitigate further erosion or failure. The contractor must mobilize and initiate stabilization measures within 24 hours of receiving written or verbal notification from the contracting officer.

1.3 CONTRACTOR USE OF SITE

A. General: The Contractor shall be responsible for containing all demolition work, staging, equipment, and personnel within the designated limits of disturbance (LOD). The Contractor shall have use of various sites during the work period, with full responsibility for ensuring safety, security, and compliance with all regulations.

B. Bluff Stabilization and Erosion Control: The Contractor is responsible for ensuring the stability of the bluff during all phases of demolition, excavation, and site restoration. The Contractor shall retain a qualified geotechnical engineer or coastal engineer to assess the site conditions and provide recommendations for bluff stabilization, erosion control, and safe demolition methods. The engineer shall review all proposed work plans and ensure they account for coastal erosion, site topography, and geotechnical stability.

C. Bluff Inspection and Monitoring: Prior to and during demolition activities, the geotechnical or coastal engineer shall conduct site inspections to monitor the condition of the bluff and surrounding areas. This includes assessing the risk of erosion and potential impacts to the site from demolition activities, particularly near the edge of the bluff. The Contractor shall implement any recommended precautions or modifications to the work plan as directed by its engineer.

D. Erosion Control Measures: Based on the engineer's recommendations, the Contractor shall implement temporary or permanent erosion control measures, which may include but are not limited to, silt fencing, erosion control blankets, riprap, or geotextile mats to minimize the impact of erosion on the bluff. Measures should be designed to protect the bluff’s integrity, local ecosystems, and water quality, especially during inclement weather or high winds.

E. The Contractor shall implement stormwater management controls, including siltation traps, drainage channels, and other BMPs, to prevent sediment and pollutants from flowing into nearby coastal waters during rainfall events.

F. Storage of Materials: Storage of materials must be confined to the limit of disturbance as shown on the drawings or as otherwise directed by the Contracting Officer. The Contractor must ensure that all materials are securely stored to prevent unauthorized access, damage, or potential safety hazards.

F. Preservation of Natural Features:

The Contractor shall prevent damage to the surrounding natural environment by ensuring all work and staging remain within the LOD. Any damage caused by the Contractor, including to trees, plants, or any other natural features, shall be the Contractor's responsibility to restore at no additional cost to the Government.

Ground Protection: Provide composite heavy equipment mats for work areas. These mats must be engineered to support heavy equipment, machinery, and vehicles, and be non-conductive, skid-resistant, and suitable for civil engineering projects.

Prior to mobilizing equipment to each site, the Contractor must ensure that all equipment is thoroughly washed and free of any offsite plant material, seeds, or contaminants.

Temporary stakes and barrier tape shall be installed to protect existing trees, plants, and root zones from damage.

The Contractor shall not remove, injure, or destroy trees or plants without prior approval from the Contracting Officer. Any roots, branches, or trees that interfere with the work may be removed only after consultation and agreement with the Contracting Officer.

The Contractor must exercise caution and carefully supervise excavation, grading, and other activities near trees to avoid damage.

Eastern Box Turtle: Between April 1 and October 31, any box turtle found within the LOD must be relocated outside the LOD to prevent harm. The Contractor shall perform daily sweeps to check for box turtles before work begins, after breaks, and after lunch. Any injury or death of a turtle must be immediately reported to the Contracting Officer and US Fish & Wildlife.

Migratory Shore Birds: No vegetation removal or tree cutting may occur between April 1 and July 31 unless it has been cleared following a survey to avoid disturbing nesting birds, as required by the Migratory Bird Treaty Act.

Bat Habitat and Construction Sequencing: US Fish & Wildlife has determined that the project is unlikely to adversely affect the federally listed northern long-eared bat. The Contractor is responsible for conducting a bat survey two to three days prior to demolition, in coordination with the Park Biologist and an approved USFWS-qualified Bat Surveyor. All associated costs for the bat survey shall be borne by the Contractor.

Should bats or bat signs be found, demolition shall be timed to occur during hibernation (November 1 to March 31).

