This is a Price Schedule attachment for the IMPROVE Operations and Filter Analysis contract with the National Park Service. The document presents pricing for three configuration scenarios across a five-year ordering period (2026-2027 through 2030-2031) plus a six-month option, with all scenarios including the same optional tasks for network modifications and support.

The Base Configuration covers 146 monitoring sites with 19,000 filters annually and includes 16 primary tasks organized into three categories: Network Operations (Tasks 1-8), Filter Analysis (Tasks 9-11), and optional Network Modifications and Support (Tasks 12-16). Network Operations tasks encompass coordinating samplers and QA modules, purchasing and managing filters, quality assurance, data reduction and database management, network documentation, and steering committee meetings (available as either in-person or virtual options). Filter Analysis tasks include gravimetric analysis for PM2.5 and PM10, elemental analysis, and optical absorption measurements. Optional tasks allow for establishing new monitoring sites, repairing or replacing sites, decommissioning stations, purchasing samplers and equipment, and providing site operators. Two alternative scenarios are also detailed: Option Scenario A reduces sampling frequency at 30 sites (17,500 filters annually), and Option Scenario B reduces the network by 10 sites while eliminating PM10 analysis (18,000 filters annually). Fully loaded labor rates are provided for 18 position categories, with key personnel designations for Principal Investigator, Lab Manager, Field Manager, Data Manager, QA Manager, Programmer, and Scientist roles. Direct costs include travel, supplies, equipment, and filter-related expenses, with capital equipment and subcontracting options available for all scenarios.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary - Base Configuration

Base Configuration (146 sites / 146 samplers), 19,000 Filter Assumption
DescriptionNew IDIQ Ordering Period 1Ordering Period 2Ordering Period 3Ordering Period 4Ordering Period 56-month option
3.3 Network Operations2026-20272027-20282028-20292029-20302030-2031
Task CostTask CostTask CostTask CostTask CostTask Cost
Task 1Coordinate operations of all IMPROVE and IMPROVE Protocol particle samplers and QA modules
Task 2Purchase of Filters
Task 3Coordination of Filters for Ion and Carbon Analysis
Task 4Filter Storage
Task 5Quality Assurance
Task 6Data Reduction and Database Management
Task 7Network Documentation
Task 8Steering Committee Meetings (in-person)
Task 8*Steering Committee Meetings (virtual)
Subtotal 3.3 Network Operations (with virtual Steering Committee Meeting)
Subtotal 3.3 Network Operations (with in-person Steering Committee Meeting)
3.4 Filter AnalysisTask CostTask CostTask CostTask CostTask CostTask Cost
Task 9Gravimetric Analysis
Task 10Elemental Analysis
Task 11Optical Absorption Measurements
Subtotal 3.4 Filter Analysis
OPTIONAL TASKS: 3.5 Network Modifications and Support
Task 12Establish New Monitoring Site
Task 13Repair or Replace Site
Task 14Decommission Monitoring Stations
Task 15Purchase Samplers and Equipment
Task 16Provide Site Operators
Subtotal 3.5 Network Modifications and Support
TOTAL COSTS (3.3 + 3.4 without Optional Tasks 3.5, with virtual Steering Committee Meeting)
TOTAL COSTS (3.3 + 3.4 without Optional Tasks 3.5, with in-person Steering Committee Meeting)
TOTAL COSTS (3.3, 3.4 and Optional Tasks 3.5, with virtual Steering Committee Meeting)
TOTAL COSTS (3.3, 3.4 and Optional Tasks 3.5, with in-person Steering Committee Meeting)

Life of Contract (All Tasks 3.3, 3.4, and 3.5, with Virtual Steering Committee Meeting)

*No cost increase for 6-mth option IAW FAR 52.217-8 based on the Ordering Period it was exercised.

