About this file
This is a Statement of Work (SOW) for the renovation of Well No. 1 at the U.S. Geological Survey's Columbia Environmental Research Center (CERC) in Columbia, Missouri. The work involves the complete recondition and update of a deep well that serves as the primary water source for the facility. Well No. 1 is a vertical turbine pump rated at 700 gallons per minute, currently installed at 680 feet depth and powered by a 200 horsepower electric motor. The well has experienced a 70 percent capacity decrease due to biological buildup, necessitating renovation to restore operational capability and prevent negative impacts on research operations. During well failure, a backup well reduces water capacity by 200 gallons per minute.
The contractor shall provide all materials, labor, equipment, travel, and supervision necessary to complete the renovation. Construction work includes temporarily removing the existing pump and motor, installing a submersible pump to evacuate debris and fill, performing airburst treatment with a minimum pulse energy of 60 to loosen debris, removing all fill and debris from the well bottom, applying CERC-approved disinfection treatment with pH-balanced chlorine and bio-dispersing agents for a minimum of 18 hours, and permanently reinstalling the cleaned pump and motor. Additional installation requirements include a 10-inch check valve in the discharge line, automatic PVC drain line, drain back valve on the pump suction end, new reverse ratchet assembly on a 200 horsepower motor, and two flow monitors integrated into the facility's Automated Logic system. The contractor must provide operational and maintenance training to CERC staff, furnish a 12-month warranty on all materials, deliver a digital video of the completed scope, and conduct complete testing of valves, motor, and pump to verify proper production. The period of performance is 30 days from Notice-to-Proceed, with work conducted at CERC's facility during normal business hours of 7:00 AM to 4:00 PM, Monday through Friday, subject to coordination requirements regarding utility interruptions and facility occupancy considerations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Attachment_1_SOW_CERC_Well_No_1_Renovation_Rev_1_0002.docx | DOCX document | |
| Sol_140G0126Q0040_Amd_0002.pdf | ||
| B09_Attachment_4_Q_A_Amd_002_0002.docx | DOCX document | |
| Sol_140G0126Q0040_Amd_0001.pdf | ||
| B09_Attachment_3_Q___A_Amd_001_0001.docx | DOCX document | |
| Sol_140G0126Q0040.pdf | ||
| B08_Attachment_2_WD_MO20260067.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
xiii. CONDITIONS AFFECTING THE WORK. It will be the responsibility of the contractor to inspect the site, determine quality of work involved. Compare the specifications with the work to be done, and inform themselves as to all conditions, including other work, if any, being performed. Failure to do so will in no way relieve the successful contractor from the necessity of furnishing any materials or performing any work that may be required to carry out the contract in accordance with the true intent and meaning of the specifications without additional cost to the Government.
xiv. EMPLOYEES. The contractor shall be responsible at all times for the supervision and control of the employees that may be assigned to render services under the contract. Fully qualified work personnel shall be available for work on the date this purchase order begins and shall be maintained throughout the period of performance.
xv. LICENSES-PERMITS. The contractor shall, without additional expense to the
Government, be responsible for obtaining any necessary licenses or permits, and for complying with any Federal, State, and Municipal laws, codes and regulations in connection with the execution of the work.
xvi. ACCIDENT PREVENTION AND FIRE HAZARDS. The contractor shall take all necessary precautions to prevent fires or injury to the public, building occupant(s), or damage to property of others during the performance of this contract. For the purpose of this contract, the public or building occupant shall include all persons not employed by the contractor or a subcontractor working under his/her direction. If welding is required, permission shall be obtained from the COTR.
xvii. INDEMNITY. The contractor shall confine all work on Government premises to areas authorized or approved by the Contracting Officer or COTR. The contractor shall save and keep harmless and indemnify the Government against any and all liability claims, and costs of whatsoever kind and nature of injury to or death of any person or persons and for loss or damage to any property
(Government or otherwise) occurring in connection with or in any way incident to or arising out of the occupancy, use, service, operations, or performance of work in connection with this contract, resulting in whole or part from the negligent acts or omissions of the contractor.