Removal of any trees greater than or equal to 3 inches in diameter (dbh) shall occur only between November 1 and March 31. All tree removals must be coordinated with the Contracting Officer and Park for approval.

G. Driveways, Entrances, & Accesses:

The Contractor shall protect all surfaces used by construction equipment, vehicles, and machinery with ground protection mats.

The Contractor shall use existing driveway accesses and ensure that the site is secured to prevent unauthorized access.

Site Access Coordination: The Contractor is required to coordinate the timing of all deliveries to minimize impacts on Ocean View Road and the surrounding public roads.

During the summer months (Memorial Day through Labor Day), which are peak visitor seasons for nearby public beaches, the Contractor shall ensure minimal impact on pedestrian and vehicular traffic along Ocean View Drive, in coordination with the Town of Eastham, Cape Cod National Seashore, and the Contracting Officer.

H. Construction Camp: Establishment of a construction camp within the park will not be permitted.

I. Hauling Restrictions: The Contractor must comply with all legal load restrictions when hauling materials.

This includes adhering to state and MASSDOT load restrictions. A special permit will not relieve the Contractor of liability for damage resulting from hauling equipment.

J. Parking Restrictions: The Contractor shall confine parking and material storage within the limits of disturbance unless directed otherwise by the Contracting Officer.

1.4 PUBLIC USE OF SITE

A. Due to the proximity of the site to the actively eroding bluff, the Contractor shall be responsible for ensuring the safety of the public during all phases of demolition. The Contractor shall install appropriate signage, fencing, and barriers to prevent access to hazardous areas, particularly near the edge of the bluff. The geotechnical or coastal engineer shall provide guidance on areas of the bluff where such safety measures should be implemented.

B. The Contractor shall provide detailed traffic management and emergency vehicle access plans to minimize public disruption and maintain safety. The plan must account for potential road closures, detours, and pedestrian access, especially during peak tourist seasons.

1.5 UTILITY AND PERMIT FEES

A. The Contractor shall be responsible for obtaining and paying for all utility permits, fees, and inspections required for the project, whether for temporary or permanent utilities.

B. The Contractor shall coordinate with Eversource Electric and Cape Cod National Seashore for the removal of the existing electrical meter and any other utility disconnections.

1.6 BENEFICIAL OCCUPANCIES

A. Upon substantial completion of the work, a one-year establishment and maintenance period shall begin.

The Contractor shall remain responsible for site grading and addressing any settlement or degradation that may occur during the maintenance period at no additional cost to the Government.

1.7 OCCUPANCY REQUIREMENTS FOR BUILDINGS

A. The Government will not occupy the premises during demolition activities. The Bartlett House and

Garage are not in use during the project.

B. Safety and Geotechnical Assessment for Site Occupancy: The Contractor shall engage the geotechnical or coastal engineer to confirm the stability of the site for future use or occupancy. This includes assessing any potential long-term risks associated with the bluff's erosion and determining if additional stabilization or maintenance measures are required to ensure the safety of any future structures or activities on the site.

1.8 CONDUCT OF OPERATIONS

A. The Contractor shall perform all work in accordance with the rules and regulations of the National Park Service, including those prescribed by the Park Superintendent.

B. Work outside of normal hours (7 AM to 5 PM, Monday through Friday) or on weekends may not be performed without prior approval from the Contracting Officer. Any work during weekends or off-hours must comply with the Town of Eastham noise ordinances and the requirements outlined in Section 01 57 19.12.

C. The Contractor is prohibited from displaying any signs or advertisements on the construction site or within the park, except as specified in the contract. The NPS will provide language for the signage.

1.9 WORK RESTRICTIONS

A. On-Site Work Hours: Work hours are generally restricted to 7 AM to 5 PM, Monday through Friday, except when otherwise authorized. No idling or warming up of equipment prior to work hours is permitted.

The Contractor must seek written approval for any work outside these hours, including weekends.