Summary - Option Scenario A

Option Scenario A – Reduced Sampling Frequency at 30 Sites, 17,500 Filter Assumption
DescriptionNew IDIQ Ordering Period 1Ordering Period 2Ordering Period 3Ordering Period 4Ordering Period 56-month option
3.3 Network Operations2026-20272027-20282028-20292029-20302030-2031
Task CostTask CostTask CostTask CostTask CostTask Cost
Task 1Coordinate operations of all IMPROVE and IMPROVE Protocol particle samplers and QA modules
Task 2Purchase of Filters
Task 3Coordination of Filters for Ion and Carbon Analysis
Task 4Filter Storage
Task 5Quality Assurance
Task 6Data Reduction and Database Management
Task 7Network Documentation
Task 8Steering Committee Meetings (in-person)
Task 8*Steering Committee Meetings (virtual)
Subtotal 3.3 Network Operations (with virtual Steering Committee Meeting)
Subtotal 3.3 Network Operations (with in-person Steering Committee Meeting)
3.4 Filter AnalysisTask CostTask CostTask CostTask CostTask CostTask Cost
Task 9Gravimetric Analysis
Task 10Elemental Analysis
Task 11Optical Absorption Measurements
Subtotal 3.4 Filter Analysis
OPTIONAL TASKS: 3.5 Network Modifications and Support
Task 12Establish New Monitoring Site
Task 13Repair or Replace Site
Task 14Decommission Monitoring Stations
Task 15Purchase Samplers and Equipment
Task 16Provide Site Operators
Subtotal 3.5 Network Modifications and Support
TOTAL COSTS (3.3 + 3.4 without Optional Tasks 3.5, with virtual Steering Committee Meeting)
TOTAL COSTS (3.3 + 3.4 without Optional Tasks 3.5, with in-person Steering Committee Meeting)
TOTAL COSTS (3.3, 3.4 and Optional Tasks 3.5, with virtual Steering Committee Meeting)
TOTAL COSTS (3.3, 3.4 and Optional Tasks 3.5, with in-person Steering Committee Meeting)

Life of Contract (All Tasks 3.3, 3.4, and 3.5, with Virtual Steering Committee Meeting)

*No cost increase for 6-mth option IAW FAR 52.217-8 based on the Ordering Period it was exercised.

Summary - Option Scenario B

Option Scenario B – (136 sites/136 samplers) Reduced Network by 10 Sites and Elimination of PM10, 18,000 Filter Assumption
DescriptionNew IDIQ Ordering Period 1Ordering Period 2Ordering Period 3Ordering Period 4Ordering Period 56-month option
3.3 Network Operations2026-20272027-20282028-20292029-20302030-2031
Task CostTask CostTask CostTask CostTask CostTask Cost
Task 1Coordinate operations of all IMPROVE and IMPROVE Protocol particle samplers and QA modules
Task 2Purchase of Filters
Task 3Coordination of Filters for Ion and Carbon Analysis
Task 4Filter Storage
Task 5Quality Assurance
Task 6Data Reduction and Database Management
Task 7Network Documentation
Task 8Steering Committee Meetings (in-person)
Task 8*Steering Committee Meetings (virtual)
Subtotal 3.3 Network Operations (with virtual Steering Committee Meeting)
Subtotal 3.3 Network Operations (with in-person Steering Committee Meeting)
3.4 Filter AnalysisTask CostTask CostTask CostTask CostTask CostTask Cost
Task 9Gravimetric Analysis
Task 10Elemental Analysis
Task 11Optical Absorption Measurements
Subtotal 3.4 Filter Analysis
OPTIONAL TASKS: 3.5 Network Modifications and Support
Task 12Establish New Monitoring Site
Task 13Repair or Replace Site
Task 14Decommission Monitoring Stations
Task 15Purchase Samplers and Equipment
Task 16Provide Site Operators
Subtotal 3.5 Network Modifications and Support
TOTAL COSTS (3.3 + 3.4 without Optional Tasks 3.5, with virtual Steering Committee Meeting)
TOTAL COSTS (3.3 + 3.4 without Optional Tasks 3.5, with in-person Steering Committee Meeting)
TOTAL COSTS (3.3, 3.4 and Optional Tasks 3.5, with virtual Steering Committee Meeting)
TOTAL COSTS (3.3, 3.4 and Optional Tasks 3.5, with in-person Steering Committee Meeting)
Life of Contract (All Tasks 3.3, 3.4, and 3.5, with Virtual Steering Committee Meeting)
$0
*No cost increase for 6-mth option IAW FAR 52.217-8 based on the Ordering Period it was exercised.

