B08_Attachment_1_RORI_VC_Carpet_Statement_of_Work.docx
DOCX document 23 KB Posted
- Attached to
- RORI VISITOR CENTER CARPET Federal contract opportunity
- Solicitation number
- 140P8524Q0108
About this file
This document is a Statement of Work (SOW) for the removal and replacement of 2,105 square feet of carpet and padding at the Rosie the Riveter World War II Home Front National Historic Park Visitor Center in Richmond, California. The work includes removing and reinstalling furnishings, disposing of old carpet and debris, and installing new commercial grade polyester carpet and padding.
The related federal contract opportunity is a Request for Quotes (RFQ) for the carpet and padding replacement, which is set-aside for small businesses under NAICS code 238330 with a $19.0 million size standard. The construction magnitude is between $25,000 and $100,000. Proposals are due by 12:00 PM Pacific Standard Time on Monday, September 9, 2024. The Department of the Interior, National Park Service is the contracting agency. All questions must be submitted by September 4, 2024, and will be answered in a future amendment posted on SAM.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8524Q0108_Amd_0003.pdf | ||
| B08_Attachement_7_RORI_Carpet_Replacement_RFIs_(1)_0003.docx | DOCX document | |
| B08_Attachment_6_Additional_Photos_0002.docx | DOCX document | |
| B08_Attachement_5_RORI_Carpet_Replacement_RFIs_0002.docx | DOCX document | |
| Sol_140P8524Q0108_Amd_0002.pdf | ||
| Sol_140P8524Q0108_Amd_0001.pdf | ||
| B08_Attachment_1_RORI_VC_Carpet_Statement_of_Work_8_20_2024_0001.docx | DOCX document | |
| Sol_140P8524Q0108.pdf | ||
| B08_Attachment_3_RORI_VC_Carpet_photots.pdf | ||
| B03_Attachment_4_Wage_Determination_CA20240018.pdf | ||
| B08_Attachment_2_RORI_VC_Basement_Floor_Plan_Carpet_Replacement.jpg | JPG image |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rosie the Riveter World War II Home Front National Historic Park Flooring Contract
Rosie the Riveter World War II Home Front Visitor Center 1414 Harbor Way Richmond, CA 94804
Background The work of this task order is the removal and replacement of 2,105 square feet (SF) of carpet and padding from the Rosie the Riveter World War II Home Front National Historic Park, located at the Ford Assembly Center (Oil House).
Carpet in the lower level areas are in need of replacement. These locations are in the basement of the building and can be accessed through elevators.
Tasks
· Theatre and Theater Entry: Replace carpet and padding (1,000 SF).
· Audio/Visual Room: Replace carpet and padding (200 SF).
· Classroom Area: Replace carpet and padding (685 SF).
· Library/Work Room: Replace carpet and padding (220 SF).
Work to be Performed
· Removal, storage, and reinstallation of furnishings as needed to complete the project.
· Removal of carpet padding, and track strips
· Disposal of carpet, padding, and other debris.
· Furnish and install new carpet, padding, and tack strips on floors.
· Cleaning of carpet for occupancy.
Scope
· The contractor shall provide all labor, equipment, and materials to accomplish the work. All work will be performed under a single contract.
· The National Park Service (NPS) will identify the flooring materials to be removed and replaced.
· The contractor shall remove and replace the flooring material with like in kind, a commercial grade polyester carpet.
· The contractor shall be responsible for the removal, storage, and reinstallation of the furnishings – including pews, musical instruments, chairs, podium, etc. Storage area will be provided onsite.
· The contractor shall repair and repaint any paneling damaged during the removal and replacement of the flooring and underlayment.
· The contractor shall remove all associated debris and dispose of them in a responsible manner not within Yosemite National Park or its refuse collection containers.
· The National Park Service will perform periodic inspections, provide a punch list as necessary, and perform a final acceptance inspection.
Period of Performance The period of performance for completing project shall not exceed 14 calendar days from the date the contractor begins work.
Onsite Requirements Work shall be generally performed during normal business working hours of 8:00am to 4:30pm. Mondays and Tuesdays preferred. These are the days that the visitor center are closed to the public.