Weekend Work: Weekend work is subject to approval by the Contracting Officer and must comply with the Town of Eastham Noise Ordinance.

B. Existing Utilities: The Contractor is responsible for identifying all existing utilities, including both underground and overhead services, prior to beginning work. Notification of utility companies, including Dig-Safe MA 811, is required. If damage occurs to any utility, the Contractor is responsible for repair at no additional expense to the Government.

C. The septic tank has been removed, and the sewer lines are in place. Should any sewerage material be encountered during demolition, the Contractor shall immediately notify the Contracting Officer.

Documentation shall be provided to confirm compliance with Massachusetts state regulations for disposal.

1.10 SPECIAL DEMOLITION REQUIREMENTS

A. The Contractor shall maintain a project website for communication and document management during the demolition work. Refer to Section 01 31 00 for specific requirements regarding the use of the project website.

B. Geotechnical/Coastal Engineer's Role in Demolition: The geotechnical or coastal engineer will be responsible for approving the demolition methodology near the bluff, monitoring erosion control measures throughout the project, and providing immediate recommendations if instability or erosion concerns arise during demolition. The geotechnical or coastal engineer shall be involved in planning and oversight of all demolition activities, particularly those occurring near the bluff. The engineer will advise on safe demolition practices, ensuring that work does not compromise the stability of the bluff or lead to increased erosion. They will also review any foundation or basement removal strategies to minimize the potential impact on the surrounding landscape.

C. Bluff Stability Monitoring During Demolition: During the demolition process, the Contractor shall have a designated erosion control supervisor on-site, working under the guidance of the geotechnical or coastal engineer. This supervisor will be responsible for ensuring all bluff stabilization measures are in place and are being maintained throughout the project. If conditions change or if any unexpected hazards are identified, the Contractor shall immediately consult with the engineer and implement corrective actions as needed.

D. Archaeological Monitoring: Archaeological monitoring is required during the demolition. If any previously undiscovered archaeological resources are uncovered, the Contractor shall halt work in the immediate vicinity and notify the Contracting Officer for direction.

E. The use of explosives or blasting on the site is strictly prohibited.

F. Salvage/Recycle Requirements: The Contractor shall comply with all applicable Massachusetts

Construction and Demolition (C&D) recycling guidelines.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 11 00

SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES

A. The work of this section consists of administrative and procedural requirements for contract modifications.

1.2 DEFINITIONS AND ALLOWANCES

A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):

1. Rent

2. Utilities

3. Furnishings

4. Office equipment

5. Executive and management staff not exclusively assigned to the project

6. Support, accounting, and administrative staff

7. Preparation of cost proposals, estimating, and schedule analyses connected with

Modifications

8. Estimating and pre-demolition services

9. Mortgage costs

10. Real estate and corporate taxes

11. Automobile maintenance and travel costs for home office personnel

12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.

13. Depreciation of equipment and other assets

14. Home office supplies (paper, staples, etc.)

15. Legal services

16. Accounting and data processing

17. Professional fees/registration

B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items shall be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:

1. Project Manager, Assistant Project Manager

2. Superintendent, Assistant Superintendent

3. Quality Control, Safety Officer, Environmental Manager, etc.

4. Engineers

5. Travel, lodging, and per diem (as established by Federal Travel Regulations)

6. Scheduling

7. Field Office Trailers and associated temporary utilities

8. Field office supplies

a. Mailing and couriers

b. Reproduction costs

c. Storage

d. Phones

e. Computers

f. Copiers

9. Personal vehicles i.e. Superintendent Pickup trucks

C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:

1. Hoisting

2. Material handling

3. Temporary fencing

4. Portable toilets

5. Trash removal, dumpsters

6. Barricades

7. Small tools

8. Safety supplies

9. Scaffolding

10. Daily cleaning

11. Traffic control

12. Temporary signage

13. Temporary heating and power

D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40-hour week and no overtime or holiday pay will be allowed.

1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:

a. Base Rate: This is the hourly rate paid directly to the worker

b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums , such as:

1) Social Security

2) Medicare

3) Workers Compensation– Policy and company calculation shall be made available.