Network Ops - Base Config

Base Configuration (146 sites / 146 samplers), 19,000 Filter Assumption
NETWORK OPERATIONSTask 1Task 2Task 3Task 4Task 5Task 6Task 7Task 8Task 8
Ordering Period 1TOTAL COST Network OperationsCoordinate OperationsPurchase FiltersCoordinate FiltersFilter StorageQuality AssuranceData Reduction and Database ManagementNetwork DocumentationIMPROVE SC Meeting (in-person)IMPROVE SC Meeting (virtual)
DIRECT LABORRATEHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTS
Director6363
Principal Investigator1,5112902020202955102728484
Lab Manager3698410060125
Field Manager1,7441,540100104
Program Manager71920510410060125125
Data Manager2,0501,850200
QA Manager835835
Programmer (multiple staff)3,1003,100
IT Support865865
Scientist (multiple staff)2,7751041,450100515606
Lab Technician (multiple staff)1,9671,345100522
Field Technician (multiple staff)6,0194,606185790438
Engineer (multiple staff)2,2561,74060310146
Student Assistant (multiple staff)0
Total Hours24,2728,3803123,0156853,8234,6003,3738484
Total Dollars
TRAVEL
Airfare
Ground Transportation
Lodging
Meals
Total TravelNTE117,500NTE110,000NTE7,500
OTHER DIRECT COSTS
Lab Supplies
Field Supplies
IT supplies and services
Wi-Fi at sites
Shipping
PTFE filters - PM2.5
PTFE filters - PM10
Nylon Filters
Shop services
Total Other Direct CostsNTE763,500NTE415,000NTE325,000NTE8,500NTE15,000
CAPITAL AND SUBCONTRACTING
Capital Equipment
Subcontracting
Total Capital & Subcontracting

TOTAL TASK COSTS

Network Ops - Option Scenario A

Option Scenario A – Reduced Sampling Frequency at 30 Sites, 17,500 Filter Assumption
NETWORK OPERATIONSTask 1Task 2Task 3Task 4Task 5Task 6Task 7Task 8Task 8
Ordering Period 1TOTAL COST Network OperationsCoordinate OperationsPurchase FiltersCoordinate FiltersFilter StorageQuality AssuranceData Reduction and Database ManagementNetwork DocumentationIMPROVE SC Meeting (in-person)IMPROVE SC Meeting (virtual)
DIRECT LABORRATEHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTS
Director6262
Principal Investigator1,4842872018192924952698484
Lab Manager358829557124
Field Manager1,7231,52595103
Program Manager7022031029557121124
Data Manager2,0301,832198
QA Manager827827
Programmer (multiple staff)3,0073,007
IT Support839839
Scientist (multiple staff)2,7321021,42595510600
Lab Technician (multiple staff)1,9321,32095517
Field Technician (multiple staff)5,9514,560176782434
Engineer (multiple staff)2,2311,72257307145
Student Assistant (multiple staff)0
Total Hours23,8768,2973062,9536513,7854,4623,3398484
Total Dollars
TRAVEL
Airfare
Ground Transportation
Lodging
Meals
Total TravelNTE117,500NTE110,000NTE7,500
OTHER DIRECT COSTS
Lab Supplies
Field Supplies
IT supplies and services
Wi-Fi at sites
Shipping
PTFE filters - PM2.5
PTFE filters - PM10
Nylon Filters
Shop services
Total Other Direct CostsNTE728,500NTE405,000NTE300,000NTE8,500NTE15,000
CAPITAL AND SUBCONTRACTING
Capital Equipment
Subcontracting
Total Capital & Subcontracting

