Performance Work Statement

August 11, 2022

RCA Point Reyes Receiving Station Vegetation Management Services for Point Reyes National Seashore

I. Project Background and Scope

The National Park Service (NPS) requires vegetation management treatments to approximately 98 trees located at the North District Operations Center (NDOC) within Point

Reyes National Seashore. The NDOC is also known as the Point Reyes Receiving Station

Historic District, a historic property listed on the National Register of Historic Places. The tree plantings and other vegetation contribute to the integrity of the site and the Monterey

Cypress allée is listed as a contributing resource. In addition to the historic status of the property, this location is frequently visited by park visitors who visit the location specifically for photo taking opportunities of and among the cypress tree allée. Both the health and visual aesthetic of individual trees and vegetative features at this site are therefore very important. The treatments required include pruning, renovation, and targeted removal in order to improve tree health, return certain trees to their intended form and function, and address identified hazard trees. Services shall include, but not be limited to, the furnishing of all materials, labor, equipment, tools, transportation, superintendence, qualified Arborist, and craftspeople to complete all work described herein.

Additional information to inform the work to be performed on individual trees that are to be treated are included in the Tree Inspections and Recommendations Report, the associated

Condition Assessment Forms, and Project Maps/Site Details, which are provided as separate attachments.

II. Work Requirements

In order to achieve the desired conditions, the following tasks shall be completed in performance of the contract:

A. Pruning‐ Besides those trees identified for removal or renovation, pruning work shall be performed for all numbered trees by or under the supervision of an International

Society of Arboriculture (ISA) certified arborist, according to the ISA A300/part 1 for tree pruning https://wwv.isa‐arbor.com/store/product/124/.

a. Utilize bucket trucks or lifts where safe and practical such as along paved driveway areas.

b. Utilize climbing arborist(s) for trees where safe for those trees that are inaccessible to large equipment.

c. Prevent undue compaction to root zone by utilizing sturdy work mats or similar, to disperse forces from tires and outriggers where necessary within tree root zone.

d. Prune to remove all dead, damaged, or diseased wood (see Figure 4 in Appendix of attached Tree Inspection and Recommendations Report).

e. Remove as much deadwood as possible for all tree canopies, from ½” in size and up.

f. Remove any broken, split, or otherwise damaged limbs and small branches of any size.

g. Remove any diseased or dying branches or foliage, dispose of all diseased material off site.

h. Prune to restore tree structure wherever possible by: removing crossing or rubbing branches, broken branches; reducing overly long and heavily end‐ weighted limbs back to smaller diameter branch.

i. Remove all ivy and encroaching vegetation from tree trunks to grade, below trunk flare.

j. Practice proper pruning techniques (see Figure 5, 6, &7 in Appendix of attached

Tree Inspection and Recommendations Report).

k. Sterilize all pruning tools between each tree or if pruning potentially diseased materials.

l. Utilize target pruning for all branches 1” in diameter or larger.

m. Always prune to outside of branch collar and at appropriate angle to minimize wound area.

n. Never “flush cut” against trunk or large branches.

o. Do not leave stubs.

p. Except where otherwise indicated, all vegetation debris shall be legally disposed of off‐site, including the recycling of all material when possible.

B. Renovation‐ Renovate all Myoporum (4001‐4012) (see Figure 9 in Appendix of attached

Tree Inspection and Recommendations Report). Based on the arrangement and location of the Myoporum trees/shrubs, it is assumed that the design intent was to create a hedge effect to screen views of the single‐story structures from the driveway turnaround area. Lack of maintenance pruning has allowed the trees to grow taller than the adjacent structures. To return these trees to their original intended form and function, renovation pruning shall be conducted.

a. Renovate all Myoporum by reducing (i.e. “topping”) their height and spread down to at or below the existing roof height of adjacent buildings to encourage new growth to emerge from the trunks.

b. Chip and spread removed parts around base of Myoporum trees as mulch.

c. Except where otherwise indicated, all vegetation debris shall be legally disposed of off‐site, including the recycling of all material when possible.

C. Removal‐ Remove six (6) trees. The trees to be removed are numbered 1022, 1058, 2007, 2008, 2009, 2010 and identified on‐site by flagging tape.

a. Except where otherwise indicated, all vegetation debris shall be legally disposed of off‐site, including the recycling of all material when possible.

b. Cut tree trunks flush with soil grade to avoid soil disturbance.

III. Qualifications

All work completed under this contract shall be conducted under the supervision and direction of a Certified Arborist.

All work completed under this contract shall be performed by current and appropriately licensed California Contractor State Licensed contractors, such as C‐27 (Landscaping

Contractor) or D‐49 (Tree Service Contractor).

IV. Deliverables

Within ten (10) days of award, contractor shall provide the following:

Satisfactory evidence of liability insurance coverage and workman’s compensation for the contractor and all/any subcontractors

Safety and Accident Prevention Plan

V. Period of Performance

Work shall begin only after the Contracting Officer is in receipt of proof of required insurance and an acceptable Safety and Accident Prevention Plan. The work is anticipated to take approximately 45 days. The anticipated period of performance for on‐site work is

September 20, 2022 to November 4, 2022; work may begin sooner upon receipt of acceptable insurance/safety plan. Work shall be conducted during regular scheduled working hours (7:00 am‐ 5:00 pm, Monday‐ Friday), excluding any federal holidays.

VI. Place of Performance

The work shall be conducted at the North District Operations Center within Point Reyes

National Seashore, Marin County, California. The work locations address is 17400 Sir Francis

Drake Boulevard, Inverness, CA and is shown on the location map.

VII. Safety

The contractor shall take all precautions to protect the public and all property from damage during performance under this contract. The contractor shall coordinate work schedules and locations with the Contracting Officer’s Representative (COR) and shall erect barricades and appropriate signs while working to prevent harm to persons and property.

The contractor shall observe Title 8, Group 3 of the California Code of Regulations, and

American National Standard Z133 Safety Requirements for Arboricultural Operations.

The contractor shall be responsible for maintaining an effective accident prevention program and providing a safe environment for all personnel and visitors. The contractor shall ensure that work is accomplished in compliance with Federal, State and local safety and health requirements.

The contractor shall comply with all OSHA requirements for operating equipment, fall protection and all other aspects of the work.

The contractor shall take every precaution to prevent damage to government and personal property. Should any damage result, the contractor shall complete repairs or replacement to the satisfaction of the COR, at no cost to the government.

Storage of materials and equipment shall be limited to areas designated by the COR during contractor’s operations. The contractor is responsible for daily clean‐up.

The contractor shall keep the work site free of any potential fire and safety hazards.

VIII. Clean‐up

Upon completion of work and before final acceptance, the contractor shall clear the entire project area and all grounds occupied by the contractor, of rubbish, excess materials, and any other debris caused by their operations.

IX. Inspection/Acceptance

NPS will inspect the completed work within ten (10) days of completion and will notify contractor of any deficiencies. The contractor shall promptly cure any problems identified.

X. Payment

Payment requests must be submitted electronically through the U. S. Department of the

Treasury's Invoice Processing Platform System (IPP) at www.ipp.gov. Upload your business invoice as an attachment to the IPP invoice before you click “submit” in IPP.

To avoid any potential payment delays, the Contractor is highly encouraged to submit a draft invoice to the attention of the CO and COR via email for review and informal approval prior to formally entering the payment request into IPP.

Payment will be made in one (1) lump sum at the conclusion of the project, after successful final inspection and Government acceptance of the work.