4) FUTA– Cap Rate and percentage shall be proportionally allocated over one year.

5) SUTA– Cap Rate and percentage shall be proportionally allocated over one year.

6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.

c. Fringe Benefits: Various non-wage compensations provided to employees such as:

1) Health Care Insurance Premiums

2) Cell Phone

3) Clothing

4) 401K and Pensions

5) Vehicle allowances

6) Gas allowance

7) Life insurance premiums

8) Disability insurance

9) Other Fringe Benefits required under an enforceable collective bargaining agreement

E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.

F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.

G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.

H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.

1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS

A. General:

1. Your proposal must be received in the format and within the time frame specified in the

Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.

2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or contractor is not requesting reimbursement.

Contractor may utilize the government provided Contractor Estimate Form, or their own http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank http://www.nps.gov/dscw/publicforms.htm form, provided that it contains the same information and level of detail as the Government provided form.

3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA). Refer to Section 01 32 16 “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter. Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.

4. All supporting documentation used to justify the proposed modification will be made available to the CO upon request.

5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.

6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.

B. Labor:

1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work.

Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.

2. Itemize labor costs for equipment operators separate from equipment costs.

3. The labor cost for foremen shall only be costs for related work required for the modification.

C. Materials:

1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.

2. No markup shall be applied to any material provided by the NPS.

D. Equipment:

1. Equipment used for the project must be appropriately sized for the work being performed.

2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.

3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:

a. U.S. Army Corps of Engineers, Ownership and Operating Expense Schedule (use latest edition and applicable region)

b. Construction Blue Book

c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.

4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires and tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.

5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.

6. Standby unit rates used shall be in accordance with paragraph 1.3, D, 2, above. If the US Army Corp of Engineers is utilized, then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.

7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.

8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.

9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.

10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.

E. Establishment and Application of Overhead and Profit Percentages:

1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.

Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:

Overhead… ................... 10% Profit… ........................... 10%

2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.

3. If contractors form a partnership, then the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to par 1.3,E,1 above). It is the responsibility of the partners to decide on the division of revenue.

4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.

5. At no time can profit be calculated on overhead or itself, it must be calculated on direct costs of work only.

PART 2 - PRODUCTS

PART 3 - EXECUTION

END OF SECTION 01 26 01

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

1. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends, and another begins.

2. If no contract line item exists for a portion of the work, include the costs in a related item.

3.1 LIST OF CONTRACT LINE ITEMS

A. Contract Line Bid Item: 1 – Base Bid- Bartlett Property.

The contractor shall provide turnkey land survey, hazardous material survey, material testing, permits and traffic management details including but not limited to the following:

1. Land Survey

a. Conduct pre-demolition and post-demolition surveys for permit applications and as-built documentation.

2. Environmental Protection Plan

a. All debris will be contained and removed in compliance with offshore/coastal protection measures, Massachusetts Coastal Regulations and environmental regulations, ensuring no contamination of nearby coastal waters.

b. A containment plan for hazardous materials, including proper disposal procedures, will be implemented.

c. Daily inspections will monitor stormwater runoff and ensure compliance with best management practices (BMPs).

4. Public Safety & Traffic Management Site Security:

a. Develop and implement a traffic control plan, including potential temporary road closures or detours of Ocean View Road.

b. Provide flaggers, barricades, lights, etc to ensure safety at the roadway and construction site.

c. Emergency vehicle access will be maintained at all times.

d. Work with the COR to develop public notification plan to inform local residents and businesses of the demolition timeline and potential disruptions.

5. Site Security:

a. Contractor shall fence and secure the site to prevent unauthorized access.

6. Hazardous Material Identification & Testing:

a. Perform a comprehensive survey to identify the presence of asbestos, lead-based paint, and polychlorinated biphenyls (PCBs). Testing shall include soils within 5 feet of the foundation.

b. Perform all required testing and provide certified results prior to demolition.