TOTAL TASK COSTS

Network Ops - Option Scenario B

Option Scenario B – (136 sites/136 samplers) Reduced Network by 10 Sites and Elimination of PM10, 18,000 Filter Assumption
NETWORK OPERATIONSTask 1Task 2Task 3Task 4Task 5Task 6Task 7Task 8Task 8
Ordering Period 1TOTAL COST Network OperationsCoordinate OperationsPurchase FiltersCoordinate FiltersFilter StorageQuality AssuranceData Reduction and Database ManagementNetwork DocumentationIMPROVE SC Meeting (in-person)IMPROVE SC Meeting (virtual)
DIRECT LABORRATEHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTS
Director6161
Principal Investigator1,4422761918182864742678484
Lab Manager346809054123
Field Manager1,6551,46390102
Program Manager676195999054116123
Data Manager1,9911,795196
QA Manager818818
Programmer (multiple staff)2,8832,883
IT Support804804
Scientist (multiple staff)2,692991,41090500594
Lab Technician (multiple staff)1,9121,31090512
Field Technician (multiple staff)5,7384,376167766429
Engineer (multiple staff)2,1501,65354301143
Student Assistant (multiple staff)0
Total Hours23,1687,9612962,9186173,7084,2783,3068484
Total Dollars
TRAVEL
Airfare
Ground Transportation
Lodging
Meals
Total TravelNTE117,500NTE110,000NTE7,500
OTHER DIRECT COSTS
Lab Supplies
Field Supplies
IT supplies and services
Wi-Fi at sites
Shipping
PTFE filters - PM2.5
PTFE filters - PM10
Nylon Filters
Shop services
Total Other Direct CostsNTE593,500NTE390,000NTE180,000NTE8,500NTE15,000
CAPITAL AND SUBCONTRACTING
Capital Equipment
Subcontracting
Total Capital & Subcontracting

TOTAL TASK COSTS

Filter Analysis - Base Config

Base Configuration (146 sites / 146 samplers), 19,000 Filter Assumption
Filter Analysis
Base Year (Ordering Period 1)
Cost per filterNumber of filtersAnnual Cost
Task 9a. Gravimetric Analysis: PM2.519000
Task 9b. Gravimetric Analysis: PM1019000
Task 10. Elemental Analysis19000
Task 11. Optical Absorption19000
TOTAL FILTER ANALYSIS
Estimates for costs per filter
Gravimetric Analysis
Labor (includes logging metadata into database)Rate (per hour)Hours/sampleCost per sample
Student Assistant0.25
Instrument maintenance/service contractRate (per year)samples/year
19000
Total Cost per sample
Elemental Analysis
Labor (includes logging metadata into database)Rate (per hour)Hours/sampleCost per sample
Lab Technician0.33
Instrument maintenance/service contractRate (per year)samples/year
19000
Total Cost per sample
Optical Analysis
Labor (includes logging metadata into database)Rate (per hour)Hours/sampleCost per sample
Lab Technician0.05
Instrument maintenance/service contractRate (per year)samples/year
19000
Total Cost per sample

Filters - Option Scenario A

IGE – Option Scenario A – Reduced Sampling Frequency at 30 Sites, 17,500 Filter Assumption
Filter Analysis
Base Year (Ordering Period 1)
Cost per filterNumber of filtersAnnual Cost
Task 9a. Gravimetric Analysis: PM2.517500
Task 9b. Gravimetric Analysis: PM1017500
Task 10. Elemental Analysis17500
Task 11. Optical Absorption17500
TOTAL FILTER ANALYSIS
Estimates for costs per filter
Gravimetric Analysis
Labor (includes logging metadata into database)Rate (per hour)Hours/sampleCost per sample
Student Assistant0.25
Instrument maintenance/service contractRate (per year)samples/year
17500
Total Cost per sample
Elemental Analysis
Labor (includes logging metadata into database)Rate (per hour)Hours/sampleCost per sample
Lab Technician0.33
Instrument maintenance/service contractRate (per year)samples/year
17500
Total Cost per sample
Optical Analysis
Labor (includes logging metadata into database)Rate (per hour)Hours/sampleCost per sample
Lab Technician0.05
Instrument maintenance/service contractRate (per year)samples/year
17500
Total Cost per sample

