B08_Attachment_1-_Quote_Sheet.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- 140P8624Q0073
About this file
This document is a Contract Bid Schedule for the "NHL ALMA Maintenance and Drydocking - 2024" project at the San Francisco Maritime National Historical Park. The solicitation number is 140P8624Q0073.
The bid schedule includes both base bid items and optional bid items for maintenance and drydocking services on the historic scow schooner ALMA. Base bid items include transportation, temporary services, haul out and blocking, bottom cleaning, coatings, and various inspection and repair tasks. Optional bid items include hull and deck caulking, bottom plank renewal, transom and bulwark repairs, hull spike removal, mast repair, and propulsion system component replacement.
Pricing is required for all base and optional line items. The government reserves the right to award any or no options at the time of contract award. The period for exercise of options is 180 calendar days from the date of award. Pricing will be evaluated to determine best value to the government.
The contracting agency is the Department of the Interior National Park Service Pacific West Region.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CONTRACT BID SCHEDULE |
| SOLICITATION NUMBER: |
| PARK: San Francisco Maritime National Historical Park |
| PROJECT TITLE: NHL ALMA Maintenance and Drydocking - 2024 |
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of errors in summations, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
| SOW LINE ITEM NUMBER | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| BASE BID ITEMS - ALMA | Total | Dollar Value | |||
| 1.01 | Transportation | Lump | $ - 0 | ||
| 1.02 | Temporary Services | Lump | $ - 0 | ||
| 1.03 | Haul Out and Blocking | Lump | $ - 0 | ||
| 2.01 | Bottom Cleaning and Draining | Lump | $ - 0 | ||
| 2.02 | Coatings for underwater surfaces | Lump | $ - 0 | ||
| 2.03 | Coatings for topsides | Lump | $ - 0 | ||
| 3.01 | Inspect and Grease Max-Props | 2 | Each | $ - 0 | |
| 3.02 | Replace Sacrificial Zincs | 8 | Each | $ - 0 | |
| 3.03 | Shaft Packing Gland Inspection | 2 | Each | $ - 0 |
| TOTAL BASE PRICE (Contract Line Item Number 1.01 through 3.03) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - | $ - 0 | |
| OPTIONAL BID ITEMS - ALMA |
| 4.01 | Hull and Deck Caulking | 50 | LF | $ - 0 |
| 4.02 | Renew Bottom Planks | 2 | Each | $ - 0 |
| 4.03 | Repair Transom and Bulwaks | 15 | BF | $ - 0 |
| 4.04 | Remove Hull Spikes for USCG Inspection | 24 | Each | $ - 0 |
| 4.05 | Unstep, Repair, Restep Mainmast | 1 | Lump | $ - 0 |
| 4.06 | R/R Prop Struts/Shafts/Bearings (Price per Shaft) | 2 | Each | $ - 0 |
| TOTAL OPTIONAL PRICE (Contract Line Item Number 4.01 through 4.06) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - | $ - 0 |
| TOTAL PROPOSED PRICE - BASE +OPTIONS (Contract Line Item Numbers 1.01 through 4.03) - - - - - - - - - - - - - - - - - - | $ - 0 |