7. Site Preparation & Environmental Protection:

a. Install ground protection as needed.

b. Implement sediment and erosion controls in accordance with regulatory requirements.

8. Permit Closeout and Contractor Responsibility:

a. Obtain all necessary permits and approvals.

b. Notify and coordinate with all relevant agencies and utility providers

c. Ensure full compliance with all hazardous material handling, disposal, and site restoration regulations.

9. Payment will be based on the percentage of work completed, as determined by the scheduled value of this line item.

10. Payment will be made at the contract lump sum price.

B. Contract Line Bid Item: 2 – Base Bid- Bartlett Property.

The contractor shall provide turnkey demolition and site restoration services, assuming full responsibility for all required work, including but not limited to the following:

1. Coastal Mitigation Measures:

a. The Contractor shall conduct a thorough evaluation of the bluff located approximately10 feet from the demolition site, which overlooks the Atlantic Ocean. The purpose of this evaluation is to assess the erosion risk and the stability of the bluff. The assessment must be conducted by a qualified geotechnical engineer, coastal engineer, or other relevant professional with expertise in bluff stability and erosion dynamics. Provide written assessment before demolition begins.

b. Heavy equipment will be positioned at a safe distance (as determined by Contractor’s qualified Geotechnical or Coastal Engineer. The contractor's geotechnical or coastal engineer shall provide specific recommendations for the safe distance, considering factors such as soil composition, load-bearing capacity, and bluff stability.) from the bluff edge, with weight limits imposed as needed.

c. Erosion control measures, including biodegradable silt fencing and temporary stabilization matting, will be installed to prevent sediment runoff.

d. Post-demolition, the bluff area will be reinforced with native vegetation and erosion control blankets to minimize erosion, stabilize the soil and restore the slope naturally.

e. Minimal Emergency Bluff Stabilization: The contractor shall implement immediate, temporary stabilization measures in the event of unexpected bluff instability during demolition.

These measures include: Stockpiling of erosion control materials such as sandbags, geotextile fabric, and erosion control blankets for rapid deployment; Continuous monitoring of bluff edge conditions by a qualified professional; Adjustments to heavy equipment operations to reduce loading near unstable areas; Temporary drainage controls to divert surface runoff and minimize water infiltration into the bluff; and Emergency response mobilization within 24 hours of detected instability to implement corrective measures.

3. Demolition and Removal:

a. Demolish and remove all structures, including the residence, garage, associated foundations, slabs, decks, appurtenances, and surrounding debris.

b. Remove all utilities, including cutting, capping, and properly abandonment of the following:

Water line from well; sewer lines; and drywell.

c. Contractor shall conduct TCLP sampling of debris prior to disposal. If debris is classified as hazardous per TCLP testing, it shall be disposed of at a permitted hazardous waste facility in accordance with all applicable regulations. If classified as non-hazardous, it shall be disposed of at a licensed C&D landfill.

4. Potable Water Well Closure:

a. Permanently abandon the existing well by removing all below grade infrastructure, and cap and close in accordance with Massachusetts DEP requirement. Contractor shall submit and pay for all costs associated with the closure permit. The contractor shall provide all Massachusetts DEP reporting and certification requirements and pay all fees associated with these requirements.

5. Payment will be based on the percentage of work completed, as determined by the scheduled value of this line item.

6. Payment will be made at the contract lump sum price.

C. Contract Line-Item No. 3 – Bid Option 1: Sheet and/or asbestos floor tile and mastic abatement and disposal.

1. This item includes all necessary supervision, equipment, material, labor and Industrial Hygiene services abate and dispose of up to 1,300 square feet of asbestos sheet good, tile and its associated mastic floor products.

2. Payment will be based on the percentage of work completed, as determined by the scheduled value of this line item.

3. Payment will be made at the contract lump sum price.

D. Contract Line-Item No. 4 – Bid Option 2: Building roof felt, shingles, flashing and mastic abatement and

1. This item includes all necessary supervision, equipment, material, labor and Industrial Hygiene services abate and dispose of up to 3000 square feet of asbestos roof felt, shingles, flashing and mastic.