Filters - Option Scenario B

IGE – Option Scenario B – (136 sites/136 samplers) Reduced Network by 10 Sites and Elimination of PM10, 18,000 Filter Assumption
Filter Analysis
Base Year (Ordering Period 1)
Cost per filterNumber of filtersAnnual Cost
Task 9a. Gravimetric Analysis: PM2.518000
Task 9b. Gravimetric Analysis: PM100
Task 10. Elemental Analysis18000
Task 11. Optical Absorption18000
TOTAL FILTER ANALYSIS
Estimates for costs per filter
Gravimetric Analysis
Labor (includes logging metadata into database)Rate (per hour)Hours/sampleCost per sample
Student Assistant0.25
Instrument maintenance/service contractRate (per year)samples/year
18000
Total Cost per sample
Elemental Analysis
Labor (includes logging metadata into database)Rate (per hour)Hours/sampleCost per sample
Lab Technician0.33
Instrument maintenance/service contractRate (per year)samples/year
18000
Total Cost per sample
Optical Analysis
Labor (includes logging metadata into database)Rate (per hour)Hours/sampleCost per sample
Lab Technician0.05
Instrument maintenance/service contractRate (per year)samples/year
18000
Total Cost per sample

OPTIONAL Network Mods & Support

Note: Optional Tasks 12, 13, 14, 15, and 16 are the same estimated cost in the Base Configuration, Option Scenario A, and Option Scenario B
OPTIONAL NETWORK MODIFICATIONS AND SUPPORTTask 12Task 13Task 14Task 15Task 16
Ordering Period 1TOTAL COST Network Modifications and SupportEstablish New Monitoring SiteRepair or Replace SiteDecommission Monitoring StationsPurchase Samplers and EquipmentProvide Site Operators
DIRECT LABORRATEHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTSHOURSCOSTS
Director0
Principal Investigator5252
Lab Manager0
Field Manager21060604545
Program Manager0
Data Manager0
QA Manager0
Programmer (multiple staff)8080
IT Support0
Scientist (multiple staff)0
Lab Technician (multiple staff)0
Field Technician (multiple staff)820240240240100
Engineer (multiple staff)340120120100
Student Assistant (multiple staff)0
Site Operator1,0401,040
Total Hours2,5424204202853251,092
Total Dollars
TRAVEL
Airfare
Ground Transportation
Lodging
Meals
Total TravelNTE$32,500NTE$32,500
OTHER DIRECT COSTS
Lab Supplies
Field Supplies
IT supplies and services
Wi-Fi at sites
Shipping
PTFE filters - PM2.5
PTFE filters - PM10
Nylon Filters
Shop services
Total Other Direct CostsNTE$25,000NTE$25,000
CAPITAL AND SUBCONTRACTING
Capital Equipment
Subcontracting
Total Capital & Subcontracting

TOTAL TASK COSTS

Fully Loaded Labor Rates Labor Rates

Labor CategoryKey Personnel?Ordering Period 1Ordering Period 2Ordering Period 3Ordering Period 4Ordering Period 56-month optionMinimum Qualifications
DirectorNoMasters Degree and five (5) or more years experience in a related field. Higher degree preferred.
Principal InvestigatorYesMasters Degree and five (5) or more years experience in a related field. Higher degree preferred.
Lab ManagerYesBachelors Degree and three (3) or more years experience in a related field. Higher degree preferred.
Field ManagerYesBachelors Degree and three (3) or more years experience.
Program ManagerNoBachelors Degree and three (3) or more years experience.
Data ManagerYesBachelors Degree and three (3) or more years experience. Higher degree preferred.
QA ManagerYesBachelors Degree and one (1) or more years experience in a related field. Higher degree preferred.
ProgrammerYesBachelors Degree.
IT SupportNoBachelors Degree.
ScientistYesBachelors Degree and three (3) or more years experience in a related field. Higher degree preferred.
Lab TechnicianNoNo minimum qualifications.
Field TechnicianNoNo minimum qualifications.
EngineerNoBachelors Degree.
Student AssistantNoNo minimum qualifications.