2. Payment will be based on the percentage of work completed, as determined by the scheduled value

E. Contract Line-Item No. 5 – Bid Option 3: Building exterior wall felt and mastic abatement and disposal.

1. This item includes all necessary supervision, equipment, material, labor and IH services abate and dispose of up to 3,000 square feet of asbestos wall felt and mastic.

2. Payment will be based on the percentage of work completed, as determined by the scheduled value

F. Contract Line-Item No. 6 – Bid Option 4: PCB and Asbestos caulking at roof, windows and chimneys abatement and disposal.

1. This item includes all necessary supervision, equipment, material, labor and IH services to abate and dispose of up to 15 linear feet.

2. Payment will be based on the percentage of work completed, as determined by the scheduled value

G. Contract Line-Item No. 7 – Bid Option 5: Garage roof felt, shingles, flashing and mastic abatement and

1. This item includes all necessary supervision, equipment, material, labor and Industrial Hygiene services to abate and dispose of up to 600 square feet of asbestos roof felt, shingles, flashing and mastic.

2. Payment will be based on the percentage of work completed, as determined by the scheduled value

H. Contract Line-Item No. 8 – Bid Option 6: Garage exterior wall felt and mastic abatement and disposal.

1. This item includes all necessary supervision, equipment, material, labor and IH services to abate and dispose of up to 2000 square feet of exterior wall felt and mastic.

2. Payment will be based on the percentage of work completed, as determined by the scheduled value

I. Contract Line-Item No. 9 – Bid Option 7: Orangeburg sewer line abatement and disposal.

1. This item includes all necessary supervision, equipment, material, labor and IH services to abate and dispose of up to 40 linear feet of asbestos sewer line (orangeburg pipe).

2. Payment will be based on the percentage of work completed, as determined by the scheduled value

J. Contract Line-Item No. 10 – Bid Option 8: Block foundation asbestos mastic water proofing abatement and disposal.

1. This item includes all necessary supervision, equipment, material, labor and IH services to abate and dispose of up to 2000 square feet of asbestos mastic used as water proofing.

2. Payment will be based on the percentage of work completed, as determined by the scheduled value

K. Contract Line-Item No. 11 – Bid Option 9: Emergency Slope Stabilization.

1. This item includes all necessary supervision, equipment, material, labor and plant to provide turnkey rapid response stabilization (should the bluff exhibit signs of unexpected instability). The Base Bid includes minimal emergency stabilization measures (e.g., erosion control materials, real-time monitoring, temporary drainage control). This bid option is for more extensive stabilization efforts beyond the base bid, such as structural reinforcement, deep stabilization, or emergency retaining structures. The materials shall consist of geotextile fabric, sandbags, erosion control blankets, fast-growing vegetation, temporary retaining structures, stake, etc., required to mitigate further erosion or failure. The estimate is not to exceed 20 linear feet stabilization along the bluff edge with depth stabilization not to exceed 30 linear feet. The contractor must mobilize and initiate stabilization measures within 24 hours of receiving written or verbal notification from the contracting officer.

This item includes reporting to the contracting officer with daily updates with photos on the status of the stabilization efforts, material installed and any observed changes in the bluff’s conditions.

2. Payment will be based on the percentage of work completed, as determined by the scheduled value

L. Contract line-Item 12- Bid Option 10: Unit price Orangeburg Sewer Line removal

1. The contractor shall provide a unit price ($/linear foot) for the abatement, removal, excavation, backfill and offsite disposal of existing orangeburg pipe.

2. Final quantities shall be field measured and verified prior to invoicing. Any additional removal beyond the estimated volume will be performed at the agreed-upon unit rate.

M. Contract line-Item 13- Bid Option 11: Unit price foundation Wall Mastic removal

1. The contractor shall provide a unit price ($/square foot) for the abatement, removal, excavation, backfill and offsite disposal of existing foundation mastic.

2. Final quantities shall be field measured and verified prior to invoicing. Any additional removal beyond the estimated volume will be performed at the agreed-upon unit rate.

END OF SECTION 01 27 00

SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION

A. This Section includes administrative provisions for coordinating demolition operations on Project including, but not limited to, the following:

1. Definitions

2. Demolition Coordination.

3. Submittals

4. Coordination Drawings.

5. Requests for Information (RFIs).

6. Approved construction management online platform.

7. Project meetings.

8. Environmental Coordination.

9. Permits

B. Related Requirements:

1. Section 01 32 16 “Construction Schedule” for preparing and submitting Contractor’s construction schedule.

2. Section 01 73 40 “Execution” for procedures for field-engineering services, including establishment of benchmarks and control points.

3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.

1.2 DEFINITIONS

A. Authority Having Jurisdiction (AHJ): An AHJ is an agency that has been granted legal authority over a location, action or resource. This authority includes the ability to issue a permit or other legal permission document.

B. CO (CO): A person with the authority to enter into, administer and/or terminate contracts and make related determinations and findings.

C. CO Representative (COR): Also referred to as CO Technical Representative. A person designated by the CO to assist in the technical monitoring or administration of a contract.

D. Permits: Are those permits obtained by the contractor based on means and methods used to execute the work. Permits are issued to the Contractor and not to the National Park Service (NPS).

E. Government Furnished Permits: Are those permits that are obtained by NPS during the design process and provided to the Contractor for compliance with the provisions throughout demolition.

These permits may address impacts to natural resources, demolition stormwater, etc.

F. “Remove” as identified in the plans and specifications shall be defined as safe and complete demolition, removal and disposal of all items and appurtenances in a legal manner offsite as paid by the contractor at no additional cost to the Government.

1.3 DEMOLITION COORDINATION

A. Coordination: Coordinate demolition operations included in different Sections of the Specifications to ensure efficient and orderly removal of each part of the Work. Coordinate demolition operations, included in different Sections, which depend on each other for proper removal.

1. Schedule demolition operations in sequence required to obtain the best results where demolition of one part of the Work depends on demolition of other components, before or after its own demolition.

2. Make adequate provisions to accommodate items scheduled for later demolition.

3. Properly plan demolition operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.

4. Properly plan and sequence demolition operations for requirements of federally listed bat, migratory bird and eastern box turtle restrictions and mitigations. Refer to section 01 11 00 1.3.C.

5. Properly plan and sequence demolition operations for early schedule timing for utility coordination and heating fuel oil tank removal.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other demolition activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Permit requirements.

7. Pre-demolition conferences.

8. Project closeout activities.

1.4 SUBMITTALS

A. Division 01 documents: The following items shall be submitted a minimum of one week prior to the Pre-demolition Conference. CO will notify Contractor of tentative date for the Pre-demolition Conference.

1. Waste Management Plan.

2. Quality Control Plan.

3. Bluff Assessment

4. Accident Prevention and Safety Plan

a. The accident prevention and safety plan shall address COVID-19 safety and health practices and procedures.

5. List of Required Construction Permits. Include the following information for each permit:

a. Name of Permit.

b. The Agency(ies) with Jurisdiction issuing the permit.

c. Information required from the Government to complete the permit application.

6. Storm Water Pollution Prevention Plan.

7. A List of Subcontractors for this project.

8. Schedule of values with comprehensive breakdown.

9. Cost- and resource- loaded construction Schedule.

10. Signing and Traffic Maintenance Plan.

11. Spill Prevention Plan for refueling.

12. Letter designating Project Superintendent.

13. Sequencing and schedule timing approach for requirements of federally listed bat and migratory bird restrictions and mitigations.

14. Certificates of Insurance (SF1413) for Contractor and all Subcontractors.

15. Written statements from Subcontractors certifying compliance with applicable labor standard clauses.

16. Submittal schedule.

B. All items listed must be provided to the CO before the Pre-Demolition Conference is held. If all of these documents have not been received one week prior to the scheduled Pre-Demolition Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the CO will consider other contractual remedies.